Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Golden Dawn Minerals Inc.

Publié le 23 janvier 2012

News Release

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |
Email not displaying correctly? View it in your browser.


GOLDEN DAWN MINERALS INC.
 
TSX-V:    GOM
FRANKFURT EXCHANGE:     3G8
NEWS RELEASE
 
GOLDEN DAWN ANNOUNCES EXPLORATION AND BULK SAMPLING INTENTIONS ON ITS GREENWOOD PROJECT, BRITISH COLUMBIA, CANADA
 
Vancouver, January 23rd, 2012 � Golden Dawn Minerals Inc. (TSX-V: GOM; FRANKFURT: 3G8)(the �Company� or �Golden Dawn�) is pleased to announce exploration and bulk sampling intentions on its Greenwood Project, Greenwood Mining District, British Columbia.
 
PROJECT SUMMARY
The Greenwood Project comprises exploration on the Company�s Boundary Falls, Wild Rose and Tam O�Shanter Properties, which are contiguous to each other and cover an area of 3,000 ha. The Boundary Falls Property hosts the historic underground May Mac Mine and the Wild Rose Mine is located on the contiguous Wild Rose Property 2 km to the north.  Proposed future work for the Project consists of:
(i)                  rehabilitation of number 6 and 7 adits on the May Mac Mine and production after evaluation (drilling), and bulk sampling from the mine;
(ii)                evaluation (drilling), bulk sampling and preparation for mining of the nearby Wild Rose vein system that has previously been explored by underground workings but not developed. The Wild Rose Mine and adits are located 2 km north of the May Mac Mine;
(iii)               continuation of diamond drilling and a revised resource study on the Tam O� Shanter and Wild Rose Properties extending the Deadwood low grade bulk tonnage style gold- copper deposit, where a 279,600 ounces (oz) inferred resource has been reported by the Company grading 0.45 grams per tonne (g/t) gold (Au) with a cutoff grade of 0.3 g/t gold; and.
(v)              continuing exploration (diamond drilling) on the nearby Royal Attwood project, where the company has conducted a Titan 24 survey and extensive ground work to delineate several high priority drill targets.
 
The initial objective is to commence mining at both mines on the Greenwood Project sites with processing to be carried out through the Golden Crown mill located 15 km  by road east of the site or alternatively, through the on-site fully permitted May Mac mill and tailings pond. Both the May Mac mill and tailings pond require rehabilitation work.
 BACKGROUND: HISTORIC MAY MAC AND WILD ROSE MINES
MAY MAC MINE
The May Mac mine is located 3 km west of Greenwood, British Columbia in the Boundary District, Greenwood Mining Division, British Columbia, Canada. According to the Paxton report, 1994, the following records have been gleaned from the old Minister of Mines Reports for BC 1904 to 1984. In 1903 -1904 Republic Gold Mines shipped 37 tonnes of ore with a grade of 10.25 ounces per tonne (oz/t)) or 318.86 grams per tonne (g/t) gold. In 1904 to 1937 there was an intermittent production totaling 807 tonnes with an average grade of 110.23 oz/t or 3,428 g/t silver (Ag). In 1962 to 1964 Skomac Mines Ltd. shipped 608 tonnes of ore with an average grade of 0.044 oz/ton or 1.37 g/t  gold and 5.96 oz/t or 185.5 g/t silver. In 1975, stoping above Level 6 in the A and AA Zones, produced 433 tonnes of ore with an average grade of 0.154 oz/t or 4.8 g/t gold and 22.37 oz/t or 696 g/t silver. In 1976, stoping on Level 6 in the B and C  Zones produced 548 tonnes of ore with an average grade of 0.077 oz/t or 2.4 g/t gold and 13.01 oz/t or 404.6 g/t  silver. In 1983, 1,725 tonnes of new ore were mined. This produced 99 tonnes of concentrate containing 45 oz or 1,399.5 g of gold and 6,405 oz or 199,195 g of silver plus lead and zinc. (All numbers are expressed in metric units).
The mine has been inactive since 1982 but has been on care and maintenance with access roads and the processing facilities preserved.
 WILD ROSE MINE
The Wild Rose vein system, lying 2 km north of the May Mac Mine, was discovered pre-1900 with minor production from a shallow shaft on the discovery.  Development by a modern 300 meter underground exploration adit was undertaken in 1995, which resulted in the discovery of a second parallel vein denoted the Wildcat vein with assays of 0.352 oz/t or 12.07 g/t and 2.2% copper over more than 1 meter and with assays up to 0.858 oz/t or 29.14 g/t gold and 5.2% copper (Linda Caron, 2006). Previous drilling in this area, combined with a series of recent drill hole intersections in the vicinity of the vein systems has determined a substantial strike extent potential for these veins, plus a potential for several other veins in the target area.  The veins measure in the order of 1-3 meters in width with good values of gold and copper.
PROJECT PROPOSAL
The Project will focus on rehabilitation of the underground workings at both the May Mac and Wild Rose historic mines leading to bulk sampling and drilling. If the results of the bulk sampling and drilling are positive, the project will proceed with eventual underground mining.
The project will consist of preparation for mining, and the mining of gold, silver and base metal-bearing material from the May Mac and the Wild Rose vein systems and the milling or sale of the production. The potential target resource is 75,000 to 125,000 tonnes grading 2 to 5 g/t gold and 342 to 684 g/t (10-20) oz/t silver at the May Mac Mine and 75,000 to 125,000 tonnes grading 5 to12 g/t gold and 0.5 to 5% copper at the Wild Rose Mine. The reader is cautioned that these are exploration target objectives, they are conceptual in nature, and that there are no known mineral reserves or resources on the Boundary Falls Property on which the May Mac Mine is located.  An inferred mineral resource of 279,600 oz of gold contained in 19.4 million tonnes of material grading 0.45 g/t gold with a lower cutoff of 0.3 g/t  has been reported by the Company from the Deadwood Gold Zone located mainly west and North-West of the Wild Rose Mine portal on the Wild Rose property (which includes the Wild Rose vein system) and extending to the contiguous Tam O� Shanter Property. The conceptual target for this bulk tonnage style deposit is 1-3 million oz of gold grading 0.5 to 0.7 g/t gold and 2 to 4 pounds of copper per tonne. However, there can be no assurance that a bulk tonnage resource of this grade and size will be identified or will become a mineral reserve that could be economically mined.
The drilling of the bulk tonnage style low grade Deadwood Gold Deposit has resulted in the identification of a number of higher grade vein and stockwork gold-silver intercepts.  These intercepts are interpreted to be part of a laterally more extensive vein zone that includes the Wild Rose vein system.  The May Mac vein system may represent another similar en echelon repetition of the laterally extensive Wild Rose vein system.
FUTURE DEVELOPMENT PLANS
For the May Mac Mine, the initial program will consist of rehabilitation of the Number 6 and Number 7 levels of the mine.  This mine was developed on 4 levels with underground tracking, with stoping proceeding upward from each level and with diamond drilling guiding the development drifting.  Limited funding at the time of the historic development of this mine led to  falling short of projected target zones which may contain substantially more tonnage of better grade material, and the then low commodity prices prevented development of portions of the vein that had been already accessed.
The Number 7 adit has a 50 meter portion of the vein, initially bypassed, situated close to the portal, and may contain mineralized material that can be extracted after the rehabilitation of the adit. Historic sampling of this undeveloped vein yielded assays of 12 g/t gold and copper values which were undisclosed.
Drifting of 60 meters from the face on the Number 7 Level will penetrate the target AA Zone, and allow drifting on the AA Zone and development of stopes between this level and the overhead Number 6 Level. An initial 10,000 tonne bulk sample will be collected from these target zones.  Once this is completed, the conceptual target of 75,000 to 125,000 tonnes grading 2 to 5  g/t gold and 342 to 684 g/t (10 to 20 oz/t) silver plus base metal credits will be extended within these two levels of the May Mac Mine.
For the Wild Rose Mine, preparation for this area by trackless underground  exploitation utilizing scoop trams, will proceed with two target objectives, namely the Wild Rose vein system projected to lie 8 meters beyond the face of the current exploration adit, and the Wild Cat vein system intersected by the adit as a discovery during the development. Both veins have numerous high grade drill hole intersections indicating a potential strike length of the vein system of at least 750 meters to the north and northwest. Drifting on both of these veins will proceed with the removal of a 10,000 tonne bulk sample initially, followed by continued production when permitting of full scale production from this mine is completed.
Additional veins are anticipated within the series of drill hole intersections located north and northwest of the Wild Rose vein system projections.  A major vein swarm is possible in this area, presenting an attractive exploration target. 
The reader is cautioned that no feasibility study has been conducted on these mines or on the inferred resource at the Deadwood Gold Zone.  There has not been a mineral reserve or mineral resource established for either the May Mac or the Wild Rose Mine. There can be no assurance that the conceptual exploration targets will become mineral reserves or that they may be economically mined.   The proposed programs will result in continued compilation of exploration data that may lead to a mineral reserve in the future.
The Company is currently in negotiations with Peruvian mining contractors who have the expertise to mine high-grade underground vein systems.
The information in this document has been reviewed and verified by Mike Dufresne, M.Sc., P.Geol. of APEX Geoscience Ltd., a Qualified Person. The program will be supervised by Mr. Dufresne.
 On behalf of the Board of Directors:
GOLDEN DAWN MINERALS INC.
­­­­­­­­­�Wolf Wiese�
­­­­Wolf Wiese
ChiefExecutive Officer
 
 
For further information, please contact:
Mike Poulin                                                    
Investor Relations
604-630-6793                                     
mike@goldendawnminerals.com                  
THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS. NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. THIS DOCUMENT CONTAINS CERTAIN FORWARD LOOKING STATEMENTS WHICH INVOLVE KNOWN AND UNKNOWN RISKS, DELAYS, AND UNCERTAINTIES NOT UNDER THE COMPANY�S CONTROL WHICH MAY CAUSE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANYTO BE MATERIALLY DIFFERENT FROM THE RESULTS, PERFORMANCE, OR ACHIEVEMENTS IMPLIED 

 
 

You are receiving this email because you a) are a shareholder b) have signed up on our website to receive updates. If we have mistakenly sent you an email without your permission, please click the unsubscribe button to be removed from our contact list.

.com from this list | Forward to a friend | Update your profile
Our mailing address is:
Golden Dawn Minerals
575 1111 West Hastings Street
Vancouver, BC V6E 2J3

Add us to your address book

Copyright (C) 2012 Golden Dawn Minerals All rights reserved.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Golden Dawn Minerals Inc.

EXPLORATEUR
CODE : GOM.V
ISIN : CA3808956070
CUSIP : 380895 10 2
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Golden Dawn est une société d’exploration minière d'or basée au Canada.

Golden Dawn détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont TAM O'SHANTER, CENTRAL CATHARINE, 80 FOOT FALL, LINK-CATHARINE et WILD ROSE BC au Canada.

Golden Dawn est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,4 millions US$, 2,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 27 mai 2011 à 2,85 CA$, et son plus bas niveau récent le 17 octobre 2014 à 0,01 CA$.

Golden Dawn possède 101 870 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Golden Dawn Minerals Inc.
08/05/2013Announcing Proposed Private Placement
04/04/2013Private Placement of $66,810
08/01/2013Private Placement of $ 162,156
06/11/2012Closing of Private Placement of $140,500
Nominations de Golden Dawn Minerals Inc.
19/12/2013Results of AGM - Appointment of New Director
15/02/2011Announces New Appointment to Board
Projets de Golden Dawn Minerals Inc.
25/01/2016Golden Dawn reports final results of 2015 drilling at May-Ma...
11/12/2012Receives Updated Inferred Mineral Resource for Deadwood Gold...
25/01/2012Announces Exploration & Bulk Sampling Intentions on its Gree...
01/09/2011Announces Drilling Program on Boundary Falls
19/08/2011Announces Drilling Program on Wild Rose, Tam O'Shanter
04/08/2011and Nass Valley Gateway Announce NI 43-101
13/07/2011Receives Technical Report for NI 43-101
26/05/2011Receives Initial Mineral Resource Estimate
02/05/2011Renews Mine Evaluation at May Mac Mine
21/04/2011Schedules Resource Calculation
04/04/2011Intersects 127m Grading 0.43 g/t Gold
Communiqués de Presse de Golden Dawn Minerals Inc.
02/06/2016Golden Dawn Minerals Inc. Appoints New Executive Director & ...
12/05/2016Golden Dawn Drilling Intersects Gold And Silver Values Below...
25/04/2016Golden Dawn Completes Second Of Three Phases Of Huakan Green...
13/04/2016Golden Dawn Reports Positive Preliminary Economic Assessment...
13/04/2016Golden Dawn Signs Option Agreement With Huakan And Solicits ...
18/12/2015Closing of the Second Tranche of the Company’s Private Place...
18/12/2015Golden Dawn Minerals Inc.: Closing of the Second Tranche of ...
17/12/2015Golden Dawn Confirms Mineralized Zone Extends Below #6 And #...
23/11/2015IIROC Trading Resumption - GOM
23/11/2015Golden Dawn Drilling Intersects Mineralized Zone from #6 to ...
23/11/2015IIROC Trading Halt - GOM
22/10/2015Golden Dawn Minerals Inc. Assays Rock Channel Samples at 529...
15/10/2015GOLDEN DAWN MINERALS INC. STARTS DRILLING AT GREENWOOD PRECI...
14/10/2015Completion of the Financing for $268,147.40
13/10/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
01/10/2015GOLDEN DAWN MINERALS INC. SAMPLES 12.97 G/T GOLD OVER 0.87 M...
24/09/2015GOLDEN DAWN MINERALS INC. APPOINTS DR MATHEW BALL TO MANAGE ...
24/09/2015Golden Dawn Minerals Inc. Appoints Dr. Mathew Ball to Manage...
12/09/2015Golden Dawn Minerals Inc. Drops Tam O’Shanter Property
12/09/2015Golden Dawn Minerals Inc. Drops Tam O'Shanter Property
08/09/2015Golden Dawn Minerals Inc. Appoints a New German Director
02/09/2015Golden Dawn Minerals Inc. Upgrades Its Current Frankfurt Lis...
15/08/2015Completion of the Financing for $207,600
14/08/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
17/07/2015Golden Dawn Minerals Inc. Options Tam O'Shanter Property fro...
08/07/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
13/06/2015Closing of the First Tranche of the Company’s Non-Brokered P...
13/06/2015Golden Dawn Provides Update for Greenwood Exploration and Bu...
13/04/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
13/04/2015Golden Dawn Minerals Inc. Granted Stock Options
02/04/2015Golden Dawn Minerals Inc. Granted Stock Options
26/03/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
11/03/2015Closing of Private Placement
06/03/2015Company Update
05/02/2015Golden Dawn Announces Development Of Greenwood Project, Brit...
09/01/2015Final Tranche Closing of Private Placement
30/12/2014Closing the Private Placement of $ 65,250
28/10/2014Golden Dawn Announces Private Placement to Existing Sharehol...
17/04/2014Golden Dawn Drops Tam O' Shanter Property
04/04/2014Golden Dawn Announces the Resignation of Director
07/01/2014Announces Consolidation
12/06/2013News Release
14/03/2013Purchases the Boundary Falls Property Hosting the May Mac Mi...
29/01/2013Files National Instrument 43-101 Technical Report For Update...
11/12/2012News Release
02/10/2012News Release
02/10/2012s Exploration and Sampling Schedules for Greenwood Project W...
30/05/2012News Release
29/05/2012News Release
14/05/2012News Release
22/03/2012News Release
23/01/2012News Release
24/10/2011News Release
24/10/2011News Release
23/09/2011signs with Lichtfield
10/05/2011Schedules Drilling on Royal Attwood
09/05/2011s from Golden Dawn
09/05/2011SCHEDULES DRILLING OF MULTIPLE PRIORITY TITAN 24 GEOPHYSICAL...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GOM.V)FRANKFURT (3G8.F)
0,030+0.00%0,029+0.00%
TSX-V
CA$ 0,030
14/10 10:30 -
0%
Cours préc. Ouverture
0,030 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,030 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 25
Produit
Développe
Recherche Copper - Gold - Nickel - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-80,00%0,210,03
20213,45%0,310,11
202026,09%0,200,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,94 US$-1,53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,39 CA$-3,24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,28 CA$+0,23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,76 CA$-1,68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,00 US$-1,07%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :