Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Niogold Mining Corp

Publié le 27 octobre 2015

NioGold cuts 3.54 g/t Au over 15.2 metres at Marban

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |

NioGold cuts 3.54 g/t Au over 15.2 metres at Marban

October 27, 2015

Val-d'Or, Quebec -- NioGold Mining Corp. (TSX-V: NOX) (OTCQX: NOXGF) ('NioGold') is pleased to release the results of thirty (30) new diamond drill holes of its resource definition program on the modelled open pit shell of the Marban deposit, located on NioGold's 100% owned Marban Block property in the Malartic Gold camp, Abitibi District, Quebec.

Drilling highlights from this set of holes include:

  • 19.82 g/t Au over 1.0 m and 20.09 g/t Au over 1.1 m in drill hole MB-15-491 at 75 m and 155 m vertical depth respectively.
  • 2.44 g/t Au over 10.5 m in drill hole MB-15-494 at 210 m vertical depth.
  • 1.57 g/t Au over 22.4 m in drill hole MB-15-496 at 260 m vertical depth.
  • 1.22 g/t Au over 22.4 m in drill hole MB-15-501 at 40 m vertical depth.
  • 2.06 g/t Au over 13.2 m in drill hole MB-15-506 at 210 m vertical depth.
  • 29.43 g/t Au over 1.2 m and 1.87 g/t Au over 16.4 m in drill hole MB-15-514 at 30 m and 150m vertical depth respectively.
  • 3.54 g/t Au over 15.2 m and 2.25 g/t Au over 14.2 m in drill hole MB-15-517 at 210 m and 245 m vertical depth respectively.

These thirty new holes total 7,021 metres. So far, a total of 179 drill holes for a cumulative length of 52,526 meters have been released. A final press release will disclose remaining results within two weeks time.

The drilling campaign ended on August 13 with a total of 72,661 metres drilled, distributed in 246 holes and one extension of a hole from a previous campaign. An update of the geological interpretation is underway in view of the next resource estimate.

Results from holes MB-15-491 to MB-15-520 are summarized in the table below. The intercepts labelled 'New' should allow for the definition of new lenses:

Hole Easting1 (m) Northing1 (m) Azimuth Dip Hole Length (m) From (m) To (m) Length (m) Grade (g/t Au) Zone
MB-15-491 4450 3817 181° -60° 359 87.8 88.8 1.0 19.82 Lense
176.4 177.5 1.1 20.09 P
MB-15-492 4449 3769 182° -59° 189 44.0 48.6 4.6 1.27 E
MB-15-493 4449 3718 179° -59° 159 135.9 137.1 1.2 1.93 New
MB-15-494 4298 4118 179° -74° 360 218.7 229.2 10.5 2.44 E-2
incl 221.6 222.8 1.2 10.32 2
MB-15-495 4299 4089 180° -64° 474 347.7 355.6 7.9 1.92 C1
MB-15-496 4298 4020 178° -59° 411 288.8 311.6 22.8 1.57 C-A
incl 310.1 311.6 1.5 9.88 A
361.0 381.4 20.4 1.08 T
MB-15-497 4248 3722 178° -52° 141 122.2 123.4 1.2 0.72 New
MB-15-498 4200 3773 182° -65° 189 98.4 101.2 2.8 2.10 C
MB-15-499 4099 3743 180° -55° 132 36.2 37.4 1.2 0.61 T
MB-15-500 4048 3729 178° -50° 81 56.6 57.8 1.2 16.45 New
MB-15-501 3998 3776 179° -50° 120 41.2 63.6 22.4 1.22 T
MB-15-502 3949 3783 180° -45° 117 34.0 37.8 3.8 3.13 T
MB-15-503 3900 3788 179° -45° 82 24.7 29.4 4.7 3.08 T
MB-15-504 4400 4007 183° -47° 420 316.0 334.0 18.0 0.99 P-M
MB-15-505 4274 4092 183° -50° 438 326.0 326.9 0.9 14.17 C
MB-15-506 4079 4135 178° -50° 401 279.6 292.8 13.2 2.06 D
353.1 362.0 8.9 1.92 A
MB-15-507 3772 3850 182° -50° 111 44.7 47.8 3.1 1.01 C
MB-15-508 3624 3870 179° -50° 111 33.0 43.2 10.2 0.83 E
MB-15-509 3625 3933 179° -51° 150 88.7 97.1 8.4 2.16 E
MB-15-510 3573 3930 178° -45° 147 76.2 85.8 9.6 1.13 C
MB-15-511 3524 4137 180° -50° 189 167.8 170.2 2.4 1.34 Z
MB-15-512 3524 4065 177° -50° 150 132.1 134.6 2.5 1.01 Z
MB-15-513 3475 4126 178° -45° 152 145.4 147.8 2.4 1.34 Z
MB-15-514 4326 3846 180° -47° 270 42.0 43.2 1.2 29.43 New
177.3 178.1 0.8 17.65 C
192.0 208.4 16.4 1.87 T
MB-15-515 4223 3802 177° -50° 192 128.4 142.8 14.4 1.36 C
MB-15-516 4224 3785 -70° 420 223.2 225.6 2.4 8.72 New
249.0 258.0 9.0 1.54 A
264.0 275.0 11.0 1.03 A
MB-15-517 4249 4023 179° -55° 402 251.6 266.8 15.2 3.54 C
incl 254.0 255.2 1.2 21.36 C
290.4 304.6 14.2 2.25 A
incl 302.0 303.3 1.3 14.91 A
MB-15-518 4122 3811 179° -50° 150 96.7 104.5 7.8 1.40 C
MB-15-519 3525 4238 180° -45° 222 116.0 117.2 1.2 1.84 New
MB-15-520 3917 4006 181° -46° 282 252.7 256.0 3.3 2.95 New

1: Marban grid.

A map showing the location of the best results is available at:

Marban Block Best Results

A longitudinal showing the new best results obtained on the Marban deposit is available at:

Marban Deposit Longitudinal Section

Technical Info. QA/QC and Qualified Persons

Drill orientations are roughly perpendicular to dip of mineralized zones and true widths of mineralized zones represent minimum 90% of reported core intervals.

Diamond drill holes were drilled with NQ-size core, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed and delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photo-graphed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to Actlabs in Ste-Germaine Boulé, Québec, which is an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 3 g/t Au by fire-assay using a gravimetric finish. As well, pulps grading above 0.5 g/t Au or mineralized intervals are sent to a second laboratory for check assaying.

Drill program design and monitoring, core logging and sample preparation are being executed at NioGold's facilities in Val d'Or, under the supervision of Yan Ducharme. M.Sc., P.Geo. (OGQ). NioGold's Vice-President Exploration and a Qualified Person as defined by National Instrument 43-101. QA/QC program utilized is consistent with NI 43-101 and industry best practice standards. This news release was prepared by Mr. Ducharme.

NioGold Mining Corp. - « On Canada's Golden Highway »

NioGold Mining Corp. is a mineral exploration and development company focused on gold. The Company's projects are located in the heart of Québec's prolific Abitibi gold mining district. The Cadillac, Malartic and Val-d'Or mining camps in this district have produced over 45 million ounces of gold since the 1930's and presently encompass six producing gold mines, including the prolific Canadian Malartic mine located adjacent to NioGold's flagship Marban project. NioGold's land holdings within the Abitibi presently cover 125km2 and encompass seven former gold producers, notably the Norlartic, Kierens, Marban and Malartic Hygrade mines that collectively produced 630,000 ounces of gold.

NioGold's experienced and qualified technical team are overseeing the advancement of these projects, targeting expansion of the resource base and reserve definition of the Marban Block project.

NioGold invites you to visit the company website at www.niogold.com.

For information on NioGold Mining Corp. contact:

Michael A. Iverson,
[email protected]
Tel: (604) 856-9887

Dale Paruk
[email protected]
Tel: (604) 510-4505
Toll-free: (877) 642-6200

Louis Baribeau
[email protected]
Tel: (514) 667-2304

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

FORWARD-LOOKING STATEMENTS

This news release includes 'forward looking statements', as that term is defined in Section 27A of the Unites States Securities Act of 1933, as amended, and Section 21E of the United States Exchange Act of 1934, as amended, that are subject to assumptions, risks and uncertainties. Statements in this news release which are not purely historical are forward looking statements, including without limitation any statements concerning the Company's intentions, plans, estimates, expectations or beliefs regarding the future. Although the Company believes that any forward looking statements in this news release are reasonable, there can be no assurance that any such forward looking statements will prove to be accurate. The Company cautions readers that all forward looking statements, including without limitation those relating to the Company's future operations and business prospects, are based on assumptions none of which can be assured, and are subject to certain risks and uncertainties that could cause actual events or results to differ materially from those indicated in the forward looking statements. Readers are advised to rely on their own evaluation of such risks and uncertainties and should not place undue reliance on forward looking statements.

Any forward looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward looking statements, or to update the reasons why actual events or results could or do differ from those projected in the forward looking statements. Except as required by law, the Company assumes no obligation to update any forward looking statements, whether as a result of new information, future events or otherwise.

CAUTIONARY NOTE TO U.S. INVESTORS

The United States Securities and Exchange Commission (the 'SEC') permits U.S. mining companies, in their filings with the SEC. to disclose only those mineral deposits that a company can economically and legally extract or produce. The Company may use certain terms in this news release, such as 'measured resources', 'indicated resources' and 'inferred resources'. which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. The news release may contain information about adjacent properties on which the Company has no right to explore or mine. U.S. investors are cautioned that mineral deposits on adjacent properties may not be indicative of mineral deposits on the Company's properties.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Niogold Mining Corp

EXPLORATEUR
CODE : NOX.V
ISIN : CA6544851018
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Niogold est une société d’exploration minière d'or basée au Canada.

Niogold détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont MALARTIC BLOCK, CAMFLO WEST, KIERENS, LE TAC, MARBAN MINE, BLONDEAU-GUILLET, BOYVINET et PUMP LAKE au Canada.

Niogold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 56,3 millions CA$ (42,5 millions US$, 38,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 29 décembre 2003 à 0,74 CA$, et son plus bas niveau récent le 19 décembre 2008 à 0,04 CA$.

Niogold possède 130 820 008 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Niogold Mining Corp
2008 Annual Report
Financements de Niogold Mining Corp
29/05/2007Updates Exploration Programs and Announces Private Placement...
26/04/2007Completion of Brokered and Non-Brokered Private Placement
23/03/2007ANNOUNCES INCREASE TO BROKERED PRIVATE PLACEMENT
05/03/2007Brokered and non brokered private placement
Attributions d'options de Niogold Mining Corp
06/07/2009 Appoints new VP, Grants stock options
Projets de Niogold Mining Corp
11/03/2011(Malartic Block)Updated Mineral Resource Technical Report
03/03/2011(Malartic Block)Commences Exploration Drilling in New Sector at Malartic
21/01/2011(Marban Mine)and Aurizon Report 9.06 G/T AU Over 7.3 Metres at Marban
06/07/2010(Marban Mine)And Aurizon Form Partnership To Develop The Marban Block Pro...
05/02/2009(Marban Mine)MARBAN WEST EXTENSION DRILLING RETURNS
05/11/2008(Marban Mine)DISCOVERS HIGH-GRADE GOLD ZONE AT MARBAN
03/09/2008(Marban Mine)DRILLING AT MARBAN DELINEATES NEAR-SURFACE WEDGE ZONE
13/05/2008(Marban Mine)WEST EXTENSION TARGET AT MARBAN RETURNS 9.45 G/T GOLD
10/01/2008MARBAN DRILLING RETURNS 9.8 G/T GOLD OVER 3.0 METRES and 13....
05/09/2007CONTINUES TO OUTLINE NEW GOLD MINERALISATION AROUND FORMER M...
11/07/2007Continues to Expand Gold Mineralisation Around Historic Marb...
20/02/2007 NioGold acquires 85 km² land position
Communiqués de Presse de Niogold Mining Corp
11/01/2016IIROC Trading Resumption - NOX
11/01/2016IIROC Trading Halt - NOX
27/10/2015NioGold cuts 3.54 g/t Au over 15.2 metres at Marban
10/09/2015NioGold intersects 4.47 g/t Au over 22.0 m at Marban
05/08/2015NioGold Intersects 1.57 g/t Au Over 31.5 m At Marban
06/07/2015NioGold Reports Preliminary Leach Test Results at Marban
25/03/2015NioGold Drills 15.8 metres at 4.95 g/t Au at Marban
25/03/2015NioGold - Management Appointments
23/03/2015NioGold - Management Appointments
23/03/2015NioGold - Nominations a la direction
26/02/2015NioGold Recoupe 15.8 metres a 4.95 g/t Au a Marban
26/02/2015NioGold Drills 15.8 metres at 4.95 g/t Au at Marban
19/02/2015NioGold Lance Un Programme de Tests Metallurgiques et Augmen...
19/02/2015NioGold Launches Metallurgical Testing Program and Boosts Dr...
16/01/2015NioGold Intersects 68.73 g/t Gold Over 4.1 m on the Marban D...
05/11/2014NioGold Launches 40,000 Meter Definition Drill Program At Ma...
05/11/2014NioGold Launches 40,000 Meter Definition Drill Program At Ma...
18/09/2014NioGold Appoints Robert Wares as President and CEO
09/09/2014NioGold Releases Exploration Results From the Malartic Block...
29/08/2014NioGold Mining Appoints Sean Roosen and John Burzynski to Bo...
25/07/2014IIROC Trading Resumption - NOX
25/07/2014NioGold Mining Announces $4.9 Million Financing with Osisko ...
25/07/2014IIROC Trading Halt - NOX
22/05/2014NioGold Mining Commences Drilling on the Malartic H Property
13/05/2014NioGold Consolidates 100% Interest in the Malartic H Propert...
06/01/2014(NOX:TSX-V) NioGold Mining Shareholder Update
18/03/2010 Exploration Drilling at Malartic Returns Values Up to 31 Gr...
11/02/2010To acquire Nicolet-south property adjoining Nevado and Bowmo...
08/02/2010The Gold Report: Jay Taylor Updates NioGold Mining (TSX-V: ...
28/01/2010Reports Significant Increase In Malartic Project’s Gold Reso...
24/12/2009 Completes $2,16M financing and updates activities in the Ma...
14/12/2009Interview with NioGold's President
03/09/2009Resumes drilling in the Malartic Gold camp
21/08/2009Acquires 4 claims in Val d'or
06/08/2009 Siscoe East drilling returns 43,67 g/t Au over 1,9 metres
20/02/2009Joins the “AGORACOM 100” and Launches Online IR and Marketin...
01/10/2008OPTIONS STRATEGIC PROPERTY IN THE MALARTIC GOLD CAMP
30/09/2008ATLANTA GOLD INC. AND NIOGOLD MINING CORP. OPTION ABITIBI QU...
12/08/2008MARBAN WEST EXTENSION DRILLING RETURNS UP TO 78.90 G/T GOLD ...
02/07/2008lexandria Minerals and NioGold Mining to Enter JV on Siscoe ...
05/02/2008ACQUIRES 10 CLAIMS IN MALARTIC GOLD CAMP
15/01/2008EXTENDS KIERENS ZONE WITH 9.6 G/T GOLD OVER 3.1 METRES INTER...
20/12/2007Investor Update
06/11/2007MARBAN DRILLING RETURNS 6.05 G/T GOLD OVER 6.5 METRES
02/10/2007ROXANE URANIUM PROSPECT TRACED OVER 2 KM ON PUMP LAKE
25/09/2007DRILLING PROVES STRONG POTENTIAL AROUND FORMER MARBAN MINE
11/09/2007FINDS URANIUM ON PUMP LAKE
08/05/2007FIELD EXPLORATION ON PUMP LAKE COPPER-GOLD-URANIUM PROSPECT
08/05/2007STARTS FIELD EXPLORATION ON PUMP LAKE COPPER-GOLD-URANIUM PR...
26/04/2007INITIATES SIZEABLE DRILL PROGRAM IN THE MALARTIC GOLD CAMP
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (NOX.V)FRANKFURT (NG1.F)
0,430+0.00%0,2320
TSX-V
CA$ 0,430
10/03 16:59 -
0%
Cours préc. Ouverture
0,430 0,430
Bas haut
0,430 0,450
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,430 -4,44%
Volume var. 1 mois
230 000 -4,44%
24hGold TrendPower© : 34
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :