Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Nevada Copper Corp.: North Deposit Continues to Expand, Drilling Multiple Intervals of Mineralization Including 358 Feet of 1.32% Copper
Published : August 16, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 16, 2011) - Nevada Copper Corp. (News - Market indicators) ("Nevada Copper") is pleased to announce additional positive step-out drill results from the 100% owned Pumpkin Hollow Property located in Nevada. The holes reported below represent assay results from the on-going 20,000 meter step-out and expansion drilling program.

Drill holes NC11-07, NC11-12, and NC11-15 were drilled in the North Deposit. Drill holes NC11-12 and NC11-15 were successful in expanding mineralization. In addition to expanding the mineralized zones NC11-15 confirmed the continuity of the shallower high grade mineralization intersecting 358.0 feet (109.1 meters) true thickness, averaging 1.32% copper. Drill hole NC11-12 was drilled along the northeast border of the deposit. The hole intersected two large intervals 195.0 feet (59.4 meters), 149.3 feet (45.5 meters) true thickness, averaging 0.41% copper; and 190.0 feet (57.9 meters), 145.7 feet (44.4 meters) true thickness, averaging 0.51% copper.

Gregory French, Vice President, Senior Project Manager, CPG, M.Sc., commented, "The North Deposit drilling continues to be successful in expanding mineralization to the northeast and along the deeper stacked mineralized zones. The positive results are expected to have a positive effect on future open pit mine designs, both by potential expansion of the ultimate pit shell and conversion of material that is now considered waste into mill feed, but will not be reflected in the current Definitive Feasibility Study pit designs. Our 2011 drilling program continues to focus on resource step-out and expansion drilling and will follow up drilling in both areas."

NORTH DEPOSIT – Assays greater than 0.2% Cu


Drill Hole #

From
(m)

To
(m)

Length
(m)

Length
(ft)
True
Length
(m)

Copper
(%)

Gold
(g/t)

Silver
(g/t)

Mo
(%)
NC11-07 519.7 534.9 15.2 50.0 3.7 1.07 0.128 4.9 0.008
  541.0 545.6 4.6 15.0 3.2 0.26 1.6 1.6 0.003
  563.9 573.0 9.1 30.0 6.4 0.38 0.025 1.8 0.006
NC11-12 131.0 147.8 16.8 55.0 12.9 0.68 0.070 4.3 0.006
  172.2 231.6 59.4 195.0 45.5 0.41 0.071 2.7 0.008
  457.2 515.1 57.9 190.0 44.4 0.51 0.082 1.9 0.006
NC11-15 218.5 327.6 109.1 358.0 109.1 1.32 0.121 3.0 0.006
  355.1 371.8 16.7 55.0 16.7 0.43 0.060 3.7 0.015
  400.8 411.5 10.7 35.0 10.7 0.34 0.037 2.3 0.008
  432.8 443.9 11.1 36.5 11.1 0.90 0.031 2.0 0.005
  524.3 530.4 6.1 20.0 6.1 0.43 0.034 1.8 0.003

Several holes were drilled along the edges of the other deposits. Drill hole NC11-08 drilled on the northwest edge of the East deposit intersected thinning mineralization. Drill hole NC11-06 intersected shallow low grade mineralization along the northeast edge of the South deposit. This shallow mineralization remains open and follow up drilling is planned. Drill holes NC11-10 located in the South Deposit and NC11-11 located in the East Deposit did not intersect any significant mineralization.

SOUTH DEPOSIT – Assays greater than 0.20% Cu


Drill Hole #

From
(m)

To
(m)

Length
(m)

Length
(ft)
True
Length
(m)

Copper
(%)

Gold
(g/t)

Silver
(g/t)

Fe
(%)
NC11-06 170.7 208.8 38.1 125.0 26.9 0.35 0.015 1.1 <0.001

EAST DEPOSIT – Assays greater than 0.75% Cu


Drill Hole #

From
(m)

To
(m)

Length
(m)

Length
(ft)
True
Length
(m)

Copper
(%)

Gold
(g/t)

Silver
(g/t)

Mo
(%)
NC11-08 492.5 496.8 4.3 14.0 4.3 1.72 0.122 4.6 0.010
  663.8 669.0 5.2 17.0 5.2 1.13 0.193 5.7 0.006

The section and plan maps with the respective drill locations for the deposits are available at http://www.nevadacopper.com/i/pdf/2011-Aug16-NR-Maps.pdf.

About Nevada Copper

Nevada Copper has 72.7 million shares outstanding and is well funded with no debt and approximately $80 million in cash. Nevada Copper is scheduled to release results from its Definitive Feasibility Study by September 30, 2011 in addition to ongoing drilling results from its 20,000 meter step-out and expansion drilling program.

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, and a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.

For additional information about Nevada Copper please visit our website at www.nevadacopper.com.

NEVADA COPPER CORP.

Giulio T. Bonifacio, President & CEO

We seek safe harbour.



Nevada Copper Corp.
Eugene Toffolo
Corporate Communications
604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com
or
Nevada Copper Corp.
Robert McKnight, P.Eng.
Executive Vice President
604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com

Nevada Copper

EN DÉVELOPPEMENT
CODE : NCU.TO
ISIN : CA64128F1099
CUSIP : 64128F
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Nevada Copper est une société d’exploration minière de cuivre basée au Canada.

Nevada Copper est en développement de projets de cuivre, d'argent, de fer et d'or en USA.

Son principal projet en développement est PUMPKIN HOLLOW en USA.

Nevada Copper est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 7,9 millions CA$ (5,8 millions US$, 5,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 avril 2011 à 6,42 CA$, et son plus bas niveau récent le 06 novembre 2020 à 0,06 CA$.

Nevada Copper possède 88 170 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Nevada Copper
09/05/2019Nevada Copper inks $115m deal to construct Pumpkin Hollow
31/08/2018Nevada Copper shares jump on construction decision
16/05/2018Nevada copper provides positive update on drill program: int...
Financements de Nevada Copper
19/04/2016Amends Red Kite and Pala Loan Terms
27/04/2010Closes $23,7 Million Bough-Deal Private Placement Financing
09/04/2010$20.6 Million Bought-Deal Private Placement Financement
27/10/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations de Nevada Copper
08/08/2013Appoints Director
28/02/2012Appoints New Director and Launches Project Website
Projets de Nevada Copper
09/09/2013Receives All Permits For Stage 1 Underground Mine
28/07/2011(Pumpkin Hollow)Obtains 100% of Water Needs for the Pumpkin Hollow Project
28/04/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
12/04/2011INTERSECTS 415 FEET OF 1.84% COPPER
31/03/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
08/02/2011S FEASIBILITY STUDY PROGRESS
04/08/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
08/07/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
16/06/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
27/05/2010(Pumpkin Hollow)Increases Drilling Program
18/05/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
06/05/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
23/04/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
16/02/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
21/01/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
14/01/2010Files NI 43-101 Preliminary Economic Assessment
08/12/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
25/08/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
15/07/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
Communiqués de Presse de Nevada Copper
09/06/2016Nevada Copper Closes Cdn$4.6 Million Equity Offering
03/06/2016Nevada Copper Closes Cdn$ 10.5 Million Financing With Red Ki...
01/06/2016Nevada Copper Solar Zoning Approved
27/05/2016Nevada Copper Annual Meeting Results
27/05/2016Nevada Copper Announces Red Kite Funding Commitment And Equi...
03/05/2016Nevada Copper and City of Yerington Advance Solar Zoning
22/04/2016Nevada Copper Announces Filing Of Amended Prospectus And Exe...
05/04/2016Nevada Copper Amends Red Kite and Pala Loan Terms
28/01/2016Nevada Copper Appoints Directors
03/11/2015Nevada Copper Intersects 105 Feet of 2.55% Copper in the Eas...
13/10/2015Nevada Copper Acquires Private Land & Completes Federal Land...
30/09/2015Nevada Copper Provides Corporate and Project Update
10/09/2015Nevada Copper Intersects 462 Feet of 0.64% Copper
21/08/2015IIROC Trade Resumption - NCU
21/08/2015Federal Land Conveyance Complete at Nevada Copper's Pumpkin ...
20/08/2015IIROC Trading Halt - NCU
17/08/2015Nevada Copper Fully Permitted
31/07/2015Nevada Copper Extends and Increases Bridge Loan Facility
31/07/2015Nevada Copper Receives Air Pollution Control Permit
17/07/2015Nevada Copper Receives Decision Record on Yerington Land Con...
15/07/2015Nevada Copper Intersects 448 Feet Grading 1.0% Copper
09/07/2015Nevada Copper Files Integrated Feasability Study on SEDAR
29/06/2015Nevada Copper Election of New Director and Annual Meeting Re...
24/06/2015Nevada Copper Continues to Expand Open Pit Mineralization In...
23/04/2015Nevada Copper Pumpkin Hollow Project Update
10/02/2015Nevada Copper Pumpkin Hollow Project Update
30/12/2014Nevada Copper Closes US$200 Million Loan Facility
22/12/2014President Signs National Defense Authorization Act That Incl...
03/12/2014Nevada Copper Project Update
04/11/2014Nevada Copper Project Update
30/07/2014Nevada Copper Advances Lyon County Bill
16/07/2014Nevada Copper Provides 2014 Update
02/07/2014Nevada Copper Provides Update & AGM Results
12/05/2014Nevada Copper Update on Lyon County Land Bill
23/01/2014NCU - Nevada Copper featured on KTVN - Channel 2 News
28/10/2013Announces Management Additions
09/10/2013Receives Additional US$15 Million Under Its US$200 Million S...
01/10/2013Announces $24 Million Equipment Financing
26/08/2013Receives Water Pollution Control Permit
16/07/2013Remaining Stage One Permits Issued for Public Comment
25/06/2013Receives Special Use Permit and Provides Update on Land Bill
17/06/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
10/06/2013Receives Reclamation Permit
28/05/2013Provides Update on State Permits
07/05/2013s Lyon County Bill Status
23/04/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
17/04/2013s Permitting and Yerington Land Bill Status
17/04/2013s Permitting and Yerington Land Bill Status
28/03/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
11/03/2013North Deposit Mineralization Continues to Expand Intersectin...
15/02/2013-Permitting and Feasibility Study Update
03/01/2013Status of Congressional Action-Lyon County Land Bill
30/10/2012North Deposit Mineralization Remains Open Intersecting 119 F...
19/10/2012Files Resource Update NI 43-101 Technical Report on SEDAR
05/10/2012to Purchase 17.8% of Mercator Minerals
05/09/2012Governor Sandoval's Trade Mission to China and South Korea
09/08/2012Drilling Continues to Expand Shallow Mineralization in the S...
10/07/2012Submits Mine Development Permit Applications and Announces D...
20/06/2012-Project Update/Land Bill Passed by the House
05/06/2012s Permitting and Yerington Land Conveyance
29/05/2012Intersects 470 Feet at 0.73% Copper in the North Deposit
19/04/2012Provides an Update on House Subcommitee Hearing on Yerington...
10/04/2012Mineralization Continues to Expand in the North Deposit; Lan...
26/03/2012Announces Introduction of Land Conveyance Bill in the United...
13/03/2012Intersects 9.08% Copper in Open Pittable North Deposit
27/02/2012Appoints New Director & Launches Project Website
22/02/2012Breaks Ground on Underground Shaft
16/02/2012Announces Introduction Of Yerington Land Conveyance Bill
07/02/2012Files Feasibility Study on SEDAR
23/01/2012Announces Positive Feasibility Study Results
17/01/2012(Pumpkin Hollow)Hosts Conference Call to Discuss Pumpkin Hollow Definitive F...
09/01/2012North Deposit Continues to Expand-NC1127 Intersects Minerali...
16/12/2011Announces Selection of Underground Contractor
29/11/2011Coppper-Update on Underground Contractor Selection & Feasibi...
29/09/2011Annnounces Management Addition and Shaft Contract Update
19/09/2011-Feasibility Study Update and Land Transfer
07/09/2011Mineralization Continues to Expand, Intersecting Over 600 Fe...
16/08/2011North Deposit Continues to Expand, Drilling Multiple Interva...
14/06/2011Expands North Deposit Intersecting 785 Feet of 0.73% Copper ...
25/05/2011Steps Out and Drills 126 Feet of 1.26% Copper/Definitive Fea...
03/05/2011(Pumpkin Hollow)Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow ...
01/12/2009Robust Economic Results
01/12/2009Reports robust economic results
03/11/2009Capstone Mining Makes Strategic Investment in Nevada Copper
29/06/2009US$2,000,000 Convertible Debenture
02/05/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
0,090+0.00%0,045-4.26%
TORONTO
CA$ 0,090
25/04 16:51 -
0%
Cours préc. Ouverture
0,090 0,095
Bas haut
0,085 0,095
Année b/h Var. YTD
0,060 -  0,140 -35,71%
52 sem. b/h var. 52 sem.
0,060 -  0,355 -73,13%
Volume var. 1 mois
470 628 -10,00%
24hGold TrendPower© : 20
Produit
Développe Copper - Gold - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-40,00%
2023-48,28%0,420,14
2022-53,23%0,790,20
2021327,59%1,220,07
2020-60,27%0,380,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,74 AU$-0,13%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :