Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Minera IRL

Publié le 21 juillet 2014

Minera IRL Identifies New Zones of Gold Mineralization at the Corihuarmi Gold Mine

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Dollar | Nsa | Precious Metals |

Minera IRL Identifies New Zones of Gold Mineralization at the Corihuarmi Gold Mine

LIMA, PERU--(Marketwired - Jul 21, 2014) - Minera IRL Limited ("Minera IRL" or the "Company") (IRL.TO) (MIRL.L) (MIRL.L),the Latin America gold mining company, announces positive results from an exploration diamond drilling program currently in progress at its Corihuarmi Gold Mine in Peru. Potentially economic gold mineralization, at similar grades to that currently being mined and treated by heap leach, has been intersected in new zones at the Laura and Cayhua prospects. In addition, bonanza-grade gold mineralization has been intersected at the Cerro Rojo prospect.

Significant results from recent drilling include:

Laura

  • DDH14-10: 76.0m grading 0.30g/t Au
  • DDH14-11: 34.5m grading 0.35g/t Au
  • DDH14-12: 23.6m grading 0.31g/t Au
  • DDH14-13: 83.6m grading 0.35g/t Au
  • DDH14-14: 15.5m grading 0.31g/t Au

Cayhua Ridge

  • DDH14-02: 11.0m grading 0.53g/t Au
  • DDH14-03: 17.5m grading 0.54g/t Au
  • DDH14-05: 9.2m grading 0.66g/t Au
  • DDH14-08: 11.7m grading 0.34g/t Au

Cerro Rojo

  • DDH14-16: 1.1m grading 53.4g/t Au (including 0.6m grading 87.9g/t Au)
  • DDH14-21: 1.3m grading 90.9g/t Au

Additional assay results, including drill hole collar inclinations, are presented in Table 1 near the end of this press release. The locations of the drill holes are presented in Figure 1 at the end of this press release.

Mr. Courtney Chamberlain, Executive Chairman of Minera IRL, commented, "The drilling program has been highly encouraging on two fronts. These substantial leach grade gold intersections, particularly at the Laura Zone, have the potential to extend the life of the Corihuarmi Mine. Also, for the first time, Minera IRL has drilled bonanza-grade intersections in two holes below an outcropping silicified structure at the top of Cerro Rojo which opens up a new exploration model for us to pursue."

Corihuarmi Exploration Update

The Company has received preliminary results from the first 21 diamond drill holes from an ongoing exploration program at Corihuarmi that has the objective of identifying new zones of potentially economic gold mineralization. To date, this drill program has focused on the Laura, Cayhua and Cerro Rojo prospects. As a result of these encouraging results, the Company expects to continue with the drill program beyond the current 1,600 metres ("m") program.

Laura

At Laura, which is adjacent to the Corihuarmi heap leach facility, five new holes, plus eight historic holes from the 2008 - 2009 exploration program, have outlined a mineralized zone with a drill-indicated strike length of approximately 150m which remains open along strike and will be subject to additional drilling.

Gold mineralization at Laura typically begins at or near surface, which indicates the presence of a zone of mineralization with a low waste-to-ore ratio. Preliminary metallurgical testing indicates that the mineralization is amenable to heap leach recovery. As a result, the Company intends to conduct column testing on this material later in 2014. Although the results are preliminary, the Company believes that the Laura Zone has the potential to extend the Corihuarmi Gold Mine's life beyond its scheduled mid-2015 closure.

Cayhua Ridge

Prior to the current drilling program, heap leachable mineralization had already been defined at Cayhua. Drilling in this program has identified additional zones of mineralization along the Cayhua Ridge. The strike length of this mineralized zone has been extended to approximately 250m and remains open to the south.

Cerro Rojo

The silicified outcrop on Cerro Rojo is located approximately 750m north of the Corihuarmi heap leach facility. Surface sampling of the silicified outcrop earlier in 2014 yielded bonanza- grade assays above 400g/t Au.

Scout drilling immediately below the outcrop of the silicified structure has yielded narrow, bonanza-grade intersections in two closely spaced drill holes. DDH14-16 recorded 53.4g/t Au over 1.1m, including 0.6m grading 87.9g/t Au, and DDH14-21 recorded 90.9g/t Au over 1.3m. This discovery is highly encouraging and represents a new exploration model for Corihuarmi, as there has been no bonanza-grade gold material encountered in prior drilling programs.

Corihuarmi Overview

After more than six years of production, the Corihuarmi Gold Mine continues to generate sound cash flow. In 2014, the mine is forecast to mine and treat 2.5 million tonnes at an average grade of 0.3g/t Au. Gold production in Q1 2014 was 5,834 ounces at a cash site operating cost of $737 per ounce (total cash cost of $831 per ounce sold). Minera IRL is engaged in extensive local community health, education and sustainable development programs and provides substantial local employment at the Corihuarmi Gold Mine. Moving forward, new Peruvian government regulations have been enacted to streamline and speed up the approval process and facilitate development of new mining areas such as the Laura zone at Corihuarmi.

Minera IRL Limited is an AIM, TSX and BVL listed precious metals mining, development and exploration company with operations in Latin America. Minera IRL is led by a management team with extensive operating experience in South America. In Peru, the Company operates the Corihuarmi Gold Mine and the advanced Ollachea Gold Project. The Company also has a 51% interest in the Don Nicolás joint venture in Argentina with CIMINAS. For more information, please visit www.minera-irl.com.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Qualified Persons

The preparation of the technical information contained herein was supervised by Courtney Chamberlain, Executive Chairman, BSc and MSc Metallurgical Engineering, a Fellow of the Australian Institute of Mining and Metallurgy (FAusIMM), who is recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the technical information in this press release.

The preparation of geological and resource information contained herein was supervised by Donald McIver, VP Exploration of the Company, MSc Exploration and Economic Geology, a Fellow of the Australian Institute of Mining and Metallurgy (FAusIMM), as well as the Society of Economic Geologists (FSEG), who is recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the resource information in this press release.

QA/QC Program

The Company maintains a Minera IRL quality assurance/quality control (QA/QC) protocol for the Corihuarmi Gold Mine to ensure best industry practice in sampling and analysis of exploration and resource drill core samples. The insertion of field duplicates, certified standards and blank samples into the sample stream form part of Minera IRL's procedures (these act as an independent check on contamination, precision and accuracy in the Corihuarmi Mine analytical laboratory).

Cautionary Statement on Forward-Looking Information

Certain information in this news release, including information about the Company's financial or operating performance and other statements expressing management's expectations or estimates of future events, performance and exploration and development programs or plans constitute "forward-looking statements". Forward-looking statements often, but not always, are identified by words such as "seek", "believe", "expect", "do not expect", "will", "will not", "intend", "estimate", "anticipate", "plan", "schedule" and similar expressions of a conditional or future oriented nature identify forward-looking statements. Forward-looking statements are, necessarily, based upon a number of estimates and assumptions. While considered, by management, to be reasonable in the context in which they are made forward-looking statements are inherently subject to political, legal, regulatory, business and economic risks and competitive uncertainties and contingencies.

The Company cautions readers that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Minera IRL's actual financial results, future performance and results of exploration and development programs and plans to be materially different than those expected or estimated future results, performance or achievements and that forward-looking statements are not guarantees of future performance, results or achievements.

Forward-looking statements are made as of the date of this news release and Minera IRL assumes no obligation, except as may be required by law, to update or revise them to reflect new events or circumstances. Risks, uncertainties and contingencies and other factors that might cause actual performance to differ from forward-looking statements include, but are not limited to, changes in the price of precious metals and commodities, changes in the relative exchange rates of the US dollar against the Peruvian nuevo sol and the Argentinean peso, interest rates, legislative, political, social or economic developments both within the countries in which the Company operates and in general, contests over title to property, the speculative nature of mineral exploration and development, operating or technical difficulties in connection with the Company's development or exploration programs, increasing costs as a result of inflation or scarcity of human resources and input materials or equipment. Known and unknown risks inherent in the mining business include potential uncertainties related to the title of mineral claims, the accuracy of mineral reserve and resource estimates, metallurgical recoveries, capital and operating costs and the future demand for minerals. For additional information, please consult the Company's most recently filed MD&A and Annual Information Form.

Non-IFRS Measures

"Site operating cash costs" and "total cash costs" are non-GAAP or non-IFRS measures that do not have a standardized meaning prescribed by GAAP or IFRS and may not be comparable to other similarly titled measures of other gold mining companies.

"Site operating cash costs" include costs such as mining, processing and administration, but are exclusive of royalties, workers' profit participation cost, depreciation, amortization, reclamation, capital, development, exploration and other non-site costs (transport and refining of metals, and community and environmental). These costs are then divided by ounces produced to arrive at "site cash operating cost per ounce".

"Total cash costs" includes "site operating cash costs" and reflects the cash operating costs allocated from in-process and doré inventory associated with ounce of gold in the period, plus applicable royalties, workers' profit participation cost, and other non-site costs (transport and refining of metals, and community and environmental). These costs are then divided by the ounces sold to arrive at "total cash costs per ounce sold".

Both of these measures may vary from one period to another due to operating efficiencies, waste-to-ore ratios, grade of ore processed and gold recovery rates in the period. "Total cash costs" is also influenced by the realized gold price in the period.

Management believes this information is useful to investors because this measure is considered to be a key indicator of a company's ability to generate operating earnings and cash flow from its mining operations. This data is furnished to provide additional information and is a non-GAAP and non-IFRS measure that does not have any standardized meaning prescribed by GAAP or IFRS. It should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs presented under IFRS.

Table 1: Corihuarmi - Select Composite Intervals1

Includes intervals at >0.3g/t Au over a 3m minimum width, no assay cut


Zone
Drill Hole Number Inclination
(degrees)
From
(m down hole)
To
(m down hole)
Intersection (m) Assay2,3
(Au g/t)
Laura DDH14-10 -36.50 - 76.0 76.0 0.30
DDH14-11 -35.32 33.3 67.8 34.5 0.35
DDH14-12 -35.14 - 23.6 23.6 0.31
DDH14-13 -39.62 - 83.6 83.6 0.35
Including - 25.8 25.8 0.50
DDH14-14 -42.60 - 15.2 15.2 0.31
Cayhua DDH14-01 -48.83 NSA
DDH14-02 -43.31 - 11.0 11.0 0.53
DDH14-03 -44.42 - 17.5 17.5 0.54
DDH14-04 -59.09 NSA
DDH14-05 -41.01 3.0 12.2 9.2 0.66
DDH14-06 -50.00 NSA
DDH14-07 -41.31 NSA
DDH14-08 -40.34 20.1 23.9 3.8 0.40
and 60.6 72.3 11.7 0.34
DDH14-09 -36.96 NSA
Cerro Rojo DDH14-15 -34.88 NSA
DDH14-16 -74.30 12.4 13.5 1.1 53.4
Including 12.4 13.0 0.6 87.9
DDH14-17 -81.18 NSA
DDH14-18 -79.47 NSA
DDH14-19 -88.71 NSA
DDH14-20 -41.78 NSA
DDH14-21 -43.34 24.5 25.8 1.3 90.9
1 Due to the exploratory nature of this drill program and the variable orientations of the mineralized zones, the intersections presented herein may not necessarily represent the true width of mineralization.
2 Gold analysis carried out at the Corihuarmi site laboratory except DDH14-16 and DDH14-21, which was carried out by an outside laboratory in Lima.
3 NSA means "No Significant Assays" over a reportable interval.

To view Figure 1, please visit the following link : http://media3.marketwire.com/docs/Figure1DrillHoleLocations1.pdf

Lire la suite de l'article sur finance.yahoo.com

Minera IRL

PRODUCTEUR
CODE : MIRL.L
ISIN : JE00B1HNYF12
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Minera IRL est une société de production minière d'or basée au Perou.

Minera IRL est en développement de projets d'or et d'argent au Perou et en Argentine, et détient divers projets d'exploration au Perou.

Son principal projet en production est CORIHUARMI au Perou, ses principaux projets en développement sont GOLDEN ZONE PROPERTY au Perou et DON NICOLAS en Argentine et ses principaux projets en exploration sont PAN DE AZUCAR, DUTCH FLAT, WINNEMUCCA MOUNTAIN, AWAKENING, CHERT CLIFF, SUMMIT PROJECT, ESCONDIDO et EAST SANTA CRUZ en Argentine, CATA PRETA, OVERLAND PASS, SCRAPER, WHITE CANYON MINE, SOUTH ESTELLE, UTAH CLIPPER, CRESTVIEW, LAURA PROPERTY, WHITE HORSE NORTH, RED HILLS PROPERTY, PETE'S SUMMIT, GUILD PROJECT, CLARA MORO et FOUR METALS PROPERTY au Bresil, HUAQUIRCA, VECA PROJECT, BETHANIA, OLLACHA et QUILAVIRA au Perou, FRONTERA au Chili et OXFORD LAKE, COTE ARCHIE LAKE, BOLO et DEL ORO au Canada.

Minera IRL est cotée au Canada et au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 809,0 millions GBX (1,2 milliards US$, 1,1 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 07 janvier 2011 à 96,00 GBX, et son plus bas niveau récent le 28 août 2015 à 0,25 GBX.

Minera IRL possède 231 130 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Minera IRL
2008 Annual Report
Rapports Financiers de Minera IRL
14/11/2013Announces Third Quarter 2013 Financial Results
14/05/2013Announces First Quarter 2013 Financial Results
16/05/2011Announces First Quarter 2011 Financial Results
Projets de Minera IRL
08/09/2015IRL resumes Peru gold mine operations after deal with locals
07/09/2015Local activists occupy Minera IRL's gold mine in Peru, share...
07/09/2015Local activists occupy Minera IRL's gold mine in Peru, share...
24/12/2013descubre Trincheras de 3 g/t de Oro en 200 metros de Don Nic...
22/05/2013Announces Final Community Endorsement of Environmental and S...
02/04/2013Announces Underground Exploration Drill Results, Ollachea Pr...
13/02/2013Announces Successful Completion of Exploration Drive at Olla...
17/10/2012(Don Nicolas)Announces Approval of EIA and Granting of Development Permit...
06/09/2012Discovers New Mineralized System at Don Nicolas Project, Arg...
18/07/2012Confirms Ollachea Resource Estimate
10/07/2012(Don Nicolas)and Communities Sign Social License Agreement for Don Nicola...
16/05/2012(Don Nicolas)Commences Permitting on Don Nicolas Project
14/02/2012Announces Successful Feasibility Study for Don Nicolas Proje...
01/04/2011(Corihuarmi)Minera IRL Announces 2010 Year-End Results
30/03/2011(Escondido)Minera IRL Announces Exploration Update, Escondido Project, ...
03/03/2011(Escondido)Announces Exploration Update, Escondido Project, Argentina
22/02/2011(Pan De Azucar)Announces Scout Drilling Results, Pan de Azucar Prospect, Ar...
Communiqués de Presse de Minera IRL
23/12/2015December 23, 2015 Minera IRL Limited Reports Resignation of ...
16/12/2015December 16, 2015 Minera IRL Limited Reports EGM Results
16/12/2015December 16, 2015 Minera IRL Limited Reports EGM Results
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
07/12/2015December 07, 2015 Minera IRL Limited Announces Adjourned EGM...
27/11/2015November 27, 2015 Minera IRL Limited Reports on Extraordinar...
27/11/2015November 27, 2015 Minera IRL Limited Reports on Extraordinar...
22/11/2015November 21, 2015 Minera IRL Limited Reports on Ollachea Com...
22/11/2015November 21, 2015 Minera IRL Limited Reports on Ollachea Com...
22/11/2015Minera IRL Limited Reports on Ollachea Community Announcemen...
20/11/2015November 20, 2015 Minera IRL Limited: Update on Developments...
20/11/2015November 20, 2015 Minera IRL Limited: Update on Developments...
20/11/2015Minera IRL Limited: Update on Developments With Ollachea Com...
30/10/2015October 30, 2015 Minera IRL Limited Announces Cease Trade Or...
30/10/2015October 30, 2015 Minera IRL Limited Announces Cease Trade Or...
28/10/2015October 28, 2015 Minera IRL Limited Announces Delisting of O...
28/10/2015Minera IRL Limited Announces Delisting of Ordinary Shares Fr...
23/10/2015October 23, 2015 Minera IRL Limited: Notice of EGM and Posti...
23/10/2015October 23, 2015 Minera IRL Limited: Notice of EGM and Posti...
23/10/2015Minera IRL Limited: Notice of EGM and Posting of Circular
22/10/2015October 22, 2015 Minera IRL Limited Responds to Unauthorized...
22/10/2015October 22, 2015 Minera IRL Limited Responds to Unauthorized...
22/10/2015Minera IRL Limited Responds to Unauthorized Press Release
21/10/2015October 21, 2015 Minera IRL Limited Provides Corporate and O...
21/10/2015October 21, 2015 Minera IRL Limited Provides Corporate and O...
21/10/2015Minera IRL Limited Provides Corporate and Operational Update
09/10/2015October 09, 2015 Minera IRL Limited Announces That a Group o...
09/10/2015October 09, 2015 Minera IRL Limited Announces That a Group o...
01/10/2015October 01, 2015 Minera IRL Limited Announces Resignation of...
29/09/2015September 29, 2015 Minera IRL Limited Announces Delay to Pub...
29/09/2015September 29, 2015 Minera IRL Limited Announces Delay to Pub...
25/09/2015CORRECTION: Trading Suspended - Minera IRL Limited (Symbol: ...
25/09/2015September 25, 2015 Minera IRL Limited Responds to Reports of...
25/09/2015September 25, 2015 Minera IRL Limited Responds to Reports of...
25/09/2015Minera IRL Limited Responds to Reports of Unauthorized Press...
21/09/2015September 21, 2015 Minera IRL Limited Announces Process of R...
21/09/2015September 21, 2015 Minera IRL Limited Announces Process of R...
21/09/2015Minera IRL Limited Announces Process of Removing Former Comp...
21/09/2015September 21, 2015 Minera IRL Limited Announces Suspension o...
21/09/2015September 21, 2015 Minera IRL Limited Announces Suspension o...
21/09/2015Minera IRL Limited Announces Suspension of Trading on AIM
21/09/2015IIROC Trading Halt - IRL
09/09/2015September 09, 2015 Minera IRL Limited Announces Lifting of B...
07/09/2015September 07, 2015 Minera IRL Limited Announces Temporary Su...
07/09/2015September 07, 2015 Minera IRL Limited Announces Temporary Su...
07/09/2015Minera IRL Limited Announces Temporary Suspension of Operati...
03/09/2015September 03, 2015 Minera IRL Limited: Appointment of Non-Ex...
03/09/2015September 03, 2015 Minera IRL Limited: Appointment of Non-Ex...
03/09/2015Minera IRL Limited: Appointment of Non-Executive Chairman to...
27/08/2015August 27, 2015 Minera IRL Limited Reports AGM Voting Result...
27/08/2015August 27, 2015 Minera IRL Limited Reports AGM Voting Result...
24/08/2015August 24, 2015 Minera IRL Limited Announces Management Chan...
24/08/2015August 24, 2015 Minera IRL Limited Announces Management Chan...
24/08/2015Minera IRL Limited Announces Management Change
17/08/2015August 17, 2015 Minera IRL Limited: Community Suspension of ...
17/08/2015Minera IRL Limited: Community Suspension of Development Acti...
22/07/2015July 22, 2015 Posting of Circular, Notice of AGM and Propose...
22/07/2015July 22, 2015 Posting of Circular, Notice of AGM and Propose...
22/07/2015Posting of Circular, Notice of AGM and Proposed Consolidatio...
14/07/2015July 14, 2015 Minera IRL Announces Appointment of Eric Olson...
14/07/2015July 14, 2015 Minera IRL Announces Appointment of Eric Olson...
14/07/2015Minera IRL Announces Appointment of Eric Olson as Chief Oper...
21/04/2015April 21, 2015 Minera IRL Announces Passing of Founding Dire...
21/04/2015April 21, 2015 Minera IRL Announces Passing of Founding Dire...
21/04/2015Minera IRL Announces Passing of Founding Director Courtney C...
01/04/2015April 01, 2015 Minera IRL Provides Corporate Update
01/04/2015April 01, 2015 Minera IRL Provides Corporate Update
01/04/2015Minera IRL Provides Corporate Update
06/03/2015March 06, 2015 Minera IRL CEO Taking Leave of Absence, Execu...
06/03/2015March 06, 2015 Minera IRL CEO Taking Leave of Absence, Execu...
06/03/2015Minera IRL CEO Taking Leave of Absence, Executive Chairman A...
21/01/2015January 21, 2015 Minera IRL Announces Director Resignation
21/01/2015January 21, 2015 Minera IRL Announces Director Resignation
21/01/2015Minera IRL Announces Director Resignation
21/01/2015Minera IRL Announces Director Resignation
23/12/2014December 23, 2014 Minera IRL Provides Update on Ollachea Fin...
23/12/2014December 23, 2014 Minera IRL Provides Update on Ollachea Fin...
23/12/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
23/12/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
13/11/2014November 12, 2014 Minera IRL Reports Third Quarter 2014 Resu...
13/11/2014November 12, 2014 Minera IRL Reports Third Quarter 2014 Resu...
13/11/2014Minera IRL Reports Third Quarter 2014 Results
13/11/2014Minera IRL Reports Third Quarter 2014 Results
30/09/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
30/09/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
13/08/2014Minera IRL Reports Second Quarter 2014 Results
13/08/2014Minera IRL Reports Second Quarter 2014 Results
30/07/2014Minera IRL Announces Sale of Don Nicolas Interest to CIMINAS
30/07/2014Minera IRL Announces Sale of Don Nicolas Interest to CIMINAS
21/07/2014Minera IRL Identifies New Zones of Gold Mineralization at th...
21/07/2014Minera IRL Identifies New Zones of Gold Mineralization at th...
30/06/2014Provides Update on Ollachea Financing Negotiations and Exist...
30/06/2014Minera IRL Receives Construction Permit to Build the Ollache...
30/06/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
30/06/2014Minera IRL Receives Construction Permit to Build the Ollache...
30/06/2014Minera IRL Provides Update on Ollachea Financing Negotiation...
04/06/2014Minera IRL Reports Positive Ollachea Project Optimization Re...
04/06/2014Minera IRL Reports Positive Ollachea Project Optimization Re...
14/05/2014Minera IRL Reports First Quarter 2014 Results
14/05/2014Minera IRL Reports First Quarter 2014 Results
09/05/2014Minera IRL Provides Notice of First Quarter 2014 Results and...
09/05/2014Minera IRL Provides Notice of First Quarter 2014 Results and...
03/04/2014Minera IRL Announces Notice of Annual General Meeting, Direc...
03/04/2014Minera IRL Announces Notice of Annual General Meeting, Direc...
31/03/2014Minera IRL Reports Year-End 2013 Financial Results
31/03/2014Minera IRL Reports Year-End 2013 Financial Results
24/03/2014March 24, 2014 Minera IRL Provides Notice of Fourth Quarter ...
24/03/2014March 24, 2014 Minera IRL Provides Notice of Fourth Quarter ...
24/03/2014Minera IRL Provides Notice of Fourth Quarter and Year-End 20...
17/02/2014Provides Company UpdateCc:
17/02/2014Informaci=F3n Actualizada de Minera IRLCc:
10/02/2014anuncia cambios en el Directorio y Gerencia de la Compa=F1=E...
29/11/2013participa del Mines and Money y es nominada a dos premios in...
29/11/2013will be attending Mines and Money
14/11/2013Anuncia los Resultados Financieros para el Tercer Trimestre ...
30/09/2013Application of the Takeover Code
26/09/2013Recibe la Aprobaci=F3n para el Desarrollo del Proyecto de Or...
26/09/2013Receives Approval to Develop the Ollachea Gold Project
19/08/2013Announces $80 million Financing for the Don Nicolas Gold Pro...
19/08/2013Anuncia Financiamiento de $80 millones par
14/05/2013Anuncia los Resultados Financieros Para el Primer Trimestre ...
09/05/2013Anuncia Tres Nuevos Sistemas de Vetas de Oro en Patagonia
02/04/2013Anuncia los Resultados de la Perforaci=F3n
28/03/2013Anuncia sus Resultados Financieros del ejercicio del a=F1o ...
28/03/2013Announces 2012 Year-End Results
13/02/2013Anuncia la Exitosa Finalizaci=F3n de
05/11/2012Anuncia los Resultados Financieros para el Tercer Trimestre ...
17/10/2012Anuncia la Aprobaci=F3n del EIA y el Otorgamiento del Permis
06/09/2012Descubre Nuevo Sistema Minera
24/08/2012Notice of Annual General Meeting
24/08/2012Notificaci=F3n de Asamblea General Anual de Minera IRL Limit...
13/08/2012Anuncia los Resultados Financieros para el Segundo Trimestre...
18/07/2012Confirma el Estimado de Recursos de Ollachea
10/07/2012y Comunidades Firman un Acuerdo de Lic
22/06/2012Sr. Diego Benavides de Minera IRL COMUNIDAD DE OLLACHEA
07/06/2012and Ollachea Community Sign a Thirty Year Surface Rights Agr...
07/06/2012y la Comunidad de Ollachea Firman un
16/05/2012Inicia Proceso de Permisos en el Proyecto Don Nicol=E1s
10/05/2012Anuncia sus Resultados Financieros al Primer Trimestre del 2...
30/03/2012Announces 2011 Year-End Results
30/03/2012Anuncia sus Resultados Financieros del Ejercicio del a=F1o 2...
05/03/2012anuncia Cierre de Oferta de Acciones Comunes por aproximadam...
05/03/2012Announces Closing of Approximately C$33.1 Million Offering
17/02/2012Announces Commencement of Ollachea Exploration Tunnel
17/02/2012Anuncia el Inicio de la Constru
14/02/2012Anuncia el Resultado Exitoso del Estudio d
29/11/2011Realiza el pago de la =FAltima cuota del Contrato de Op
31/08/2011El Directorio de Minera IRL Aprueba la Cons
14/06/2011Announces Significant Resource Upgrade, Ollachea Project, Pe...
14/06/2011Anuncia Significativo Aumento =?ISO-8859-1?Q?de_Recursos_en_...
13/05/2011Anuncia los Resultados Financieros para el Primer Trimestre ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (MIRL.L)TSX-V (IRL.TO)
3,50+0.00%0,075+0.00%
LSE
GBX 3,50
21/09 18:50 -
0%
Cours préc. Ouverture
3,50 3,30
Bas haut
3,30 3,30
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  3,50 -%
Volume var. 1 mois
10 000 -%
24hGold TrendPower© : -27
Produit Gold
Développe Gold - Silver
Recherche Antimony - Copper - Gold - Iron - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :