Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Marathon PGM Corporation

Publié le 11 juin 2007

Promising First Results from Bird River Property for Marathon PGM Corp

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Nickel | Palladium |

Promising First Results from Bird River Property for Marathon PGM Corp

June 11, 2007 - Toronto, Ontario: Marathon PGM Corporation (MAR :TSX) ("Marathon" or the "Company") is pleased to announce it has commenced the 2007 exploration campaign on the Bird River Sill ("BRS" or "Bird River"), located in southeastern Manitoba.  Marathon PGM is earning a 50 % interest in the property from Gossan Resources Ltd., and has the right to earn 70% by completing a feasibility study.  Marathon has identified a number of targets that warrant diamond drilling.

THIS PRESS RELEASE CONTAINS A MAP.  CLICK HERE TO VIEW ORIGINAL PDF VERSION.

Positive Initial Results from Prospecting

Marathon has started a detailed compilation of historical work and has mobilized geological staff to the Bird River Sill.  Initially, prospecting will be the main focus of work, which will verify some of the airborne geophysical targets and evaluate the numerous occurrences. Marathon's prospecting has yielded positive initial results, as a number of rock samples collected over a strike length of 100 meters exhibit high values of PGM and variable nickel and copper values.  Collected in the far western end of the BRS, some 21 km west of the Page Zone, the chemistry of the samples clearly demonstrates that PGM mineralization is known to occur in multiple environments over the entire property. 

Sample

Au (g/t)

Pt (g/t)

Pd (g/t)

PGM+Au (g/t)

Ag (g/t)

Cu (%)

Ni (%)

C377509

0.04

0.37

0.35

0.76

0.2

0.01

0.02

C377511

0.70

1.21

1.39

3.30

1.2

0.44

0.21

C377514

0.34

0.38

0.78

1.50

1.1

0.39

0.22

C377519

0.09

0.35

0.70

1.14

0.7

0.27

0.19

C377520

0.23

0.67

1.48

2.17

0.4

0.09

0.32

C377521

0.14

0.45

0.84

1.43

1.1

0.21

0.02

The Page Zone

The Page Zone is the most advanced target within Marathon's BRS property, having several holes containing nickel, copper, platinum and palladium values over a strike length of 1km.  Most of the historic drill holes were not assayed for PGM.  The Page Zone is approximately 4 km North West of Mustang Minerals Maskwa mine, which is at present undergoing a prefeasibility study.  The total potentially mineable material (prepared by Micon International, September 2006) at Maskwa is 9,048,200 tonnes at 0.62% Ni, 0.13% Cu, 0.02% Co, 0.15 g/t Pt and 0.58 g/t Pd.

Marathon has given the Page Zone highest priority for drilling due to both its proximity to the past producing Maskwa and Dumbarton mines and the similarity of the contact style of mineralization.  Numerous showings of similar Ni+Cu and PGM mineralization exist along the sill for much of the 21 km of the property's strike length. A ground geophysical program is planned to optimize drilling on the Page Zone as well as locate on the ground the airborne geophysical targets for planned drilling later in the year.

David Good, VP of Exploration, noted "Taking into account that mineralization at the Page Zone has been intersected over a 1 km strike length on surface, and is open to a depth of 200 metres is the prime reason we're focusing on the Page immediately.  We are excited about the potential the Page represents, in addition to the exploration potential from the PGM mineralization now having been recognized in more than one environment."

Table 1: Some Significant Historical Drillhole Results from Bird River Sill Page Zone

Location

Hole

From (m)

To (m)

Interval (m)

Ni (%)

Cu (%)

Co (%)

Pd (g/t)

Pt (g/t)

Au (g/t)

Total PGM (g/t)

Page Zone

BR-05-01

42.90

51.10

8.20

0.48

0.15

0.03

0.46

0.12

0.02

0.60

 

BR-05-02

43.68

61.40

17.72

0.96

0.45

0.04

0.65

0.24

0.03

0.92

 

BR-06-09

42.90

58.90

16.00

0.66

0.42

0.03

0.42

0.14

n/a

0.56

 

BR-06-10

77.90

86.60

8.70

0.92

0.45

0.05

0.89

0.26

n/a

1.15

 

HUDBAY 3

71.48

76.21

4.73

1.43

1.38

0.06

1.49

inc

n/a

1.49

Notes to Table 1 - Assaying from HUDBAY hole 3 was sporadic, resulting in "inc" indicating assaying was incomplete.  Designation of "n/a" indicates element not assayed for.

All of the samples from the "BR" holes were sent to Accurassay, an accredited laboratory in Thunder Bay, Ont., to be assayed using fire assay and other standard techniques.  All of the "HUDBAY" holes were analysed by Hudson Bay Smelting and Mining Company's internal assay laboratory.  The "C" series of rock samples were submitted to ALS Chemex, an accredited laboratory in Vancouver, BC., to be assayed using fire assay and other standard techniques.

All exploration work is being performed under the guidance and supervision of Phillip C. Walford, President and Chief Executive Officer of the Company, a professional geologist and Qualified Person as defined by National Instrument 43-101. Mr. Walford has approved the contents of this press release.

About the Marathon PGM - Cu Project

The company has a 100-per-cent interest in the Marathon PGM -- Cu project, located about 10 kilometers north of Marathon, Ont. The project is currently undergoing a definitive feasibility study and a 35,000 m drill campaign. As announced previously, the company has completed a revised preliminary economic assessment in compliance with the provisions of National Instrument 43-101, showing a measured resource of 39.2 million tonnes containing 1.6 million ounces of PGM and gold and 285 million pounds of copper, and an indicated resource of 28.9 million tonnes containing 1.1 million ounces of PGM and gold and 178 million pounds of copper. An additional low-grade resource was also identified in the report completed by P&E Mining Consultants Inc. and filed on SEDAR on April 5, 2007.
 
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION Except for statements of historical fact relating to the Company, certain info rmation contained herein constitutes "forward-looking statements". Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These risks and uncertainties include but are not limited to those identified and reported in Management's Discussion and Analysis for the year ended December 31, 2006. Circumstances or management's estimates or opinions could change, and management disclaims any obligation to revise or update forward-looking statements, whether for new information, future events or otherwise. The reader is cautioned not to place undue reliance on forward-looking statements.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

ON BEHALF OF MARATHON PGM:

"PHILLIP C. WALFORD"
PHILLIP C. WALFORD, P.GEO.
PRESIDENT, CHIEF EXECUTIVE OFFICER 
GEN@MARATHONPGM.COM
TEL: +1.416.987.0711 

FOR MORE INFORMATION, PLEASE CONTACT:
DAVID LENG, P.GEO: DLENG@MARATHONPGM.COM
TEL:  +1.905.537.5377  
FAX: +1.416.861.1925 
WWW.MARATHONPGM.COM      

FOR MEDIA INQUIRIES, PLEASE CONTACT:
VANESSA NAPOLI, VNAPOLI@RENMARKFINANCIAL.COM
TEL: +1.514.939.3989

Marathon PGM Corporation

EXPLORATEUR
CODE : MAR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Marathon PGM est une société d’exploration minière de nickel et de zinc basée au Canada.

Marathon PGM détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BIRD RIVER - PAGE BLOCK, MARATHON, BIRD RIVER - NI ZONE, BIRD RIVER - ZN & CU ZONE et GEORDIE LAKE au Canada.

Marathon PGM est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 9,2 millions CA$ (7,1 millions US$, 6,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 14 août 1998 à 0,02 CA$, et son plus haut niveau récent le 03 juin 2011 à 7,50 CA$.

Marathon PGM possède 17 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Marathon PGM Corporation
18/12/2009 Closes First Tranche of Non-Brokered Private Placement Flow...
Nominations de Marathon PGM Corporation
08/08/2007 appoints Raymond Mason as VP of Operations
Rapports Financiers de Marathon PGM Corporation
15/08/2008Announces 2008 Q2 Financial Results
14/11/2007 Announces 2007 Q3 Financial Results
02/08/2007 Announces 2007 Q2 Financial Results
15/05/2007Announces 2007 Q1 Financial Results
Projets de Marathon PGM Corporation
12/09/2013(Marathon)Marathon Trenching Adds 300m Strike-length to Mineralized Zo...
27/07/2010Cu Project Advances: Permitting, Financing and Metallurgy
21/07/2010(Marathon)Hits 33.54 g/t (uncut) Gold Across 4 m (0.98 oz/ton uncut ac...
22/03/2010(Geordie Lake)Excellent Geordie Lake Drill Results
24/11/2009(Marathon) Receives Optimized Definitive Feasibility Study - Significa...
07/10/2009(Geordie Lake)Development Plans for Geordie Lake Deposit
29/09/2009(Marathon) Wraps Up 2009 Campaign with 4.31 g/t PGM+Au and 0.19% Cu ov...
16/09/2009(Marathon)Drilling Program Hits High Grade Outside Pit Shell
10/09/2009(Marathon)Announces Analyst Day at Marathon PGM-Cu Project
08/09/2009(Marathon)Marathon's Drilling Pushing New Boundaries
06/07/2009(Marathon)Project DFS Being Optimized
10/06/2009(Marathon)Completes Purchase of Bamoos Land Package
12/06/2009(Bird River - Page Block)Marathon Intersects Sulphide Lenses at Coppermine Zone
01/06/2009(Marathon)Better Metallurgy and Economics
11/03/2009(Bird River - Page Block) Reports Positive Drill Results at Bird River
27/02/2009(Bird River - Page Block)Bird River Resource Expansion Continues
03/02/2009(Bird River - Page Block)Marathon Files Technical Report on Feasibility Study and Res...
15/01/2009(Bird River - Page Block) Develops Two Resources on Bird River Project
19/12/2008(Marathon)Project Receives Positive Feasibility Study
06/11/2008(Marathon)Project Receives Support from Pic River First Nation
12/08/2008Definitive Feasibility Study Update
29/07/2008(Marathon)Hits Thickest Ever Intersection of PGM-Cu Mineralization, 18...
16/07/2008(Bird River - Page Block)Ore Fault Drilling Hits 4.5m of 1.32% Ni, 0.14% Cu, and 1.31...
28/01/2008(Marathon) Entering into Option and JV Agreement with Benton Resources...
12/12/2007(Bird River - Page Block)Reviews Progress of 2007 and Plans for 2008
24/10/2007(Marathon)reports final holes of 2007 campaign and hits thickest ever ...
11/09/2007 intersects 44 m of 1.48 g/t PGM and gold and 0.36% copper o...
26/07/2007(Marathon)Drilling intersects 14.6 g/t PGM and gold and 0.18% copper o...
18/04/2007(Marathon)drills 8 m of 3.1 g/t PGM+Au in W Zone
04/04/2007(Marathon)drilling continues to expand W and RD Zones
21/03/2007(Marathon)Drilling Expands High Grade W Zone and Establishes New Poten...
17/02/2007(Marathon)hits high-grade Palladium, Platinum and Rhodium in 2 holes, ...
Communiqués de Presse de Marathon PGM Corporation
28/07/2015Marret Resource Corp. Releases Q2 2015 Financial Statements
17/07/2015Marret Asset Management Inc. - Issuance of Early Warning Rep...
07/07/2015Marret Resource Corp. Announces Record Date and Distribution
29/06/2015Marret Resource Corp. Announces Results of Annual and Specia...
12/05/2015IIROC Trade Resumption - MAR
12/05/2015Marret Resource Corp. announces shareholder proposal
12/05/2015IIROC Trading Halt - MAR
06/05/2015Marret Resource Corp. Releases Q1 2015 Financial Statements
20/04/2015Marret Resource Corp. provides update
31/03/2015Marret Resource Corp. Releases 2014 Year End Financial State...
01/12/2014IIROC Trade Resumption - MAR
01/12/2014Marret Resource Corp. suspends dividend; Provides update
20/08/2014Marret Resource Corp. Announces Monthly Dividend
20/08/2014Marret Resource Corp. Announces Monthly Dividend
11/12/2013Completes Financing with Rambler and Announces Exploration P...
01/05/2013(Marathon)Marathon Intersects Multiple High-Grade Intervals while Unde...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
16/01/2013Marret Resource Corp. announces participation in Cline Minin...
06/10/2011(Marathon)Marathon Intersects Best Interval at the Leprechaun Gold Dep...
03/10/2011(Marathon)Marathon Continues to Expand the Leprechaun Gold Deposit wit...
11/08/2010Receives Initial Metallurgical
13/05/2010Announces 8,000 Meter Drilling
04/05/2010New Geordie Lake Resource: Increased Metals, Grade and
27/04/2010Joseph G. Spiteri Appointed to Marathon PGM
17/03/2010Drilling Confirms Near Surface Gold Mineralization at Leprec...
23/12/2009Enters Option and JV Agreement for Mountain Lake's Valentine...
26/08/2009Marathon Converting Waste to Ore
15/07/2009Improving Resources Classifications at Marathon
11/12/2008Project accepted into MPMO Projects List
04/09/2008Completes 2008 Drilling Program on BCF JV Property, Intersec...
27/08/2008Acquires Remaining Discovery Shares Pursuant to Compulsory A...
19/08/2008Growth Continues, Ore Fault Property Acquisition Completed
04/02/2008Cabo Awarded Marathon PGM Corporation Contract
07/01/2008 Fault Agreement Approved by Bird River Mines Shareholders, ...
01/11/2007Finalizes Option Agreement for Ore Fault and Plans Drill Cam...
11/10/2007and Bird River Mines Inc., Announce an Option Agreement for ...
04/10/2007 completes 40,000 m drilling campaign and expects new minera...
03/10/2007: CEO Interview
02/10/2007signs Memorandum of Understanding with the Ojibways of Pic R...
21/09/2007 Samples 7.09 g/t PGM and gold,
29/08/2007extends mineralized zone to 800 m at the Coppermine Zone, Bi...
24/08/2007acquires PGM-Ni-Cu property in the Steel Mountain Complex, N...
16/08/2007- CEO Interview
13/08/2007hits 6 m of 7.48 g/t PGM and gold and 0.06% copper in W Hori...
12/07/2007discovers additional mineralization outside perimeter of exi...
28/06/2007drilling discovers mineralization outside of resource open p...
25/06/2007drilling hits mineralization at WD zone 3 km south of Malach...
11/06/2007Promising First Results from Bird River Property for Maratho...
11/05/2007Drilling Continues Expansion of W Zone and Southern Resource
18/04/2007acquires Bird River Ni-Cu+PGM Property through option
25/01/2007Measured and Indicated In-Pit Resource Grows 39%
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAR.TO)Other OTC (MRPGF)
0,520+0.00%4,52+4.63%
TORONTO
CA$ 0,520
05/10 10:30 -
0%
Cours préc. Ouverture
0,520 0,520
Bas haut
0,520 0,520
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,520 -%
Volume var. 1 mois
1 000 -%
24hGold TrendPower© : 20
Produit
Développe
Recherche Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 03/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :