Project Receives Positive Feasibility Study

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Palladium | Rhodium |

Marathon Project Receives Positive Feasibility Study

     TORONTO, Dec. 19 /CNW/ - Marathon PGM Corporation ("Marathon" or "the
Company", MAR-TSX) is pleased to announce it has received a positive
Definitive Feasibility Study ("DFS") of its 100% owned Marathon PGM-Cu Project
(the "Project") located 10 km north of Marathon, Ontario. The summary of the
DFS will be filed within 45 days on SEDAR and posted on the Company's web page
upon receipt from Micon International Limited ("Micon").

     Summary highlights of the DFS are:

     -------------------------------------------------------------------------
                                                            Base Case (3 year
                                                             trailing average)
     -------------------------------------------------------------------------
     Undiscounted cash flow (pre-tax)                         CAD$510 million
     -------------------------------------------------------------------------
     Undiscounted cash flow (after tax)                       CAD$369 million
     -------------------------------------------------------------------------
     NPV @ 8% (after tax)                                   CAD$77 million
     -------------------------------------------------------------------------
     IRR (pre-tax)                                                      15.5%
     -------------------------------------------------------------------------
     IRR (after tax)                                                    12.4%
     -------------------------------------------------------------------------
     Payback period                                                 4.7 years
     -------------------------------------------------------------------------
     Proven and probable reserves
     -------------------------------------------------------------------------
       Copper                                                  465,310,000 lb
     -------------------------------------------------------------------------
       PGM+Au                                                    2,745,000 oz
     -------------------------------------------------------------------------
       Silver                                                    4,026,000 oz
     -------------------------------------------------------------------------
     Average annual metal production
     -------------------------------------------------------------------------
       Copper                                                  42 million lbs
     -------------------------------------------------------------------------
       PGM+Au                                                      201,000 oz
     -------------------------------------------------------------------------
       Silver                                                      310,000 oz
     -------------------------------------------------------------------------
     Cash cost per PGM+Au oz (net of credits)                  Negative US$53
     -------------------------------------------------------------------------
     Cash cost per Cu lb (net of credits)                             US$0.28
     -------------------------------------------------------------------------

     The DFS examined the economics of developing and mining the Marathon
Deposit, a large polymetallic deposit in Northern Ontario, at a rate of 22,000
tpd. The project will produce a single concentrate containing copper,
platinum, palladium, gold, silver and rhodium.
     The study used three different economic cases and metal price forecasts,
which are presented below.

     1. Base Case - Three Year Trailing Price, as of August, 2008:
        US$3.12/lb Cu; US$345/oz Pd; US$1,340/oz Pt; US$688/oz Au,
        US$13.0/oz Ag, US$/CAD$ exchange rate = 1.092.

     2. TD Newcrest Variable Forecast as at November 2008:

     -------------------------------------------------------------------------
                                                                          Long
     Metal       Units   2009   2010   2011   2012   2013   2014   2015   Term
     -------------------------------------------------------------------------
     Copper     US$/lb   2.25   2.50   3.00   3.00   2.75   2.50   1.75   1.75
     -------------------------------------------------------------------------
     Platinum   US$/oz  1,750  1,750  1,750  1,750  1,750  1,750  1,750  1,750
     -------------------------------------------------------------------------
     Palladium  US$/oz    400    400    400    400    400    400    400    400
     -------------------------------------------------------------------------
     Gold       US$/oz    850    800    800    800    800    800    800    800
     -------------------------------------------------------------------------
     Silver     US$/oz   10.5   11.0   12.0   12.0   12.0   12.0   12.0   12.0
     -------------------------------------------------------------------------
     Exchange
      rate     USD/CAD  1.200  1.200  1.200  1.200  1.200  1.200  1.200  1.200
     -------------------------------------------------------------------------

     3. Current Year Prices, average from January to August 2008:
        US$3.67/lb Cu; US$426/oz Pd; US$1,888/oz Pt; US$906/oz Au,
        US$17.2/oz Ag, US$/CAD$ exchange rate = 1.014.


     Results of Three Different Pricing Scenarios

     -------------------------------------------------------------------------
                                              Bank Variable           Current
                                Base Case          Forecast       Year Prices
     -------------------------------------------------------------------------
     Undiscounted cash flow
     -------------------------------------------------------------------------
       Pre-tax            CAD$510 million   CAD$493 million   CAD$902 million
     -------------------------------------------------------------------------
       After tax          CAD$369 million   CAD$359 million   CAD$650 million
     -------------------------------------------------------------------------
     Net present value @
      8% discount rate
     -------------------------------------------------------------------------
       Pre-tax            CAD$142 million   CAD$158 million   CAD$352 million
     -------------------------------------------------------------------------
       After tax           CAD$77 million    CAD$93 million   CAD$230 million
     -------------------------------------------------------------------------
     Average annual cash
      flow (pre tax)       CAD$51 million    CAD$49 million    CAD$90 million
     -------------------------------------------------------------------------
     Internal rate
      of return
     -------------------------------------------------------------------------
       Pre-tax                      15.5%             17.5%             25.0%
     -------------------------------------------------------------------------
       After tax                    12.4%             14.1%             20.5%
     -------------------------------------------------------------------------
     Capital investment
     -------------------------------------------------------------------------
       Pre-production     CAD$386 million   CAD$386 million   CAD$386 million
     -------------------------------------------------------------------------
       Life-of-mine       CAD$586 million   CAD$586 million   CAD$586 million
     -------------------------------------------------------------------------
     Payback period             4.7 years         4.0 years         3.5 years
     -------------------------------------------------------------------------
     Cash costs, net
      of credits
     -------------------------------------------------------------------------
       Per PGM+Au oz       Negative US$53             US$99   Negative US$129
     -------------------------------------------------------------------------
       Per lb copper              US$0.28  Negative US$0.41  Negative US$0.29
     -------------------------------------------------------------------------

     The DFS was managed and compiled by Micon with support by Met-Chem Canada
Inc. for process engineering and costing of the process and infrastructure,
Golder Associates Ltd. for environmental and geotechnical aspects of the study
and design and costing of the tailings, waste rock and water management
systems and P&E Mining Consultants Inc. ("P&E") for mineral resource and
reserve estimates, mine design, mine scheduling and mine costing. The DFS cost
estimates are considered to be of an accuracy of +/-15%.
     The DFS included modeling of an optimized engineered open pit design that
resulted in a proven and probable mineral reserve estimate of 79 million
tonnes containing 465 million pounds of copper and 2.7 million ounces of PGMs
(Pt, Pd, Rh) + gold. This represents a 78% conversion rate relative to the 3.4
million ounce PGM+Au and 595 million pounds of Cu measured and indicated
resource estimate (see October 9, 2008 press release).
     The DFS base case demonstrates that the Marathon Deposit generates strong
cash flow under appropriate metal price assumptions. This project is
potentially the base for establishing PGM and copper production in the
Marathon district by further exploration of the Company's extensive land
position and the potential of new acquisitions within proximity to the
proposed processing facilities.
     The two largest areas for adding resources are located (i) immediately
outside the Marathon designed pit and (ii) at the Geordie Lake Deposit,
located 14 km west of Marathon. Large blocks of PGM-Cu extend well beyond the
current Marathon designed pit. These blocks were not included in the reserves
due to economic constraints, yet may represent future mining potential in
later stages of mining. In addition, there are several known PGM-Cu
mineralized zones on strike from the Marathon deposit that have not been fully
explored.
     The Geordie Lake Deposit is located 14 km west of the Marathon Deposit
and is 100% owned by Marathon. It has an existing measured and indicated
resource of 25.99 Mt grading 0.55 g/t Pd, 0.03 g/t Pt, 0.05 g/t Au, 0.35% Cu
and 2.35 g/t Ag representing 456,800 oz Pd, 28,400 oz Pt, 45,800 oz Au, 195.7M
lb Cu and 1,938,400 oz Ag (please see MAR release of 08-Jul-08).
Mineralization at Geordie Lake is open down dip and to the north and south,
which bodes well for open pit mining potential. The potential for additional
PGM-Cu zones is high.

     Location

     The Marathon Deposit is located 8 km north of Marathon, Ontario. The
deposit is easily accessible from the Trans Canada Highway and is also close
to the CN railway. Electrical power is easily accessible with the deposit
being located within 1 km from two spurs of OPG's electrical power grid. The
region also benefits from a strong contractor and supplier base to the mining
industry and an experienced mining workforce.

     Capital Investment Program

     The initial capital investment program amounts to CAD$386 million and is
summarized below.

     -------------------------------------------------------------------------
                                                                CAD $ million
     -------------------------------------------------------------------------
     Processing plant and infrastructure                                289.5
     -------------------------------------------------------------------------
     Tailings and water management                                       14.3
     -------------------------------------------------------------------------
     Owner's cost                                                        14.0
     -------------------------------------------------------------------------
     Pre-strip and other mining                                          10.3
     -------------------------------------------------------------------------
     Contingencies                                                       57.8
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------
     Total Pre-production capital                                       385.9
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------
     Life-of-mine CAPEX (net of salvage)                                162.5
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------
       including Mining equipment(1)                                    586.5
     -------------------------------------------------------------------------
     -------------------------------------------------------------------------

     (1) Assumes a 10% down payment on mining equipment and financing of the
         balance over 5 years at 9% p/a.

     Mineral Reserve Estimate

     Mineral reserves were based on a Whittle based open pit optimization and
subsequent mine design, undertaken by P&E using the measured and indicated
mineral resources, which were estimated by P&E and reported by Marathon in a
press release dated October 9, 2008. The optimal pit shell produced by the
Whittle software was used as a guideline for the design of the engineered pit.
The table below shows the reserve and resource statement for the Marathon
deposit:

     -------------------------------------------------------------------------
     Classification     Tonnes   Cu %  Au g/t  Pt g/t  Pd g/t  Ag g/t  Rh g/t
     -------------------------------------------------------------------------
     Proven         58,902,000  0.291   0.081   0.233   0.794    1.61  0.0059
     -------------------------------------------------------------------------
     Probable       20,445,000  0.194   0.075   0.235   0.650    1.50  0.0069
     -------------------------------------------------------------------------
     Total          79,347,000  0.266   0.079   0.234   0.757    1.58  0.0062
     -------------------------------------------------------------------------

     Open pit mining reserves were developed under the direction of "Qualified
Person" Eugene Puritch, P.Eng., of P&E.

     Mining

     The Marathon PGM Deposit will be mined utilizing conventional open pit
mining equipment and practices with a total fleet of sixteen 228 tonne
capacity haul trucks, two 27 m3 diesel-hydraulic shovels, three production
drills, a pre-shear drill and one 25 m3 wheel loader, and various ancillary
equipment to support the mining operations, to be acquired over four years on
a lease/purchase plan.
     The open pit will operate on a year round basis and provide ore feed to
an on-site processing plant and low-grade ore stockpile. The feed rate to the
processing plant is designed to be 22,000 tpd ore. The pit will require the
removal of a total of 3.6 Mt of overburden and a total of 286.6 Mt of waste
rock over a mine life of 10.1 years. The overall waste tonnes to ore tonnes
stripping ratio is estimated to be 3.6:1. The pit design includes inter-ramp
pit slope angles that range from 48 to 55 degrees with the majority at 55
degrees.
     The waste rock storage facility has been designed to hold the
life-of-mine waste rock production and has a storage volume of 114 million m3
with a footprint area of 241 hectares.

     Mineral Processing

     The plant design comprises a sulphide flotation facility with a nominal
throughput capacity of 22,000 tpd (7.7 M tonnes per annum) based on 90% plant
availability. Metallurgical recoveries are estimated at 91% for Cu, 63% for
Pt, 77% for Pd, 73% for Au and 77% for Ag.
     The process flowsheet and design criteria are based on extensive
metallurgical testwork programs that were conducted at various laboratories,
including SGS Lakefield located in Lakefield, Ontario. The process includes
primary and secondary crushing using conventional crushers, tertiary crushing
using high pressure grinding rolls (HPGR), ball milling, conventional
flotation and concentrate dewatering. Approximately 90,000 tonnes per year of
a single bulk concentrate containing copper and high values of PGMs, Au and Ag
will be shipped to a third party smelter.
     Thickened tailings disposal technology has been selected to minimize the
environmental impact of the Project. Marathon will dispose of the life-of-mine
tailings into a managed tailings facility with a design volume of 49 million
m3 and a footprint area of approximately 142 hectares.

     Operating Costs

     Total on-site cash operating costs are estimated at CAD$14.50 per tonne
milled. Estimated average life-of-mine unit operating costs per tonne of ore
processed are CAD$7.37/t for mining, CAD$6.02/t for processing and CAD$1.11
for general and administration. The cost of mining ore and waste is CAD$1.60
per tonne.

     Financing and Cash Resources

     As at November 30, 2008, Marathon had $17.0 million in its treasury. The
Company is examining a variety of different methods of securing the required
funding to develop the Marathon Deposit, including joint ventures, royalty
arrangements, project equity and debt instruments.
     The Company has engaged TD Newcrest to act as financial advisor in
determining the best approach to developing the Marathon PGM-Copper Project.
     Phillip Walford noted: "Despite the current situation, we are confident
that the healthy economics of the Marathon Project will enable the Project to
progress towards producing status."

     Technical Report

     A NI 43-101 F1 Technical Report summarizing the DFS will be filed within
45 days on SEDAR and posted on the Company's web page upon receipt from Micon.

     Qualified Person

     The Marathon DFS was prepared by Micon under the supervision of Richard
Gowans, P.Eng., the independent QP. Mr. Gowans is President and Principal
Metallurgist with Micon. Mr. Phillip Walford, President and CEO of Marathon,
is the Company's designated QP for the purpose of the DFS. Mr. Gowans and Mr.
Walford have reviewed and approved the contents of this press release.

     Cautionary Notes Concerning Estimates of Mineral Resources

     This news release uses the terms measured, indicated and inferred
resources as a relative measure of the level of confidence in the resource
estimates that occur separate from the quoted mineral reserves. Readers are
cautioned that Marathon's mineral resources associated with the Geordie Lake
Deposit are not economic mineral reserves and that the economic viability of
resources that are not mineral reserves has not been demonstrated. In
addition, inferred resources are considered too geologically speculative to
have any economic considerations applied to them. It cannot be assumed that
all or any part of an inferred mineral resource will ever be upgraded to a
higher category. Under Canadian rules, estimates of inferred mineral resources
may not form the basis of feasibility or pre-feasibility studies or economic
studies except for Preliminary Assessment as defined under NI 43-101. Readers
are cautioned not to assume that that further work on mineral resources will
lead to mineral reserves that can be mined economically.

     About Marathon PGM Corporation:

     Marathon has completed a definitive feasibility study on the Marathon
PGM-Cu deposit and also has development and exploration stage properties in
southeastern Manitoba and western Newfoundland and Labrador. The Company is
actively looking for additional projects of merit.

     Cautionary Statement Regarding Forward Looking Information:

     Except for statements of historical fact relating to the Company, certain
information contained herein constitutes "forward-looking statements".
Forward-looking statements are frequently characterized by words such as
"plan," "expect," "project," "intend," "believe," "anticipate" and other
similar words, or statements that certain events or conditions "may" or "will"
occur. Forward-looking statements are based on the opinions and estimates of
management at the date the statements are made and are subject to a variety of
risks and uncertainties and other factors that could cause actual events or
results to differ materially from those projected in the forward-looking
statements. These risks and uncertainties include but are not limited to those
identified and reported in Management's Discussion and Analysis for the year
ended December 31, 2007. Circumstances or management's estimates or opinions
could change, and management disclaims any obligation to revise or update
forward-looking statements, whether for new information, future events or
otherwise. The reader is cautioned not to place undue reliance on
forward-looking statements.

     On Behalf of Marathon PGM:
     "Phillip C. Walford"
     Phillip C. Walford, P.Geo.
     President, Chief Executive Officer
     Tel: +1.416.987.0711
     gen@marathonpgm.com

     %SEDAR: 00020574E
For further information: David Leng, P.Geo: Tel: (416) 849-3432, Fax: (416)
861-1925, dleng@marathonpgm.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Marathon PGM Corporation

EXPLORATEUR
CODE : MAR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Marathon PGM est une société d’exploration minière de nickel et de zinc basée au Canada.

Marathon PGM détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BIRD RIVER - PAGE BLOCK, MARATHON, BIRD RIVER - NI ZONE, BIRD RIVER - ZN & CU ZONE et GEORDIE LAKE au Canada.

Marathon PGM est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 9,2 millions CA$ (7,1 millions US$, 6,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 14 août 1998 à 0,02 CA$, et son plus haut niveau récent le 03 juin 2011 à 7,50 CA$.

Marathon PGM possède 17 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Marathon PGM Corporation
18/12/2009 Closes First Tranche of Non-Brokered Private Placement Flow...
Nominations de Marathon PGM Corporation
08/08/2007 appoints Raymond Mason as VP of Operations
Rapports Financiers de Marathon PGM Corporation
15/08/2008Announces 2008 Q2 Financial Results
14/11/2007 Announces 2007 Q3 Financial Results
02/08/2007 Announces 2007 Q2 Financial Results
15/05/2007Announces 2007 Q1 Financial Results
Projets de Marathon PGM Corporation
12/09/2013(Marathon)Marathon Trenching Adds 300m Strike-length to Mineralized Zo...
27/07/2010Cu Project Advances: Permitting, Financing and Metallurgy
21/07/2010(Marathon)Hits 33.54 g/t (uncut) Gold Across 4 m (0.98 oz/ton uncut ac...
22/03/2010(Geordie Lake)Excellent Geordie Lake Drill Results
24/11/2009(Marathon) Receives Optimized Definitive Feasibility Study - Significa...
07/10/2009(Geordie Lake)Development Plans for Geordie Lake Deposit
29/09/2009(Marathon) Wraps Up 2009 Campaign with 4.31 g/t PGM+Au and 0.19% Cu ov...
16/09/2009(Marathon)Drilling Program Hits High Grade Outside Pit Shell
10/09/2009(Marathon)Announces Analyst Day at Marathon PGM-Cu Project
08/09/2009(Marathon)Marathon's Drilling Pushing New Boundaries
06/07/2009(Marathon)Project DFS Being Optimized
10/06/2009(Marathon)Completes Purchase of Bamoos Land Package
12/06/2009(Bird River - Page Block)Marathon Intersects Sulphide Lenses at Coppermine Zone
01/06/2009(Marathon)Better Metallurgy and Economics
11/03/2009(Bird River - Page Block) Reports Positive Drill Results at Bird River
27/02/2009(Bird River - Page Block)Bird River Resource Expansion Continues
03/02/2009(Bird River - Page Block)Marathon Files Technical Report on Feasibility Study and Res...
15/01/2009(Bird River - Page Block) Develops Two Resources on Bird River Project
19/12/2008(Marathon)Project Receives Positive Feasibility Study
06/11/2008(Marathon)Project Receives Support from Pic River First Nation
12/08/2008Definitive Feasibility Study Update
29/07/2008(Marathon)Hits Thickest Ever Intersection of PGM-Cu Mineralization, 18...
16/07/2008(Bird River - Page Block)Ore Fault Drilling Hits 4.5m of 1.32% Ni, 0.14% Cu, and 1.31...
28/01/2008(Marathon) Entering into Option and JV Agreement with Benton Resources...
12/12/2007(Bird River - Page Block)Reviews Progress of 2007 and Plans for 2008
24/10/2007(Marathon)reports final holes of 2007 campaign and hits thickest ever ...
11/09/2007 intersects 44 m of 1.48 g/t PGM and gold and 0.36% copper o...
26/07/2007(Marathon)Drilling intersects 14.6 g/t PGM and gold and 0.18% copper o...
18/04/2007(Marathon)drills 8 m of 3.1 g/t PGM+Au in W Zone
04/04/2007(Marathon)drilling continues to expand W and RD Zones
21/03/2007(Marathon)Drilling Expands High Grade W Zone and Establishes New Poten...
17/02/2007(Marathon)hits high-grade Palladium, Platinum and Rhodium in 2 holes, ...
Communiqués de Presse de Marathon PGM Corporation
28/07/2015Marret Resource Corp. Releases Q2 2015 Financial Statements
17/07/2015Marret Asset Management Inc. - Issuance of Early Warning Rep...
07/07/2015Marret Resource Corp. Announces Record Date and Distribution
29/06/2015Marret Resource Corp. Announces Results of Annual and Specia...
12/05/2015IIROC Trade Resumption - MAR
12/05/2015Marret Resource Corp. announces shareholder proposal
12/05/2015IIROC Trading Halt - MAR
06/05/2015Marret Resource Corp. Releases Q1 2015 Financial Statements
20/04/2015Marret Resource Corp. provides update
31/03/2015Marret Resource Corp. Releases 2014 Year End Financial State...
01/12/2014IIROC Trade Resumption - MAR
01/12/2014Marret Resource Corp. suspends dividend; Provides update
20/08/2014Marret Resource Corp. Announces Monthly Dividend
20/08/2014Marret Resource Corp. Announces Monthly Dividend
11/12/2013Completes Financing with Rambler and Announces Exploration P...
01/05/2013(Marathon)Marathon Intersects Multiple High-Grade Intervals while Unde...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
06/10/2011(Marathon)Marathon Intersects Best Interval at the Leprechaun Gold Dep...
03/10/2011(Marathon)Marathon Continues to Expand the Leprechaun Gold Deposit wit...
11/08/2010Receives Initial Metallurgical
13/05/2010Announces 8,000 Meter Drilling
04/05/2010New Geordie Lake Resource: Increased Metals, Grade and
27/04/2010Joseph G. Spiteri Appointed to Marathon PGM
17/03/2010Drilling Confirms Near Surface Gold Mineralization at Leprec...
23/12/2009Enters Option and JV Agreement for Mountain Lake's Valentine...
26/08/2009Marathon Converting Waste to Ore
15/07/2009Improving Resources Classifications at Marathon
11/12/2008Project accepted into MPMO Projects List
04/09/2008Completes 2008 Drilling Program on BCF JV Property, Intersec...
27/08/2008Acquires Remaining Discovery Shares Pursuant to Compulsory A...
19/08/2008Growth Continues, Ore Fault Property Acquisition Completed
04/02/2008Cabo Awarded Marathon PGM Corporation Contract
07/01/2008 Fault Agreement Approved by Bird River Mines Shareholders, ...
01/11/2007Finalizes Option Agreement for Ore Fault and Plans Drill Cam...
11/10/2007and Bird River Mines Inc., Announce an Option Agreement for ...
04/10/2007 completes 40,000 m drilling campaign and expects new minera...
03/10/2007: CEO Interview
02/10/2007signs Memorandum of Understanding with the Ojibways of Pic R...
21/09/2007 Samples 7.09 g/t PGM and gold,
29/08/2007extends mineralized zone to 800 m at the Coppermine Zone, Bi...
24/08/2007acquires PGM-Ni-Cu property in the Steel Mountain Complex, N...
16/08/2007- CEO Interview
13/08/2007hits 6 m of 7.48 g/t PGM and gold and 0.06% copper in W Hori...
12/07/2007discovers additional mineralization outside perimeter of exi...
28/06/2007drilling discovers mineralization outside of resource open p...
25/06/2007drilling hits mineralization at WD zone 3 km south of Malach...
11/06/2007Promising First Results from Bird River Property for Maratho...
11/05/2007Drilling Continues Expansion of W Zone and Southern Resource
18/04/2007acquires Bird River Ni-Cu+PGM Property through option
25/01/2007Measured and Indicated In-Pit Resource Grows 39%
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAR.TO)Other OTC (MRPGF)
0,520+0.00%4,52+4.63%
TORONTO
CA$ 0,520
05/10 10:30 -
0%
Cours préc. Ouverture
0,520 0,520
Bas haut
0,520 0,520
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,520 -%
Volume var. 1 mois
1 000 -%
24hGold TrendPower© : 20
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 03/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :