Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Nevada Copper Corp.: Mineralization Continues to Expand in the North Deposit; Land Acquisition Bill Progress Update
Published : April 10, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 10, 2012) - Nevada Copper Corp. (News - Market indicators) ("Nevada Copper") is pleased to announce continued positive step-out drill results from its 100% owned Pumpkin Hollow Property located near Yerington, Nevada, and, an update on progress of the City of Yerington land acquisition bill through the House and Senate.

The holes reported below represent results from the 50,000 meter step-out and expansion drilling program. To date we have drilled 73 holes totaling 37,000 meters with additional drill results to be released as they become available. Three exploration drill rigs are currently active at the Pumpkin Hollow project.

The results reported below represent the latest holes drilled in the open-pittable Western deposits: five holes drilled on the edges of the North deposit and two holes between the North and South deposit. The holes have intersected new mineralization within or just outside the outside the current NI 43-101 Feasibility Study ultimate pit limits. The current holes, along with the holes drilled since October 2010, will be incorporated into an updated mineral resource that will be released in Q3 2012 followed by an updated mineral reserve that will be incorporated into an updated feasibility study discussed below.

Drilling along the southwest edge of the North deposit, NC11-51 intersected mineralization at the boundary of the current designed pit, several zones were intersected, the largest zone, 470 feet (143.2 meters), 407 feet (124.0 meters) true thickness, grading 0.73% copper. Additional step out drilling continues in this area where the mineralized zones remain open in several directions.

NC11-47 was drilled in the northeast sector of the North deposit were multiple zones of mineralization were intersected. The mineralized zones are both outside, and within, the present ultimate pit limit. Mineralization along the northeast border remains open and follow up drilling is in progress.

NC11-41, 42, and 46 targeted the mineralization along the southeastern portion of the North Deposit. Mineralization continues to be intersected. Drilling continues to extend and confirm the continuity of mineralization along the southern border of the North deposit.

Drilling continues to intersect mineralization between the North and South deposits. NC11-40 and NC11-45 intersected mineralization. NC11-40 intersected, 191 feet (58.2 meters), 146.3 feet (44.6 meters) true thickness, grading 0.25% copper. The mineralization remains open and additional drilling is planned.

Gregory French, Vice President, Senior Project Manager, commented, "Drilling continues to focus on expanding mineralization along the edges of the open pit deposits as well as mineralization found between the two pits. In addition to intersecting mineralization just outside the current Feasibility Study pit limits, new mineralization has been discovered within the pit boundaries converting areas originally modeled as waste. We believe the continued success of the expansion drilling suggests that the North and South pits will eventually merge, with positive implications for lowering strip ratios, improving overall mining efficiencies and lowering costs."

NORTH DEPOSIT - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Mo
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (g/t)
NC11-41 235.0 249.9 14.9 49.0 11.4 0.36 0.025 0.8 0.003
  265.2 271.3 6.1 20.0 4.7 0.78 0.022 0.8 <0.001
NC11-42 234.7 239.3 4.6 15.0 3.5 0.24 0.020 0.8 <0.001
NC11-46 182.9 201.2 18.3 60.0 16.6 0.58 0.051 2.2 0.008
  265.2 271.3 6.1 20.0 5.5 0.32 0.030 1.1 0.013
  296.7 307.9 12.2 40.0 9.3 0.18 0.019 0.8 <0.001
NC11-47 186.5 190.2 3.7 12.0 3.6 0.26 0.051 1.5 0.003
  240.5 253.0 12.5 41.0 12.1 0.51 0.095 1.9 0.003
  295.3 300.2 4.9 16.0 4.7 0.41 0.028 1.9 0.002
  314.5 336.8 22.6 74.0 21.8 0.78 0.117 3.0 <0.001
  357.8 364.2 6.4 21.0 6.2 0.37 0.018 1.0 <0.001
  374.3 379.5 5.2 17.0 5.0 0.19 0.054 1.0 0.002
  490.7 501.4 10.7 35.0 10.3 0.20 0.006 1.3 <0.001
  527.3 554.7 27.4 90.0 26.5 0.26 0.015 1.2 <0.001
NC11-51 161.5 167.6 6.1 20.0 6.1 0.28 0.028 0.8 0.001
  245.4 253.0 7.6 25.0 6.6 0.59 0.090 2.6 0.013
  341.4 355.1 13.7 45.0 11.9 0.31 0.194 0.9 0.006
  365.8 509.0 143.2 470.0 124.0 0.73 0.119 2.5 0.014
BETWEEN NORTH & SOUTH DEPOSITS - Assays greater than 0.15% Cu
 
Drill Hole # From To Length Length True Length Copper Gold Silver Mo
  (m) (m) (m) (ft) (m) % (g/t) (g/t) (g/t)
NC11-40 150.9 209.1 58.2 191.0 44.6 0.25 0.023 0.8 <0.001
NC11-45 129.5 192.0 62.5 205.0 47.9 0.20 0.024 0.8 <0.001

A cross section and a plan maps with the respective drill locations will be made available at http://www.nevadacopper.com/i/pdf/2012-04-10_NR-Media.pdf.

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, and a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.

City of Yerington Land Acquisition Bill Progress

Nevada Copper is also very pleased to report that the House of Representatives has scheduled a hearing date of the Subcommittee on National Parks, Forests and Public Lands on Tuesday April 17, 2012 to consider House Bill H.R. 4039, "Yerington Land Conveyance and Sustainable Development Act". This bill was sponsored by Congressman Mark Amodei of Nevada (see February 16, 2012 News Release).

The link is: http://naturalresources.house.gov/Calendar/EventSingle.aspx?EventID=289304.

This legislation would convey approximately 10,300 acres of the BLM-administered Federal Lands to the City in order to develop a multiple use economic development, mining, industrial, recreational and open space area. The Federal Lands are interspersed with, and adjacent to, the 1,560 acres of Nevada Copper private patented lands in the proposed mine area. The City of Yerington would be the municipal entity to take title from the federal government. The City would subsequently enter into development agreements with businesses, including Nevada Copper, to develop mining, industrial and commercial businesses. The City would also facilitate development of recreational uses and facilities.

About Nevada Copper

Nevada Copper has 73 million shares outstanding and is well funded with no debt and approximately $60 million in cash.

Nevada Copper has filed a National Instrument 43-101 Technical Report-Feasibility Study for the Pumpkin Hollow Copper project on SEDAR (www.sedar.com). An updated feasibility study, targeted to be released later this year, will incorporate the benefits of both magnetite recovery and sales from the project's significant iron magnetite resource in addition to all drilling results received since October 2010. The current drilling program will be incorporated into an updated mineral resource, mineral reserve and related mining plans. The dual benefits of the iron resource and results from the current drilling program are expected to have a further positive impact on project economics.

For additional information about Nevada Copper please visit our website at www.nevadacopper.com.

NEVADA COPPER CORP.

Giulio T. Bonifacio, President & CEO

We seek safe harbor.



Nevada Copper Corp.
Eugene Toffolo
Corporate Communications
604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com
or
Nevada Copper Corp.
Robert McKnight, P.Eng.
Executive Vice President
604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com

Nevada Copper

EN DÉVELOPPEMENT
CODE : NCU.TO
ISIN : CA64128F1099
CUSIP : 64128F
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Nevada Copper est une société d’exploration minière de cuivre basée au Canada.

Nevada Copper est en développement de projets de cuivre, d'argent, de fer et d'or en USA.

Son principal projet en développement est PUMPKIN HOLLOW en USA.

Nevada Copper est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 7,9 millions CA$ (5,8 millions US$, 5,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 avril 2011 à 6,42 CA$, et son plus bas niveau récent le 06 novembre 2020 à 0,06 CA$.

Nevada Copper possède 88 170 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Nevada Copper
09/05/2019Nevada Copper inks $115m deal to construct Pumpkin Hollow
31/08/2018Nevada Copper shares jump on construction decision
16/05/2018Nevada copper provides positive update on drill program: int...
Financements de Nevada Copper
19/04/2016Amends Red Kite and Pala Loan Terms
27/04/2010Closes $23,7 Million Bough-Deal Private Placement Financing
09/04/2010$20.6 Million Bought-Deal Private Placement Financement
27/10/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations de Nevada Copper
08/08/2013Appoints Director
28/02/2012Appoints New Director and Launches Project Website
Projets de Nevada Copper
09/09/2013Receives All Permits For Stage 1 Underground Mine
28/07/2011(Pumpkin Hollow)Obtains 100% of Water Needs for the Pumpkin Hollow Project
28/04/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
12/04/2011INTERSECTS 415 FEET OF 1.84% COPPER
31/03/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
08/02/2011S FEASIBILITY STUDY PROGRESS
04/08/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
08/07/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
16/06/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
27/05/2010(Pumpkin Hollow)Increases Drilling Program
18/05/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
06/05/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
23/04/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
16/02/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
21/01/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
14/01/2010Files NI 43-101 Preliminary Economic Assessment
08/12/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
25/08/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
15/07/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
Communiqués de Presse de Nevada Copper
09/06/2016Nevada Copper Closes Cdn$4.6 Million Equity Offering
03/06/2016Nevada Copper Closes Cdn$ 10.5 Million Financing With Red Ki...
01/06/2016Nevada Copper Solar Zoning Approved
27/05/2016Nevada Copper Annual Meeting Results
27/05/2016Nevada Copper Announces Red Kite Funding Commitment And Equi...
03/05/2016Nevada Copper and City of Yerington Advance Solar Zoning
22/04/2016Nevada Copper Announces Filing Of Amended Prospectus And Exe...
05/04/2016Nevada Copper Amends Red Kite and Pala Loan Terms
28/01/2016Nevada Copper Appoints Directors
03/11/2015Nevada Copper Intersects 105 Feet of 2.55% Copper in the Eas...
13/10/2015Nevada Copper Acquires Private Land & Completes Federal Land...
30/09/2015Nevada Copper Provides Corporate and Project Update
10/09/2015Nevada Copper Intersects 462 Feet of 0.64% Copper
21/08/2015IIROC Trade Resumption - NCU
21/08/2015Federal Land Conveyance Complete at Nevada Copper's Pumpkin ...
20/08/2015IIROC Trading Halt - NCU
17/08/2015Nevada Copper Fully Permitted
31/07/2015Nevada Copper Extends and Increases Bridge Loan Facility
31/07/2015Nevada Copper Receives Air Pollution Control Permit
17/07/2015Nevada Copper Receives Decision Record on Yerington Land Con...
15/07/2015Nevada Copper Intersects 448 Feet Grading 1.0% Copper
09/07/2015Nevada Copper Files Integrated Feasability Study on SEDAR
29/06/2015Nevada Copper Election of New Director and Annual Meeting Re...
24/06/2015Nevada Copper Continues to Expand Open Pit Mineralization In...
23/04/2015Nevada Copper Pumpkin Hollow Project Update
10/02/2015Nevada Copper Pumpkin Hollow Project Update
30/12/2014Nevada Copper Closes US$200 Million Loan Facility
22/12/2014President Signs National Defense Authorization Act That Incl...
03/12/2014Nevada Copper Project Update
04/11/2014Nevada Copper Project Update
30/07/2014Nevada Copper Advances Lyon County Bill
16/07/2014Nevada Copper Provides 2014 Update
02/07/2014Nevada Copper Provides Update & AGM Results
12/05/2014Nevada Copper Update on Lyon County Land Bill
23/01/2014NCU - Nevada Copper featured on KTVN - Channel 2 News
28/10/2013Announces Management Additions
09/10/2013Receives Additional US$15 Million Under Its US$200 Million S...
01/10/2013Announces $24 Million Equipment Financing
26/08/2013Receives Water Pollution Control Permit
16/07/2013Remaining Stage One Permits Issued for Public Comment
25/06/2013Receives Special Use Permit and Provides Update on Land Bill
17/06/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
10/06/2013Receives Reclamation Permit
28/05/2013Provides Update on State Permits
07/05/2013s Lyon County Bill Status
23/04/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
17/04/2013s Permitting and Yerington Land Bill Status
17/04/2013s Permitting and Yerington Land Bill Status
28/03/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
11/03/2013North Deposit Mineralization Continues to Expand Intersectin...
15/02/2013-Permitting and Feasibility Study Update
03/01/2013Status of Congressional Action-Lyon County Land Bill
30/10/2012North Deposit Mineralization Remains Open Intersecting 119 F...
19/10/2012Files Resource Update NI 43-101 Technical Report on SEDAR
05/10/2012to Purchase 17.8% of Mercator Minerals
05/09/2012Governor Sandoval's Trade Mission to China and South Korea
09/08/2012Drilling Continues to Expand Shallow Mineralization in the S...
10/07/2012Submits Mine Development Permit Applications and Announces D...
20/06/2012-Project Update/Land Bill Passed by the House
05/06/2012s Permitting and Yerington Land Conveyance
29/05/2012Intersects 470 Feet at 0.73% Copper in the North Deposit
19/04/2012Provides an Update on House Subcommitee Hearing on Yerington...
10/04/2012Mineralization Continues to Expand in the North Deposit; Lan...
26/03/2012Announces Introduction of Land Conveyance Bill in the United...
13/03/2012Intersects 9.08% Copper in Open Pittable North Deposit
27/02/2012Appoints New Director & Launches Project Website
22/02/2012Breaks Ground on Underground Shaft
16/02/2012Announces Introduction Of Yerington Land Conveyance Bill
07/02/2012Files Feasibility Study on SEDAR
23/01/2012Announces Positive Feasibility Study Results
17/01/2012(Pumpkin Hollow)Hosts Conference Call to Discuss Pumpkin Hollow Definitive F...
09/01/2012North Deposit Continues to Expand-NC1127 Intersects Minerali...
16/12/2011Announces Selection of Underground Contractor
29/11/2011Coppper-Update on Underground Contractor Selection & Feasibi...
29/09/2011Annnounces Management Addition and Shaft Contract Update
19/09/2011-Feasibility Study Update and Land Transfer
07/09/2011Mineralization Continues to Expand, Intersecting Over 600 Fe...
16/08/2011North Deposit Continues to Expand, Drilling Multiple Interva...
14/06/2011Expands North Deposit Intersecting 785 Feet of 0.73% Copper ...
25/05/2011Steps Out and Drills 126 Feet of 1.26% Copper/Definitive Fea...
03/05/2011(Pumpkin Hollow)Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow ...
01/12/2009Robust Economic Results
01/12/2009Reports robust economic results
03/11/2009Capstone Mining Makes Strategic Investment in Nevada Copper
29/06/2009US$2,000,000 Convertible Debenture
02/05/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
0,090+0.00%0,045-4.26%
TORONTO
CA$ 0,090
26/04 16:59 -
0%
Cours préc. Ouverture
0,090 0,090
Bas haut
0,085 0,090
Année b/h Var. YTD
0,060 -  0,140 -35,71%
52 sem. b/h var. 52 sem.
0,060 -  0,345 -74,65%
Volume var. 1 mois
324 008 -10,00%
24hGold TrendPower© : 20
Produit
Développe Copper - Gold - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-40,00%
2023-48,28%0,420,14
2022-53,23%0,790,20
2021327,59%1,220,07
2020-60,27%0,380,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :