Thompson Creek Metals Company Reports First Quarter 2013 Financial Results
Published : May 08, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Report |

DENVER, CO--(Marketwired - May 8, 2013) - Thompson Creek Metals Company Inc. (NYSE: TC) (TSX: TCM) (the "Company" or "Thompson Creek"), a growing, diversified North American mining company, today announced financial results for the three months ended March 31, 2013, prepared in accordance with United States generally accepted accounting principles ("US GAAP"). All dollar amounts are in United States ("US") dollars unless otherwise indicated. References to C$ refer to Canadian dollars.

First Quarter 2013 Highlights (compared to the same period in 2012, unless noted)

Operational:

  • Molybdenum production increased 74% to 7.7 million pounds, from 4.4 million pounds
  • Average cash costs of molybdenum produced decreased 54% to $5.91 per pound, compared to $12.95 per pound
  • Total sales of molybdenum increased 18.5% to 8.8 million pounds, compared to 7.4 million pounds

Financial:

  • Operating income was $17.0 million, a $33.5 million improvement from an operating loss of $16.5 million in the prior year, despite lower revenue
  • Consolidated revenue was $108.7 million, compared to $113.6 million
  • Cash flow from operations was $15.3 million, compared to $3.1 million
  • Net income totaled $0.9 million, or nil per diluted share, compared to $1.1 million, or $0.01 per diluted share

Mt. Milligan:

  • Another safety milestone was reached at Mt. Milligan with approximately 4.0 million work hours without a lost time incident
  • Advanced construction progress at Mt. Milligan to overall completion of approximately 89%
  • Maintained construction schedule with anticipated commissioning and start-up in August of 2013
  • Approximately 95% of capital expenditures spent or contractually committed since inception of the Mt. Milligan project

Kevin Loughrey, the Company's Chairman and Chief Executive Officer, stated, "We are pleased to report continued improvement of operational performance at both our Thompson Creek and Endako Mines, compared to the fourth quarter of 2012. We achieved lower cash costs per pound produced and increased sales compared to the fourth quarter of 2012. Metallurgical recovery at our Endako Mine has also continued to improve. The Company's first quarter operational performance was significantly improved from a year earlier, with increased production and sales, and significantly decreased costs. We are also pleased to report that construction of the Mt. Milligan Mine remains on schedule. We currently anticipate commissioning and start-up in August of 2013, and commercial production of copper and gold in the fourth quarter of 2013."

At the Thompson Creek Mine, molybdenum production for the first quarter of 2013 was 5.9 million pounds at a cash cost of $4.18 per pound produced, compared to 3.4 million pounds at a cash cost of $10.34 per pound produced for the first quarter of 2012. These improvements were primarily the result of the planned mine pit sequencing and mining in a higher grade section of the mine during the first quarter of 2013 compared to the first quarter of 2012, together with the suspension of waste stripping activity associated with the next phase of production, which began in October of 2012.

At the Endako Mine, the Company's 75% share of molybdenum production for the first quarter of 2013 was 1.8 million pounds at a cash cost of $11.75 per pound produced, compared to 1.0 million pounds at a cash cost of $21.87 per pound produced for the first quarter of 2012. These improvements were primarily the result of the suspension of waste stripping activities and processing of stockpiled ore beginning in the third quarter of 2012, together with lower production in the first quarter of 2012 related to the start-up of the new mill. Although production from the Endako Mine was significantly improved in the first quarter of 2013 from a year ago, production was negatively impacted due to the previously disclosed winter tailings pond management issues. The Company has completed initial remediation work and instituted tailings management procedures to address these issues to ensure sufficient water supply to the mill for future winter seasons beyond 2013.

Sales of molybdenum for the first quarter of 2013 were 8.8 million pounds, at an average realized sales price of $11.87 per pound, compared to 7.4 million pounds, at an average realized sales price of $14.74 per pound for the first quarter of 2012. 

"We remain focused on completing and successfully starting up Mt. Milligan, continuing the operational improvements at Endako, maximizing the value of the Thompson Creek Mine during this time of continued weakness in the molybdenum market, and meeting our previously announced production and cash cost guidance," added Mr. Loughrey.

Selected Consolidated Financial and Operational Information
(US$ in millions except per share and per pound amounts)

    Three Months Ended March 31,
    2013   2012
Financial Information            
Revenues            
  Molybdenum sales   $ 104.7   $ 109.6
  Tolling, calcining and other     4.0     4.0
    Total revenues     108.7     113.6
Costs and expenses            
  Cost of sales            
    Operating expenses     68.6     99.6
    Depreciation, depletion and amortization     12.8     19.6
  Total cost of sales     81.4     119.2
  Selling and marketing     2.3     1.9
  Accretion expense     0.8     0.5
  General and administrative     7.1     7.7
  Exploration     0.1     0.8
    Total costs and expenses     91.7     130.1
Operating income (loss)     17.0     (16.5)
Other expense (income)     19.3     (5.5)
(Loss) before income and mining taxes     (2.3)     (11.0)
Income and mining tax (benefit)     (3.2)     (12.1)
Net income   $ 0.9   $ 1.1
Net income per share            
  Basic   $ 0.01   $ 0.01
  Diluted   $ --   $ 0.01
Cash generated by operating activities   $ 15.3   $ 3.1
Adjusted Non-GAAP Measures:(1)            
Adjusted net income (1)   $ 0.9   $ 1.2
Adjusted net income per share--basic(1)   $ 0.01   $ 0.01
Adjusted net income per share--diluted(1)   $ --   $ 0.01
Operational Statistics            
Molybdenum production (000's lb)(2)     7,690     4,424
Cash cost ($/lb produced)(3)   $ 5.91   $ 12.95
Molybdenum sold (000's lb):            
  Thompson Creek Mine and Endako Mine product     6,574     4,871
  Purchased and processed product     2,240     2,567
      8,814     7,438
Average realized sales price ($/lb)(1)   $ 11.87   $ 14.74
(1) See "Non-GAAP Financial Measures" for the definition and reconciliation of these non-GAAP measures.
(2) Production pounds reflected are molybdenum oxide and high performance molybdenum disulfide ("HPM") from the Company's share of production from the mines, but exclude molybdenum processed from purchased product.
(3) Weighted-average of Thompson Creek Mine and Endako Mines (75% share) cash costs (mining, milling, mine site administration, roasting and packaging) for molybdenum oxide and HPM produced in the period, including all stripping costs. Cash cost excludes the effect of purchase price adjustments; the effects of changes in inventory; corporate allocations; stock-based compensation; other non-cash employee benefits; depreciation, depletion, amortization and accretion; and commissioning and start-up costs for the Endako mill. The cash cost for Thompson Creek Mine, which only produces molybdenum sulfide and HPM on site, includes an estimated molybdenum loss (sulfide to oxide), an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Thompson Creek Mine to the Langeloth Facility. The cash cost for the Endako Mine in 2013 includes an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Endako Mine to the Langeloth Facility. See "Non-GAAP Financial Measures" for additional information.

Mt. Milligan Copper-Gold Project

During the first quarter of 2013, the Company made cash and financing capital expenditures of C$154.3 ($153.0) million for the Mt. Milligan copper-gold project. Capitalized interest and debt issuance costs were C$25.4 ($24.6) million for the first quarter of 2013. Capital expenditures were primarily related to the ongoing construction of buildings and facilities (concentrator, truck shop, administration building, tailings storage facility, and primary and pebble crushers), continued development of the mine and expenses for mining equipment. The Company incurred C$1,294.2 million in cash spend since the inception of the project through March 31, 2013.

The Company is currently estimating an aggregate of approximately C$1.5 billion to construct and develop Mt. Milligan, of which approximately C$240.0 million of expenditures remain to be spent, plus an additional C$40.0 million to C$50.0 million of aggregate capital expenditures for a permanent operations residence (of which C$1.5 ($1.4) million has been spent on capital expenditures and C$6.6 ($6.5) million has been prepaid to one vendor in the first quarter of 2013. The permanent operations residence is expected to be completed in 2014.

As of March 31, 2013, overall project completion is estimated to be at 89%. The Mt. Milligan project remains on schedule, with commissioning and start-up expected to commence in August of 2013, and commercial production of copper and gold expected in the fourth quarter of 2013.

Guidance

Mt. Milligan average annual production is expected to be higher during the first full six years of production (approximately 89 million pounds of copper and 262,000 ounces of gold, both in concentrate), compared to annual life-of-mine production (approximately 81 million pounds of copper and 194,500 ounces of gold, both in concentrate). Production and cash cost guidance for 2014 will be provided once Mt. Milligan is fully operational.

    Three Months Ended   Years Ended December 31,
    March 31, 2013
(Actual)
  2013
(Estimated, Including Q1 2013)
  2014
(Estimated)
Molybdenum production (000's lb):(1)                  
  Thompson Creek Mine     5,929     20,000 - 22,000     17,000 - 19,000
  Endako Mine (75% share)     1,761     7,500 - 8,500     10,500 - 11,500
Total molybdenum production (000's lb)     7,690     27,500 - 30,500     27,500 - 30,500
Cash cost ($/lb produced):(2)                  
  Thompson Creek Mine   $ 4.18   $ 4.75 - 5.75   $ 5.00 - 6.00
  Endako Mine     11.75     10.75 - 12.25     9.00 - 10.50
Total cash cost ($/lb produced)   $ 5.91   $ 6.50 - 7.50   $ 6.50 - 7.75
Capital expenditures (in millions):                  
  Mt. Milligan (3),(4),(5)   $ 153.0   $ 370 - 390     --
  Mt. Milligan permanent operations residence(6)     1.4     35 - 40   $ 5 - 10
  Mt. Milligan operations     --     20 - 30     20 - 30
  TC and Endako Mines, Langeloth & other (3),(4)     0.7     15 - 20     30 - 40
Total capital expenditures   $ 155.1   $ 440 - 480   $ 55 - 80
(1) Production pounds reflected are molybdenum oxide and HPM from the Company's share of production from the mines, but exclude molybdenum processed from purchased product.
 
(2) Weighted-average of the Thompson Creek Mine and the Endako Mine (75% share) cash costs (mining, milling, mine site administration, roasting and packaging) for molybdenum oxide and HPM produced in the period, including all stripping costs. Cash cost excludes: the effect of purchase price adjustments; the effects of changes in inventory; corporate allocations; stock-based compensation; other non-cash employee benefits; depreciation, depletion, amortization and accretion; and commissioning and start-up costs for the Endako mill. The cash cost for the Thompson Creek Mine, which only produces molybdenum sulfide and HPM on site, includes an estimated molybdenum loss (sulfide to oxide), an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Thompson Creek Mine to the Langeloth Facility. The cash cost for the Endako Mine in 2013 includes an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Endako Mine to the Langeloth Facility. See "Non-GAAP Financial Measures" for additional information.
 
(3) Excludes capitalized interest and debt issuance costs of $24.6 million and excludes decreases in accruals of $28.7 million for the three months ended March 31, 2013.
 
(4) Canadian to US foreign exchange rate for the remainder of 2013 and the year 2014 assumed at parity (C$1.00 = US$1.00).
 
(5) Includes capital expenditures anticipated to be incurred during production ramp up. Total project capital expenditures may be affected by the period of time to reach commercial production. All operating expenses will be capitalized until commercial production is reached.
 
(6) Excludes $6.5 million of deposits made to one vendor during the first quarter of 2013.

Non-GAAP Financial Measures
In addition to the condensed consolidated financial statements presented in accordance with US GAAP, we use certain non-GAAP financial measures of the Company's financial performance for the reasons described further below. The presentation of these measures is not intended to be considered in isolation from, as a substitute for, or as superior to, the financial information prepared and presented in accordance with US GAAP, and the presentation of these measures may be different from non-GAAP financial measures used by other companies. In addition, these non-GAAP measures have limitations in that they do not reflect all of the amounts associated with the results of operations as determined in accordance with US GAAP.

Adjusted Net Income, Adjusted Net Income Per Share--Basic and Diluted
Adjusted net income and adjusted net income per basic and diluted share are considered key measures by management in evaluating the Company's operating performance on a quarterly and annual basis. Management uses these measures in evaluating the Company's performance as they represent profitability measures that are not impacted by changes in the market price of our previously outstanding warrants or significant non-cash items, such as asset impairments, that are considered non-recurring in nature. These measures do not have standard meanings prescribed by US GAAP and may not be comparable to similar measures presented by other companies. Management believes that these non-GAAP measures provide useful supplemental information to investors in order that they may evaluate the Company's performance using the same measures as those used by management and, as a result, the investor is afforded greater transparency in assessing our financial performance.

Adjusted net income represents net income prepared in accordance with US GAAP, adjusted for significant non-cash items. For the first quarter of 2013, there were no significant non-cash items. For the first quarter of 2012, the significant non-cash items were non-cash losses on the fair value adjustment related to certain warrants that were outstanding until June 30, 2012.

In connection with the Company's acquisition of Terrane Metals Corp. in 2010, the Company agreed to pay holders of common stock purchase warrants issued by Terrane certain share and cash consideration. Per guidance issued by the Emerging Issues Task Force, common stock purchase warrants with a strike price denominated in a currency other than the entity's reporting currency are not considered linked to equity and, therefore, are to be accounted for as derivatives. The Company thus accounted for the Terrane warrants as derivatives. The Company recorded a cumulative adjustment to retained earnings upon its acquisition of Terrane, and subsequent changes to the fair value of the Terrane Warrants were recorded to the Company's Condensed Consolidated Statements of Operations and Comprehensive (Loss) Income at each quarter-end.

As a cash payment was not required by the Company at settlement of the Terrane warrants, management does not consider gains or losses on these warrants in its evaluation of our financial performance and believes that presentation of the Company's adjusted net income excluding these gains or losses provides useful information to its investors regarding the Company's financial condition and results of operations.

Adjusted net income per basic and diluted share is calculated using adjusted net income, as defined above, divided by the weighted-average basic and weighted-average diluted shares outstanding during the period as determined in accordance with US GAAP.

The following table reconciles net income presented in accordance with US GAAP to the non-GAAP financial measures of adjusted net income and adjusted net income per basic and diluted share for the three months ended March 31, 2012. For the three months ended March 31, 2013, net income and net income per basic and diluted share represented in accordance with US GAAP equals the non-GAAP financial measures of adjusted net income and adjusted net income per basic and diluted share. All figures within the tables are unaudited and are presented in US$ in millions, except shares and per share amounts.

For the Three Months Ended March 31, 2012

        Weighted-Average
Basic Shares
  Weighted-Average
Diluted Shares
    Net Income
(Loss)
  Shares
(000's)
  $/share   Shares
(000's)
  $/share
Net income   $1.1   168,054   $0.01   168,483   $0.01
Add (Deduct):                    
Unrealized loss on common stock purchase warrants   0.1   168,054   --   168,483   --
Non-GAAP adjusted net income   $1.2   168,054   $0.01   168,483   $0.01

Cash Cost per Pound Produced, Weighted-Average Cash Cost per Pound Produced and Average Realized Sales Price per Pound Sold

Cash cost per pound produced, weighted-average cash cost per pound produced and average realized sales price per pound sold are considered key measures by management in evaluating the Company's operating performance. Cash cost per pound produced, weighted-average cash cost per pound produced and average realized sales price per pound sold are not measures of financial performance, nor do they have a standardized meaning prescribed by US GAAP and may not be comparable to similar measures presented by other companies. Management uses these measures to evaluate the operating performance at each of its mines, as well as on a consolidated basis, as measures of profitability and efficiency. Management believes that these non-GAAP measures provide useful supplemental information to investors in order that they may evaluate the Company's performance using the same measures as those used by management and, as a result, the investor is afforded greater transparency in assessing the Company's financial performance. Non-GAAP financial measures should not be considered in isolation from, as a substitute for, or superior to, measures of financial performance prepared in accordance with US GAAP.

Cash cost per pound produced represents the mining (including all stripping costs), milling, mine site administration, roasting and packaging costs for molybdenum oxide and HPM produced at each mine in the period. Stripping costs represent the costs associated with the activity of removing overburden and other mine waste materials in the production phase of a mining operation. Stripping costs that provide access to mineral reserves that will be produced in future periods are expensed under US GAAP as incurred. Cash cost per pound produced excludes the effects of purchase price adjustments, the effects of changes in inventory; corporate allocations; stock-based compensation; other non-cash employee benefits and depreciation, depletion, amortization and accretion. Cash cost for the Thompson Creek Mine, which only produces molybdenum sulfide and HPM on site, includes an estimated molybdenum loss (sulfide to oxide), an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Thompson Creek Mine to the Langeloth Facility. The cash cost for the Endako Mine in 2013 includes an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Endako Mine to the Langeloth Facility. The weighted-average cash cost per pound produced represents the cumulative total of the cash costs for the Thompson Creek Mine and the Endako Mine divided by the cumulative total production from the Thompson Creek Mine and the Endako Mine.

The average realized sales price per pound sold represents molybdenum sales revenue divided by the pounds sold.
The following table provides a reconciliation of cash costs and cash cost per pound produced, by mine, and operating expenses included in our Condensed Consolidated Statements of Operations and Comprehensive (Loss) Income in the determination of net income. All figures within the tables are unaudited and are presented in US$ in millions, except shares and per share amounts.

    Three Months Ended
March 31, 2013
  Three Months Ended
March 31, 2012
    Operating
Expenses
    Pounds
Produced
(1)
  $/lb   Operating
Expenses
  Pounds
Produced
(1)
  $/lb
    (in millions)     (000's lbs)       (in millions)   (000's lbs)    
Thompson Creek Mine                                  
Cash costs--Non-GAAP (2)   $ 24.8     5,929   $ 4.18   $ 35.4   3,422   $ 10.34
Add/(Deduct):                                  
  Stock-based compensation     0.2                 0.1          
  Inventory and other adjustments     3.3                 --          
GAAP operating expenses   $ 28.3           $     35.5          
Endako Mine                                  
Cash costs--Non-GAAP (2)   $ 20.7     1,761   $ 11.75   $ 21.9   1,002   $ 21.87
Add/(Deduct):                                  
  Stock-based compensation     0.1                 0.2          
  Commissioning and start-up costs     --                 2.3          
  Inventory and other adjustments     (5.2 )               4.3          
GAAP operating expenses   $ 15.6           $     28.7          
Other operations GAAP operating expenses (3)   $ 24.7           $     35.4          
GAAP consolidated operating expenses   $ 68.6           $     99.6          
Weighted-average cash cost--Non-GAAP   $ 45.4     7,690   $ 5.91   $ 57.3   4,424   $ 12.95
(1) Production pounds are molybdenum oxide and HPM from the Company's share of the production from the mines, but exclude molybdenum processed from purchased product.
 
(2) Cash costs represent the mining (including all stripping costs), milling, mine site administration, roasting and packaging costs for molybdenum oxide and HPM produced in the period. Cash cost excludes: the effect of purchase price adjustments; the effects of changes in inventory; corporate allocations; stock-based compensation; other non-cash employee benefits; depreciation, depletion, amortization and accretion; and commissioning and start-up costs for the Endako mill. The cash cost for the Thompson Creek Mine, which only produces molybdenum sulfide and HPM on site, includes an estimated molybdenum loss (sulfide to oxide), an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Thompson Creek Mine to the Langeloth Facility. The cash cost for the Endako Mine in 2013 includes an allocation of roasting and packaging costs from the Langeloth Facility and transportation costs from the Endako Mine to the Langeloth Facility.
 
(3) Other operations represent activities related to the roasting and processing of third-party concentrate and other metals at the Langeloth Facility and exclude product volumes and costs related to the roasting and processing of Thompson Creek and Endako Mines concentrate. The Langeloth Facility costs associated with roasting and processing of Thompson Creek Mine and Endako Mine concentrate are included in their respective operating results above.

Additional information on the Company's financial position is available in Thompson Creek's Quarterly Report on Form 10-Q for the period ended March 31, 2013, which was filed today on EDGAR (www.sec.gov) and SEDAR (www.sedar.com) and posted on the Company's website (www.thompsoncreekmetals.com).

Conference Call and Webcast

Thompson Creek will hold a conference call for analysts and investors to discuss its first quarter 2013 financial results on Thursday, May 9, 2013 at 8:30 am Eastern Time. Kevin Loughrey, Chairman and Chief Executive Officer, and Pamela Saxton, Executive Vice President and Chief Financial Officer, will be available to answer questions during the call.

To participate in the call, please dial 1 (888) 395-3230. A live audio webcast of the conference call will be available at http://www.visualwebcaster.com/event.asp?id=92852 and www.thompsoncreekmetals.com. An archived recording of the conference call/webcast will be available at 1 (888) 203-1112 (access code 5144866) from 11:30 a.m. ET on May 9, 2013 to 11:59 p.m. ET on May 16, 2013. 

About Thompson Creek Metals Company Inc.
Thompson Creek Metals Company Inc. is a growing, diversified North American mining company. The Company's principal operating properties are its 100%-owned Thompson Creek Mine, an open-pit molybdenum mine and concentrator in Idaho, a 75% joint venture interest in the Endako Mine, an open-pit molybdenum mine, concentrator and roaster in British Columbia, and the Langeloth Metallurgical Facility in Pennsylvania. The Company is also in the process of constructing the Mt. Milligan Mine in British Columbia. Mt. Milligan is designed to be a conventional truck-shovel open-pit copper-gold mine. Mt. Milligan is expected to commence production in 2013. The Company's development projects include the Berg property, a copper, molybdenum, and silver exploration property located in British Columbia, the Davidson property, an underground molybdenum exploration property located in British Columbia, and the Maze Lake property, a joint venture gold exploration project located in the Kivalliq District of Nunavut, Canada. The Company's principal executive office is located in Denver, Colorado. More information is available at www.thompsoncreekmetals.com.

Cautionary Note Regarding Forward-Looking Statements
This news release contains ''forward-looking statements'' within the meaning of the United States Private Securities Litigation Reform Act of 1995 Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934 and applicable Canadian securities legislation. These forward-looking statements generally are identified by the words "believe," "project," "expect," "anticipate," "estimate," "intend," "future," "plan," "may," "should," "will," "would," "will be," "will continue," "will likely result," and similar expressions. Our forward-looking statements include statements with respect to: future financial or operating performance of the Company or its subsidiaries and its projects; future inventory, production, sales, cash costs, capital expenditures and exploration expenditures; future earnings and operating results; expected concentrate and recovery grades; statements as to the projected development of Mt. Milligan and other projects, including expected production commencement dates; estimates of Mt. Milligan development costs; future operating plans and goals; and future molybdenum prices.

Where we express an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, our forward-looking statements are based on current expectations and assumptions that are subject to risks and uncertainties which may cause actual results to differ materially from future results expressed, projected or implied by those forward-looking statements. Important factors that could cause actual results and events to differ from those described in such forward-looking statements can be found in the section entitled "Risk Factors" in Thompson Creek's Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and other documents filed on EDGAR at www.sec.gov and on SEDAR at www.sedar.com. Although we have attempted to identify those material factors that could cause actual results or events to differ from those described in such forward-looking statements, there may be other factors, currently unknown to us or deemed immaterial at the present time, that could cause results or events to differ from those anticipated, estimated or intended. Many of these factors are beyond our ability to control or predict. Given these uncertainties, the reader is cautioned not to place undue reliance on our forward-looking statements. We undertake no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events, or otherwise.

 
 
 
THOMPSON CREEK METALS COMPANY INC.
CONDENSED CONSOLIDATED BALANCE SHEETS
(UNAUDITED)
 
(in millions, except share data)   March 31,   December 31,
    2013   2012
ASSETS            
Current assets            
  Cash and cash equivalents   $ 469.3   $ 526.8
  Accounts receivable     61.3     52.9
  Accounts receivable-related parties     3.7     6.4
  Product inventory     105.7     110.8
  Material and supplies inventory     50.4     48.4
  Prepaid expenses and other current assets     13.5     5.8
  Income and mining taxes receivable     11.3     16.0
  Restricted cash     25.0     37.1
      740.2     804.2
Property, plant, equipment and development, net     2,622.6     2,538.9
Restricted cash     5.7     5.7
Reclamation deposits     29.5     30.1
Other assets     30.0     31.3
    $ 3,428.0   $ 3,410.2
LIABILITIES AND SHAREHOLDERS' EQUITY            
Current liabilities            
  Accounts payable and accrued liabilities   $ 105.8   $ 128.5
  Income, mining and other taxes payable     0.8     0.6
  Current portion of long-term debt     16.4     16.6
  Current portion of long-term capital lease obligations     18.6     14.1
  Deferred income tax liabilities     7.0     5.9
  Other current liabilities     13.7     13.8
      162.3     179.5
Gold Stream deferred revenue     731.6     669.6
Long-term debt     918.1     921.8
Long-term capital lease obligations     74.5     58.0
Other liabilities     5.8     5.3
Asset retirement obligations     35.1     36.6
Deferred income tax liabilities     122.1     137.5
      2,049.5     2,008.3
Commitments and contingencies            
Shareholders' equity            
  Common stock, no-par, 170,671,457 and 168,726,984 shares issued and outstanding as of March 31, 2013 and December 31, 2012, respectively     1,025.8     1,017.9
  Additional paid-in capital     227.7     233.8
  Retained earnings     93.2     92.3
  Accumulated other comprehensive income     31.8     57.9
      1,378.5     1,401.9
    $ 3,428.0   $ 3,410.2
             
             
             
THOMPSON CREEK METALS COMPANY INC.
CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS AND COMPREHENSIVE (LOSS) INCOME
(UNAUDITED)
 
(in millions, except per share amounts)   Three Months Ended March 31,
    2013   2012
REVENUES            
  Molybdenum sales   $ 104.7     $ 109.6  
  Tolling, calcining and other     4.0       4.0  
    Total revenues     108.7       113.6  
COSTS AND EXPENSES            
  Cost of sales            
    Operating expenses     68.6       99.6  
    Depreciation, depletion and amortization     12.8       19.6  
  Total cost of sales     81.4       119.2  
  Selling and marketing     2.3       1.9  
  Accretion expense     0.8       0.5  
  General and administrative     7.1       7.7  
  Exploration     0.1       0.8  
    Total costs and expenses     91.7       130.1  
OPERATING INCOME (LOSS)     17.0       (16.5 )
OTHER EXPENSE (INCOME)            
  Change in fair value of common stock purchase warrants     --       0.1  
  Loss (gain) on foreign exchange     19.4       (6.6 )
  Interest and finance fees     0.1       1.5  
  Interest income     (0.2 )     (0.2 )
  Other     --       (0.3 )
    Total other expense (income)     19.3       (5.5 )
  (Loss) before income and mining taxes     (2.3 )     (11.0 )
  Income and mining tax (benefit)     (3.2 )     (12.1 )
NET INCOME   $ 0.9     $ 1.1  
COMPREHENSIVE (LOSS) INCOME            
  Foreign currency translation     (26.1 )     27.4  
    Total other comprehensive (loss) income     (26.1 )     27.4  
Total comprehensive (loss) income   $ (25.2 )   $ 28.5  
             
NET INCOME PER SHARE            
  Basic   $ 0.01     $ 0.01  
  Diluted   $ --     $ 0.01  
Weighted-average number of common shares            
  Basic     169.7       168.1  
  Diluted     216.3       168.5  
                   
                   
                   
THOMPSON CREEK METALS COMPANY INC.  
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS  
(UNAUDITED)  
   
(in millions)   Three Months Ended March 31,  
    2013     2012  
OPERATING ACTIVITIES                
Net income   $ 0.9     $ 1.1  
Items not affecting cash:                
  Change in fair value of common stock purchase warrants     --       0.1  
  Depreciation, depletion and amortization     12.8       19.6  
  Accretion expense     0.8       0.5  
  Amortization of finance fees     --       0.7  
  Stock-based compensation     1.4       1.5  
  Product inventory write downs     4.7       8.3  
  Deferred income tax benefit     (6.7 )     (11.3 )
  Unrealized loss on derivative instruments     --       1.6  
  Unrealized foreign exchange loss (gain)     19.6       (5.1 )
  Change in working capital accounts     (18.2 )     (13.9 )
    Cash generated by operating activities     15.3       3.1  
INVESTING ACTIVITIES                
Capital expenditures     (155.1 )     (187.9 )
Capitalized interest payments     (7.9 )     --  
Restricted cash     11.4       2.7  
Reclamation (deposit) refund     (0.2 )     5.2  
  Cash used by investing activities     (151.8 )     (180.0 )
FINANCING ACTIVITIES                
Proceeds from the Gold Stream Arrangement     62.0       45.0  
Proceeds from sales leaseback transactions     27.3       --  
Down payment on capital lease transactions     (2.7 )     --  
Repayment of sale leaseback obligations     (1.0 )     --  
Repayment of capital lease obligations     (2.5 )     --  
Repayment of long-term debt     (3.9 )     (1.5 )
Proceeds from issuance of common shares, net     0.4       0.5  
  Cash generated by financing activities     79.6       44.0  
EFFECT OF EXCHANGE RATE CHANGES ON CASH     (0.6 )     1.1  
DECREASE IN CASH AND CASH EQUIVALENTS   $ (57.5 )     (131.8 )
Cash and cash equivalents, beginning of period   $ 526.8       294.5  
Cash and cash equivalents, end of period   $ 469.3     $ 162.7  
                 


For more information, please contact:

Pamela Solly
Director, Investor Relations and Corporate Responsibility
Thompson Creek Metals Company Inc.
Tel: (303) 762-3526
Email Contact

Christine Stewart
Renmark Financial Communications Inc.
Tel: (416) 644-2020
Email Contact

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Thompson Creek Metals Co Inc.

PRODUCTEUR
CODE : TCM.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Thompson Creek est une société de production minière d'or et de cuivre basée au Canada.

Thompson Creek est productrice d'or, de cuivre, de molybdène au Canada, en développement de projets de cuivre, de molybdène et d'or au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont ENDAKO et THOMPSON CREEK MINE au Canada, ses principaux projets en développement sont DAVIDSON (YORKE-HARDY) et MOUNT MILLIGAN au Canada et ses principaux projets en exploration sont MAZE LAKE, BERG et HOWARDS PASS au Canada.

Thompson Creek est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 149,3 millions CA$ (111,4 millions US$, 102,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 juillet 2011 à 9,88 CA$, et son plus bas niveau récent le 22 janvier 2016 à 0,16 CA$.

Thompson Creek possède 222 780 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Thompson Creek Metals Co Inc.
29/09/2007War Eagle - Financial Post article - Commodities boom extend...
Financements de Thompson Creek Metals Co Inc.
23/05/2011Announces Closing of its Senior Unsecured Notes Offering
Nominations de Thompson Creek Metals Co Inc.
17/09/2013mpany Announces Start Date for New Chief Executive Officer
08/08/2013mpany Announces Appointment of Jacques Perron as Chief Execu...
25/05/2011Promotes Scott Shellhaas to President
11/08/2010Appointment of General Counsel
11/08/2009Appointment of Chief Operating Officer
08/08/2008Announces Appointment of James L. Freer to Board of Director...
29/07/2008Announces Appointment of Chief Financial Officer
Rapports Financiers de Thompson Creek Metals Co Inc.
21/10/2013mpany Schedules Third Quarter 2013 Financial Results Confere...
11/07/2013mpany Schedules Second Quarter 2013 Financial Results Confer...
08/05/2013mpany Reports First Quarter 2013 Financial Results
17/04/2013mpany Schedules First Quarter 2013 Financial Results Confere...
25/02/2013mpany Reports Fourth Quarter and Full Year 2012 Financial Re...
28/01/2013mpany Schedules 2012 Financial Results Conference Call/Webca...
08/11/2012Reschedules Third Quarter 2012 Financial Results Conference ...
12/10/2011Schedules Third Quarter 2011 Financial Results Conference Ca...
09/08/2011Announces 2011 Second Quarter Revenue Up 28.6% to $190.9 Mil...
15/07/2011Schedules Second Quarter 2011 Financial Results Conference C...
14/07/2011Schedules Second Quarter 2011 Financial Results Conference ...
09/05/2011Announces Offering of Senior Unsecured Notes
06/04/2011Schedules First Quarter 2011 Financial Results Conference Ca...
25/02/2011Announces Record Production and Sales Volumes for Fiscal 201...
06/08/2010Reports significantly improved financial results for second ...
26/07/2010Schedules Conference Call/Webcast to Review Second Quarter 2...
05/05/2010First-Quarter 2010 Financial Results
22/04/2010Schedules First-Quarter 2010 Financial Results Conference Ca...
06/11/2009Third-quarter 2009 financial results and production and cost...
28/10/2009Schedules third-quarter 2009 financial results conference ca...
28/07/2009schedules second-quarter 2009 financial results conference c...
08/08/2008Announces Second-Quarter 2008 Financial Results
14/03/2008Announces 2007 Financial Results
Projets de Thompson Creek Metals Co Inc.
03/10/2012(Thompson Creek Mine)New Mine Plan at the Thompson Creek Mine Expected to Achieve...
15/12/2011Announces Royal Gold Increases Gold Stream Interest to Purch...
08/08/2011(Endako)mpany Inc. - Lawsuit Relating to Endako Expansion Project Di...
04/04/2011(Mount Milligan)Annouces Completion of $132 Million Equipment Financing
27/07/2010(Endako)Union Obtains Certification
19/08/2008Signs Option Agreement to Acquire Up to 75% of High-Grade Mo...
02/04/2008(Davidson (yorke-hardy)) Announces Davidson Deposit Feasibility Study
14/03/2008(Endako)Announces Approval for Endako Expansion
20/02/2008(Endako)Announces Revised 2008 Endako Production Guidance and 2007 P...
14/12/2007(Endako)Announces Changes to Production Estimates for 2007
Communiqués de Presse de Thompson Creek Metals Co Inc.
12/07/2016Thompson Creek Reports Second Quarter and Year-to-Date 2016 ...
05/07/2016Centerra Gold And Thompson Creek Announce Transformational B...
24/06/2016Thompson Creek Metals Company Announces Election of Director...
19/05/2016Thompson Creek Reports First Quarter 2016 Financial Results
14/01/2016Thompson Creek Announces Listing Change
14/01/2016Thompson Creek Reports 2015 Production Results and Announces...
28/11/2015Is Sotherly Hotels Inc (SOHO) A Good Stock To Buy?
15/10/2015Thompson Creek (TC) Posts Q3 Production & Sales Results
13/10/2015Thompson Creek Reports Third Quarter 2015 Production and Sal...
08/10/2015Why Thompson Creek Metals (TC) Could Be Positioned for a Slu...
07/08/2015Edited Transcript of TCM.TO earnings conference call or pres...
06/08/2015Thompson Creek misses Street 2Q forecasts
06/08/2015Thompson Creek Reports Second Quarter 2015 Financial Results
05/08/2015Why Thompson Creek Metals (TC) Might Surprise This Earnings ...
04/08/2015Will Thompson Creek (TC) Beat Earnings Estimates in Q2? - An...
16/07/2015Thompson Creek Schedules Second Quarter 2015 Financial Resul...
14/07/2015Thompson Creek Repurchases $34M of Senior Secured Notes - An...
13/07/2015Thompson Creek Announces Repurchase of $34 Million of 9.75% ...
13/07/2015Announces Repurchase of $34 Million of 9.75% Senior Secured ...
08/07/2015Thompson Creek Reports Second Quarter 2015 Production and Sa...
07/07/2015Thompson Creek Receives Continued Listing Standard Notice fr...
20/04/2015Royal Gold (RGLD) Issues Update on Mt. Milligan Mine - Analy...
13/04/2015Thompson Creek Schedules First Quarter 2015 Financial Result...
19/02/2015Thompson Creek Reports Significantly Improved 2014 Financial...
19/02/2015Reports Significantly Improved 2014 Financial Results Revenu...
06/02/2015Thompson Creek Schedules 2014 Financial Results Conference C...
19/01/2015Thompson Creek reports 2014 production results and announces...
12/01/2015Thompson Creek Schedules Conference Call/Webcast on January ...
10/12/2014Thompson Creek Metals Company to Place Endako Molybdenum Min...
09/12/2014Thompson Creek Metals Company Announces Change in Senior Man...
10/11/2014Thompson Creek Reports Significantly Improved Third Quarter ...
20/10/2014Thompson Creek Metals Company Schedules Third Quarter 2014 F...
14/10/2014Thompson Creek Metals Company Announces Third Quarter 2014 O...
05/08/2014Thompson Creek Metals Company Reports Increase in Second Qua...
21/07/2014Thompson Creek Metals Company Schedules Second Quarter 2014 ...
10/07/2014Thompson Creek Metals Company Announces Second Quarter 2014 ...
25/06/2014Thompson Creek Announces Results of Its Previously Announced...
23/06/2014Thompson Creek Announces Pricing Terms for Its Previously An...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
11/06/2014Thompson Creek Announces Extension and Amendment of Pricing ...
27/05/2014Thompson Creek Metals Company Announces Appointment of Anne ...
07/10/2013mpany Celebrates the Opening of Mt. Milligan With Dedication...
24/09/2013mpany Announces Copper-Gold Concentrate Production at Mt. Mi...
16/08/2013mpany Processes First Feed at Mt. Milligan Copper and Gold M...
22/01/2013mpany Approval of Deposition of Tailings at the Mt. Milligan...
13/09/2011(Endako)Announces Increased Reserves and Extended Mine Life for the ...
15/08/2011Announces Executive Promotions
09/05/2011Announces First Quarter 2011 Record Production of 10.3 Milli...
31/03/2011ANNOUNCES COMPLETION OF $132 MILLION EQUIPMENT FINANCING
15/07/2010Enters into agreement to acquire Terrane Metals Corp.
10/05/2010Election Of Carol T. Banducci To Board Of Directors
06/05/2010Annual General Meeting Webcast Notification - May 6, 2010
25/01/2010Confirms move to U.S. generally accepted accounting principl...
24/06/2009completion of stock option cancellation program
08/06/2009Changes to 2009 Operating Plans
05/06/2009Resignation of Chief Operating Officer
18/02/2009provides update on 2009 operating plans
27/01/2009Changes Production Guidance for 2009
05/12/2008Provides Update on Capital Expenditure Plans
25/09/2008announces normal course issuer bid
27/06/2008Completes Over-Allotment Option
05/06/2008Completes C$215,000,000 Financing
05/05/2008webcast Annual and Special Meeting of Shareholders on May 8 ...
11/12/2007Announces Changes to Board of Directors
26/11/2007Announces Revised Reserves and New 10-Year Mine Plan for Tho...
14/11/2007 Reports Slide at Endako Mine Affects Operations
15/10/2007(angl) Posts New Report On Expanded Uses Of Molybdenum In T...
10/08/2007Reports Net Income of US$56.8 Million or 51 Cents Per Share ...
10/07/2007Announces Revised Mine Life of 27 Years at Endako Molybdenum...
11/05/2007Elects Two New Directors And Changes Name To Thompson Creek ...
10/05/2007Reports Cash Flow From Operating Activities of US$105.1 Mill...
16/04/2007A New Measured And Indicated Resource Of 464 Million Pounds
11/04/2007New Report on 'Structural Changes in Molybdenum Demand'
27/03/2007Reports Cash Flow From Operating Activities Of US$75.4 Milli...
13/04/2006Reports grades up to 0,797% MoS2 from Davidson drilling:…
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (TCM.TO)FRANKFURT (A6R.F)
0,670+3.08%0,433-0.69%
TORONTO
CA$ 0,670
21/10 14:59 0,020
3,08%
Cours préc. Ouverture
0,650 0,650
Bas haut
0,650 0,670
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,670 -%
Volume var. 1 mois
192 028 -%
24hGold TrendPower© : 20
Produit Molybdenum
Développe Copper - Gold - Molybdenum
Recherche Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 30/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,24 AU$+0,76%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 +100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,06 US$+1,93%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX-4,68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+18,18%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,26 +6,10%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 +0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
14,59 +0,97%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,31 +3,33%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 -2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,20 +4,27%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
42,96 US$+0,23%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Sun Res.(Oil)SUR.AX
Released ASX Announcement: Quarterly Activities Report
0,00 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.