Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Nevada Copper

Publié le 02 mai 2007

Press Release: Augusta Files Q1 Financials - Negotiates Sale of Nevada Properties

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | K Street |

Augusta Files Q1 Financials – Negotiates Sale of Nevada Properties

 

VANCOUVER, BC, May 1, 2007 - Augusta Resource Corporation (TSX/AMEX: AZC; FRANKFURT: A5R) (“Augusta” or the “Company”) reports the Company filed its first quarter financial statements today.  During the first quarter, the Company was pleased to deliver the 2007 Rosemont Deposit Mineral Resource Estimate, which included 5.7 billion pounds (“lbs”) of copper (“Cu”) and 157 million ounces (“oz”) of molybdenum (“Mo”) in measured and indicated resources, and 1.5 billion lbs of Cu and 23 million oz of Mo in inferred resources.  The estimate also included a new silver (“Ag”) resource for the deposit, which quantified approximately 66.5 million ounces (“oz”) of Ag in measured and indicated resources and 9.3 million oz of Ag in inferred resources.  On a copper equivalence basis, the measured and indicated resource contains 8.4 billion lbs of Cu equivalent, and 1.9 billion lbs of Cu equivalent in inferred resources*.  The new NI 43-101 compliant technical report on the Rosemont Property was filed on SEDAR at www.sedar.com on April 26, 2007.

 

The Company also reports it has entered into a Letter of Intent (“LOI”) with Ivana Ventures Inc. (“Ivana”) respecting Augusta’s proposed sale of the Company’s interest in the Mt. Hamilton and Shell properties, both of which are located in White Pine County, Nevada. 

 

The LOI provides for the sale of 100% of the shares of DHI Minerals Ltd., which owns 100% of the shares of DHI Minerals (U.S.) Ltd. (the “Subsidiaries”) which in turn holds a 100% interest in each of the Mount Hamilton and Shell properties.  Each property is subject to a sliding scale net smelter royalty and, in the case of the Mount Hamilton property, minimum advance royalty payments of US$100,000 per year until November 9, 2010 when the minimum royalty payments increase to US$300,000 per year.   In the case of the Shell property, annual advance royalty payments commencing at US$80,000 on the first anniversary, increasing by US$20,000 per year until production commences.

 

The consideration for the sale will be US$6.5 million in cash, and warrants exercisable to purchase up to 3,000,000 shares of Ivana for eighteen months after closing at the price of $0.50 per share.  The cash portion of the purchase price will be payable in installments over five years, with US$1,500,000 payable on closing and an additional US$1,000,000 payable each 12 months thereafter.  The shares of the Subsidiaries will be pledged to the Company as its sole recourse for non-payment of any portion of the purchase price. 

 

The proposed sale is subject to a 30 day due diligence period in favour of Ivana, execution of a formal agreement acceptable to both parties and acceptance of such agreement for filing by the TSX Venture Exchange.

 

ABOUT AUGUSTA RESOURCE CORPORATION - Augusta is a mineral exploration and development company responsibly advancing the Rosemont copper project in Southern Arizona. The Company’s Rosemont property is located in Pima County, approximately 50 kilometers southeast of Tucson, Arizona, and contains a potentially world class open-pit copper/molybdenum/silver (“Cu/Mo/Ag”) deposit.  Augusta has a solid asset base, proven management team, and is committed to becoming a mid-tier copper producer within five years. The company is traded on the American Stock Exchange and the Toronto Stock Exchange under the symbol AZC.

 

* Copper equivalence is based on prices of $1.25/lb Cu, $18.00/lb Mo and $8.50/oz Ag, with no applied recovery factors.   

 

For additional information please visit www.augustaresource.com or contact:

Gil Clausen, President and CEO                   Marlo Hamer-Jackson, Investor Relations Manager 

Phone: 303-300-0136                                   Phone:  604-687-1717           

Fax: 303-300-0135                                        Fax:  604-687-1715   

gclausen@augustaresource.com                      mhamer-jackson@augustaresource.com

 

ON BEHALF OF THE BOARD OF DIRECTORS

 

Gil Clausen”

_________________________                                                                                                           

Gil Clausen
President and CEO                                                                                                                                            

 

CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION

Certain of the statements made and information contained herein and in the documents incorporated by reference may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking statements or information within the meaning of the Securities Act (Ontario).  Forward- looking statements or information include statements regarding the expectations and beliefs of management. Forward looking statements or information include, but are not limited to, statements or information with respect to known or unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.  Forward-looking statements or information are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks and uncertainties relating to the Company’s plans at its Rosemont Property and other mineral properties, the interpretation of drill results and the estimation of mineral resources and reserves, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations, metal recoveries, accidents, equipment breakdowns, title matters, labor disputes or other unanticipated difficulties with or interruptions in production and operations, the potential for delays in exploration or development activities or the completion of feasibility studies, the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations, currency fluctuations, failure to obtain adequate financing on a timely basis, the effect of hedging activities, including margin limits and margin calls, regulatory restrictions, including environmental regulatory restrictions and liability, the speculative nature of mineral exploration, dilution, competition, loss of key employees, and other risks and uncertainties, including those described under “Risk Factors Relating to the Company’s Business” in the Company’s Annual Information Form dated March 1, 2007.  Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements.  Accordingly, readers are advised not to place undue reliance on forward-looking statements or information.  We do not expect to update forward-looking statements or information continually as conditions change, and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in Canada and the United States.

 

 

 
Marlo Hamer-Jackson
Investor Relations & Corporate Communications
 
Augusta Resource Corporation (TSX/AMEX: AZC)
Suite 400 - 837 West Hastings Street
Vancouver, BC  V6C 3N6
Phone: (604) 687-1717
Mobile: (778) 996-3775
Fax: (604) 687-1715
 
 
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Nevada Copper

EN DÉVELOPPEMENT
CODE : NCU.TO
ISIN : CA64128F1099
CUSIP : 64128F
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Nevada Copper est une société d’exploration minière de cuivre basée au Canada.

Nevada Copper est en développement de projets de cuivre, d'argent, de fer et d'or en USA.

Son principal projet en développement est PUMPKIN HOLLOW en USA.

Nevada Copper est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 8,8 millions CA$ (6,5 millions US$, 6,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 avril 2011 à 6,42 CA$, et son plus bas niveau récent le 06 novembre 2020 à 0,06 CA$.

Nevada Copper possède 88 170 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Nevada Copper
09/05/2019Nevada Copper inks $115m deal to construct Pumpkin Hollow
31/08/2018Nevada Copper shares jump on construction decision
16/05/2018Nevada copper provides positive update on drill program: int...
Financements de Nevada Copper
19/04/2016Amends Red Kite and Pala Loan Terms
27/04/2010Closes $23,7 Million Bough-Deal Private Placement Financing
09/04/2010$20.6 Million Bought-Deal Private Placement Financement
27/10/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations de Nevada Copper
08/08/2013Appoints Director
28/02/2012Appoints New Director and Launches Project Website
Projets de Nevada Copper
09/09/2013Receives All Permits For Stage 1 Underground Mine
28/07/2011(Pumpkin Hollow)Obtains 100% of Water Needs for the Pumpkin Hollow Project
28/04/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
12/04/2011INTERSECTS 415 FEET OF 1.84% COPPER
31/03/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
08/02/2011S FEASIBILITY STUDY PROGRESS
04/08/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
08/07/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
16/06/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
27/05/2010(Pumpkin Hollow)Increases Drilling Program
18/05/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
06/05/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
23/04/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
16/02/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
21/01/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
14/01/2010Files NI 43-101 Preliminary Economic Assessment
08/12/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
25/08/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
15/07/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
Communiqués de Presse de Nevada Copper
09/06/2016Nevada Copper Closes Cdn$4.6 Million Equity Offering
03/06/2016Nevada Copper Closes Cdn$ 10.5 Million Financing With Red Ki...
01/06/2016Nevada Copper Solar Zoning Approved
27/05/2016Nevada Copper Annual Meeting Results
27/05/2016Nevada Copper Announces Red Kite Funding Commitment And Equi...
03/05/2016Nevada Copper and City of Yerington Advance Solar Zoning
22/04/2016Nevada Copper Announces Filing Of Amended Prospectus And Exe...
05/04/2016Nevada Copper Amends Red Kite and Pala Loan Terms
28/01/2016Nevada Copper Appoints Directors
03/11/2015Nevada Copper Intersects 105 Feet of 2.55% Copper in the Eas...
13/10/2015Nevada Copper Acquires Private Land & Completes Federal Land...
30/09/2015Nevada Copper Provides Corporate and Project Update
10/09/2015Nevada Copper Intersects 462 Feet of 0.64% Copper
21/08/2015IIROC Trade Resumption - NCU
21/08/2015Federal Land Conveyance Complete at Nevada Copper's Pumpkin ...
20/08/2015IIROC Trading Halt - NCU
17/08/2015Nevada Copper Fully Permitted
31/07/2015Nevada Copper Extends and Increases Bridge Loan Facility
31/07/2015Nevada Copper Receives Air Pollution Control Permit
17/07/2015Nevada Copper Receives Decision Record on Yerington Land Con...
15/07/2015Nevada Copper Intersects 448 Feet Grading 1.0% Copper
09/07/2015Nevada Copper Files Integrated Feasability Study on SEDAR
29/06/2015Nevada Copper Election of New Director and Annual Meeting Re...
24/06/2015Nevada Copper Continues to Expand Open Pit Mineralization In...
23/04/2015Nevada Copper Pumpkin Hollow Project Update
10/02/2015Nevada Copper Pumpkin Hollow Project Update
30/12/2014Nevada Copper Closes US$200 Million Loan Facility
22/12/2014President Signs National Defense Authorization Act That Incl...
03/12/2014Nevada Copper Project Update
04/11/2014Nevada Copper Project Update
30/07/2014Nevada Copper Advances Lyon County Bill
16/07/2014Nevada Copper Provides 2014 Update
02/07/2014Nevada Copper Provides Update & AGM Results
12/05/2014Nevada Copper Update on Lyon County Land Bill
23/01/2014NCU - Nevada Copper featured on KTVN - Channel 2 News
28/10/2013Announces Management Additions
09/10/2013Receives Additional US$15 Million Under Its US$200 Million S...
01/10/2013Announces $24 Million Equipment Financing
26/08/2013Receives Water Pollution Control Permit
16/07/2013Remaining Stage One Permits Issued for Public Comment
25/06/2013Receives Special Use Permit and Provides Update on Land Bill
17/06/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
10/06/2013Receives Reclamation Permit
28/05/2013Provides Update on State Permits
07/05/2013s Lyon County Bill Status
23/04/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
17/04/2013s Permitting and Yerington Land Bill Status
17/04/2013s Permitting and Yerington Land Bill Status
28/03/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
11/03/2013North Deposit Mineralization Continues to Expand Intersectin...
15/02/2013-Permitting and Feasibility Study Update
03/01/2013Status of Congressional Action-Lyon County Land Bill
30/10/2012North Deposit Mineralization Remains Open Intersecting 119 F...
19/10/2012Files Resource Update NI 43-101 Technical Report on SEDAR
05/10/2012to Purchase 17.8% of Mercator Minerals
05/09/2012Governor Sandoval's Trade Mission to China and South Korea
09/08/2012Drilling Continues to Expand Shallow Mineralization in the S...
10/07/2012Submits Mine Development Permit Applications and Announces D...
20/06/2012-Project Update/Land Bill Passed by the House
05/06/2012s Permitting and Yerington Land Conveyance
29/05/2012Intersects 470 Feet at 0.73% Copper in the North Deposit
19/04/2012Provides an Update on House Subcommitee Hearing on Yerington...
10/04/2012Mineralization Continues to Expand in the North Deposit; Lan...
26/03/2012Announces Introduction of Land Conveyance Bill in the United...
13/03/2012Intersects 9.08% Copper in Open Pittable North Deposit
27/02/2012Appoints New Director & Launches Project Website
22/02/2012Breaks Ground on Underground Shaft
16/02/2012Announces Introduction Of Yerington Land Conveyance Bill
07/02/2012Files Feasibility Study on SEDAR
23/01/2012Announces Positive Feasibility Study Results
17/01/2012(Pumpkin Hollow)Hosts Conference Call to Discuss Pumpkin Hollow Definitive F...
09/01/2012North Deposit Continues to Expand-NC1127 Intersects Minerali...
16/12/2011Announces Selection of Underground Contractor
29/11/2011Coppper-Update on Underground Contractor Selection & Feasibi...
29/09/2011Annnounces Management Addition and Shaft Contract Update
19/09/2011-Feasibility Study Update and Land Transfer
07/09/2011Mineralization Continues to Expand, Intersecting Over 600 Fe...
16/08/2011North Deposit Continues to Expand, Drilling Multiple Interva...
14/06/2011Expands North Deposit Intersecting 785 Feet of 0.73% Copper ...
25/05/2011Steps Out and Drills 126 Feet of 1.26% Copper/Definitive Fea...
03/05/2011(Pumpkin Hollow)Intersects 1,164 Feet of 0.49% Copper in the Pumpkin Hollow ...
01/12/2009Robust Economic Results
01/12/2009Reports robust economic results
03/11/2009Capstone Mining Makes Strategic Investment in Nevada Copper
29/06/2009US$2,000,000 Convertible Debenture
02/05/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
0,100+5.26%0,045-4.26%
TORONTO
CA$ 0,100
23/04 16:03 0,010
5,26%
Cours préc. Ouverture
0,095 0,095
Bas haut
0,095 0,105
Année b/h Var. YTD
0,060 -  0,140 -28,57%
52 sem. b/h var. 52 sem.
0,060 -  0,355 -72,97%
Volume var. 1 mois
133 519 -9,09%
24hGold TrendPower© : 20
Produit
Développe Copper - Gold - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :