Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Typhoon Exploration Inc.: Positive Preliminary Economic Assessment Options for the Fayolle Deposit
Published : April 09, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report |

LAVAL, CANADA--(Marketwired - April 9, 2013) -

Editors' Note: There are two maps associated with this press release.

TYPHOON EXPLORATION INC. (News - Market indicators) is pleased to report results of a positive Preliminary Economic Assessment study done on the Fayolle Deposit, located 30km of the town of Rouyn-Noranda, Quebec.

The PEA study was prepared by InnovExplo with contributions from SNC-Lavalin with respect to chapter 20, "Environmental Studies, Permitting and Social or Community Impact". The PEA was prepared with the objective to compare two (2) distinct and independent scenarios, the open pit approach versus an underground mining approach, all in accordance with Standards of Disclosure for Mineral Projects defined by National Instrument 43-101 ("NI 43-101").

"The report indicates an economic potential to recover 74,813 oz. of gold from an open pit including resources amenable to mining of 568,941 tonnes at 4.35 grams per tonne", noted Mr. David Mc Donald, President of Typhoon Exploration Inc.

The Preliminary Economic Assessment study of the Fayolle Deposit, based on a 43-101-compliant technical report, will be filed on the Company's website www.explorationtyphon.com and on SEDAR www.sedar.com within 45 days.

HIGHLIGHTS (open pit scenario)

For the open pit scenario, the PEA study shows potential viability for 568,941 tonnes of diluted resources at 4.35 g/t gold (representing 74,813 ounces of recovered gold) at a minimum cut-off grade of 0.84 g/t gold. This open pit mineralized material was obtained from a global undiluted mineral resource of 1,814,800 tonnes at 2.68 g/t gold (representing 156,497 ounces of gold) at a similar minimum cut-off grade of 0.84 g/t gold.

  • The operation plan takes into account a 3,937,889 tonnes pit shell to be mined during a 3-year mine life (including one year of pre-production) with an average mine run of 350,000 tonnes of mineralized material per year, down to a depth of 85 metres with a strip ratio of 3.7.
  • The average daily mineralized material production planned will be around 1,000 tonnes per day. The model uses the assumption that the material will be trucked 40 kilometres away to the Iamgold Westwood mill.
  • Preliminary metallurgical testing done on two samples returned between 94% and 97% recovery using conventional cyanidation. A recovery rate of 94% is selected for this study and on the environmental side, testing done on two composites samples suggests that acid generation is highly unlikely to occur from these samples considering the high carbonate/low sulphur content profile of both types of mineralized rocks.

The study includes 100% of reclamation costs at the beginning of the project. 

The pre-production capital costs, sustaining, and reclamation costs for the Fayolle Deposit open pit option are evaluated respectively at CAD$4.96 M, CAD$ 0.93 M and CAD$4.4 M. The average cash cost is estimated at US$697 per ounce of gold or $ 92 per tonne milled. The financial analysis, using a price of gold of US$1,518 per ounce, indicates a pre-tax net present value ("NPV") (using a 7% discount rate) of CAD$30.15 million with a pre-tax internal rate of return ("IRR") of 166%. On an after tax basis, the IRR is estimated at 110%.

HIGHLIGHTS (Underground scenario)

For the underground scenario, the PEA study shows potential viability for 449,426 tonnes of diluted resources at 4.73 g/t gold (representing 64,195 ounces of recovered gold) at a minimum cut-off grade of 2.5 g/t gold. This underground mineralized material was obtained from a global undiluted mineral resource of 548,500 tonnes at 5.75 g/t gold (representing 101,399 ounces of gold) at the same minimum cut-off grade of 2.5 g/t gold.

  • The different mining methods considered to optimize the cost and recovery of each mineralized lenses are as follow: mechanized cut and fill, long hole stoping, room and pillar.
  • The mineralized material zones will be accessed by a portal and a ramp representing a total of 2,082 meters of development.
  • The average daily production of mineralized material planned will start at 750 tonnes per day and will gradually reach an average of 1000 tonnes per day during a life of mine of 27 months (including 1 year of pre-production). The model uses the assumption that the material will be trucked 40 kilometres away at the Iamgold Westwood mill.
  • Preliminary metallurgical testing done on two samples returned between 94% and 97% recovery using conventional cyanidation. A recovery rate of 94% is selected for this study. 

The pre-production capital costs and sustaining costs for the Fayolle Deposit underground project are evaluated at CAD$22.7 M. The average cash cost is estimated at US$1205 per ounce of gold and $173 per tonne milled. The financial analysis, using a price of gold of US$1,518 per ounce, indicates a pre-tax net present value ("NPV") (using a 7% discount rate) of CAD$5.61 million with a pre-tax internal rate of return ("IRR") of 26.21%. On an after tax basis, the IRR is estimated at 19.12%.

PROJECT HIGHLIGHTS : Open pit option    
     
Assumptions    
  Gold Price (US$/ounce) 1,518  
  Foreign exchange rate (CAD$/US$) 1.004  
  Net Smelter Royalty (%) 2 %
     
Mineral Resources    
  Indicated undiluted resources (tonnes) at a cut-off grade of 0.8 g/t 1,814,800  
  Grade (g/t) 2.68  
  Contained gold (oz) 156,497  
     
Mine Parameters    
  Resources potentially viable to mining (tonnes)Cut-off grade of 0,84 g/t diluted 568,941  
  Diluted grade (g/t) 4.35  
  Total contained gold (oz) 79,589  
  Waste material (tonnes) 2,092,148  
  Overburden material (tonnes) 1,276,800  
  Average strip ratio 3.7 : 1  
  ROM average daily production rate (tonnes/day) 1,000  
  Milling recovery (%) 94 %
  Total recovered gold (oz) 74,813  
  Pre-production period, post permitting (months) 12  
  Mine life including pre-production (months) 36  
  Average annual gold production (ounces) 24,938  
     
Costs    
  Capital Expenditures (total, including sustaining, CAD$) 5.9  
  Total cash cost (CAD$/tonne milled) 92  
  Total cash cost (US$/ounce) 697  
  Royalties (CAD$/ounce) 30  
     
Financial Analysis    
  Net cash flow (CAD$ Million) 38.52  
  Cash Surplus After-tax (CAD$ Million) 23.39  
  NPV 7% Discount pre-tax (CAD$ Million) 30.15  
  IRR pre-tax (%) 166 %
  NPV 7% Discount after-tax (CAD$ Million) 17.89  
  IRR after-tax (%) 110 %
     
     
     
PROJECT HIGHLIGHTS : Underground option    
     
Assumptions    
  Gold Price (US$/oz) 1,518  
  Foreign exchange rate (CAD$/US$) 1.004  
  Net Smelter Royalty (%) 2 %
     
Mineral Resources    
  Indicated undiluted resources (tonnes) at a cut-off grade of 2.5 g/t 548,500  
  Grade (g/t) 5.75  
  Contained gold (oz) 101,399  
     
Mine Parameters    
  Resources potentially viable to mining (t) at a cut-off grade of 2.5 g/t diluted 449,426  
  Diluted grade (g/t) 4.73  
  Total contained gold (oz) 68,293  
  Waste material (t) 142,398  
  Overburden material (t) 445,450  
  ROM average daily production rate (tpd) 750 to 1000  
  Milling recovery (%) 94 %
  Total recovered gold (oz) 64,195  
  Pre-production period, post permitting (months) 12  
  Mine life including pre-production (months) 27  
  Average annual gold production (oz) 28,531  
     
Costs    
  Capital Expenditures (total, including sustaining, CAD$) 22.7  
  Total Costs (CAD$/tonne milled) 173  
  Total Costs (US$/oz) 1,205  
  Royalties (CAD$/oz) 30  
     
Financial Analysis    
  Net cash flow (CAD$ Million) 9.45  
  Cash Surplus After-tax (CAD$ Million) 6.45  
  NPV 7% Discount pre-tax (CAD$ Million) 5.61  
  IRR pre-tax (%) 26.21 %
  NPV 7% Discount after-tax (CAD$ Million) 3.31  
  IRR after-tax (%) 19.12 %

PROPOSED SURFACE INFRASTRUCTURE

The proposed mine infrastructure presents similar characteristics for both underground and surface options. Overall, an area of approximately 0.6 km2 of ground will be impacted by the mining activity.

  • Site access road; a distance of 2.25 kilometres will need to be upgrade for the circulation of heavy equipment;
  • Parking and guardhouse;
  • Temporary modular building for office and garages
  • Fuel storage, explosive storage installation in accordance with current regulation
  • Polishing pond for pumping water: No waste water management has been evaluated upfront for this study considering a low acid water generation potential indicated by preliminary tests. 
  • Power consumption: The Fayolle Project is currently not served by an electric power line. Due to the short duration of both options, it was evaluated that only generators would be used to provide electricity.
  • ROM stockpile of 26,900 tonnes capacity (temporary) located at the truck charging station for the mill,
  • Overburden stockpile and waste rock stockpiles will be required for the two options. These infrastructures will require a footprint of 111,100m2 and 42,107m2 respectively for the surface and the underground option. The excavation of the ramp portal and the glory holes explains the large volume of material generated by the underground option.

MINE CLOSURE AND RECLAMATION

The closure and reclamation costs for the Fayolle Deposit are estimated at CAD$1.7 M for the underground option and CAD$4.4 M for the open pit option. A detailed closure plan will have to be submitted with the feasibility study. Wherever practical, a progressive reclamation approach of the mining site will be done.

CAPITAL COSTS ESTIMATES

This PEA is based on current budgetary prices coming from contractors acting within the Abitibi region. In addition to InnovExplo's technical expertise to evaluate the two potential scenarios, this evaluation is also based on other reliable information. The evaluation of custom milling was provided by Iamgold, Westwood Project. The after-tax cash flow estimation was completed by Samson Bélair/Deloitte & Touche.

ADDITIONAL TECHNICAL INFORMATION RELATED TO THE PRELIMINARY ECONOMIC ASSESSMENT

The Fayolle property is composed of 39 claims covering 1,475.15 hectares 100%-owned by Typhoon and subject to an earn-in agreement with Aurizon Mines.

  • The project is located along a prolific geological belt, the Abitibi gold belt and, more specifically, on the LaPause - Manneville faults intersection.
  • The drilling density used to build the resources estimate supporting the PEA allowed to reach the indicated level (see TYP press release September 6th, 2012).
  • The Fayolle Project is located 1.4 km from the Aiguebelle National Park and is managed under a MOU signed with the town of Rouyn-Noranda. Typhoon Exploration has always maintained strict working protocol in the field, and open communication with the town representatives.
  • A pool of experienced manpower is available in Abitibi, where the project is located.

GEOLOGY

Gold mineralization of the Fayolle Zone is mainly contained in deformed komatiitic rocks and altered intermediate intrusions near the contact with massive basalt and silicified sediments. Shear zones and fault patterns observed are generally oriented west to north-west, corresponding to a major inflexion of the La Pause Fault.

The dense and complex dykes swarm is characterized by changing orientation and perceived as a strong favourability indicator for gold mineralization.

Mineralization is part of a stacking of pluri-metric zones located inside a 50 to 100 metre wide favourable structural envelope, plunging moderately towards the east. Visually, this mineralized structure corresponds to tectonic breccias. The grades can generally be correlated with the intensity and complexity of brecciation. Alteration is characterized by carbonates, chlorite and fuchsite in ultramafic rocks and by albite-hematite in dykes. Gold is mostly observed as free grains up to a millimetre in size in both host rocks.

MINERAL RESOURCES

The updated mineral resource estimate integrates the results of all the drill programs on the Fayolle deposit since the mineral resource estimate prepared by InnovExplo Inc. published on October 9, 2012. A total of 253 surface holes and 68,826 metres are included in the updated mineral resource estimate, of which 92 holes and 30,927 metres have been drilled since May 2010, when Aurizon and Typhoon Exploration Inc. ("Typhoon") first entered into an exploration joint venture on the Fayolle Project.

All of the updated mineral resources are in the Indicated mineral resource category. Different capping grades have been applied, and are referenced on the resource table on the following page.


Indicated Mineral Resources- as at September 2012 (1)
Grade Cut-off
(gold grams/tonne)
Tonnes Grade
(grams/tonne)
Gold
(ounces)
0.4 3,573,900 1.6 188,000
0.6 2,423,300 2.2 170,000
0.8 1,814,800 2.7 156,000
1.0 1,451,500 3.1 146,000
2.0 701,000 5.0 112,000
2.5 548,500 5.8 101,000
3.0 438,000 6.5 92,000
4.0 295,500 8.0 76,000
5.0 216,400 9.3 64,000

NOTES:

  • The Independent and Qualified Persons for the Mineral Resource Estimate, as defined by NI 43-101, are Pierre-Luc Richard, M.Sc., P.Geo. and Alain Carrier, M.Sc., P.Geo., both from InnovExplo Inc. The effective date of the estimate is August 3, 2012 and officially published on October 9, 2012 (press release published by Typhoon and Aurizon on September 6th, 2012).
  • These Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability.  
  • Results are presented undiluted and in situ. The estimate includes four (4) gold-bearing zones.
  • Resources were compiled at cut-off grades ranging from 0.40 g/t Au to 5.00 g/t Au. Cut-off grades must be re-evaluated in light of prevailing market conditions (gold price, exchange rate and mining cost). No pitshell was used and lower cut-offs are therefore only for comparison.
  • A fixed density of 2.82 g/cm3 was used in mineralized material zones.
  • A minimum true thickness of 2.0 metres was applied, using the grade of the adjacent material when assayed, or a value of zero when not assayed.
  • High grade capping was done on the raw data and established at 40 g/t Au for Zone 1, Zone 2 and the Envelope, and at 90 g/t Au for Zone 3.
  • Compositing was done on drill hole sections falling within the mineralized zone envelopes (composite = 1 metres).
  • Resources were evaluated from drill hole using the ID2 interpolation method in a multi folders percent block model.
  • The Indicated category is defined by the drill hole spacing and established geological continuity.
  • Ounce (troy) = Metric Tons x Grade / 31.10348. Calculations used metric units (metres, tonnes and g/t).
  • The number of metric tons was rounded to the nearest hundred. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations laid out in NI 43-101. 
  • InnovExplo is not aware of any environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the Mineral Resource Estimate.

METALLURGICAL TESTWORK

As the gold can be found in two different types of rocks, two gold-bearing composite samples were examined by SGS Mineral Services: a Komatiite composite, containing an assay grade of 7.78 grams of gold per tonne and an intrusive composite, containing an assay grade of 4.59 grams of gold per tonne. After 48 hours, gold recoveries ranged from 94% to 97% for both composites. Finer grinding typically increased the gold recovery at the cost of higher cyanide consumption.

Gravity separation testing on the Komatiite composite showed a 27.3% Gravity Recoverable Gold ("GRG"). Gravity separation testing on the Intrusive composite showed a 41.4% GRG. The combination of gravity recovery and cyanidation of the gravity tail did increase the overall gold recovery by 1-3%. This demonstrates that this concept would be beneficial from a plant design and financial perspective.

Bond ball mill testing indicated that the two composites fell in the medium range of hardness compared to the SGS database (12.0-14.1 kWh/t).

AGREEMENT WITH AURIZON MINES LTD.:

Typhoon Exploration Inc. signed an option agreement with Aurizon Mines Ltd., for the development of its Fayolle gold property (100%-owned by Typhoon), located in the heart of Abitibi's mining projects. Pursuant to the Agreement, Aurizon has the option to acquire up to a 65% interest in the Fayolle Project by incurring total expenditures of (CAD) $25 M and by subscribing for common shares of the Corporation for gross proceeds of (CAD) $2 M. To date, Aurizon Mines Ltd. have invested CAD$9,003,825 in exploration expenditures and have subscribed to 3 private placements of CAD$500,000 each, totaling CAD$1,500,000.

ABOUT TYPHOON EXPLORATION INC.

  • Typhoon Exploration Inc. holds only 24,101,235 shares outstanding.
  • The Fayolle Property offers the company the potential to host important gold resources.  

THE COMPANY OWNS THE FOLLOWING PROJECTS:

  • Fayolle Project, 100%-owned by Typhoon Exploration Inc. / Rouyn-Noranda region
    (See agreement with Aurizon Mines Ltd. in press release dated May 18, 2010) 
  • Faille 1 Project, 100%-owned by Typhoon Exploration Inc. / Rouyn-Noranda region
  • Monexco Project, 100%-owned by Typhoon Exploration Inc. / Chibougamau region, in the heart of Plan Nord territory
  • Nordair Project, 100%-owned by Typhoon Exploration Inc. / James Bay region, in the heart of Plan Nord territory
  • Aiguebelle-Goldfields Project, 51%-owned by Typhoon and 49%-owned by Agnico-Eagle Mines Limited / Rouyn-Noranda region
  • Destorbelle Project, 50%-owned by Typhoon and 50%-owned by Diamond Frank Exploration Inc. / Rouyn-Noranda region

For more information, visit SEDAR's website at www.sedar.com or the company's website at www.typhoonexploration.com

QUALIFIED PERSON

Mr. Daniel Gaudreault, P. Eng., Geol. (OIQ No. 39834), of Géologica Groupe-Conseil, is the Qualified Person as defined by NI 43-101, to supervise the preparation of this press release.

The Independent and Qualified Persons for the PEA, as such terms are defined by NI 43-101, are Sylvie Poirier, Eng. (OIQ 112196), Alain Tremblay, Eng. (OIQ107489) and Alain Carrier, M.SC., P.Geo. (OGQ no.281) of InnovExplo Inc. and Denis Isabel FEC, PhD, Eng. (OIQ no. 36006) of SNC-Lavalin Inc. (chapter 20, "Environmental Studies, Permitting and Social or Community Impact").

The common shares of Typhoon Exploration Inc. are listed on the TSX Venture Exchange under the symbol "TYP".

Forward-Looking Statements

This news release contains statements that constitute "forward-looking information" or "forward-looking statements" within the meaning of applicable securities legislation. This forward-looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of Typhoon. Actual results or achievements may differ materially from those expressed in, or implied by, this forward-looking information. No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, or if any of them do so, what benefits that Typhoon will derive therefrom. Forward-looking information is based on the estimates and opinions of Typhoon at the time the information is released and Typhoon does not undertake any obligation to update publicly or to revise any of the forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

To view the two maps associated with this press release, please visit the following links:

http://media3.marketwire.com/docs/FayolleProject.jpg

http://media3.marketwire.com/docs/SurfaceGeology.jpg



David Mc Donald
President and CEO
450.622.4066
Toll free: 1.877.622.4004
450.622.4337 (FAX)
info@typhoonexploration.com
www.explorationtyphon.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Typhoon Exploration Inc.

EXPLORATEUR
CODE : TYP.V
ISIN : CA9023976033
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Typhoon Expl. est une société d’exploration minière d'or basée au Canada.

Typhoon Expl. détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont MONEXCO / MCCORKILL, AIGUEBELLE - GOLDFIELDS, U3O8, FAILLE 1, DESTORBELLE et FAYOLLE au Canada.

Typhoon Expl. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,6 millions CA$ (1,3 millions US$, 1,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 20 février 2009 à 0,01 CA$, et son plus haut niveau récent le 24 septembre 2010 à 1,71 CA$.

Typhoon Expl. possède 36 180 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Typhoon Exploration Inc.
2008 Annual Report
Financements de Typhoon Exploration Inc.
11/12/2012Preparing for a $150,000 Private Placement
Attributions d'options de Typhoon Exploration Inc.
15/04/2013Grants Options
14/02/2011Grant of 570,000 stock options
Projets de Typhoon Exploration Inc.
25/09/2013(Fayolle)Exploration Program Underway on the Fayolle Project
08/05/2013(Fayolle)Update on the Fayolle Project
28/06/2011(Fayolle)Undertakes Airborne Magnetic Geophysical and Electromagnetic...
18/05/2011(Destorbelle)and its Partner Are Analyzing Results From the Drilling Camp...
17/03/2011(Fayolle)Announces an Average of 22.2 g/t Gold for Drilling in 2010
23/02/2011(Fayolle)New Discovery of Gold and Silver at More Than 750 Meters of ...
16/02/2011(Fayolle)Hits 7.14 g/t Gold Over 10.00 Metres, 318 g/t Silver and Con...
15/02/2011(Aiguebelle - Goldfields)Has Begun a Drilling Campaign on the Aiguebelle-Goldfields P...
14/02/2011(Destorbelle)The Drilling Campaign on the Destorbelle Project Is on Sched...
28/02/2008(Fayolle)Moves In Another Drill and Identifies New Targets at Fayolle
03/07/2007(Opinaca)Amorce les travaux du Projet Opinaca, Baie James, Quebec
24/05/2007(Aiguebelle - Goldfields)Nouvelles Exploration Typhon - News
24/05/2007(Aiguebelle - Goldfields) Updates Property Explorations
21/02/2007(Fayolle)Resource Grades at Fayolle showing similar to other Gold min...
Communiqués de Presse de Typhoon Exploration Inc.
13/07/2015Typhoon Exploration Announces the Publication of the NI 43-1...
31/03/2015Typhoon Acquires Two New Properties
31/03/2015Acquires Two New Properties
27/02/2015Typhoon Grants Options
30/12/2014Typhoon Exploration Inc. Closes a Second Tranche of a Privat...
17/12/2014Typhoon Exploration Inc. Closes a $171,500 Private Placement
21/10/2014Typhoon and Hecla Will Initiate an Exploration Campaign on t...
31/07/2014Update on the Joint Venture Between Typhoon and Hecla
26/06/2014Typhoon Shareholders Approved Resolutions at the 2014 Annual...
21/05/2014Typhoon Exploration Carried Out Soil and Magnetic Ground Sur...
09/05/2014Typhoon Exploration: Amendment to Stock Option Plan
29/04/2014Typhoon Exploration: Second Drillhole Results from the Cinco...
17/04/2014Typhoon Exploration Announces the Acquisition of a Building ...
15/04/2014Typhoon Exploration Receives its First Drilling Assay Result...
29/10/2013(Fayolle)Visible Gold at Fayolle
23/10/2013Very Active with 3 Exploration Programs Underway
01/10/2013Adopts Advance Notice By-Law
08/08/2013Shareholders Unequivocally Approved Resolutions at the 2013 ...
30/07/2013Annual General Assembly is Scheduled for August 8th, 2013
30/07/2013Annual General Assembly is Scheduled for August 8th, 2013
10/06/2013Amends Option Agreement
02/05/2013(Fayolle)Aurizon Continues Its Work on Fayolle
09/04/2013(Fayolle)Positive Preliminary Economic Assessment Options for the Fay...
15/03/2013Announcement
30/10/2012(Fayolle)The Fayolle Deposit is at an Advanced Stage and Hosts Signif...
09/10/2012Announces Results of Reconnaissance Work on the Nordair Prop...
13/07/2011(Fayolle)and Aurizon Mines Ltd. Intersects 1,480 g/t Au at More Than ...
13/06/2011Completes a Second Placement With Aurizon Mines Ltd
08/03/2011Welcomes Jean-Pierre Thomassin in its Management Team
25/01/2011Has Begun its Drilling Campaign at Destorbelle
16/04/2008ACQUISITION OF A PROPERTY WITH URANIFEROUS POTENTIAL
28/12/2007 Obtains Receipt For Final Prospectus
08/11/2007(fr) PRÉVOIT DISTRIBUER DES ACTIONS DE DIAMOND FRANK
03/08/2007Shareholders Approve Resolutions at Annual Meeting
19/06/2007Acquires Key Ground near Goldcorp
19/06/2007Prend Position près de Goldcorp
12/06/2007Obtains 125 G/T Gold on Monexco
29/05/2007Début des Travaux sur la Propriété Monexco
24/04/2007Nouvelles Exploration typhon
14/03/2007Cloture un financement de 1,000,000 $ avec Mineralfields po...
08/03/2007acquiert une propriété uranifère dans le secteur cote nord, ...
06/02/2007Nouvelles Exploration typhon - News
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TYP.V)OTHER OTC (TYPFF)
0,045+0.00%0,030+0.00%
TSX-V
CA$ 0,045
20/09 14:42 -
0%
Cours préc. Ouverture
0,045 0,045
Bas haut
0,040 0,045
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,045 -%
Volume var. 1 mois
30 111 -%
24hGold TrendPower© : -3
Produit
Développe
Recherche Diamonds - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2021-43,75%0,090,04
202045,45%0,110,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-0,46%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX+3,64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,44 CA$+2,52%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,50 CA$+1,17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,88 US$-0,42%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :