Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Mirasol Resources Ltd.

Publié le 28 janvier 2015

Mirasol Announces Initial Pit Constrained Mineral Resource for the Virginia Silver Project Santa Cruz Province, Argentina

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Mirasol Announces Initial Pit Constrained Mineral Resource for the Virginia Silver Project Santa Cruz Province, Argentina

January 28, 2015

Mirasol Announces Initial Pit Constrained Mineral Resource for the Virginia Silver Project Santa Cruz Province, Argentina

  • View PDF

VANCOUVER, BC, January 28th, 2015 -- Mirasol Resources Ltd. (TSX-V: MRZ, Frankfurt: M8R)

Mirasol is pleased to announce that a National Instrument 43-101 Technical Report for an initial mineral resource estimate has been filed on SEDAR with a report date of January 23, 2015, (the "Virginia Mineral Resource Report") for the 100% owned Virginia Silver Project located in the Santa Cruz Province, Argentina (Figure 1). This report presents a conceptual open-pit constrained mineral resource estimate exclusively focused on the vein/breccia high-grade component of the mineralization previously reported (see news release February 7th 2013). Initial metallurgical testwork on this material indicated favourable silver recovery from conventional technologies.

The mineral resource estimate (Table 1) tabulates Indicated material totalling 11.9 million ounces Ag at 310 g/t, and Inferred material totalling 3.1 million ounces Ag at 207 g/t, contained within seven outcropping veins of high grade silver mineralization based on a silver price of US$20 per ounce and a 63 g/t Ag cut-off grade.

Table 1: Virginia Project - Pit Constrained Diluted Mineral Resource estimate
Vein Shoot Deposit Indicated Resources Inferred Resources
Tonnes  (,000) Ag (g/t) Ag Oz (,000) Tonnes  (,000) Ag (g/t) Ag Oz (,000)
Julia North 561 402 7,251 5 344 55
Julia Central 252 239 1,936 94 189 571
Ely South 171 184 1,012 76 187 457
Julia South 110 291 1,029 61 175 343
Naty 45 285 412 144 268 1,241
Ely North 58 154 287 53 138 235
Martina 27 184 160
Total 1,197 310 11,927 460 207 3,062

Note: Mineral resources which are not Mineral reserves do not have demonstrated economic viability. Inferred Mineral Resources have a high degree of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Tonnes, grade values, and contained silver metal quantities may differ due to rounding.

The mineral resources shown in Table 1 were estimated with MineSight® software and constrained by conceptual Lerchs-Grossmann pits using parameters listed in Table 2, at a silver price of US$20 and 63 g/t Ag cut-off.

Mirasol announced the discovery of the outcropping high-grade Virginia silver mineralization and the subsequent surface sampling and drill testing programmes in a series of news releases between January 2010 and June 2012 (please refer to the Mirasol website www.mirasolresources.com). In February 2013, Mirasol reported positive preliminary metallurgical results for the vein breccia mineralization with recoveries of between 75 and 81% from industry-standard technologies. On 21st February 2014, the company filed a comprehensive NI 43-101 exploration report summarising the drilling and preliminary metallurgical testwork. This report also highlighted 21 new exploration targets at Virginia (Figure 2) positioned adjacent to the seven shoots previously tested by the systematic drilling, which suggested the potential for expansion to the known mineralization. Since late 2013, Mirasol has not conducted further exploration at the Virginia - Santa Rita project. The Virginia mineral resource estimate considered all drilling and surface channel sampling for the seven shoots. All drilling and channel sampling used in the mineral resource estimate was completed prior to August 2012.

The Virginia mineralization is interpreted to be an example of a silver-dominant bonanza - style low - sulphidation epithermal deposit associated with a rhyolitic dome volcanic field. The seven silver deposits (see news release June 26, 2012) considered in this mineral resource estimate are mineralized from surface, and are highly oxidized to the lower limit of drilling, at 150 m vertical depth. The primary silver mineral in the vein/breccia is acanthite, a silver sulphide favourable to conventional metallurgical processes.

The deposits are characterized by a high-grade core of quartz + iron oxide-bearing vein / breccia structures which host silver mineralization and yield drill core intersections in the range of 1.5 to 5.3 m true-width containing 100's to 1,000's of g/t Ag. The central core of the veins has a broad halo exceeding 30 g/t Ag. True-widths of the mineralized zone, at a cut-off of 30 g/t Ag, commonly attains widths of 10 to 20 m, and can reach as much as 79 m wide. The seven mineralized bodies are in some cases open at-depth and along-strike. While silver grades in some mineralized bodies appear to pinch out or decrease down-dip, there has been no exploration drilling below approximately 160 m to test for additional shoots at depth.

Mirasol is encouraged by the delineation of this initial silver mineral resource at the Virginia Project. Mirasol's exploration drilling to August 2012 at Virginia has focused on testing outcropping shoots to relatively shallow depths. Mirasol has also identified a series of new untested targets, some with high-grade rock chip and trench silver assays adjacent to areas of current mineral resources which warrant further exploration. Mirasol believes the high-grade outcrops, favourable metallurgy and the potential use of open-pit mining methods position this mineral resource as a "building block" for further exploration in this under-explored district. Discovery of new mineralization adjacent to, or at-depth beneath the current mineral resources could positively impact this project. Mirasol recognizes Virginia is part of a new precious metal district, with untested veins identified within Mirasol's claims at the Santa Rita prospect and an initial silver mineral resource on adjacent competitor claims.

Mirasol Resources is not presently planning to undertake further exploration in the Virginia / Santa Rita claims and is actively seeking a joint venture partner to advance this project.

Additional Technical Information on the Virginia initial Resource Modelling.

The Virginia Mineral Resource Report was prepared following NI 43-101 guidelines and in accordance with CIMM Standards on Mineral Resources and Reserves: Definitions and Guidelines (CIM2010) by independent mineral resource consultants Mr. Mike Lechner, President of Resource Modeling Inc. located in Stites, Idaho, USA and Mr. Donald Earnest, President of Resource Evaluation Inc. located in Tucson Arizona. Mineral resources for the Virginia Project were estimated using MineSight®, an industry standard software application. The resource modelling utilised silver assay data from 194 core drill holes and 191 surface saw cut channel samples, disregarding drill holes or partial holes that were considered by the independent consultants to have low core recovery. This only impacted holes that Mirasol had previously identified as having problematic recovery, and had been re-drilled with twinned holes (See news release 19 April 2011).

The vein / breccia bodies (Figures 3 & ) were modelled as three-dimensional wireframes constructed by Mirasol using geological observations from core logging, augmented by silver assay results. Block grades were estimated within the wireframes using a three-pass inverse distance cubed (id3) methodology. Silver grades were also estimated within the halo zone and a 1 m dilution rind surrounding the vein wireframes. The mineral resource summarized in Table 1 did not include any silver mineralization in the lower-grade halo zone surrounding the vein/breccia, except for the inclusion of a 1 m mining dilution rind around the bodies. Initial metallurgical studies based upon a composite sample of mineralised halo material indicated a low silver recovery of 22%. Further metallurgical testwork is needed to determine if this can be improved to a point where the halo mineralization could be considered in subsequent mineral resource estimates.

Conceptual Lerchs-Grossmann open pits were generated for each of the seven deposits with MineSight® software using the input parameters summarized in Table 2.

Table 2. Parameters used for concetual Minesight® Pits 
Parameter Units Value
Drill hole composite metre 2
Block Size (cube) 2
Dilution rind wireframes 1
Vein/breccia density g/cm3 2.52
Wallrock/halo density 2.11
Silver Price $US/ounce $20
Silver Recovery  % 80
Mining Cost $US/tonne $2.85
Processing Cost $28
General & Administrative Cost $1.50
Pit Slope Angle degrees 45
Resource Cutoff Grade gram/tonne 63


Conservative pit slope angles of 45° were used to develop the conceptual Virginia pits; however, higher-angle pit slopes are employed at operating vein mines in Santa Cruz province. Detailed geotechnical studies would be required at Virginia to determine if the pit-slope angles could be steepened to reduce the strip ratio and increase the mineral resource tonnage. As a complement to the Virginia Mineral Resource Report, additional plans, sections and a table of drill hole information has been generated by Mirasol from the mineral resource models. This additional information, along with copies of the NI 43-101 exploration report and the Virginia Resource Report have been posted on the Mirasol's website, www.mirasolresources.com.

The mineral resource information contained in this news release has been summarised from the Virginia Mineral Resource Report prepared by Mr. Lechner and Mr. Earnest. Messers Lechner and Earnest are independent mineral resource consultants and are Qualified Persons under NI 43 -101 whom have reviewed and approved the mineral resource information in this release. The mineral resource and exploration content of this news release has been summarised from the Virginia Mineral Resource Report and other sources referenced in this news release by Stephen Nano, President and CEO of Mirasol Resources. Mr. Nano has approved the technical content of this news release and is a Qualified Person under NI 43 -101.

For further information, contact:
Stephen Nano
President and CEO

Tel: 604 602 9989: Fax: 604 609 9946

Email:[email protected]
Website:www.mirasolresources.com

Quality Assurance/Quality Control of the Virginia exploration program:

Exploration at the Virginia Projects was supervised by Stephen C. Nano, then the Vice President of Exploration; Timothy Heenan, Exploration Manager; and Paul Lhotka, the former Principal Geologist who is the Qualified Person under NI 43-101 for the surface exploration and drilling used in the mineral resource estimate. All technical information for the Virginia project was obtained and reported under a formal quality assurance and quality control (QA/QC) program. Drill core, rock channel and rock chip samples were collected under the supervision of Company geologists in accordance with standard industry practice. Samples were dispatched via commercial transport to an ISO 9001:2000-accredited laboratory in Argentina for analysis. Results of this exploration program have been audited by an independent geochemist to confirm the Company's QA/QC process/procedures and laboratory performance met required standards.

Assay results from diamond drill core samples may be higher, lower or similar to results obtained from surface samples due to surficial oxidation and enrichment processes or due to natural geological grade variations in the primary mineralization.

Forward Looking Statements: The above contains forward looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry. Forward-looking statements in this release include statements regarding future exploration programs, operation plans, geological interpretations, mineral tenure issues and mineral recovery processes. Although we believe the expectations reflected in our forward looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Lire la suite de l'article sur www.noodls.com

Mirasol Resources Ltd.

EN DÉVELOPPEMENT
CODE : MRZ.V
ISIN : CA6046801081
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Mirasol Res. est une société d’exploration minière d'or et d'argent basée au Canada.

Mirasol Res. détient divers projets d'exploration en Argentine.

Son principal projet en développement est JOAQUIN en Argentine et ses principaux projets en exploration sont SASCHA, ESPEJO, CLAUDIA, NICO et SANTA RITA SILVER en Argentine.

Mirasol Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 28,0 millions CA$ (22,4 millions US$, 19,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 24 octobre 2008 à 0,04 CA$, et son plus haut niveau récent le 11 mars 2011 à 7,94 CA$.

Mirasol Res. possède 49 120 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Mirasol Resources Ltd.
2008 Annual Report
Projets de Mirasol Resources Ltd.
09/05/2016(Claudia)Reports Start of Cerro Vanguardia Mines JV Drilling at the C...
25/04/2016Mirasol reports encouraging drilling results from the Atlas ...
21/03/2016Mirasol reports drilling & new geophysical survey results fr...
26/03/2015Mirasol announces joint venture agreement for Gorbea Belt Go...
03/09/2014Mirasol provides exploration update on Rubi copper- gold por...
18/09/2013Options the Rubi Copper Property to First Quantum Minerals L...
16/09/2013Reports Encouraging Trench Results from the Atlas Gold-Silve...
26/06/2013Signs Option Agreement for Gold Exploration Program in Nort...
10/06/2013Reports Initial Encouraging Gold-Silver Surface Results from...
17/01/2013Stakes Nine High Sulphidation Gold Projects in Chile with R...
11/12/2012(Joaquin)Agrees to Sell its Interest in the Joaquin Silver-Gold Proje...
09/11/2012Invitation to the 2012 San Francisco Hard Assets Conference
04/10/2012(Espejo)Finalizes Exploration Agreement for the Espejo Project
14/06/2012(Claudia)Drills the Rio Seco Prospect, Claudia gold-silver Project, A...
05/03/2012(Claudia)reports new gold-silver and geophysical results from the Rio...
28/02/2012Invitation to the 2012 Prospectors and Developers Conference
26/01/2012Reports Initial Results of Phase 3 Drilling at the Virginia...
18/01/2012Commences Phase IV Drilling at the Virginia Silver Project
08/08/2011(Joaquin)Reports Additional Results for the La Negra Deposit, Joaquin...
18/07/2011Significant Silver Intercepts reported from New Veins drille...
09/06/2011(Virginia Argentina)Reports Virginia Silver Project Additional Drill Results
12/05/2011(Virginia Argentina)Reports Additional Phase 2 Drill Results from Virginia Proje...
09/05/2011(Joaquin)Reports Coeur's Initial Resource Estimate for the Joaquin Pr...
27/04/2011(Espejo)signs exploration agreement with Pan American Silver for the...
19/04/2011(Virginia Argentina)Reports Initial Phase 2 Drill Results from Virginia Project ...
15/03/2011(Joaquin)partner Coeur d'Alene elects to take the Joaquin Project to...
15/02/2011(Virginia Argentina)Commences Phase Two Drilling at the Virginia Project, Argent...
23/07/2010(Joaquin)Reports initial results from Phase 4 drilling and commenceme...
16/02/2010Reports Results from New High-Grade Silver Veins at the Virg...
11/01/2010(Joaquin)Updates Joaquin Project Phase Three Drilling Results with Ad...
06/01/2010Reports Discovery of a New High Grade Silver Vein, Santa Cru...
24/11/2009(Joaquin)reports highest grade silver yet from the La Negra zone at J...
08/10/2009(Joaquin)Announces Commencement of Phase Three Drill Program at the J...
17/08/2009(Joaquin)partner Coeur upbeat about Joaquin silver project drill resu...
12/08/2009(Nico)reports the start of 1,600 metre drill program at Nico silve...
23/07/2009(Joaquin)reports high grade silver from the La Negra zone at Joaquin
13/07/2009(Joaquin)New Drill Results Extend Morocha Silver Zone at Joaquin Proj...
02/06/2009(Claudia)Reports Claudia Project Exploration Summary
02/03/2009(Joaquin)Encouraging Silver-Gold Results from Drilling at Mirasol's J...
27/02/2009Announces New High Grade Silver And Gold Showings At The Lib...
24/02/2009La Curva Project Returns High-Grade Gold Values and New Diss...
12/02/2009(Nico)Options the Nico Silver-Gold Project to Coeur d'Alene Mines
08/01/2009(Claudia)Exploration Update for the Claudia Project and Start of Seco...
17/11/2008(Joaquin)commences a 1,700-metre drill program at Joaquin and extends...
27/06/2008(Claudia)increases land holding in strategic silver - gold belt at Es...
27/05/2008(Nico)defines multiple drill targets at the Nico Silver-Gold Proje...
11/04/2008(Claudia)Announces High Grade Gold Results from the Curva Project
Communiqués de Presse de Mirasol Resources Ltd.
27/08/2016Grants Options
26/07/2016Mirasol Reports Encouraging Drill Results from Cerro Vanguar...
09/05/2016Mirasol Reports Start of Cerro Vanguardia Mines JV Drilling ...
29/03/2016Mirasol files Amended Resource Report for Virginia Silver Pr...
28/07/2015Mirasol Provides Exploration Update on the Gorbea Belt JV an...
27/07/2015Mirasol expands the large Curahue gold-silver vein system, S...
02/04/2015Mirasol reports that First Quantum Minerals has relinquished...
01/03/2015Chairman of the Mirasol Board
13/02/2015John Tognetti Joins The Mirasol Board
11/02/2015John Tognetti Joins the Mirasol Board
28/01/2015Mirasol Announces Initial Pit Constrained Mineral Resource f...
17/12/2014Mirasol Resources Ltd. Reports On Annual And Special Meeting
10/12/2014Mirasol advances the Atlas gold-silver project in Northern C...
01/12/2014Mirasol reports start of field campaign for the Frontera JV ...
21/10/2014Mirasol -- Redeems Rights Under Shareholder Rights Plan
27/08/2014Mirasol and First Quantum Minerals sign Definitive Explorati...
23/07/2014Mirasol advances Atlas AGZ prospect in the Miocene belt of C...
18/07/2014Mirasol reports high-grade gold and silver assays associated...
07/05/2014Mirasol Announces New CEO
26/02/2014Expands Targets at Atlas High-sulphidation Silver-gold Proje...
25/02/2014Provides Update on Aggressive Exploration Program on the Rub...
21/02/2014Files 43-101 Technical Report and Identifies Exploration Tre...
23/01/2014advances La Curva gold project with geophysics and surface g...
16/12/2013in the News
04/12/2013Announces Results from Annual General and Special Meeting an...
25/11/2013reports positive drill results from Titan gold project in Ch...
05/11/2013Presenting at the Precious Metals Summit Zurich
23/10/2013to Exhibit and Present at the Silver Summit
27/09/2013Featured in Hard Rock Analyst and Northern Miner
20/09/2013Presents at Two Leading Precious Metal Investment Conference...
07/02/2013Reports Successful Initial Metallurgical Test Results on Hig...
21/01/2013Reports Trench Results from the Newly Discovered Titan Gold ...
22/09/2012(Joaquin)Files 43-101 Technical Report with Updated Resource Estimate...
07/08/2012(Joaquin)Reports Coeur's Updated Resource Estimate for the Joaquin Pr...
26/06/2012Summarizes Virginia Silver Project Drill Results on Seven De...
21/06/2012Completes Phase 4 Drilling at the Virginia Silver Project --...
07/05/2012(Joaquin)Reports Joaquin Silver Project Infill Drill Results, Argenti...
18/04/2012(Claudia)reports discovery of a new large gold silver vein zone at th...
16/04/2012(Joaquin)Reports on Exploration Drilling of New Targets, Joaquin Silv...
01/03/2012Reports Final Results of Phase 3 Drilling at the Virginia Si...
23/02/2012(Joaquin)Reports Joaquin Silver Project Expansion Drill Results, Arg...
07/09/2011Summarizes Virginia Silver Project Drill Results on Four Dep...
28/06/2011(Joaquin)Files First NI 43-101 Technical Report on Joaquin Silver Pro...
16/06/2011(Joaquin)Announces Exploration Drilling on the Joaquin Silver Project...
04/03/2010channel samples further upgrade silver values at the Julia V...
04/02/2010in the news: The Northern Miner
08/12/2009profiled in Exploration Insights newsletter
05/11/2009In The News: HRA Journal October 2009
20/10/2009upgrades Libanesa silver-gold project with significant new d...
10/11/2008Corporate Update
21/07/2008Upgrades Libanesa and Identifies new Silver - Gold Target ad...
16/06/2008(Espejo)Completes Espejo Project Geophysical Program and Confirms Dr...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MRZ.V)OTHER OTC (MRZLF)
0,570-3.39%0,410+5.94%
TSX-V
CA$ 0,570
17/04 16:48 -0,020
-3,39%
Cours préc. Ouverture
0,590 0,550
Bas haut
0,540 0,590
Année b/h Var. YTD
0,510 -  0,700 -18,57%
52 sem. b/h var. 52 sem.
0,510 -  1,31 -58,09%
Volume var. 1 mois
121 750 -8,06%
24hGold TrendPower© : 21
Produit
Développe Silver
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 15/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-3,39%
2023-13,24%1,450,57
202241,67%0,930,39
2021-4,00%0,690,31
2020-16,67%0,590,29
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :