New gold zone returns up to 13g/t Au in auger drilling

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso | Copper | K Street | Niger |

New gold zone returns up to 13g/t Au in auger drilling

Microsoft Word - 150813_Mankarga5_SS

Press Release

17th June 2015

New gold zone returns up to 13g/t Au in auger drilling

Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to announce high-grade results from auger drilling from a new zone at its Tanlouka Gold Project, Burkina Faso.

Highlights

./ New gold zone (named M3) discovered 2km from proposed low-cost oxide starter project
./ High grade auger results up to 13g/t Au
./ Follow up RC drilling imminent
Managing Director Richard Hyde commented:
"Auger drilling has discovered a new zone less than 2km northwest from the proposed oxide starter pit. High-grade auger results up to 13g/t Au were returned, within an anomalous trend over 1.3km. The new zone, named M3, trends parallel to the M1 prospect. Follow-up RC drilling is planned to commence shortly.
"Infill auger drilling at the M2 prospect has also returned high-grade auger results up to 5g/t Au within a
1km east-west trend. Follow-up RC drilling is underway.
"Both of these areas are located close to the proposed starter pit, therefore any significant results from follow-up drilling has the potential to upgrade the economics of the oxide heap leach starter project."
Auger drilling at the Tanlouka Gold Project has delivered high-grade results 2km northwest of the M5
Mineral Resource and proposed oxide starter pit (Figure 1). Significant high-grade auger assays, with a peak result of 12,772 ppb Au (12.77g/t Au), were returned from a new zone 500m west of and parallel to the M1 prospect. Results occur over a 1.3km mineralised trend. Follow-up RC drilling is imminent.
Infill auger drilling was also completed over the historic M2 prospect. M2 is located 800m west of the southern end of the proposed starter pit. Recent mapping by WAF geologists indicate that mineralisation occurs over a 1km east-west arcuate zone within weathered diorite, coincident with historic artisanal workings. A peak of 5,280ppb Au (5.28g/t Au) was returned. Follow-up RC drilling is in progress.
Finally, auger drilling on the M1 trend was extended to the south to cover potential north-northwest structures intersecting the north-northeast M5 trend in the southern pit area (Figure 1). A peak result of
1,681ppb Au (1.68g/t Au) was returned adjacent to the proposed pit, along with a number of +50ppb samples.
The heavy rains have been hampering our current drilling programs on the project, however the
Company intends to complete first-pass drilling over the new areas before halting work. Follow-up

Principal Office: 14 Southbourne Street, Scarborough WA 6019, Western Australia

T: + 61 8 9481 7344 F: + 61 8 9481 7355 E: [email protected] www.westafricanresources.com ACN: 121 539 375

West African Resources Limited

drilling around the M1-M5 intersection is planned for October, following the wet season. Significant results from the auger drilling programs are presented below in Table 1 and shown in Figure 1.

Figure 1: Mankarga 1 & 5 Summary Plan

Table 1: Mankarga 1 Significant Results from Auger Drilling

Hole

From

To

Int

Au ppb

Au g/t

Dip

Azi

East

North

RL

Prospect

TLA3862

3

6

3

5.28

5,280

-90

0

741721

1336047

292

M2

TLA3935

3

6

3

0.62

616

-90

0

741386

1336341

299

M2

TLA3942

2

5

3

0.79

787

-90

0

741286

1336441

303

M2

TLA3995

2

5

3

0.52

522

-90

0

740868

1336512

308

M2

TLA4090

4

7

3

0.57

567

-90

0

740524

1337608

303

M3

TLA4160

5

8

3

12.77

12,772

-90

0

740701

1337361

306

M3

TLA4215

5

8

3

0.51

513

-90

0

740949

1337184

299

M3

TLA4242

5

8

3

0.60

596

-90

0

741002

1337096

298

M3

TLA4245

7

10

3

0.51

512

-90

0

740949

1337043

297

M3

TLA4348

4

7

3

1.68

1,681

-90

0

742081

1336344

291

MK1/5

The company is fully funded by Macquarie Bank (ASX, TSXV: 22/12/14) to complete a Feasibility Study for a heap leach starter project by Q3 of this year, which will incorporate any positive results from ongoing exploration programs. Follow-up RC drilling is in progress and results will be reported as they
are received by the company.

Page: 2

West African Resources Limited

2015 PFS Highlights

West African Resources Limited completed an updated Pre-Feasibility Study report for an oxide heap leach starter project on its Mankarga 5 Gold Project, Burkina Faso in May 2015 (ASX, TSXV: 15/5/15,
29/5/2015). It was prepared in accordance with the requirements of both the Australian 2012 JORC Code and Canadian NI 43-101. The report is filed on SEDAR and on the Company's website. A summary of the base case is stated below assuming a 100% project at a gold price of $1,300/oz. All amounts are in US dollars.
• Production of 69,000oz pa for first 3 years, 49,000oz pa for life of mine, 7 year life of mine
• Cash costs $428/oz for 3 years, $635/oz life of mine
• All-in cash costs of $538/oz for 3 years, $749/oz life of mine
• Pre-tax IRR of 63% with 14-month payback, post-tax IRR of 50% with 16-month payback
• Pre-tax cash flow of $146m, post-tax cash flow of $118m after initial and sustaining capital costs
• Pre-tax NPV5% of $117m, Post-tax NPV5% of $86m
• Probable Ore reserve of 440,000oz, life of mine strip ratio 2:1
• Potential to upgrade in-pit Inferred Resources currently treated as waste in mining schedule
• Nearby drill ready oxide targets with potential to add to the base case

Mankarga5 April 2015 Resource

Cut-off

Indicated Resource

Inferred Resource

(Au g/t)

Tonnes

Grade

Au Oz

Tonnes

Grade

Au Oz

Tonnes

(Au g/t)

Au Oz

Tonnes

(Au g/t)

Au Oz

Oxide

0.5

7,200,000

1.2

273,000

800,000

0.8

20,000

Oxide

1

3,100,000

1.8

180,000

200,000

1.2

7,000

Transitional

0.5

2,300,000

1.2

89,000

500,000

0.9

13,000

Transitional

1

1,000,000

1.9

60,000

200,000

1.3

6,000

Fresh

0.5

9,500,000

1.2

377,000

39,100,000

1.0

1,320,000

Fresh

1

4,200,000

1.9

256,000

14,800,000

1.6

778,000

Total

0.5

19,000,000

1.2

736,000

40,400,000

1.0

1,350,000

Total

1

8,400,000

1.8

495,000

15,200,000

1.6

791,000

Mankarga5 May 2015 Ore Reserve

Category

Strongly

Oxidised

Moderately

Oxidised

Transition

Fresh

Total

Category

Mt

Au g/t

Au

Mt

Au

g/t

Au

Mt

Au

Au

Mt

Au

Au

Mt

Au

Au

Category

Mt

Au g/t

koz

Mt

Au

g/t

koz

Mt

g/t

koz

Mt

g/t

koz

Mt

g/t

koz

Probable

3.0

1.10

96

5.4

1.04

183

1.3

1.46

63

1.5

2.11

98

11.2

1.22

440

Cautionary Note:

Mineral Resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral Page: 3

West African Resources Limited

resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied.
Production targets for the proposed heap leach starter project referred to in this announcement were first released to the ASX and TSXV on 23 February 2015. They are preliminary and there is no certainty that the production targets, or the forecast financial information derived from the production targets, will be realised. All material assumptions underpinning production targets or forecast financial information derived from production targets continue to apply and have not materially changed.

Competent Person's Statement

Information in this announcement that relates to exploration results, exploration targets or mineral resources is based on information compiled by Mr Richard Hyde, a Director, who is a Member of The Australian Institute of Mining and Metallurgy and Australian Institute of Geoscientists. Mr Hyde has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and a Qualified Person under National Instrument 43-101. Mr Hyde consents to the inclusion in this announcement of the statements based on his information in the form and context in which they appear.

Forward Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian and Australian securities legislation, including information relating to West African's future financial or operating performance may be deemed "forward looking". All statements in this news release, other than statements of historical fact, that address events or developments that West African expects to occur, are "forward-looking statements". Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "does not expect", "plans", "anticipates", "does not anticipate", "believes", "intends", "estimates", "projects", "potential", "scheduled", "forecast", "budget" and similar expressions, or that events or conditions "will", "would", "may", "could", "should" or "might" occur. All such forward-looking statements are based on the opinions and estimates of the relevant management as of the date such statements are made and are subject to important risk factors and uncertainties, many of which are beyond West African's ability to control or predict. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. In the case of West African, these facts include their anticipated operations in future periods, planned exploration and development of its properties, and plans related to its business and other matters that may occur in the future. This information relates to analyses and other information that is based on expectations of future performance and planned work programs. Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if a mineral property is developed.

Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation: exploration hazards and risks; risks related to exploration and development of natural resource properties; uncertainty in West African's ability to obtain funding; gold price fluctuations; recent market events and conditions; risks related to the uncertainty of mineral resource calculations and the inclusion of inferred mineral resources in economic estimation; risks related to governmental regulations; risks related to obtaining necessary licenses and permits; risks related to their business being subject to environmental laws and regulations; risks related to their mineral properties being subject to prior unregistered agreements, transfers, or claims and other defects in title; risks relating to competition from larger companies with greater financial and technical resources; risks relating to the inability to meet financial obligations under agreements to which they are a party; ability to recruit and retain qualified personnel; and risks related to their directors and officers becoming associated with other natural resource companies which may give rise to conflicts of interests. This list is not exhaustive of the factors that may affect West African's forward-looking information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those

described in the forward-looking information.

Page: 4

West African Resources Limited

West African's forward-looking information is based on the reasonable beliefs, expectations and opinions of their respective management on the date the statements are made and West African does not assume any obligation to update forward looking information if circumstances or management's beliefs, expectations or opinions change, except as required by law. For the reasons set forth above, investors should not place undue reliance on forward-looking information. For a complete discussion with respect to West African, please refer to West African's financial statements and related MD&A, all of which are filed on SEDAR at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Section 1: Sampling Techniques and Data

Criteria

JORC Code Explanation

Commentary

Sampling

Technique

Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as downhole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling

Include reference to measures taken to ensure sample representivity

and the appropriate calibration of any measurement tools or systems used. Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where 'industry standard' work has been done this would

be relatively simple (e.g. 'reverse circulation drilling was used to

obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

The M1, M2, M3 and M5 areas have been drilled by auger techniques. The drill spacing is being in- filled to a nominal 100m x 25m grid spacing on northwest-southeast, southwest-northeast or north-south lines. Samples are taken from a 3m composite at the end of hole. Hole depths range from 1 to 12m vertical depth.

Samples were despatched to BIGS in Ouagadougou for sample preparation, where they were crushed and dried to produce a sub sample for 0.5kg bottle roll analysis with AAS finish.

Drilling

Drill type (e.g. core, reverse circulation, open- hole hammer, rotary

air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc.).

Auger drilling was completed for geochemical

samples. Holes were vertical and drilled between 1m and 12m, with an average of 5.5m.

Drill Sample

Recovery

Method of recording and assessing core and chip sample recoveries

and results assessed.

Measures taken to maximise sample recovery and ensure

representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

Sample recoveries are not applicable to auger

drilling. Samples are only used for exploration purposes and are not used in resource estimation.

Logging

Whether core and chip samples have been geologically and

geotechnical logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean/Trench, channel, etc.) photography.

The total length and percentage of the relevant intersections logged.

Logging of auger chips are recorded lithology,

mineralogy, mineralisation, weathering, alteration, colour and other features of the samples.

Sub-Sampling

Technique and

Sample

Preparation

If core, whether cut or sawn and whether quarter, half or all core

taken. If non-core, whether riffled, tube sampled, rotary split, etc.

and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the

sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

Auger samples were collected on the rig using a

scoop. All samples were dry.

The sample preparation for all samples follows industry best practice. BIGS in Ouagadougou for sample preparation, where they were crushed and dried sub sample for analysis.

Field QC procedures involve the use of certified

reference material as assay standards and

blanks. The insertion rate of these averaged 1:20.

Page: 5

West African Resources Limited

Quality of Assay Data and Laboratory Tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (e.g. standards,

blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

The laboratory used a bottle roll for with an AAS

finish for gold analysis.

No geophysical tools were used to determine any

element concentrations used in this report. Laboratory QA/QC involves the use of internal lab standards using certified reference material, blanks, splits and duplicates as part of the in house procedures.

Certified reference materials, having a good range of values, were inserted blindly and randomly. Results highlight that sample assay values are accurate and that contamination has been contained.

Repeat or duplicate analysis for samples shows

that the precision of samples is within acceptable limits.

Sample preparation conducted and fire assay performed by BIGS SARL.

Verification of Sampling and Assaying

The verification of significant intersections by either independent or alternative company personnel.

The use of twinned holes The verification of significant

intersections by either independent or alternative company personnel.

Discuss any adjustment to assay data

WAF's QP R. Hyde has verified significant results from auger drilling.

Primary data was collected using a set of

company standard ExcelTM templates on ToughbookTM laptop computers using lookup codes. The information was validated on-site by the Company's database technicians and then merged and validated into a final Access TM database by the company's database manager.

Location of Data

points

Accuracy and quality of surveys used to locate drill holes (collar and

down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used Quality and adequacy of

topographic control

All drill holes have been located by DGPS in UTM

grid WGS84 Z30N.

No dh surveys are take for auger drilling.

DGPS was used for topographic control.

Data Spacing

and Distribution

Data spacing for reporting of Exploration Results

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

Whether sample compositing has been applied

The nominal drill hole spacing is 25m (northeast)

by 100m (northwest) which is appropriate for exploration purposes.

Orientation of Data in Relation to Geological Structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

Not relevant.

Sample Security

The measures taken to ensure sample security

Chain of custody is managed by WAF

Samples are stored on site and delivered by WAF personnel to BIGS Ouagadougou for sample preparation.

Whilst in storage, they are kept under guard in a

locked yard. Tracking sheets are used track the

progress of batches of samples

Audits or

reviews

The results of any audits or reviews of sampling techniques and

data.

WAF personnel and consultants have completed

numerous site visits and data reviews since acquiring the project in 2014. No material issues were noted. A technical reports are located on WAF's website.

Page: 6

West African Resources Limited

Section 2 Reporting of Exploration Results

Criteria

JORC Code Explanation

Commentary

Mineral Tenement and Land Tenure Status

Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of

reporting along with any known impediments to

obtaining a licence to operate in the area.

The Boulsa Project tenements covers over 3,700km2, granting the holders the right to explore for gold.

The tenements have been acquired by either direct grant to

WAF or its subsidiaries or by contractual agreements with tenement holders. Apart from the Tanlouka Agreement where Tanlouka SARL holds a 90% interest, all other vendor agreements provide WAF with the right to obtain an ultimate interest of 100%.

All licences, permits and claims are granted for gold. All fees have been paid, and the permits are valid and up to date with the Burkinabe authorities.

The payment of gross production royalties are provided for by the Mining Code and the amount of royalty to be paid for ranges from 3% ($1300).

Exploration Done by Other Parties

Acknowledgment and appraisal of exploration by other parties.

Very little exploration has been carried out over greater project the tenement prior to WAF's involvement which commenced in 2008, with the exception of the Tanlouka Permit. The area comprising the Tanlouka Permit has been held by Channel Resources Ltd since the early 1990's. Work recommenced in earnest on the Tanlouka Permit in 2010. WAF acquired Channel Resources Ltd on January 17th 2014. Available historic records and data were reviewed by both WAF during Due Diligence prior to the acquisition.

Geology

Deposit type, geological setting and style of

mineralisation.

The Boulsa Project straddles some 70km strike length of the

Manga-Sebba greenstone belt, which bifurcates and trends

northeast and east-northeast respectively from southern- central Burkina Faso into Niger over some 450km. The south- eastern portion of the project area covers the southern extension of the Fada N'Gourma Belt.

Lithologies comprise volcano-plutonic bodies including

amphibolised basalts with amphiboloschists, andesites and basalts, rhyolites and rhyodacites, brecciated tuffs, and gabbroic bodies including pyroxenite and serpentinite. Gold mineralisation in the project area is mesothermal orogenic in origin and structurally controlled. The project also contains shear hosted porphyry related copper-gold-molybdenum mineralisation on the Sartenga Permit which is believed to

be unique in West Africa."

Drill hole

Information

A summary of all information material to the

understanding of the exploration results including a

tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole

collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

Not relevant for auger drilling as holes are generally very

short and give an indication of mineralisation at depth and

will be followed-up with RC and diamond drilling in due course. None of the information in this release will be used to compile a Mineral Resource.

Data aggregation

methods

In reporting Exploration Results, weighting averaging

techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

All samples represent a 3m end of hole composite, where

possible.

Page: 7

West African Resources Limited

Relationship between mineralisation widths and intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to

the drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are

reported, there should be a clear statement to this effect (e.g. 'down hole length, true width not known').

The orientation of the mineralised zone has been inferred from geophysical and geological interpretation.

Diagrams

Appropriate maps and sections (with scales) and

tabulations of intercepts should be included for any

significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

The appropriate plans and sections have been included in

the body of this document.

Balanced reporting

Where comprehensive reporting of all Exploration

Results is not practicable, representative reporting of

both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

Not applicable to reporting of auger results.

Other substantive

exploration data

Other exploration data, if meaningful and material,

should be reported including (but not limited to):

geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

Preliminary metallurgical test work has been completed,

with excellent results. Gold recoveries exceed 95% from

oxide bottle roll tests, exceed 92% for sulphide bottle roll tests and a significant proportion of the gold is recoverable by gravity concentration. Additional metallurgical test work is being completed.

Further work

The nature and scale of planned further work (e.g.

tests for lateral extensions or depth extensions or

large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible

extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

Follow-up drilling is planned and is ongoing, aimed at

defining the source of the anomalies discussed in this report.

A figure showing proposed work programs is included in the body of this report.

Page: 8

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Burkina Faso | Niger | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Niger | Tous

West African Resources Ltd.

EXPLORATEUR
CODE : WAF.AX
ISIN : AU000000WAF6
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

West African Resources est une société d’exploration minière basée en Australie.

Ses principaux projets en exploration sont MARANDET au Niger et BOULSA au Burkina Faso.

West African Resources est cotée en Australie. Sa capitalisation boursière aujourd'hui est 648,9 millions AU$ (414,2 millions US$, 389,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 26 février 2016 à 0,05 AU$, et son plus haut niveau récent le 19 novembre 2021 à 1,47 AU$.

West African Resources possède 484 249 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de West African Resources Ltd.
25/07/2016in The Australian
Financements de West African Resources Ltd.
18/08/2016Issue of securities
18/08/2016ISSUE OF SECURITIES WITHOUT A DISCLOSURE DOCUMENT
25/03/2011$7 Million Capital RaisingUser-Agent: ExpressionEngine 1.6.9
Nominations de West African Resources Ltd.
28/02/2014Appointment of Colin Jones as Non-Executive Director
Rapports Financiers de West African Resources Ltd.
31/10/2016Quarterly Activities and Cashflow Report
29/07/2016June 2016 Quarterly Activities Report
02/05/2016March 2016 Quarterly Activities Report
14/02/2016December 2015 Quarter Interim Financial Report
Projets de West African Resources Ltd.
14/09/2016hits 10m at 18.33g/t Au including 1m at 165.14g/t at M1 Sout...
01/08/2016(Tanlouka)Upgrades Mineral Resources as at Tanlouka
01/02/2016West African hits 19m at 1.9g/t Au from 40m, including 3m at...
15/10/2015West African commences drilling at M3 gold discovery
16/08/2015New gold zone returns up to 13g/t Au in auger drilling
18/06/2015Outstanding results at Mankarga 1 prospect – Up to 4g/t Au i...
19/02/2014Acquires Heap Leach Plant Targeting Gold Production 2015
20/01/2014Completes Acquisition of Channel Resources
13/12/2013Channel Receives Final Court Approval for Arrangement With W...
26/09/2013Channel Resources and West African Resources
18/05/2011Further high-grade results at MokteduUser-Agent: ExpressionE...
20/03/2011New high grade gold discoveryUser-Agent: ExpressionEngine 1....
Communiqués de Presse de West African Resources Ltd.
31/07/2017June 2017 Quarterly Activities and Cashflow Report
25/08/2016West African Resources Repays US$5m Loan Facility
01/08/2016West African Upgrades Mineral Resources as at Tanlouka
27/07/2016West African hits 41m at 2.2 g/t Au including 8m at 5.7 g/t ...
20/07/2016Clarus Securities initiates coverage on West African Resourc...
17/07/2016West African hits 1107g/t Au at M1 South
16/06/2016West African hits visible gold at 175m, confirms depth poten...
13/05/2016March 2016 Quarter Interim Financial Report
13/05/2016March 2016 Quarter Management Discussion & Analysis
11/05/2016West African hits 14m at 8.7g/t Au from 75m including 1m at ...
05/05/2016West African hits 6m at 9.2g/t Au from 15m at M1 South
26/04/2016Notice of General Meeting/Proxy Form
26/04/2016Section 708 Notice
20/04/2016West African hits 9m at 9.7g/t Au from 112m, including 1m at...
13/04/2016Trading Halt
05/04/2016West African hits 96.3g/t Au at M1 North
23/12/2015Becoming a substantial holder for WAF
21/12/2015Preliminary metallurgical recoveries average 97.5% at M1 and...
14/12/201515m at 1.2g/t Au including 7m at 2.2g/t Au from 4m at M3
30/09/2015Management Discussion & Analysis
30/09/2015Annual Report
18/09/2015Company Update
01/09/2015Final Director’s Interest Notice x 2
31/07/2015June Quarterly Activities Report
17/06/2015West African extends M5 by 1.5km, up to 0.63g/t Au in Auger
06/10/2014West African Resources Limited 72m at 2.2 g/t Au Including 7...
19/08/2014West African Resources Limited 15m at 5.9 g/t Au including 5...
12/08/2014West African Resources Limited Finds Extension of Mankarga 5...
06/08/2014West African Resources Limited West African Oxide Drilling 2...
06/12/2013Acquisition by West African Resources Approved
14/08/2013Letter of Intent for the Acquisition of Channel Resources by...
09/10/2012Hartleys initiates coverage on West African Resources (ASX: ...
29/07/2011June 2011 Quarterly ReportUser-Agent: ExpressionEngine 1.6.9
27/04/2011March 2011 Quarterly ReportUser-Agent: ExpressionEngine 1.6....
31/01/2011December 2010 Quarterly ReportUser-Agent: ExpressionEngine 1...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (WAF.AX)
1,34+1.13%
AUSTRALIA
AU$ 1,34
19/04 13:53 0,020
1,13%
Cours préc. Ouverture
1,33 1,30
Bas haut
1,30 1,35
Année b/h Var. YTD
0,830 -  1,42 36,73%
52 sem. b/h var. 52 sem.
0,665 -  1,42 32,02%
Volume var. 1 mois
2 836 674 31,37%
24hGold TrendPower© : 9
Produit
Développe
Recherche Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202456,73%
2023-27,23%1,220,77
2022-10,98%1,440,96
202126,32%1,470,72
2020143,02%1,230,40
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,94 AU$+3,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :