Niblack Mineral Development Inc.

Publié le 20 décembre 2007

Perseverance Feasibility Study Yields Positive Result Base Case Scenario gives 52% ROFE

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Nickel |
Committee Bay Resources Ltd News Release

December 20, 2007

Perseverance Feasibility Study Yields Positive Result
Base Case Scenario gives 52% ROFE

EDMONTON, Alberta - Committee Bay Resources Ltd. (CBR: TSXV) ("Committee Bay" or the "Company") and Australian Redemption Joint Venture ("RJV") partner Focus Minerals Ltd. (FML: ASX) today announced the results of a Feasibility Study and proposed initial development of the high grade Perseverance Project, located in the prolific Coolgardie Gold Belt in Western Australia. The RJV has commenced the process of tendering mining contracts and obtaining the final mining permits required to develop the Perseverance Project, with development activities scheduled to commence early 2008.

Key Highlight Points

  • Completion of Bankable Feasibility Study (BFS) confirms economic viability of Perseverance Gold Project, Coolgardie.
     
  • Base case cash flow analysis (based on average grade of 6.9 g/t Au) shows net cash flow of AUD $19.3M with a Return on Funds Employed of Employed (ROFE) of 52%.
     
  • Upside case (utilizing uncapped grade in main quartz sulphide lode of 8.5 g/t Au) increases net cash flow to AUD $32.4M with a ROFE of 88%.
     
  • Base case production of 64,187 ounces over 21 months at average cash operating cost of AUD $533/ounce.
     
  • Based on results of the BFS the RJV has commenced permitting and tendering of mining contracts.
     
  • Development of the Perseverance ore body scheduled to commence first quarter of 2008 .
     
  • Continued development and exploration drilling in the Tindals area has excellent potential to discover additional Perseverance type ore bodies.

"We are extremely pleased with the outcome of the Perseverance Feasibility Study" stated Committee Bay President and CEO, John Williamson. "The base case scenario of the project's economics are quite robust and, given our ongoing exploration and recently released grade control drilling results, I believe the project will outperform the base case, particularly with respect to grade.  Utilizing a combination of cut and fill and long-hole stope mining methods the project will develop early cash flow which will be used for continued development of the project" Mr. Williamson added.  

Summary of Feasibility Study on Perseverance Deposit

Assumptions

Base Case

Upside Case

Gold Price (AUD)

900

900

Gold Royalty

2.5%

2.5%

 

 

 

Production

 

 

Ore Milled (tonnes)

315,000t

315,000t

Average Monthly Production Rate (tonnes/month)

15,000t

15,000t

Operating Life (months)

21

21

Grade (g/t Au)

6.9

8.5

Mining Recovery %

90

90

Mining Dilution %

20

20

Metallurgical Recovery %

92

92

Gold Recovered (life of mine) (k oz)

64.2

79.2

 

 

 

Cash Operating Costs (AUD/oz)

533

432

Total Cost (AUD/oz)

577

468

 

 

Capital Costs  (AUD millions)

2.8

2.8

Net Cash Flow (AUD millions)

19.3

32.4

Return on Funds Employed %

52

88

Development Months

11

11

Payback Period (months)

14

10

Feasibility Study

Objectives

The Redemption Joint Ventures objective in completing a feasibility study on the Perseverance Deposit is to facilitate the development of high return gold production on the Coolgardie Project that would generate significant cash flow to fund continued development and exploration of the Tindals Mining Centre, and general exploration over the Coolgardie tenements.

Continued development and exploration drilling in the Tindals area indicates that the potential to discover additional Perseverance type ore bodies is high. Ongoing exploration at the Tindals and Empress deposits, along with delineation at the Countess deposit, all within existing underground infrastructure, provide potential for additional near term ore sources.

Mineral Resources

Derwent Geoscience Pty Ltd issued the current mineral resource estimate for the Perseverance deposit. The resource is based on surface drilling comprising 52 reverse circulation (RC) and 25 diamond drill holes. The resource has been estimated utilizing Ordinary Kriging within the main Quartz Sulphide zone and Inverse Distance Squared interpolation in the peripheral diorite zone. The disclosed mineral resources for the Perseverance deposit are summarized in Table 1 below (See CBR news release dated October 9th , 2007).

Table 1. Perseverance Deposit Resource

Zone

Category

Volume

Tonnes

Au g/t

Au g/t Cut1

Uncut Ozs

Cut1 Ozs

Quartz - Sulphide

Inferred

54,988

157,036

2.79

2.77

14,086

13,985

 

Indicated

109,984

324,598

9.35

7.79

97,576

81,296

 

 

 

 

 

 

 

Diorite

Inferred

86,285

249,422

3.06

2.63

24,538

21,090

 

Indicated

42,469

123,159

3.94

2.72

15,601

10,770

 

 

 

 

 

 

 

Total Indicated

152,453

447,757

7.86

6.4

113,176

92,066

Total Inferred

141,273

406,458

2.96

2.68

38,624

35,075

Resource reported at 1.0 g/t Au lower cutoff grade

1 Upper cut of 35 g/t Au used for quartz sulphide zone, Upper cut of 15 g/t Au used for Diorite zone

The current Perseverance Resource does not incorporate underground grade control drilling completed by the RJV from the recently completed Perseverance decline (see CBR press release dated December 12th 2007); the results of which indicate the deposit may demonstrate higher grades than indicated by the surface drill holes.

Mineral Reserves

Utilizing the base case scenario, a fully diluted Minable Ore Reserve of 315,073 tonnes grading 6.89 g/t Au has been calculated for the Perseverance Lode, based upon the following parameters:

  • Application of a break-even (operating) cut-off grade of 3.2g/t to determine the stope outline.
     
  • Cut-offs have been applied on a lode and level basis consistent with the geological resource block breakdown.
     
  • Application of identified ore loss and dilution factors for each of the lodes and mining methods.
     
  • Only JORC compliant Indicated resources have been considered in determining an underground reserve.           

Mining

The Perseverance deposit will be mined entirely by underground methods and the ore body will be accessed on 25 metre vertical level intervals via a spiral incline/decline developed from the existing exploration decline.

The mining method selected for the feasibility study is a combination of cut and fill and shorter long-hole stoping within each mining panel. This combined method gives good exposure to early ore production from the cut and fill, but limits the higher cost of cut and fill by long-holing a substantial portion of each panel. Cut and fill stoping assumes a minimum mining width of 3.5 metres with 0.5 metre dilution applied to both the footwall and hanging wall. Long-hole stopes will be limited to 10 metres vertical, and have a minimum mining width of 3.0 metres with 0.75 metres of dilution applied to both the footwall and hanging wall.

Mineral Processing

Negotiations are at an advanced stage for the treatment of the Perseverance ore at a local toll-treatment facility located 8 kilometres from the project site at a rate of AUD 22/tonne. This reduces the exposure to operational issues as the project will use an established operation that has previously treated similar ores. The agreement with the treatment facility fixes the price paid for milling the ore. When concluded, this agreement will leave very little exposure to changes in the milling costs for the project. Cartage costs from the mine to the treatment facility are estimated at AUD 5/tonne

Infrastructure

One of the highlights of the proposed Perseverance project is that good quality infrastructure is already established in the area. This is particularly relevant for the underground infrastructure, as this includes decline access to within 60 metres of the ore body.

It is expected that there will be very low risk associated with the infrastructure as there is a long operational history for the area.

Exploration

The RJV is continuing to aggressively explore the Tindals Mining Centre and the Redemption Fault Corridor proximal to the Perseverance deposit and is currently conducting an extensive ground electro-magentic (EM) survey over the area targeting additional high sulphide Perseverance style mineralization. Exploration drilling is continuing at Perseverance, targeting down-hole EM conductors immediately on strike of and down-dip of existing mineralization.

Mining reserves at Perseverance are based only on the Indicated portion of the mineral Resource. Results from underground grade control drilling conducted by the RJV from the exploration decline are not included in the current mineral resource. An updated resource is expected to be completed by the end of Q1 2008 which will incorporate the underground drilling, and is reasonably expected to result in the upgrading of additional ounces to the measured and indicated categories.

Operating Costs

A mining contractor will be engaged to carry out all work associated with the operation of the underground mine. As was done recently with the development of the Perseverance exploration access decline, a schedule of rates contract will be utilized for the project. This has the advantage of being able to fix key operating cost parameters and thus limit the project to fluctuations associated with other contract styles. Operating costs (Table 2) have been based upon formal tender estimates for underground contract mining as at October 2007. Other cost estimates have been supplied by the RJV or sourced, where specified, from budget quotations, industry benchmarking, in-house databases and evaluations.

Table 2. Operating Costs

Cost Centre

Estimated Operating Cost (AUD millions)

Estimated Operating Cost (AUD per tonne milled)

Mining

23.43

74.36

Milling/Cartage

8.51

27.00

Administration

2.29

7.27

Total

 

 

Capital Costs

Due to the existence of a significant portion of the infrastructure for the project, there is only a relatively small requirement for new capital works. This is estimated at AUD 2.8M and primarily covers additional dewatering and ventilation requirements not currently available at the Perseverance deposit. As infrastructure requirements are minimal, the project does not have a significant exposure to construction issues experienced at other resource development projects.

Acknowledgements

This technical information in this news release has been prepared in accordance with JORC and National Instrument 43-101. The following Qualified Persons Have Contributed to the Study

Darren Gibcus - B.Eng-Mining, M.AusIMM
Brett Ustick - B.Eng-Mining, M.AusIMM
Dr. Garry Adams - PhD, B.Sc(Hons)-Geology, M.AusIMM, M.AIG, F.SEG
Mark Rigby - B.Sc-Geology. M.AusIMM
Brian Eaton- B.Eng-Mining, Assoc Min Eng, FAusIMM, CP-Eng
Stewart Capp - B.Sc(Hons)-Geology, M.AusIMM
Coffey Consulting - hydrogeological, geotechnical and environmental
Ammtec Ltd - metallurgical

Coolgardie Project , Western Australia  

Committee Bay Resources Ltd., through the Redemption Joint Venture (Committee Bay in a 50% partnership with Focus Minerals Ltd. ASX: FML), has the mineral rights to more than 210 km2 of under-explored greenstone tenements, located in one of the world's most significant gold and nickel mining regions.  These tenements contain Measured Resources of 31,014 ounces gold* (0.55 million tonnes at 1.77 g/t gold), Indicated Resources of 564,631 ounces gold* (8.53 million tonnes at 2.06 g/t gold), and Inferred Resources of 1,038,292 ounces gold* (11.52 million tonnes at 2.80 g/t gold).  The RJV also has a 100% interest in the fully permitted, 1.2mtpa, Three Mile Hill Mill processing plant.*

*For more information on the stated gold resources and historic drill results of Committee Bay Resources Ltd., Coolgardie Project please refer to the detailed NI 43-101 compliant technical report filed on SEDAR by Committee Bay on February 26, 2007. 

Committee Bay Resources Ltd. maintains an extensive quality control program in the preparation, shipping and checking of all samples from the property as detailed in Committee Bay Resources Ltd. 'Technical Report for the Coolgardie Gold Project, Coolgardie, Western Australia' by Dean Besserer - May 27, 2005 pp. 76-80. The program is supervised by Peter Kleespies, M.Sc. P.Geol., and Vice President of Exploration, who is the Qualified Person as defined by NI 43-101. Mr. Kleespies has reviewed and approved the information contained in this release.

On behalf of the Board
Committee Bay Resources Ltd.
/s/"John Williamson"
John Williamson, P.Geol.
President

For further information about Committee Bay Resources Ltd. or this news release, please visit our website at www.committeebay.com or contact:

Derek Iwanaka
Manager, Investor Relations
Email:
info@committeebay.com
Dial 604-646-4524 or toll-free 1-888-331-2269

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release

Certain disclosures in this release, including management's assessment of Committee Bay's plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Committee Bay's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Readers are cautioned not to place undue reliance on forward-looking statements. Committee Bay expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

- -

Niblack Mineral Development Inc.

PRODUCTEUR
CODE : NIB.V
ISIN : CA65365X1096
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Niblack Mineral est une société de production minière de zinc et d'or basée au Canada.

Niblack Mineral détient divers projets d'exploration au Canada et en Australie.

Ses principaux projets en production sont 3 BLUFFS au Canada et JAURDI HILLS en Australie et ses principaux projets en exploration sont BORDEN et NIBLACK au Canada et JAURDI HILLS (BLACK CAT) en Australie.

Niblack Mineral est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 15,5 millions CA$ (15,5 millions US$, 11,6 millions €).

La valeur de son action a atteint son plus haut niveau récent le 23 janvier 2004 à 9,95 CA$, et son plus bas niveau récent le 23 décembre 2011 à 0,16 CA$.

Niblack Mineral possède 35 977 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Niblack Mineral Development Inc.
2008 Annual Report
Financements de Niblack Mineral Development Inc.
04/01/2012Announces Private Placement
Projets de Niblack Mineral Development Inc.
12/01/2012Announces Security holder Approval for Arrangement with Heat...
01/12/2011(Niblack)Supports As Heatherdale Explores Niblack Project Partnership...
31/08/2011(Niblack)Joint Venture Partner Completes Requirments To Secure 60% In...
22/08/2011Joint Venture Receives Priority Permitting Approval From US ...
16/03/2011(Niblack)Larger Niblack Mine Estimates Released
13/07/2010(Niblack)Expands Precious Metals-Enriched VMS Deposit
06/05/2008(Commitee Bay)Exploration Program Set for 2008 Committee Bay Greenstone Be...
30/04/2008(Coolgardie)Concludes Sale of Coolgardie Gold Project for Total Consider...
15/04/2008(Coolgardie)Focus Minerals Shareholders Approve Acquisition of Committee...
13/03/2008(Commitee Bay)Significant Resource Upgrade for Three Bluffs Deposit Commit...
19/02/2008(Coolgardie)Further Resource Upgrade For High-Grade Perseverance Gold De...
30/01/2008(Redemption)Enters Exclusivity Agreement Redemption Joint Venture Proje...
20/12/2007(Redemption)Perseverance Feasibility Study Yields Positive Result Base C...
12/12/2007Further High Grade Drill Results from Perseverance Deposit
31/10/2007(Commitee Bay)Final 2007 Three Bluffs Drilling Results: 9.29 g/t Au over 8...
09/10/2007Upgraded Resource Within the "Tindals Gold Mining Centre"
13/09/2007(3 Bluffs)Three Bluffs Drilling Continues to Expand Resource Potential
05/09/2007New High Grade Intersections Increase Size Potential of Inuk...
Communiqués de Presse de Niblack Mineral Development Inc.
19/01/2012Announces Acquisition by Heatherdale Resources Ltd.
16/12/2011Mails Information Circular
29/11/2011(Niblack)Joint Venture Announces 31% Increase To Total Mineral Resour...
26/10/2011(Niblack)Definitive Agreement Reached between Niblack and Heatherdale
28/07/2011(Niblack)Drilling Continues To Intersect & Expand Mineralization At N...
07/03/2011Announces 54% Increase to Mineral Resources
06/05/2010Amends Warrant Terms
30/07/2008Acquire Key Areas on Borden Project Airborne Magnetics Surve...
20/06/20082008 Committee Bay Exploration Program Initiated
06/02/2008 Will Be Exhibiting at the 2008 Phoenix Resource Investment ...
06/11/2007 Present at the 2007 Money Talks Conference
05/11/20072007 President'sLetter and Corporate Update
18/10/2007 to present at Toronto and New Orleans Investment Conference...
14/09/2007Drill Program Extended at Three Bluffs Deposit
06/09/2007Three Bluffs Drilling Delivers Outstanding Intercepts 19.44 ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (NIB.V)
0,430+1.18%
TSX-V
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -100,00%
Volume var. 1 mois
-100,00%
Produit Gold
Développe
Recherche Copper - Diamonds - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :