Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Emgold Moves Forward With Idaho-Maryland Project Permitting
Published : April 11, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 11, 2011) - Emgold Mining Corporation (News - Market indicators)(PINK SHEETS:EGMCF)(FRANKFURT:EML) ("Emgold" or the "Company")  provides the following update on its Idaho-Maryland Project ("Project"), located in Grass Valley, California. In follow up to the Company's March 7, 2011 press release, Emgold, through its 100 percent owned subsidiary Idaho-Maryland Mining Corporation ("IMMC"), has commenced the filing process for its 2011 Revised Permit Application with the City of Grass Valley ("City"). The City is the Lead Agency and responsible for completing the Environmental Impact Report ("EIR") for the Idaho-Maryland Project, as part of the California Environmental Quality Act ("CEQA") process.

The Idaho-Maryland Mine was once the second largest underground gold mine in California and is reported to have produced 2.4 million ounces of gold at an average recovered grade of 0.43 ounce per ton. The mine contains a NI 43-101 compliant measured and indicated resource of 472,000 ounces of gold at a grade of 0.28 ounces per ton and an inferred resource of 1,002,000 ounces of gold at a grade of 0.39 ounce per ton, estimated as of March 1, 2007 (see Emgold's NI 43-101 compliant Technical Report titled "Idaho-Maryland Mine Project" dated December 8, 2009 at www.emgold.com or, filed under the Company's profile at www.sedar.com). A detailed summary of the Idaho-Maryland Project is also available at www.emgold.com and www.idaho-maryland.com.

Permitting History

Emgold is in the advanced stage of permitting the re-opening of the Idaho-Maryland Mine and is completing an EIR for the Project through its 100% owned subsidiary, IMMC. Since 2003 and in accordance with CEQA, IMMC has submitted to the City conceptual applications followed by the original 2005 Project Permit Applications. The City then completed a Master Environmental Assessment ("MEA") for the Project in 2006. Subsequently, Emgold completed 2007 Revised Project Permit Applications to take into account community input obtained through the MEA process. The City and its consultant, Environmental Science Associates (ESA) then completed an Initial Study for the Project in 2007 and then prepared the Draft EIR, which was completed in October 2008. The public comment period for the Draft EIR was completed in January 2009. The Draft EIR concluded that, of the 15 areas evaluated, the Company was successfully able to avoid or mitigate potential environmental impacts of the Project in all areas, but one (air quality). This is a major accomplishment for any mining and/or industrial project, regardless of the jurisdiction.

After reviewing the Draft EIR, meeting with various government agencies to review their comments, reviewing public comments from the Draft EIR obtained during the public comment period (letters and public meetings), and obtaining input from the local community through IMMC's community outreach program, the Company elected in mid-2009 to modify and clarify the project design contained in the 2007 Project Permit Applications to further mitigate and/or eliminate potential environmental impacts of the Project identified in the Draft EIR. Subsequently IMMC commenced technical work to modify and support changes to its 2007 Project Description.

During each phase of the permitting process IMMC has participated in local information sessions and held numerous consultation meetings in order to address stakeholder concerns and seek community input with its submissions to local, state and federal agencies.

Current Activity

On April 1st, IMMC submitted a check for US$25,000 to allow the City to commence the review of its 2011 Revised Permit Applications to determine their completeness. On April 8th, IMMC submitted drafts of the Revised Executive Summary, Introduction, and Project Description. Upon receipt of comments on the aforementioned submittals, IMMC plans to submit drafts of the Revised Formal Development Review Application and Mineral Project Application to the City by April 20th. Three other applications, the General Plan Amendment, Pre-zone, and Annexation Applications, that make up the remaining part of the Permit Applications for the Idaho-Maryland Project, have been deemed by the City to need no further revisions. IMMC's goal is to have the 2011 Revised Permit Applications complete and accepted by the City at the end of April, 2011. A similar review process was completed with the City for its original project applications and for its 2007 Revised Permit Application.

Based on the modifications and clarifications IMMC has included in the Revised Project Description, IMMC anticipates that a Revised Draft EIR will be required and has been proceeding on this basis since mid-2009. The Revised Draft EIR will ensure the modifications and clarifications in the Revised Project Description are fully analyzed in the EIR. The Revised Draft EIR will also ensure that the public has the opportunity to comment on the revised Project as part of the CEQA process. In its letter to the City on April 1st, IMMC has requested that a Revised Draft EIR be completed and that the City expedite the decision on the requirement for IMMC to complete a Revised Draft EIR. 

Key Modifications and Clarifications to the Project Description

The 2011 Project Description modifications and clarifications reflect the goal of Emgold and IMMC to ensure the Idaho-Maryland Mine Project is a socially and environmentally responsible project that will benefit the City, Nevada County, the local communities, and our shareholders. As the air quality analysis in the 2008 Draft EIR identified certain impacts to be significant or potentially significant, the primary focus of the modifications in the Revised Project Description was to lessen potential air quality impacts from oxides of nitrogen, random organic gases, respirable dust (PM10), and greenhouse gas emissions. 

IMMC has completed significant work on air quality modeling for the Project and alternatives to address the air quality impacts outlined in the Draft EIR. Modeling done by IMMC's air quality experts has significantly reduced oxides of nitrogen, reactive organic gases, and respirable particulate matter from previous estimates contained in the Draft EIR. IMMC's proposed measures taken to accomplish these reductions include, but are not limited to, use of a Traffic Management Plan (e.g., van-pooling and car-pooling) to reduce employee traffic trips and associated air emissions, use of low NOX burners for combustion of natural gas, use of emulsion explosives, use of higher tier engines for off road underground and surface equipment, and use of shaft hoisting instead of trucking for material handling of ore and development rock.

To lessen potential impacts to the South Fork of Wolf Creek, IMMC has eliminated the water treatment plant and the water discharge to South Fork of Wolf Creek. Instead, a raw water line will be constructed under East Bennett Road. Dewatering of historic mine workings will occur at the New Brunswick site, with raw water transferred through the raw water line under East Bennett Road to the Idaho-Maryland site mine water detention pond. Any mine water discharged from the mine water detention pond at the Idaho-Maryland site will go through a water treatment plant to be located there, with discharge going to Wolf Creek instead of South Folk Wolf Creek.

Residents in the vicinity of the mine have expressed concerns that their domestic wells may be impacted by mine dewatering. IMMC has included in the project provision of an Nevada Irrigation District (NID) trunk line along East Bennett Road and feeder lines on roads proximate to East Bennett Road, to have an alternative supply of potable water available to hook up to residences should they be impacted. IMMC has provided a Domestic Well Level Monitoring Program and Domestic Well Mitigation Program which outline how domestic wells will be monitored through the life of the project and how impacts to domestic wells will be mitigated, should they occur.

IMMC has also provided additional information on the clean up of historic mine tailings remaining from past mining activities (prior to 1956) on the Idaho-Maryland site. This clean up was not included in the analysis completed by the City in the 2008 EIR and IMMC wants to ensure the positive aspects of this clean up are properly analyzed as part of the Project.

Additional modifications amd clarifications are contained in the Revised Project Description. Subsequent to finalization and acceptance of the 2011 Revised Permit Applications, the application documents will be made available to the public at www.idaho-maryland.com, www.cityofgrassvalley.com, and at the public libraries located in Grass Valley. This should occur in early May. 

Expected Path to Move Forward with the EIR Process

Subsequent to acceptance of the 2011 Revised Permit Applications by the City, it is expected that the City's consultant, ESA, will prepare a budget and schedule to complete the EIR process (Revised Draft EIR and Final EIR). Upon review of this budget and schedule by the City and IMMC, a decision will be made to proceed with the work or alternatively obtain competitive bids to complete the process. Once a decision is made to move forward, the City and IMMC will complete a revised Reimbursement Agreement. As part of the CEQA process, IMMC (as the applicant) is responsible for reimbursing the City and any its consultants for any costs to complete the EIR.

The City and its consultants will prepare the Revised Draft EIR. The Revised Draft EIR will be published and a public comment period will then commence with public meetings held through the City of Grass Valley Planning Commission. Subsequent to the public comment period, the Final EIR will be prepared by the City and its consultants. The Grass Valley Planning Commission will review the Final EIR and entitlements for the Project, make a determination if the documents are complete and adequate, and forward the package to the Grass Valley City Council. The City Council will be responsible for Certification of the Final EIR, approving the entitlements, and approving a Conditional Use Permit for the Project. Additional public meetings will be held when the Project reaches City Council. It is anticipated that the Final EIR will be completed in late 2011 or early 2012. 

David Watkinson, President and CEO of Emgold stated, "We have been working hard over the last year and a half and believe that the revisions to the Project will eliminate, reduce, or mitigate a number of potential impacts identified in the Draft EIR. While air quality was identified as a significant issue in the Draft EIR, the significance, in the case of nitrogen oxides, is a result of Nevada County being a non-attainment area for ozone (nitrogen oxides are a precursor to ozone). Nevada County has high ozone levels due to air that blows into the Sierra Nevada Mountains from the San Francisco and Sacramento area, not due to local emissions. As such, the significance level the mine has to meet is much lower than in an area that is not a non-attainment zone. We expect to meet the nitrogen oxide significance level for several project alternatives that will be analyzed in the EIR. We are also required to deal with AB32 legislation in California, in the CEQA process, even though the state has yet to adopt many provisions of this law, including defining of 'significant levels'. We look forward to completion of the Revised Draft EIR and Final EIR with these changes incorporated." 

For more information about Emgold, the Idaho-Maryland Gold Project and the Buckskin Rawhide, Stewart, and Rozan Properties, please visit www.emgold.com.

On behalf of the Board of Directors

David G. Watkinson, P.Eng., President & CEO

This news release may include certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address the mineral resource estimates, are forward-looking statements and are based on a number of assumptions, including but not limited to the assumptions underlying the estimated resources outlined in the Technical Report are and remain valid, that the demand for and price of gold remains constant or increases and does not experience a material decline, and that the Company will be able to raise the capital required to hold and develop the Idaho-Maryland Project. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include changes the price of gold, the price of the company's shares, the costs of labour, equipment and other costs associated with exploration, development and mining operations, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, Investors should review the Company's filings that are available at www.sedar.com or the Company's website at www.emgold.com.

U.S. 20-F Registration: 000-51411

This release was prepared by the Company's management. Neither TSX Venture Exchange nor its Regulation Services Provider (as the term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Emgold Mining Corporation
David G. Watkinson, P.Eng.
President & CEO
604-687-4622 or Toll Free: 1-888-267-1400
info@emgold.com
www.emgold.com

Emgold Mining Corp

PRODUCTEUR
CODE : EMR.V
ISIN : CA2909283087
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Emgold Mining est une société développant des projet miniers d'or basée au Canada.

Emgold Mining détient divers projets d'exploration au Canada.

Ses principaux projets en production sont IDAHO-MARYLAND en USA et ROZAN au Canada et ses principaux projets en exploration sont JAZZ, STEWART et BUCKSKIN RAWHIDE au Canada.

Emgold Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 6,0 millions CA$ (4,8 millions US$, 4,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 12 mai 2006 à 9,90 CA$, et son plus bas niveau récent le 01 janvier 2016 à 0,01 CA$.

Emgold Mining possède 79 710 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Emgold Mining Corp
01/02/2013Provides Properties Update and Closes CDN $285,000 Private P...
07/04/2010Closes First Tranche Of Private Placement Financing
22/10/2007Completes $8 Million Private Placement Financing
09/06/2007Announces $10,000,000 Brokered Private Placement
Attributions d'options de Emgold Mining Corp
08/05/2012Grants Options Moves To OTCQB Status
Nominations de Emgold Mining Corp
21/08/2013Announces Change In Directors
11/05/2010Appoints New Chief Executive Officer
07/04/2008 Announces The Appointment Of Chief Financial Officer
01/11/2007Announces The Appointment Of President And Chief Operating O...
Projets de Emgold Mining Corp
17/06/2013(Buckskin Rawhide)Drilling to Commence on Emgold's Buckskin Rawhide East Prope...
08/04/2013(Stewart)Discovers New Gold Zone at its Stewart Property, B.C.
07/09/2012(Idaho-maryland)Idaho-Maryland Project Update
28/08/2012(Rozan)Commences 2012 Exploration Program Rozan Property, B.C.
15/02/2012Doubles Size of its Koegel Rawhide Gold-Silver Property, Nev...
06/02/2012(Buckskin Rawhide)Completes Acquisition and Expands its Buckskin Rawhide Gold ...
01/02/2012(Stewart)Announces Successful Results from its 2011 Core Drilling Pro...
30/01/2012(Buckskin Rawhide)s Gold Exploration Activities at its Buckskin Rawhide Proper...
25/01/2012(Rozan)Announces Successful Results 2011 Exploration Program Rozan ...
16/06/2011(Idaho-maryland)Advances Idaho-Maryland Gold Mine Permitting
11/04/2011(Idaho-maryland)Moves Forward with Idaho-Maryland Project Permitting
11/04/2011(Buckskin Rawhide)Expands Claim Position at its Buckskin Rawhide Gold-Silver P...
25/03/2011(Stewart)Announces Upcoming 2011 Field Exploration and Drilling Progr...
09/03/2011(Idaho-maryland)Announces Idaho-Maryland Project Update
12/01/2011(Buckskin Rawhide)Finds High Grade Gold at its Buckskin Rawhide Property, Neva...
23/07/2010(Idaho-maryland)Extends Lease And Option To Purchase Agreement For The Idaho...
07/01/2008(Idaho-maryland Mine)Achieves Important Milestone In Gold Mine Permit Application
16/11/2007(Stewart Property) Discovers Additional Tungsten Mineralization In Trenches At...
26/06/2007Achieves Important Permitting Milestone For Idaho-Maryland M...
Communiqués de Presse de Emgold Mining Corp
29/11/2013Announces Annual General Meeting and Special Meeting Results
04/09/2013Raises US$450,000 Through Real Estate Transaction
30/01/2013(Buckskin Rawhide)Announces Non-Brokered Private Placement Provides Update on ...
28/01/2013(Rozan)Intersects Gold at its Rozan Property, B.C.
10/09/2012Warrants Exercised
17/08/2012Completes Re-Pricing and Extension of Warrants
18/07/2012to Re-Price and Extend Existing Warrants Offers Early Conver...
01/05/2012Retains Vanguard Shareholder Solutions for Investor Relation...
28/03/2012Identifies Gold Target at its Koegel Rawhide Gold-Silver Pro...
27/02/2012Finds High Grade Gold at its Recently Acquired Koegel Rawhid...
20/04/2011(Buckskin Rawhide)Finds More High Grade Gold And Silver at its Buckskin Rawhid...
07/08/2010Converts Series A Preference Shares And Accrued Dividends To...
23/09/2009Annual And Special Meeting
29/09/2008Presents The Idaho-Maryland Project Overview
21/09/2008Shareholder Update
06/02/2008 Receives Recent Coverage By Smartstox.Com
28/11/2007Completes Drilling On Its Molybdenum, Tungsten And Gold Prop...
01/08/2007Takes New Direction
11/04/2007Additional Exploration Targets At Idaho-Maryland Gold Mine
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (EMR.V)FRANKFURT (EML.F)
0,075+7.14%0,039+0.00%
TSX-V
CA$ 0,075
12/04 15:28 -
7,14%
Cours préc. Ouverture
0,070 0,075
Bas haut
0,075 0,075
Année b/h Var. YTD
0,045 -  0,090 -16,67%
52 sem. b/h var. 52 sem.
0,045 -  0,190 -63,41%
Volume var. 1 mois
39 000 50,00%
24hGold TrendPower© : 16
Produit Gold
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 25/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-34,78%
2023-54,00%0,290,05
2022614,29%0,300,02
2021-56,25%0,090,03
202023,08%0,160,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,32%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :