Prefeasibility Study

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Europe | Precious Metals | Zinc |

Prefeasibility Study


20 July 2015

Prefeasibility Study Outlines Optimisation Plan of

Canadian Copper Producer with 45 per cent IRR and 21 Year Mine Life

London, England & Baie Verte, Newfoundland and Labrador, Canada - Rambler Metals and Mining plc, a Canadian copper and gold producer, explorer and developer (TSXV: RAB, AIM: RMM) ("Rambler" or the "Company") today reports that it has completed a pre-feasibility engineering study and economic assessment ('PFS') aimed to integrate the Lower Footwall Zone ('LFZ') mineral resource into the life of mine ('LOM') plan for the Ming Copper-Gold Mine.

The PFS was successful in defining a staged, low capital strategy for the optimisation of all existing infrastructure allowing the operation to run at full capacity of 1,250 metric tonnes per day ('mtpd') by 2018.
The results show positive economics, a strong internal rate of return and significant cash flow under reasonable commodity price assumptions. In addition, there remain further opportunities for improvement as the operation becomes fully optimised.
All currency is expressed in Canadian dollars ($CDN) unless otherwise noted.

SUMMARY

The PFS is based on an optimisation of the current high grade massive sulphide (Phase 1) operation by blending increasing amounts of LFZ ore with the massive sulphides as production ramps up to 1,250 mtpd.

Current production at the operation is 650 metric tonnes of massive sulphide ore per day. The PFS plans increases in mill throughput to 850 mtpd in 2016; 1,180 mtpd in 2017 and finally 1,250 mtpd in 2018.

Additional opportunities exist to improve the low risk, low capital base case scenario, including :

o Integration of ore pre-concentration at the mine site. This could potentially allow for further optimisation of mine production with equal tonnage, but higher grade, being delivered to the mill;

o Additional resource growth through ongoing exploration in both the higher grade massive sulphide and LFZ;

o Further utilisation of the Nugget Pond base and precious metals milling facility with new feed sources from other regional copper and gold plays.

PRE-FEASIBILY STUDY ('PFS') HIGHLIGHTS

Project after-tax net present value ('NPV5%') of $62.1 million with an internal rate of return ('IRR') of 45 per cent, based on trending copper and gold prices including long-term copper price of USD $2.79 per pound (see Note 2, page 5). Pre-tax NPV5% of $70.2 million with an IRR of 46 per cent.

Net cash flow from operations of $273 million, undiscounted. Net after-tax cash flow of $110 million

(before-tax $128 million).

Five year, $66 million LFZ capital plan, mainly self-funded by the current mining operation. During the initial expansion the operation will require additional working capital funding to execute its plan. The first year is projecting a shortfall of $8.43 million dollars with a net cash position of - $650,000 over the five year period.

The Company has initiated discussions with various debt type financing partners targeting up to USD $25 million to strengthen the working capital shortfall, initiate the expansion's construction and provide additional capital should the Company choose to be more aggressive with construction or underground development.

During the 21 year mine life (ending 2036), after milling and recovery, approximately 536,000 tonnes of copper concentrate (337 million pounds of copper) is estimated to be produced with 89,600 ounces of gold and 527,800 ounces of silver.

Average annual cash operating cost of $1.97 per equivalent pound copper (USD $1.71).

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB


Norman Williams, President and CEO of Rambler, commented:

"I am pleased with the results of the PFS, demonstrating a low risk and low capital solution to optimise and expand the operation into a profitable mine with an expected life of more than 20 years. Being a Canadian producer, Rambler benefits not only from working in one of the safest jurisdictions in the world, but also from selling commodities in US dollars whilst most of our costs remain in Canadian dollars.

"The Company has been advancing discussions with a selection of financing partners, focusing on debt type financing arrangements. This main project financing is intended to mainly cover working capital shortfalls as the Company progresses its optimisation plan. In the interim, the Company is in advance discussions to secure a USD5 million bridge loan facility with its current off-take partner as a means of strengthening its working capital position whilst expediting development into the LFZ.

"We will continue to advance and develop the other opportunities with a goal to further strengthening the base case economics and potentially allowing more of the 26 million tonne LFZ resource to be converted into reserve."

PRE-FEASIBILITY STUDY ('PFS')

The new twenty one year life of mine for the project will see the underground mining from both the high grade massive sulphides and the Lower Footwall Zone. The initial feasibility study, released on 26 August 2010, only considered the mining of the massive sulphides, that being the Phase 1 - high grade, low tonnage start-up. With the current infrastructure in place, this Phase 2 expansion into the Lower Footwall Zone is the natural next step allowing the mining and milling processes to be fully optimised.
The PFS has been developed through a number of independent consultants; WSP Canada Inc. out of Sudbury, Thunder Bay and Montreal were responsible for the mineral resource and reserve estimates, mining, environmental and project economics; Thibault & Associates Inc. out of New Brunswick were responsible for all processing aspects of the project; while West Coast Engineering Limited, based out of Newfoundland and Labrador, were responsible for all mill site civil and structural.
The procedures used for the resource and reserve estimation processes are consistent with the Canadian Institute of Mining and Metallurgy ('CIMM') best practices and in compliance with NI 43-101 guidelines. All operational data from the ongoing mining and milling at the Ming Copper-Gold Mine was made available for review and inclusion where necessary.
A National Instrument 43-101 ("NI 43-101") technical report will be filed on SEDAR at www.sedar.com within 45 days, before the end of August 2015.
As part of the PFS, a new geological resource and reserve has been estimated for the project. Tables 1 and 2 below outline the results of this updated estimate which will also be detailed in the technical report filed with SEDAR. No inferred mineralisation was included in the reserve estimate. Resources are inclusive of reserves.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

2


MINERAL RESOURCE and RESERVE STATEMENT MINERAL RESERVE

Table 1: Mineral Reserve Estimate Summary for the Ming Copper-Gold Mine*

Classification

Quantity

Grades

Contained Metal

Classification

tonnes

Copper

Gold

Silver

Zinc

Copper

Gold

Silver

Zinc

Classification

tonnes

%

g/t

g/t

%

M lbs

K oz

K oz

M lbs

* All figures are rounded to reflect the accuracy of the estimate; numbers may not total due to this rounding. This reserve statement reflects changes to reserves in the massive sulphides based on depletion due to mining and additions due to new exploration drilling results. The NSR for the reserve material was calculated using an all-in costs of $147 per tonne of ore milled for the massive sulphides and $118 per tonne of ore milled for the lower footwall zone.

Forecast long term metal prices of USD$2.79 per pound copper and USD$1,100 per ounce gold, and USD$15.50 per ounce silver with a long term

USD/CDN FX rate of 1:0.88.

MINERAL RESOURCE

Table 2: Mineral Resource Estimate Summary for the Ming Copper-Gold Mine*

Classification

Quantity

Grades

Contained Metal

Classification

('000) t

Copper

Gold

Silver

Zinc

Copper

Gold

Silver

Zinc

Classification

('000) t

%

g/t

g/t

%

M lbs

K oz

K oz

M lbs

* Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. All figures are rounded to reflect the accuracy of the estimate. Cut‐off grades of 1.0 per cent copper for the massive sulphides, 1.25 grams per tonne gold for any gold zones and 1.00 per cent copper for the stringer sulphides have been used in the estimate.

Cut‐offs are based on an NSR model and forecast long term metal prices of USD$2.79 per pound copper and USD$1,100 per ounce gold, and USD$15.50 per ounce silver with a long term USD/CDN FX rate of 1:0.88. Zinc does not contribute to the revenues. Resources are inclusive of reserves.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

3


HIGHLIGHTS AND ASSUMPTIONS OF THE PFS

As with all mining and exploration projects this optimisation plan carries with it some risk, but also significant upside potential. The table below summarises the sensitivities associated with head grade, commodity pricing, currency rate, project operating expenditures ('OPEX') and capital expenditures ('CAPEX').

Table 3: Summary of Sensitivities

Variable

-10% Base NPV 10%

Range

Grade to mill Metal Price Currency OPEX

CAPEX

$6.3M $70.2M $134.1 ($1.5M) $70.2M $141.9M

$143.9M $70.2M $9.9M

$114.5M $70.2M $25.9M

$82.7M $70.2M $57.7M

$127.8M

$140.4M

$134.0M

$88.6M

$24.9M

Note: Discounted NPV5% before-tax in Canadian Dollars.

Basic assumptions used for the compilation of this PFS:

o Average copper price of USD $2.79 per pound, gold price of USD $1,100 per ounce and silver of USD $15.54 per ounce. Long term pricing of USD $2.79 per pound, $1075 per ounce and $15.50 per ounce for copper, gold and silver respectively. (see Note 2)

o Average USD to Canada exchange rate of 1 : 0.87. Long term exchange of 1 : 0.88.

o Project discount rate of 5%

o Mill recoveries are based on:

Current operations at Nugget Pond for the massive sulphide ore types at 96.1%, 67.8%

and 76.1% for copper gold and silver respectively, and;

Recent lock cycle testing of LFZ ore with recoveries of 98.9%, 63.6% and 62.0% for copper, gold and silver respectively;

A weighted average ratio is used for any years with blended ore types.

The LOM envisages that production will increase from the existing 650 mtpd, to 850 mtpd in the first year, 1,180 mtpd in year two and 1,250 mtpd from year three to year twenty one. Once in "steady state" production (from year three onwards) the majority of the planned tonnage will come from longhole bulk mining of the LFZ which will help reduce the overall operating unit costs. Paste backfill augmented with waste rock from underground development will be the primary filling mechanism with access to each of the zones made possible through new development and extensions of the existing ramps and raises. Due to the increase in production, supplement al ventilation will be installed after year two.
Five year, $66 million LFZ capital plan, mainly self-funded by the current mining operation. During the initial expansion the operation will require working capital funding to execute its plan. The first year is projecting a shortfall of $8.43 million dollars with a net cash position of - $650,000 over the five year period.
The Company has initiated discussions with various debt type financing partners targeting up to USD $25 million to strengthen working capital shortfalls and initiate the expansion's construction.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

4


OPPORTUNITIES

The mineralisation of the LFZ consists of dense, narrow copper rich stringer sulphides hosted within lighter weight un-mineralised chlorite schist. The initial phase of bench scale and mini-pilot processing, developed with the assistance of the Research & Development Corporation of Newfoundland and Labrador ('RDC'), has revealed that physical separation of the denser mineralization from the lighter rock using Dense Media Separation ('DMS') is possible. Bench scale and pilot testing indicates that technically the DMS process could increase the grade of copper in the LFZ by removing 30 per cent to 40 per cent of the lighter waste host rock with copper recoveries averaging 95 per cent. In terms of grade improvement, the mini-pilot testing using run of mine material from the LFZ grading 1.39 per cent copper returned a pre-concentrate grade of

2.27 per cent copper (an upgrade ratio of 1.63).
All onsite test work for pre-concentration has been completed with final results pending for review.

Rambler's gold hydromet facility, at a 500 mtpd capacity, is not being utilised in this plan. With any expansion of Rambler's gold resources or participation in another gold project, like the Maritime Resources Corp.'s Hammerdown mine, this facility could take advantage of any deposit outside the Ming Mine area and operate independently.

On 17 November 2014, Rambler and Maritime entered into a letter of intent ('LOI') to evaluate the economic potential of re-opening the past producing Hammerdown gold mine. As per the LOI Rambler will oversee engineering and evaluation work to determine the mineable ounces available at Hammerdown. The work will be initiated following the successful completion of an equity financing by Maritime.

The Ming Mine ore bodies remain open in all directions and have been proven to return significant copper and gold intersections with ongoing diamond drill delineation and exploration programs. By expanding on these programs the Company is confident that new resources and reserves may be added.

Further updates on these opportunities will be announced as the Company moves forward with the Phase 2
Optimisation plan.

Note 1: Unless otherwise noted all figures are quoted in $CDN

Note 2: Commodity pricing for years 1 to 5 are reflective of published 2015 forecast reports. Long term pricing beyond year 5 trending to $2.79 per pound copper, $1,075 per ounce gold and $15.50 per ounce silver.

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development Company that in November 2012 brought its first mine into commercial production. The group has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte Peninsula, Newfoundland and Labrador, Canada.
The Company's Vision is to be Atlantic Canada's leading mine operator and resource developer through growth and expansion of its existing assets; discovering new deposits; strategic partnerships; mergers and acquisitions. In addition to the Ming Mine, Rambler has strategic investments in the former producing Hammerdown gold mine, the Little Deer/ Whales Back copper mines and the advanced Valentine Lake Gold Project.
Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RMM.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

5


For further information, please contact:

Norman Williams, CPA, CA President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President and Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Stewart Dickson / Jeremy Stephenson

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Tim Blythe/ Megan Ray

Blytheweigh

Tel No: +44 (0) 20 7138 3204

Website: www.ramblermines.com

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

The NI43‐101 technical report has been complied by a number of independent, third party, consultants. Including:

Brian Saul, P.Eng., WSP Canada Inc: Project economics;

Dean Thibault, P.Eng., Thibault & Associates Inc: Metallurgical processing;

Jean-Sébastien Houle, Eng., WSP Canada Inc: Environmental;

Leo Hwozdyk, P.Eng., WSP Canada Inc.: Reserve Estimation and mining methodology;

Rimas Pakalnis P. Eng., Pakalnis & Associates: Rock Mechanics; Todd McCracken, P.Geo., WSP Canada Inc: Resource estimation;

Overton Colbourne, P.Eng., West Coast Engineering Limited: Civil and Structural

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ material ly from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs tow ards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

6


APPENDIX 1 - Mineral Reserve and Mineral Resource Statements

Table 4: Mineral Reserve Estimate for the Ming Copper-Gold Mine - 20 July 2015

Classification

Quantity

Grades

Contained Metal

Classification

tonnes

Copper

Gold

Silver

Zinc

Copper

Gold

Silver

Zinc

Classification

tonnes

%

g/t

g/t

%

M lbs

K oz

K oz

M lbs

MMS - Total Proven Reserve

707,300

1.91

2.32

11.69

0.41

29.8

52.8

265.9

6.4

LFZ - Total Proven Reserve

(undiluted, unrecovered)

4,498,000

1.99

0.13

1.73

0.02

197.1

18.8

249.6

2.0

TOTAL

5,205,300

1.98

0.43

3.08

0.07

226.9

71.6

515.5

8.4

MMS - Total Probable Reserve

848,100

2.06

2.40

7.48

0.31

38.6

65.5

203.9

5.8

LFZ - Total Probable Reserve

(undiluted, unrecovered)

2,202,000

1.96

0.12

1.53

0.02

95.2

8.7

108.5

0.8

TOTAL

3,050,100

1.99

0.76

3.19

0.10

133.8

74.2

312.4

6.6

MMS - Dilution (all sources)

257,500

0.00

0.00

0.00

0.00

0.0

0.0

0

0.0

LFZ - Dilution (all sources)

1,117,000

0.75

0.07

0.86

0.01

18.5

2.6

30.7

0.3

TOTAL

1,374,500

0.61

0.06

0.70

0.01

18.5

2.6

30.7

0.3

Total MMS Reserve (diluted and recovered)

1,631,600

1.90

2.26

8.96

0.34

68.3

118.3

469.8

12.2

Total LFZ Reserve (diluted and recovered)

7,035,400

1.80

0.12

1.55

0.02

279.7

27.0

349.9

2.8

Combined Total Reserve

(diluted and recovered) 8,667,000 1.82 0.52 2.94 0.08 348.1 145.3 819.8 15.0

Mineral Reserve Notes

All figures are rounded to reflect the accuracy of the estimate; numbers may not total due to this rounding. This reserve statement reflects changes to reserves in the massive sulphides based on depletion due to mining and additions due to new exploration drilling results. The NSR for the reserve material was calculated using an all-in costs of $147 per tonne of ore milled for the massive sulphides and $118 per tonne of ore milled for the lower footwall zone.

Forecast long term metal prices of USD$2.79 per pound copper and USD$1,100 per ounce gold, and USD$15.50 per ounce silver with a long term

USD/CDN FX rate of 1:0.88.

Mineral Resource Notes

Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. All figures are rounded to reflect the accuracy of the estimate. Cut‐off grades of 1.0 per cent copper for the massive sulphides, 1.25 grams per tonne gold for any gold zones and 1.00 per cent copper for the stringer sulphides have been used in the estimate.

Cut‐offs are based on an NSR model and forecast long term metal prices of USD$2.79 per pound copper and USD$1,100 per ounce gold, and USD$15.50 per ounce silver with a long term USD/CDN FX rate of 1:0.88. Zinc does not contribute to the revenues. Resources are inclusive of reserves.

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

7


Table 5: Mineral Resource Estimate for the Ming Copper-Gold Mine - 20 July 2015

Resource

Classification

Cutoff

Quantity

Grades

Contained Metal

Resource

Classification

Cutoff

(000't)

Copper

Gold

Silver

Zinc

Copper

Gold

Silver

Zinc

Resource

Classification

Cutoff

(000't)

%

g/t

g/t

%

M lbs

K oz

K oz

M lbs

Measured

1807 Zone

1.00 % Cu

205

3.45

2.38

17.64

0.65

15.6

15.7

116.2

2.9

1806 Zone

1.25 g/t Au

185

0.40

3.00

14.74

0.60

16.2

17.8

87.7

2.5

Ming South

1.00 % Cu

560

1.70

2.28

9.94

0.40

21.0

41.0

178.8

4.9

Ming North

1.00 % Cu

66

1.96

1.52

10.62

1.15

2.8

3.2

22.4

1.7

Unmined Levels

--

--

--

--

--

--

--

--

--

--

Remnant Pillars

--

--

--

--

--

--

--

--

--

--

Sub-Total Mass

ive Sulphides

1,015

1.83

2.38

12.41

0.53

41.0

77.8

405.1

11.9

Upper Footwall

1.00 % Cu

--

--

--

--

--

--

--

--

--

Lower Footwall

1.00 % Cu

18,112

1.48

0.11

1.31

0.02

591.0

64.1

762.8

8.0

Sub-Total Strin

ger Sulphides

18,112

1.48

0.11

1.31

0.02

591.0

64.1

762.8

8.0

Combined Measured Total 19,127 1.50 0.23 1.90 0.05 632.0 141.8 1,167.9 19.9

Indicated

1807 Zone

1.00 % Cu

44

2.05

2.11

17.29

0.74

2.0

3.0

24.7

0.7

1806 Zone

1.25 g/t Au

65

0.71

2.87

16.01

0.73

1.0

6.0

33.7

1.1

Ming South

1.00 % Cu

731

1.60

2.12

8.83

0.42

25.7

11.7

49.9

6.8

Ming North

1.00 % Cu

128

1.82

1.57

9.08

0.80

5.2

6.5

37.4

2.3

Unmined Levels

--

125

2.43

1.99

--

--

6.7

8.0

--

--

Remnant Pillars

--

259

3.96

2.00

--

--

22.6

16.7

--

--

Sub-Total Mass

ive Sulphides

1,353

2.12

2.07

6.97

0.36

63.2

90.1

303.2

10.8

Upper Footwall 1.00 % Cu -- -- -- -- -- -- -- -- -- Lower Footwall 1.00 % Cu 7,846 1.43 0.10 1.23 0.02 247.4 25.2 310.3 3.5

Sub-Total Stringer Sulphides 7,846 1.43 0.10 1.23 0.02 247.4 25.2 310.3 3.5

Combined Indicated Total 9,199 1.53 0.39 2.07 0.07 310.5 115.3 613.5 14.3

Measure and Indicated Combined

1807 Zone 1.00 % Cu 249 3.20 2.33 17.58 0.66 17.6 18.7 140.9 3.6

1806 Zone 1.25 g/t Au 250 0.48 2.96 15.07 0.64 2.6 23.9 121.3 3.5

Ming South 1.00 % Cu 1,291 1.64 2.19 9.31 0.41 46.7 90.9 386.3 11.6

Ming North 1.00 % Cu 194 1.87 1.56 9.60 0.92 8.0 9.7 59.8 3.9

Unmined Levels -- 125 2.43 1.99 -- -- 6.7 8.0 -- -- Remnant Pillars -- 259 3.96 2.00 -- -- 22.6 16.7 -- -- Sub-Total Massive Sulphides 2,368 2.00 2.20 9.30 0.44 104.2 167.8 708.3 22.7

Upper Footwall

1.00 % Cu

--

--

--

--

--

--

--

--

--

Lower Footwall

1.00 % Cu

25,958

1.46

0.11

1.29

0.02

838.3

89.3

1,073.1

11.4

Sub-Total Strin

ger Sulphides

25,958

1.46

0.11

1.29

0.02

838.3

89.3

1,073.1

11.4

Combined Measured & Indicated 28,326 1.51 0.28 1.96 0.05 942.5 257.1 1,781.4 34.2

Inferred

1807 Zone

1.00 % Cu

28

1.23

0.36

2.89

0.02

0.7

0.3

2.6

0.0

1806 Zone

1.25 g/t Au

149

0.66

2.63

10.67

0.50

2.2

12.6

51.1

1.7

Ming South

1.00 % Cu

744

1.52

1.94

8.39

0.44

25.0

11.3

200.5

7.2

Ming North

1.00 % Cu

673

1.72

1.61

9.43

0.91

25.6

34.9

204.2

13.5

Unmined Levels

--

--

--

--

--

--

--

--

--

--

Remnant Pillars

--

--

--

--

--

--

--

--

--

--

Sub-Total Mass

ive Sulphides

1,593

1.52

1.84

8.95

0.64

53.5

94.2

458.4

22.5

Upper Footwall

1.00 % Cu

402

2.58

0.21

2.54

0.05

22.9

2.7

32.8

0.4

Lower Footwall

1.00 % Cu

3,090

1.37

0.11

1.23

0.01

93.3

10.9

122.2

0.7

Sub-Total Strin

ger Sulphides

3,492

1.51

0.12

1.38

0.01

116.2

13.6

155.0

1.1

Combined Inferred Total 5,086 1.51 0.66 3.75 0.21 169.7 107.8 613.4 23.6

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

8


APPENDIX 2: Summary of Pre-feasibility Economics

Table 6: Project Economics

Item Value $CDN

Value $USD

Copper produced (million lbs) 336.8

Gold produced (ozs) 89,600

Silver Produced (ozs) 527,800

Mine Life (2016 to 2036) 21 Years

Net Revenue (million) $ 1,142

Net Cash Flow from Operations (million) $ 273

Total Capital Cost (Over LOM, million) $ 163

Net Cash Flow (before tax, million) $ 128

Net Cash Flow (after tax, million) $ 110

Net Present Value-before tax ( 5% discount, million) $ 70.2

Net Present Value-after tax ( 5% discount, million) $ 62.0

Internal Rate of Return-before tax ("IRR") 46% Internal Rate of Return-after tax ("IRR") 45%

336.8

89,600

527,800

21 Years

$ 992

$ 239

$ 139

$ 113

$ 100

$ 62.0

$ 56.3

46%

45%

Payback (years) 5.1

5.1

Table 7: Summary of Economic Parameters

Item Value $CDN Value $USD

Average Copper Price1 ($USD per lbs) $ 3.21 $ 2.79

Average Gold Price1 ($USD per oz) $ 1264 $ 1,100

Average Silver Price1 ($USD per oz) $ 17.86 $ 15.54

Average $USD/$CDN Exchange Rate 0.87 1

5 Year Project Capital Plan (million) (million) Mill Site $ 6.90 $ 5.53

Mine Site Surface $ 9.92 $ 8.33

Mine Underground and In-directs $ 40.67 $ 34.08

Port Site nil nil

Contingency $ 8.75 $ 7.28

Total (million) $ 66.24 $ 55.22

Net Cash (Shortfall) (million) (million) F2016 ($ 8.43) ($ 6.75) F2017 nil $ 4.28 ($ 3.47) F2018 nil $ 6.57 $ 5.46

F2019 ($ 6.64) ($ 5.64) F2020 nil $ 3.57 $ 3.14

Total Cash Shortfall (million) ($ 0.65) ($ 0.33)

Operating Costs ($CDN per tonne milled)

Mining $ 41.37 $ 35.99

Ore Haulage to Mill $ 8.00 $ 6.96

General & Administration $ 12.77 $ 11.10

Sub-total $ 62.14 $ 54.05

Processing $ 15.92 $ 13.83

Port Operations $ 0.86 $ 0.75

Royalties $ 1.78 $ 1.54

Total (per tonne milled) $ 80.70 $ 70.17

Price per equivalent pound of Cu $ 1.97 $ 1.71

Other Parameters

Mining Dilution (Stopes, Drifts) 15%, 0% Mining Recovery (Stopes, Drifts) 90%, 100% Mill Recoveries MMS (Cu, Au, Ag) 96.1%, 67.8%, 76.1% Mill Recoveries LFZ (Cu, Au, Ag) 98.9%, 63.6%, 62.0% Concentrate Grade (Cu) 28.5%

(1) See Page 5, Note 2

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

9


APPENDIX 3 - Glossary of Select Geological and Mining Terms

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

10

Term

Definition

''Au''

gold

"Ag"

silver

''base metal''

generally non-ferrous, non-precious metal, including copper, lead and zinc

''concentrate''

in general, the saleable product resulting from crushing and grinding of mined ore in a processing plant along with concentration to remove impurities. Base metal operations can produce copper, lead and/or zinc concentrates

''Cu''

copper

''cut-off''

lowest grade of mineralised material considered economic, used in the calculation of ore reserves. Also used in reserve estimation, meaning all material higher than the given grade

''down plunge''

the direction within a rock mass indicated by linear features such as mineral lineation, fold axes or direction of maximum strain caused by deformation

''drift''

a horizontal (or nearly horizontal) passageway in a mine

''Footwall Zone'' or ''LFZ''

a mineralised zone beneath a geological feature such as a fault, another mineralised zone or bed

''grade''

relative quantity or the percentage of ore mineral or metal content in an ore body

''Indicated Mineral Resource''

that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed

''massive sulphide''

occurrence of a concentrated mass of sulfide mineral such as pyrite, sphalerite or chalcopyrite in one place, as opposed to their being disseminated or occurring in vein

''measured mineral resource''

that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity

''Mineral resource''

a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form that there are reasonable prospects for eventual economic extraction. Mineral resources are sub-divided, in order of increasing confidence, into Inferred, Indicated and Measured categories

''mineralised''

containing or impregnated with minerals

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

11

''National Instrument 43-101''

provides standards of disclosure for mineral projects in Canada. It is a legal requirement in Canada for all oral and written disclosure of scientific or technical information on mineral deposits

''net smelter return''

the value or estimated value resulting from the sale of a concentrate or other mineral or metal product, net of all costs for mining, processing, smelting, refining, sales and the like

''ore''

rock that can be mined and processed at a profit

''orebody''

mining term to define a solid mass of mineralised rock which can be mined profitably under current or immediately foreseeable economic conditions

''oz''

troy ounce (=31.103 grammes)

''Probable mineral reserves''

measured and/or indicated mineral resources which are not yet proven, but where technical economic studies show that extraction is justifiable at the time of the determination and under specific economic conditions

''Proved mineral reserves''

measured mineral resources, where technical economic studies show that extraction is justifiable at the time of the determination and under specific economic conditions

''reserve''

that part of a resource that can be mined at a profit under reasonably expected economic conditions

''resource''

mineralised body for which there is sufficient sampling information and geological understanding to outline a deposit of potential economic merit

''strike length''

the longest horizontal dimension of an ore body or zone of mineralization

''stringer''

a thin, discontinuous mineral vein or rock layer

''sulphide''

a mineral containing sulphur in its non-oxidised form

''t''

a metric tonne

''VMS''

Volcanogenic Massive Sulphide, a recognised type of base metal ore deposit derived from submarine hydrothermal vent sediments

''volcanic''

igneous rock produced by eruption and solidified on or near the earth's surface;

rhyolite or andesite or basalt

''Zn''

zinc

London, England: Salatin House 19 Cedar Road Sutton, Surrey SM2 5DA T.020 8652 2700 F.020 8652 2719

www.ramblermines.com AIM : RMM; TSX-V : RAB

12

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Rambler Metals & Mining Plc

EXPLORATEUR
CODE : RMM.L
ISIN : GB00B06Y3F14
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Rambler Metals & Mining est une société d’exploration minière de zinc et d'or basée au Royaume-Uni.

Rambler Metals & Mining détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BIG BEAR et MING MINE au Canada.

Rambler Metals & Mining est cotée au Canada et au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 1,1 milliards GBX (1,3 milliards US$, 1,2 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 17 février 2017 à 9,99 GBX, et son plus bas niveau récent le 30 décembre 2022 à 0,05 GBX.

Rambler Metals & Mining possède 549 739 702 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Rambler Metals & Mining Plc
23/04/2007Announces Private Placement
Nominations de Rambler Metals & Mining Plc
24/09/2012-Board Appointment
11/08/2008 Appoints General Manager
Rapports Financiers de Rambler Metals & Mining Plc
09/12/2013Rambler Reports Financial Results for Quarter Ended 31 Octob...
20/11/2013Rambler Provides a Summary of its First Quarter 2014 Operati...
29/10/2013Rambler Reports Financial Results for the Year Ended July 31...
22/10/2012and Mining plc Financial Results Year Ended 31 July 2012
21/03/2011Financial Results Quarter Ended January 31, 2011
08/12/2009First Quarter Results 2010 & Operational Highlights
Projets de Rambler Metals & Mining Plc
02/09/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
02/09/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
14/01/2014Rambler Ships More High Grade Copper Concentrate to Internat...
13/11/2013Rambler Provides Diamond Drilling Update at its Ming Mine
01/10/2013Rambler Ships More High Grade Copper Concentrate; 26,000 Wet...
29/05/2013Rambler Ships More High Grade Copper Concentrate, Over 18,00...
28/05/2013Strategic Partner Releases Its First NI43-101
01/05/2013Rambler Makes Further Repayment to Sprott Resource Lending P...
16/04/2013Rambler Completes Property Arrangement to Explore for New Go...
09/10/2012(Ming Mine)Buys Out 1% Net Smelter Royalty on the Ming Mine Property
04/09/2012Rambler Continues to Optimize Copper and Gold Production Whi...
15/02/2012and Mining Aligns Itself With Maritime Resources Through 17%...
01/06/2011Rambler Signs Exploration and Development Alliance with Mari...
10/05/2011Rambler Develops Through High Grade Gold Zone Returning 227....
10/05/2011Develops Through High Grade Gold Zone Returning 227.15 g/t G...
26/04/2011Production Approval Received for Nugget Pond Crown Pillar Al...
02/03/2011(Ming Mine) Updated Footwall Zone Resource Estimate
02/03/2011Realizes a 21% Increase in Contained Metal by Updating its F...
16/02/2011(Ming Mine)Progresses in Bringing Its Copper and Gold Projects Into Pro...
01/06/2010(Ming Mine)Environmental Approval Received
12/04/2010(Ming Mine)Environmental Project Registration and Project Update for th...
26/02/2009(Ming Mine)NI43-101 Resource Estimate for the Ming Mine
10/02/2009(Ming Mine)and Mining Reports Positive Results From Its Lock Cycle Metu...
09/07/2008(Ming Mine)Ming Mine Dewatered and Project Update
16/06/2008Files NI43-101 Technical Report
02/06/2008Completes Scoping Study and Moves Ahead to Pre-Feasibility
15/05/2008(Ming Mine) Drills 5.10 metres of 3.68 g/T Gold and 15.77% Copper
30/04/2008Publishes Its NI43-101 Resource Estimate for the Ming Mine
26/03/2008Underground Footwall Program Drills 11.7 Metres of 2.25% Cop...
19/02/2008Directional Drilling Returns 5.37% copper over 3.0 metres
12/12/2007(Ming Mine)Drills 60.7 Feet of 4.26% Copper, 4.3 g/T Gold and 1.25% Zin...
Communiqués de Presse de Rambler Metals & Mining Plc
28/07/2016Director / PDMR Shareholding
28/07/2016Director / PDMR Shareholding
29/06/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
29/06/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
13/06/2016Notification of Major Interests in Shares - Correction
13/06/2016Notification of Major Interests in Shares - Correction
09/06/2016Notification of Major Interest in Shares
09/06/2016Notification of Major Interest in Shares
07/06/2016Notification of Major Interest in Shares
06/06/2016Transaction Close
06/06/2016Transaction Close
06/06/2016Holdings in Company
06/06/2016Holdings in Company
27/05/2016Result of General Meeting
27/05/2016Result of General Meeting
20/05/2016Notification of Major Interests in Shares
02/02/2016Rambler Metals & Mining PLC: Issuance of Share
02/02/2016Rambler Metals & Mining PLC: Issuance of Share
02/02/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
02/02/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
13/01/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
13/01/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
13/01/2016Acquisition of Thundermin Resources Inc.
13/01/2016Acquisition of Thundermin Resources Inc.
22/12/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
22/12/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
22/12/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
22/12/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
14/12/2015Unaudited Consolidated Financial Information for the Quarter...
14/12/2015Unaudited Consolidated Financial Information for the Quarter...
14/12/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
14/12/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
26/10/2015Rambler Metals and Mining PLC: Financial Results for year en...
26/10/2015Rambler Metals and Mining PLC: Financial Results for year en...
26/10/2015Financial Results Year End July 31, 2015
09/09/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
09/09/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
08/09/2015Fiscal 2015 Q4 and Yearend Production Results
08/09/2015Fiscal 2015 Q4 and Yearend Production Results
03/09/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
03/09/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
02/09/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
02/09/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
02/09/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
02/09/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
19/08/2015Rambler Metals & Mining PLC: 11th Shipment of High Grade Cop...
31/07/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
31/07/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
31/07/2015TR-1: Notification of Major Interest in Shares
31/07/2015TR-1: Notification of Major Interest in Shares
20/07/2015Prefeasibility Study
20/07/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
20/07/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
22/06/2015Financial Results for the Third Quarter 2015
22/06/2015Rambler Metals & Mining PLC: Financial Results for the Third...
22/06/2015Rambler Metals & Mining PLC: Financial Results for the Third...
19/03/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
19/03/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
19/03/2015Rambler Management Discussion and Analysis for the Quarter e...
19/03/2015Rambler Management Discussion and Analysis for the Quarter e...
19/03/2015Financial Results for the Second Quarter & Interim Six Month...
23/02/2015Second Quarter 2015 Production Results
23/02/2015and Mining plc: Second Quarter 2015 Production Results
23/02/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
23/02/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
09/02/2015Progress Update on the Lower Footwall Zone
09/02/2015Rambler Metals & Mining PLC Announces Progress Update on the...
09/02/2015Rambler Metals & Mining PLC Announces Progress Update on the...
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
29/12/2014Holdings in Company
29/12/2014Holdings in Company
29/12/2014Rambler Metals & Mining PLC: Holdings in Company
29/12/2014Rambler Metals & Mining PLC: Holdings in Company
23/12/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
23/12/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
09/12/2014First Quarter 2015 Unaudited Financial Results
09/12/2014First Quarter 2015 Unaudited Financial Results
09/12/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
09/12/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
04/12/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
04/12/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
02/12/2014Resource and Technical Update and Update on DMS Project
02/12/2014Resource and Technical Update and Update on DMS Project
02/12/2014Rambler Provides Resource and Technical Update, Reporting a ...
02/12/2014Rambler Provides Resource and Technical Update, Reporting a ...
27/11/2014First Quarter 2015 Production Results
27/11/2014First Quarter 2015 Production Results
27/11/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
27/11/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Metals & Mining PLC: Holding(s) in Company
17/11/2014Hammerdown Gold Mine Update
17/11/2014Rambler and Maritime Agree to Evaluate the Viability of Rest...
29/10/2014Proposed Change to its Board of Directors
29/10/2014Rambler Metals & Mining PLC Announces Proposed Change to Boa...
27/10/2014Financial Results Year Ended July 31, 2014
27/10/2014Rambler Metals & Mining PLC Announces Financial Results Year...
23/09/2014Fourth High Grade Copper Concentrate Shipment Delivered in t...
09/09/2014CORRECTION - Rambler Metals and Mining plc: Rambler Provides...
21/08/2014Rambler Metals & Mining PLC Announces Fourth Quarter and Yea...
05/08/2014Rambler Continues Its Investment in Marathon Gold
03/07/2014Rambler Continues to Ship High Grade Copper Concentrate
19/06/2014Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
19/06/2014Financial Results for Quarter Ended 30 April 2014 Debt Free ...
19/06/2014Rambler Metals & Mining PLC: Financial Results for Quarter E...
27/01/2014Rambler Updates the Reserve and Resource Estimates at its Mi...
15/01/2014Rambler Senior Management Changes
04/12/2013Marathon Gold Enters into an Agreement With Rambler Metals a...
03/12/2013Rambler Reduces Debt Facility with Sprott Lending Partnershi...
29/10/2013and Mining PLC: Report of the Directors and Audited Financia...
15/10/2013Completes Purchase of 50% Interest in the Little Deer Projec...
01/10/2013Ships More High Grade Copper Concentrate
17/09/2013Enters Conditional Agreement to Purchase Cornerstone's 50% I...
09/09/2013TR-1: Notification of Major Interest in Shares
03/09/2013Rambler Makes a $500,000 Debt Re-Payment to Sprott Lending P...
03/09/2013Makes a $500,000 Debt Re-Payment to Sprott Lending Partnersh...
23/08/2013Announces Options Exercising
18/07/2013Exercises Warrants in Support of Maritime's Work Program on ...
11/07/2013Strategic Partner Maritime Files Technical Report
27/06/2013and Mining Releases Its Q3 2013 Results
24/06/2013Rambler Provides Diamond Drilling Update - Intersected 13.18...
24/06/2013Provides Diamond Drilling Update
24/06/2013Provides Diamond Drilling Update
03/06/2013Rambler Pays a Further $600,000 in Debt Re-Payment to Sprott...
03/06/2013Pays a Further $600,000 in Debt Re-Payment To Sprott Lending...
01/05/2013Makes Further Repayment to Sprott Resource Lending Partnersh...
16/04/2013Completes Property Arrangement to Explore for New Gold & Cop...
15/04/2013and Mining - Novation of Nominated Advisor and Brokerage Agr...
27/03/2013Extends Loan Arrangement With Sprott Resource Lending Partne...
21/02/2013Non-Executive Board Member Resigns
28/01/2013TR-1: Notification of Major Interest in Shares
13/11/2012Appoints New General Manager at the Ming Copper-Gold Mine; F...
29/10/2012(Ming Mine)and Mining Plc, Rambler's Ming Mine Moves into Commercial Pr...
30/05/2012Rambler Begins Trucking Copper Concentrate Following Start-u...
02/05/2012Rambler Completes Record Gold Pour of 1935 Ounces
11/04/2012Rambler Produces Over 9,700 Ounces of Gold While Exploration...
22/02/2012and Mining Produces Over 5,000 Ounces of Gold and Intersects...
09/01/2012Rambler Signs Commercial Off-take Agreement with Transamine ...
28/06/2011Significant Progress Being Made at Rambler's Copper Gold Pro...
17/06/2011Notification of Major Interest in Shares
01/06/2011Signs Exploration and Development Alliance With Maritime and...
05/05/2011Holding In Company
03/05/2011Results of EGM, Closing of Announced Placing and Admission o...
20/04/2011and Mining Presenting and the Proactive Investors One2One Fo...
07/04/2011Notice of General Meeting
14/03/2011Receives Final Permitting For the Ming Copper-Gold Mine
02/03/2011and Mining plc: Updated Footwall Zone Resource Estimate
01/12/2010VP Corporate Development Assumes Corporate Secretary Role
10/08/2010Construction Permits Received for Nugget Pond and Ming Mine ...
26/04/2010Financial Controller Promoted to Chief Financial Officer
26/03/2010Proposed Placing of £2.7 Million to Support Bringing Min
15/02/2010Apointment of Joint Broker
08/02/2010Hires Key Mine Engineering Staff
08/12/2009Features on CEO Clips airing on BNN
23/11/2009Notice of AGM
27/10/2009Completes Purchase of the Nugget Pond Processing Facility
22/10/2009Confirms Closing of Previously Announced Placing
29/09/2009Proposed Placing
25/09/2009NOTICE OF EGM CIRCULAR
21/09/2009Explores for New Gold
09/09/2009COMPLETES NEGOIATIONS FOR THE SALE AND PURCHASE OF THE NUGGE...
13/08/2009BEGINS NEGOTIATING THE DETAILS OF A SALE AND PURCHASE AGREEM...
27/05/2009Q3 2009 Results
21/01/2009REPORTS POSITIVE RESULTS FROM ITS TITAN 24 GEOPHYSICAL SURVE...
08/01/2009Implements Cost Reduction Programme
10/11/2008and Mining Drills 9.50 metres of 20.31 g/t Gold, 4.21 % Copp...
23/09/2008Drills 4.00 metres of 0.25 g/T Gold and 4.48 % Copper
09/09/2008Drills 2.9 metres of 3.05 g/T Gold and 5.19% Copper
27/08/2008Drills 7.4 metres of 2.22 % Copper in the Lower Footwall Zon...
18/06/2008ootwall Zone
07/05/2008Drills 6.00 metres of 2.86% Copper
15/04/2008Underground Gold Exploration Continues to Develop: Drills 5....
28/02/20081807 Zone Returns 4.0 Metres of 6.3% Copper New 200 Metre St...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (RMM.L)TSX-V (RAB.V)
2,00+3603.70%0,030+20.00%
LSE
GBX 2,00
27/04 12:21 1,95
3603,7%
Cours préc. Ouverture
0,054 2,00
Bas haut
2,00 2,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
2,00 -  2,00 3 603,70%
Volume var. 1 mois
256 931 -%
24hGold TrendPower© : -8
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 14/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-4,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,79 CA$-0,32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$+0,54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,13 US$+0,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :