Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Orvana Minerals Corp

Publié le 15 octobre 2013

Orvana Surpasses 2013 Production Guidance

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

 

Breaking News Release 

Orvana Surpasses 2013 Production Guidance

2014 Guidance Release

TORONTO, ONTARIO--(Oct. 15, 2013) - Orvana Minerals Corp. (TSX:ORV), (the "Company") is pleased to announce positive production results for the fourth quarter ended September 30, 2013 ("Q4 2013") and fiscal year 2013 ("FY2013"). Overall production for the Company for FY2013 was 80,541 ounces of gold, an increase of 7% from FY2013 guidance and 44% from FY2012 production. In addition, Orvana produced approximately 17.3 million pounds of copper and 1,018,000 ounces of silver.

Production at the EVBC Mines in Spain for Q4 2013 was 17,891 ounces of gold, 1.88 million pounds of copper and 54,188 ounces of silver. FY2013 production at EVBC was 65,992 ounces of gold, over 6.66 million pounds of copper and 197,768 ounces of silver.

With strong mining and processing performance, EVBC achieved record production numbers in the second half of FY2013. In response to the hoisting accident in June, increased production at the Carl�s Mine and ramp haulage for the Boin�s ore exceeded expectations in Q4. Mill throughput hit an all time high average of 2250 DMT/d in August, demonstrating the capacity of the plant to operate at least 10% above nominal capacity for a prolonged period of time when there is adequate stockpiled feed ahead of the primary crushing plant. The EVBC team responded extremely well to the challenges of mining without a hoisting system at Boinas Mine.

  Past News Releases
  Mon, Sept 23, 2013

Orvana Provides Update On Copperwood Project, Upper Peninsula, Michigan, USA
 

  Thur, Aug 15, 2013

Orvana Reports Successful Completion of Annual Wage Negotiations at its UMZ Mine in Bolivia

  Fri, Aug 9, 2013

Orvana Achieves Strong Mine Performance in Fiscal Third Quarter
 

Production at the UMZ Mine in Bolivia for Q4 2013 was 4,427 ounces of gold, approximately 2.63 million pounds of copper and 235,195 ounces of silver. FY2013 production at UMZ was 14,549 ounces of gold, over 10.6 million pounds of copper and 820,043 ounces of silver.

At the end of Q3 2013, the Company moved to the steady, sulphide flotation process only at UMZ, after terminating the more costly LPF campaigns. Through-put increased by 6% to 206,000 tonnes in Q4 2013 compared to the earlier three quarters. Stripping of waste and oxides was accelerated throughout 2013 to access more transition and sulphide ore that has better recoveries with this flotation circuit. In September, a 10 day campaign of oxides processing using a special reagent addition was trialed. A second campaign will be initiated in November, with the intent being of future oxides processing of stockpiled material. The Company is installing a gravity gold circuit in Q1 2014, which is expected to increase gold recovery from the current average of about 45% to up to 65%. This will contribute to increased gold production at UMZ in 2014.

"We are very pleased to have met our production guidance for FY2013" said Michael Winship Interim President and CEO. "Our operational focus has been merited and we look forward to further increased production success in FY2014. Cost savings measures have been also tackled in the second half of 2013 and announcements in this regard will be made in conjunction with the release of the year end financials."

FY2014 production guidance is 80,000 to 93,000 ounces gold, 18 to 20 million pounds copper and 875,000 to 950,000 ounces silver from the EVBC Mines and the UMZ Mine.

About Orvana

Orvana Minerals is a multi-mine gold and copper producer. Orvana's primary asset is the El Valle/Boin�s-Carl�s gold-copper Mine in northern Spain. Orvana also owns and operates the Don Mario Mine in Bolivia, processing its copper-gold-silver Upper Mineralized Zone deposit. Orvana is also advancing its Copperwood copper project in Michigan, USA. Additional information is available at Orvana's website (www.orvana.com).

Orvana Minerals Corp.

181 University Avenue
Suite 1901
Toronto, Ontario
M5H 3M7
Tel: 416 369 1629
Fax: 416 369 1402

Forward Looking Disclaimer

Certain statements in this press release constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as "believes", "expects" "plans", "estimates" or "intends" or stating that certain actions, events or results "may", "could", "would", "might", "will" or "are projected to" be taken or achieved) are not statements of historical fact, but are forward-looking statements.

Forward-looking statements relate to, among other things, all aspects of the development of the Upper Mineralized Zone deposit ("the UMZ Mine") at the Don Mario Mine in Bolivia, the El Valle- Boin�s/Carl�s Mine (the "EVBC Mine") in Spain and the Copperwood project (the "Copperwood Project") in Michigan and their operations and production; the outcome and timing of decisions with respect to whether and how to proceed with such development and production; the timing and outcome of any such development and production; estimates of future capital expenditures; mineral resource estimates; estimates of permitting time lines; statements and information regarding future feasibility studies and their results; production forecasts; future transactions; future metal prices; the ability to achieve additional growth and geographic diversification; future operating costs; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development plans.

Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Orvana as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of Orvana contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in the Company's most recently filed Management's Discussion & Analysis and Annual Information Form in respect of the Company's most recently completed fiscal year (the "Annual Disclosures"), or as otherwise expressly incorporated herein by reference as well as: there being no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at the UMZ Mine, the EVBC Mine and the Copperwood Project being consistent with the Company's current expectations; political developments in any jurisdiction in which the Company operates being consistent with its current expectations; certain price assumptions for gold, copper and silver; prices for key supplies being approximately consistent with current levels; production and cost of sales forecasts meeting expectations; the accuracy of the Company's current mineral reserve and mineral resource estimates; and labour and materials costs increasing on a basis consistent with Orvana's current expectations.

A variety of inherent risks, uncertainties and factors, many of which are beyond the Company's control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include fluctuations in the price of gold, silver and copper; the need to recalculate estimates of resources based on actual production experience; the failure to achieve production estimates; variations in the grade of ore mined; variations in the cost of operations; the availability of qualified personnel; the Company's ability to obtain and maintain all necessary regulatory approvals and licenses; the Company's ability to use cyanide in its mining operations; risks generally associated with mineral exploration and development, including the Company's ability to continue to operate the UMZ Mine and/or the EVBC Mine or develop the Copperwood Project; the Company's ability to acquire and develop mineral properties and to successfully integrate such acquisitions; the Company's ability to obtain financing when required on terms that are acceptable to the Company; challenges to the Company's interests in its property and mineral rights; current, pending and proposed legislative or regulatory developments or changes in political, social or economic conditions in the countries in which the Company operates; general economic conditions worldwide; and the risks identified in the Annual Disclosures under the heading "Risks and Uncertainties". This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements and reference should also be made to the Company's Annual Disclosures for a description of additional risk factors.

Forward-looking statements are based on management's current plans, estimates, projections, beliefs and opinions and, except as required by law, the Company does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Readers are cautioned not to put undue reliance on forward-looking statements.

Disclaimer: Vantage Communications Ltd. was paid to distribute this bulletin. Vantage Communications may or may not own securities in this particular company. THIS IS NOT A RECOMMENDATION TO BUY OR SELL ANY SECURITY! You are on this mailing list because you registered for VantageWire News. Past performance of Companies mentioned does not guarantee future performance. This email complies with the US Federal CAN-SPAM Act of 2003

If you would like to opt out of You are receiving this email because you opted in at VantageWire.com . For more information about this service, please contact: Vantage Communications Ltd. at 1.800.574.0901, Suite 150 - 666 Burrard St, Vancouver, British Columbia V6C 2X8

� 2013 Copyright Vantage Communications Ltd. All Rights Reserved.

Orvana Minerals Corp

PRODUCTEUR
CODE : ORV.TO
ISIN : CA68759M1014
CUSIP : 68759M101
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Orvana Min. est une société de production minière de cuivre et d'or basée au Canada.

Orvana Min. est productrice de cuivre, d'or, d'argent en Bolivie et en Espagne, et détient divers projets d'exploration en Bolivie.

Ses principaux projets en production sont DON MARIO (CERRO PELADO) en Bolivie et EL VALLE-BOINÁS/CARLÉS en Espagne et son principal projet en exploration est COPPERWOOD en Bolivie.

Orvana Min. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 25,3 millions CA$ (18,4 millions US$, 17,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 29 décembre 2000 à 0,05 CA$, et son plus haut niveau récent le 24 décembre 2010 à 3,97 CA$.

Orvana Min. possède 136 623 171 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Orvana Minerals Corp
Correction and re-filing of its annual report
Financements de Orvana Minerals Corp
11/08/2011. Announces Completion of Equity Offering
26/07/2011. Announces Equity Offering
18/05/2011Obtains US$15 Million Bridge Loan Commitment and Amends Shar...
Nominations de Orvana Minerals Corp
30/03/2015Announces Appointment of New Chief Executive Officer
08/04/2013. Announces Appointment of New Interim Chief Executive Offic...
09/03/2012Announces Changes to Board of Directors
04/01/2012Appoints Ron Simkus to the Board of Directors
25/02/2010Appointment of Roland Horst as Chief Executive Officer
22/02/2010Appointment of new vice president, Mining
24/08/2009Appoints James Gilbert to board of Directors
Rapports Financiers de Orvana Minerals Corp
07/02/2014Orvana Reports Results for the First Quarter of Fiscal 2014 ...
08/02/2013Orvana Reports Results for the First Quarter of Fiscal 2013 ...
08/02/2013Reports Results for the First Quarter of Fiscal 2013 With Ad...
15/05/2012Reports Results for the Second Quarter Ended March 31, 2012
15/03/2012Announces Results for the First Quarter Ended December 31, 2...
01/03/2012Announces Revised Issue Date for Its Financial Statements fo...
14/02/2011Reports First Quarter Results for the Three Months Ended Dec...
16/02/2010Reports operating results for the first quarter ended decemb...
17/08/2009Operating results for the third quarter ended june 30, 2009
19/05/2009Operating results for the 2nd quarter ended march 31, 2009
13/02/2009reports operating results for the first quarter ended decemb...
15/08/2008Reports operating results for the third quarter ended june 3...
15/05/2008Reports Operating Results for the second Quarter ended March...
Projets de Orvana Minerals Corp
09/12/2014Reports Record Gold and Copper Production, Balance Sheet Sig...
11/02/2014Highland to Acquire Orvana's Copperwood Project
06/12/2013Orvana Reports Record Mine Performance and Fiscal 2013 Resul...
15/10/2013Orvana Surpasses 2013 Production Guidance
15/10/2013Surpasses 2013 Production Guidance
23/09/2013(Copperwood)Provides Update on Copperwood Project, Upper Peninsula, Mich...
25/02/2013Orvana Granted Wetlands Permit for Copperwood Project, Upper...
25/02/2013(Copperwood)Granted Wetlands Permit for Copperwood Project, Upper Penins...
18/10/2012Orvana Reports Production Results for the Fourth Quarter and...
30/04/2012(Copperwood)Receives Part 632 Mining Permit for Copperwood Project, Uppe...
07/02/2012(Copperwood)Announces Feasibility Study Results for Copperwood Project, ...
24/06/2011(Copperwood)Announces Prefeasibility Study Results for Copperwood Projec...
05/06/2011(El Valle-boinás/carlés)Announces Commissioning of El Valle-Boinas/Carles Gold/Coppe...
25/03/2011(El Valle-boinás/carlés)Provides Update from El Valle-Boinas/Carles Mine, Northern S...
07/03/2011(Don Mario (cerro Pelado)).: Construction Completed of Leaching-Precipitation-Flotatio...
25/02/2011(Copperwood)Reports Measured and Indicated Resources Increase of 50% for...
05/03/2010(El Valle-boinás/carlés)Updated resource estimate at El Valle-Boinás/Carlés Project
17/02/2010(El Valle-boinás/carlés)Provides update on El Valle-Boinas/Carles Project
20/01/2010(Copperwood)Reports final assay batch from its Copperwood Project
13/07/2009(Copperwood)Provides drill program update
19/05/2009(Don Mario (cerro Pelado))announces completion of updated feasibility study and decisi...
13/02/2009(Copperwood)New drill results from Copperwood
11/02/2009(Copperwood)Collection for environmental studies commenced at copperwood
09/02/2009(Don Mario (cerro Pelado))Progresse on a detalied Operation Study
Communiqués de Presse de Orvana Minerals Corp
18/12/2015Orvana Reports Year End, Fourth Quarter Fiscal Results and P...
01/10/2015Merger Market article from Sept 11, 2015
30/09/2015Orvana Announces Two New Mineral Resource Estimates at Don M...
16/09/2015Orvana on Track to Deliver Don Mario Mine Life Extension and...
07/08/2015Orvana Reports Third Quarter Fiscal Results
13/04/2015to Present at the European Gold Forum, Zurich and the 1-2-1 ...
13/04/2015Orvana to Present at the European Gold Forum, Zurich and the...
12/04/2015Orvana Reports Production for Second Quarter 2015 and Update...
08/04/2015Orvana Announces Appointment of Chief Financial Officer
30/03/2015Orvana Announces Appointment of New Chief Executive Officer
25/03/2015Orvana to Present at the John Tumazos Very Independent Resea...
25/03/2015to Present at the John Tumazos Very Independent Research Met...
27/02/2015Orvana Announces Results of Annual Shareholders' Meeting
24/02/2015Orvana to Exhibit at Prospectors and Developers Association ...
23/02/2015Orvana Announces Annual Shareholders' Meeting, Live Webcast ...
23/02/2015Announces Annual Shareholders' Meeting, Live Webcast Februar...
05/02/2015Orvana Reports First Quarter Fiscal 2015 Results, Strong Bal...
17/01/2015Orvana Continues to Deliver Results in the First Quarter 201...
17/01/2015Continues to Deliver Results in the First Quarter 2015 and R...
08/01/2015Orvana Minerals to Attend Vancouver Resource Investment Conf...
16/12/2014Orvana Receives $7.5 Million Additional Cash Payment for Cop...
09/12/2014Orvana Reports Record Gold and Copper Production, Balance Sh...
01/12/2014Orvana Announces Fourth Quarter Financial Results Release Da...
04/11/2013Orvana Minerals takes strides towards sustained profitabilit...
15/08/2013Midday Breaking News From Orvana and Eagle Hill
15/08/2013Reports Successful Completion of Annual Wage Negotiations at...
09/08/2013Orvana Achieves Strong Mine Performance in Fiscal Third Quar...
09/08/2013Achieves Strong Mine Performance in Fiscal Third Quarter
17/07/2013Reports Suspension of its Leach-Precipitation-Flotation Plan...
08/07/2013Midday Breaking News From Cavan=2C Orvana=2C and Pacific Pot...
08/07/2013Advises Production Guidance for Fiscal 2013 Remains on Targe...
17/06/2013Reports Hoist Incident and Provides Company Update
14/05/2013Mid-Day Breaking News From Orvana, Skyharbour, Zenyatta, Dig...
14/05/2013Achieves Strong Mine Performance In Fiscal Second Quarter
24/04/2013Celebrates 60 Years on the TSX
15/04/2013Mid-Day Breaking News From Orvana Minerals and Pacific Potas...
03/01/2013Reports Fiscal 2012 Conference Call Details
18/10/2012Reports Production Results for the Fourth Quarter and Fiscal...
21/08/2012Mid-Day Breaking News From Orvana, Great Panther, Lomiko, Tr...
13/08/2012Mid-Day Breaking News From Orvana, CanAm, Corazon, and Rio G...
13/08/2012Reports Results for the Third Quarter With Adjusted Earnings...
18/07/2012Announces June Operations Results for El Valle-Boinas/Carles...
10/07/2012Announces June Operations Update for the Upper Mineralized Z...
19/06/2012Announces May Operations Update for El Valle-Boinas/Carles G...
05/06/2012Announces Changes to Executive Management
09/05/2012Provides an Operations Update for the Upper Mineralized Zone...
17/04/2012Announces Operations Update at El Valle-Boinas/Carles Gold/C...
10/04/2012Announces Commercial Production and Increases Gold and Silve...
16/02/2012Completes a US$13.8 Million Increase in Its Credit Facility ...
18/01/2012Provides an Operations Update and Revised Reserve Estimate f...
13/12/2011Reports Results for the Year Ended September 30, 2011
06/12/2011. Announces Changes in Management
22/09/2011Announces Drill Results and Provides an Operations Update at...
11/07/2011on Orvana Operations
05/04/2011Announces Production at Don Mario UMZ Copper-Gold-Silver Min...
26/02/2010Additions to board of directors
15/01/2010Update on activities relating to El valle-Boinas/Carles
05/10/2009Amalgamation of kinbauri gold corp. and orvana minerals acqu...
25/09/2009Completes Compulsory Acquisition of Kinbauri Common Shares
18/08/2009Takes up Kinbauri shares and extends offer until august 28, ...
13/08/2009 Urges Kinbauri shareholders to tender their shares
04/08/2009Extends offer to acquire kinbauri to august 17, 2009
30/07/2009Supports Kinbauri's decision to let shareholders decide
30/07/2009Urges Kinbauri shareholders to tender to its all-cash offer
29/07/2009Issues reminder that its all cash offer
28/07/2009Kinbauri Shareholders Urged to Tender To The Orvana Offer by...
24/07/2009receives notification that Kinbauri has agreed to waive its ...
21/07/2009raises cash offer for Kinbauri to C$0,75 per share
15/07/2009Extends its offer to acquire Kinbauri Gold Corp.
02/07/2009Extends its Offer to Acquire Kinbauri Gold Corp. to July 13,...
25/05/2009Commences all-cash offer to acquire Kinbauri Glod Corp.
19/05/2009 to apply to OSC for relief relating to Kinbauri's recent ac...
14/05/2009Highlights risks and uncertainties surrounding Kinbauri's pr...
04/12/2008Reports Record Revenue, Cash Provided by Operating Activitie...
10/09/2008Enters into a minerals lease in the state of Michigan
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ORV.TO)OTHER OTC (ORVMF)
0,185-7.50%0,143-4.03%
TORONTO
CA$ 0,185
25/04 12:00 -0,020
-7,5%
Cours préc. Ouverture
0,200 0,185
Bas haut
0,185 0,185
Année b/h Var. YTD
0,120 -  0,265 8,82%
52 sem. b/h var. 52 sem.
0,120 -  0,265 -7,50%
Volume var. 1 mois
500 15,63%
24hGold TrendPower© : -12
Produit Copper - Gold - Silver
Développe
Recherche Copper - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 14/05/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202412,12%
2023-19,51%0,230,14
2022-32,79%0,530,17
2021-11,59%0,540,23
2020115,63%0,360,11
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,02 US$+10,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+11,34%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,74 CA$+2,77%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,90%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :