Publié le 06 janvier 2011

Provides Updated Black Fox Mine Technical Report and Update on Black Fox Mine Operations

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

http://gallery.mailchimp.com/07570b824e9971b0d0ddfb1e9/images/brigus_header.1.jpg

Halifax, Nova Scotia � January 6, 2011� Brigus Gold Corp. (�Brigus� or the �Company�) announces the results from a recently completed independent Technical Report (the �Report�) on its Black Fox Mine in the Timmins Gold District, Ontario, Canada.  The Report was based on the mine operations and reserves as of October 31, 2010 and included a Net Present Value of $359.4 million for the Black Fox Mine using a 5% discount rate.  The Company also provides an update on underground development at the Black Fox Mine including production results from the fourth quarter (�Q4�) of 2010, which have been impacted by development progress.  All currency is reported in U.S. dollars. 
 
The Report, which is anticipated to be filed by the end of this week under the Company�s name at 
www.sedar.com and posted to the Company�s website at www.brigusgold.com, was prepared in compliance with Canadian National Instrument 43-101 (�NI 43-101�) by Wardrop Engineering Inc., A Tetra Tech Company, Toronto, Ontario, with assistance from Brigus staff.  Highlights from the Report include:
 

  • Mine life of 8.6 years based on existing reserves of 906,375 ounces of gold within 6.5 million tonnes at an average gold grade of 4.4 grams per tonne (�gpt�).
  • Processing rate of 730,000 tonnes per annum (2,000 tonnes per day (�tpd�)) and a recovery rate of 94%.
  • Average cash operating costs of $502 per ounce ($66.94 per tonne milled) with a break even gold price of $602 per ounce.
  • Capital costs, including sustaining capital, of $74.8 million.
  • The Net Present Value (�NPV�) of Black Fox, at a 5% discount rate, is $359.4 million with pre-tax undiscounted cash flow of the project of $439.0 million from revenues of $0.9 billion based on a gold price of $1,200 per ounce for 88% of the ounces produced and $500 per ounce for the remaining 12% of production ounces (in accordance with the gold stream agreement with Sandstorm Resources (�gold stream agreement�)).
  • Average annual production of 104,000 ounces of gold over the next five years of production.

 
Potential upside exists beyond the results of the Report which excludes management�s anticipated extensions to the Black Fox ore body that remain open at depth and along strike.  Further upside potential is demonstrated by ongoing drilling success at the Contact Zone gold deposit and the Gibson Zone, each located within the Black Fox Complex, within three kilometres to the southeast of the mine.
 
Commenting on the Report, Chief Operating Officer Richard Allan said, �The completion of Brigus� merger in June 2010 and the commencement of underground mine development in July 2010 has represented a new beginning for the Black Fox Mine and Mill. This Report marks a baseline for continuing gold production from Black Fox and confirms that the project is financially robust based on existing reserves.  The Report reinforces our confidence that Black Fox will continue to be a low cost gold producer.  Opportunities have been identified (as noted below) that are expected to provide significant operating upside to the mine.  During the first quarter of 2011, we plan to complete the main underground infrastructure development at Black Fox and, in the process, transition to steady state production levels contemplated in the Report.�

Table 1: Black Fox Mine�s Cash Flow and Net Present Value Sensitivity to Changes in the Gold Price

Table 2: Black Fox Mine�s Net Present Value Sensitivity
(
Please see the PDF of the news release for these tables.)
 

Estimated Mineral Resources
 
As of October 31, 2010, Indicated Resources at Black Fox, including reserves, were estimated at 1,031,400 ounces of gold within 5.7 million tonnes of ore at an average gold grade of 5.7 gpt and additional Inferred Resources were estimated at 77,500 ounces of gold within 0.8 million tonnes of ore at 3.1 gpt.   
 
Positive drill results from several ore-grade holes distant from the existing mine reserves, which were included in previous resource estimates, were excluded from the current resource estimate as they were considered by Brigus and Wardrop to be too far from the main deposit and too far apart to be included within the Inferred Resource category.  Follow up and infill drilling around these drill holes provides the Company with high-priority exploration targets and a further opportunity for future resource additions. Prior to the Brigus merger, drilling to expand Black Fox resources and reserves was limited from 2008 to early 2010 due to capital constraints.
 
The gold mineral resource statement in the Report was reported at a 0.88 gpt cut-off grade for the open pit and at a 2.54 gpt cut-off grade for the underground. 
 
The resource estimate as of October 31, 2010 shows Indicated Resources, including Probable Reserves, and Inferred Resources as follows:

Table 3: Estimated Gold Mineral Resources for the Black Fox Mine (at October 31, 2010)
(
Please see the PDF of the news release for this table.)
 

Estimated Mineral Reserves
 
Black Fox�s estimated gold mineral reserves total 0.9 million ounces of gold within 6.4 million tonnes at an average gold grade of 4.4 gpt, according to the Report.  The economic analysis in the Report was based on the following gold mineral reserve estimate as of October 31, 2010:

Table 4: Estimated Gold Mineral Reserves for the Black Fox Mine (at October 31, 2010)
(
Please see the PDF of the news release for this table.)


Cash Operating Costs
 
The Report cites cash operating costs of $502 per ounce of gold over the known life of mine.  Using constant dollar terms, the cash operating costs are summarized as follows:
 
Table 5: Life of Mine Cash Operating Costs at the Black Fox Mine
(
Please see the PDF of the news release for this table.)

A summary of the economic results for the base case are as follows:

Table 6: Technical Economic Results for the Black Fox Mine (as of January 1, 2011)
(
Please see the PDF of the news release for this table.)
 

Upside Opportunities
 
The Report identifies the following upside operating opportunities:

  • Potential expansion and further optimization of the mill to enhance the gold recovery rate by expanding or optimizing the grinding and leaching circuit.
  • The deposit exhibits good potential for additional resources at depth and along strike.
  • Cut and fill stopes have been conservatively designed and in wider areas will support higher productivity and lower unit costs.
  • Evaluation of long hole stoping methods for steeply dipping ore blocks to enhance underground mining productivity and lower mining costs.
  • Toll processing of lower grade, open pit ore stockpiles.

The Company believes that there is significant upside opportunity for additions to reserves and resources from its ongoing exploration drilling program within the 42 square kilometre Black Fox Complex including potential extensions to the Black Fox ore body.  Continuing exploration success at the Contact and Gibson Zones and planned 2011 exploration at the former Stock gold mine, located at the Black Fox Mill, represent additional exploration potential.


Black Fox Operations Update
 
Following the mid-2010 merger of Linear Gold Corp. and Apollo Gold Corporation to form Brigus, the Company has optimized mining operations in the open pit while simultaneously initiating underground mine development.   The Black Fox Mine commenced production as an open pit mine in May 2009.
 
The Black Fox Mine operated as the former Glimmer underground mine, from 1997-2001, before suspending operations as a result of depressed gold prices.  The current underground development includes the total replacement of all previous underground infrastructure, including the service and ventilation raise as well as the haulage ramp to surface.     
 
To date, ongoing development of the new underground infrastructure has been slower than anticipated.  Delays are attributable to certain legacy issues preceding the Brigus merger, an extremely competitive labour market that has contributed to various staffing challenges and operational issues arising from contractor scheduling and equipment availability.  Completion of the new vent raise and portal are now targeted for completion by mid-February 2011.
 
Recently, Brigus has accelerated its efforts to hire permanent Company mining and development personnel with underground staffing levels increasing and coinciding with the commencement of the new year. 
 
Construction and relocation of the vent raise and portal continue to result in logistical issues that have significantly restricted ore production from the open pit.  During this transitional period the Black Fox Mill continues to operate at 2,000 tpd by drawing down low-grade stockpiles (<2.0 gpt) held in inventory.  During Q4 2010, the Company produced approximately 13,700 ounces of gold from approximately 184,000 tonnes of ore. 
 
The Company is committed to the completion of the underground development and near-term commencement of commercial production levels from the underground mine.  The new vent raise and portal is nearing completion and when complete will result in the attainment of commercial production during the first quarter of 2011 and quarterly production increases over the balance of the year.  The 2011 mine plan is being adjusted to reflect the updated schedule and revised guidance will be provided following completion of the portal and vent raise.
 

Goldfields Update
 
The Company has retained March Consulting Associates Inc. and Wardrop to update the capital and operating costs and the resource model, respectively, for the Company�s 100% owned Goldfields Project, located near Uranium City, Saskatchewan, Canada.  The Goldfields Project is comprised of the Box and Athona gold deposits hosting in excess of one million ounces of gold of Proven and Probable Reserves contained within 14.9 million tonnes at 1.4 gpt for Box and 10.5 million tonnes at 1.0 gpt for Athona.  These reports are expected to support a development decision in Q2 2011.  
 

Qualified Persons
 
The Qualified Persons who reviewed the technical information of this news release were Richard Allan, P. Eng., Vice President and Chief Operating Officer for Brigus and Tim Maunula, P. Geo. for Wardrop in regards to the references to the Report.  
 

About Brigus Gold
 
Brigus is a growing gold producer committed to maximizing shareholder value through a strategy of efficient production, targeted exploration and select acquisitions.  The Company operates the wholly owned Black Fox Mine in the Timmins gold district of Ontario, Canada.  The Black Fox Complex encompasses the Black Fox Mine and Mill, and adjoining Grey Fox-Pike River property, all in the Township of Black River-Matheson, Ontario, Canada.  Brigus is also advancing the Goldfields Project located near Uranium City, Saskatchewan, Canada, which hosts the Box and Athona gold deposits. In Mexico, Brigus holds a 100% interest in the Ixhuatan Project located in the state of Chiapas, and a 3% NSR interest in the Huizopa Project, an early stage, gold-silver exploration project located in the state of Chihuahua.  In the Dominican Republic, Brigus Gold has a joint venture covering three mineral exploration projects.
 
Contact Information:
 
Wendy Yang, Vice President of Investor Relations
Phone: 720-886-9656 Ext. 217                                   
E-mail: 
ir@brigusgold.com                                        
 
Website: 
www.brigusgold.com
 

Cautionary Note to U.S. Investors Concerning Estimates of Mineral Resources
 
This news release uses the term mineral �resources�.  The Company advises U.S. investors that while these terms are defined in and required by Canadian regulations, these terms are not defined terms under the U.S. Securities and Exchange Commission (�SEC�) Industry Guide 7 and are generally not permitted to be used in reports and registration statements filed with the SEC.  The SEC generally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant �reserves� as in-place tonnage and grade without reference to unit measures. U.S.investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.
 

Non-GAAP Financial Measures
 
The term �total cash cost� is a non-GAAP financial measure and is used on a per ounce of gold basis. Total cash cost is equivalent to direct operating cost as found on the Consolidated Statements of Operations and includes by-product credits for payable silver production. The Company has included total cash cost information to provide investors with information about the cost structure of our mining operations. This information differs from measures of performance determined in accordance with GAAP in the United States and Canada and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. This measure is not necessarily indicative of operating profit or cash flow from operations as determined under GAAP and may not be comparable to similarly titled measures of other companies.
 

Cautionary and Forward-Looking Statements
 
This news release includes �Forward-Looking Statements� within the meaning of section 21E of the United States Securities Exchange Act of 1934, as amended.  All statements regarding the ability of the Company to be a low-cost gold producer; to successfully transition to steady state production levels; to extend the Black Fox ore body; to have continued exploration success at the Contact and Gibson zones and initial exploration success at the former Stock Mine/Black Fox Mill property; to successfully complete underground infrastructure, including completion of a new vent raise and portal; to remedy certain legacy operational issues; to be able to hire sufficient skilled workers; life of mine production and costs; NPV and cash flow based on life of mine plan; upside potential to extend the mine life or increase production or resources and reserves;  the amount of exploration drilling and the timing associated therewith; are forward-looking statements and estimates that involve various risks and uncertainties.  There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.  Important factors that could cause actual results to differ materially from these forward-looking statements include environmental risks and other factors disclosed under the heading �Risk Factors� in Brigus Gold�s and its predecessor companies� most recent annual report on Form 10-K filed with the United States Securities and Exchange Commission and elsewhere in Brigus Gold�s documents filed from time to time with the Toronto Stock Exchange, the NYSE Amex, the United States Securities and Exchange Commission and other regulatory authorities.  All forward-looking statements included in this news release are based on information available to the Company on the date hereof.  The Company assumes no obligation to update any forward-looking statements, except as required by applicable securities laws.

http://brigusgold.us1.list-manage.com/track/open.php?u=07570b824e9971b0d0ddfb1e9&id=71de8b25d0&e=b3b24113c7

Brigus Gold Corp.

PRODUCTEUR
CODE : BRD
ISIN : CA1094901024
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Brigus Gold est une société de production minière d'or basée au Canada.

Brigus Gold détient divers projets d'exploration au Canada.

Son principal projet en production est BLACK FOX au Canada, son principal projet en développement est GOLDFIELDS - BOX DEPOSIT au Canada et ses principaux projets en exploration sont STOCK MINE, GOLDFIELDS - ATHONA DEPOSIT, GREY FOX, BOX, PIKE RIVER et ATHONA au Canada, PONTON DOMINICAN REPUBLIC, LA CUEVA, LOMA EL MATE, LOMA HUECA et AMPLIACION PUEBLO VIEJO en Republique Dominicaine et IXHUATAN, HUIZOPA et IXHUATÁN - CAMPAMENTO au Mexique.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Brigus Gold Corp.
30/10/2012Brigus Gold Closes $30 Million Bought Deal Debt Financing
23/02/2012Brigus Gold Corp. Announces $15 Million Bought Deal Equity F...
05/12/2011Completes $8,170,000 Flow-Through Share Financing
24/03/2011Completes US$50 Million Bought Deal of Convertible Debentur...
17/03/2011Brigus Gold Announces Filing of Final Prospectus
04/03/2011Bought deal financing for US$50 million principal
Nominations de Brigus Gold Corp.
27/08/2013A Letter from Brigus Gold's Chairman and Chief Executive Off...
25/07/2012Brigus Appoints Daniel Racine as COO
25/04/2012A Letter from Brigus Gold’s President and Chief Executive Of...
07/03/2011Jennifer Nicholson has been appointed Vice President, Invest...
09/02/2011Dana Hatfield appointed Chief Financial Officer following re...
Rapports Financiers de Brigus Gold Corp.
12/11/2013Reports Third Quarter Financial Results
13/05/2013Brigus Gold Reports Strong First Quarter 2013 Financial Resu...
27/03/2013Brigus Gold Reports Fourth Quarter and 2012 Financial Result...
10/08/2012Brigus Gold Reports Q2 Financial Results
29/03/2012Brigus Gold Reports 2011 Financial Results
14/10/2011Brigus Gold Provides Third Quarter Update
16/08/2011Releases Q2 Financial Results
20/07/2011Brigus Gold Provides Second Quarter Update
03/04/2011(angl) reports operating income of $7.8 million for the year...
Projets de Brigus Gold Corp.
13/01/2014Reports Annual Production of 98,710 Ounces of Gold
01/11/2013Brigus Drills 18.09 gpt Gold Over 37.80 Metres & Announces U...
08/10/2013Reports Q3 Production Results
02/07/2013Brigus Gold Reports Grey Fox Resource of 507,400 Indicated O...
04/06/2013(Grey Fox)Brigus Gold Reports High Grade Gold Results from Grey Fox So...
08/05/2013(Grey Fox)Brigus Gold Drills Deepest High Grade Intersection to Date a...
29/04/2013(Black Fox)Brigus Gold Reports High Grade Drill Results at Black Fox
08/04/2013Brigus Gold Exceeds Q1 Production Target
02/04/2013(Grey Fox)High Grade Drilling Results Returned on the 147 and Contact ...
18/03/2013(Grey Fox)High Grade Drilling Results to Expand the Resource at Grey F...
07/01/2013Brigus Gold Hits 2012 Production Target
10/10/2012CORRECTING and REPLACING Brigus Gold Reports Q3 Production a...
20/09/2012(Grey Fox)Brigus Gold Reports 480,850 Indicated Ounces in New Grey Fox...
10/09/2012Brigus Gold Makes New High-Grade Gold Discovery
04/09/2012Brigus Gold’s 147 Zone Continues to Return High-Grade Gold R...
23/08/2012Brigus Gold Reports Further High Grade Gold Results from the...
10/07/2012Brigus Gold Meets Q2 Production Target
12/06/2012Brigus Releases High-Grade Exploration Results
05/04/2012Brigus Gold Hits Q1 Production Target
14/03/2012High-Grade Gold Assays Continue at Brigus Gold’s 147 Zone
02/02/2012Infill Drilling at 147 Zone Returns Excellent Gold Assays
07/09/2011Brigus Reports High-Grade Gold Assays at the Contact Zone of...
07/09/2011Brigus Reports High-Grade Gold Assays at the Contact Zone of...
28/07/2011(Black Fox)Brigus Continues to Intersect High Grade Gold at the 147 Gol...
23/06/2011Mill Expansion News from Brigus Gold
20/06/2011(Black Fox)Exploration News from Brigus Gold
07/06/2011Brigus Gold Provides Black Fox Mine Update
29/03/2011(Black Fox)Completes Construction of Underground Infrastructure
28/02/2011(Black Fox)Intersects High-Grade Gold Mineralization at Black Fox Compl...
28/02/2011Brigus Gold Intersects High-Grade Gold Mineralization at Bla...
23/02/2011(Black Fox)Completes New Ventilation Raise and Prepares for Commercial ...
12/01/2011(Black Fox)Positive Exploration Drilling Results Continue at Brigus Gol...
06/01/2011(Black Fox)Provides Updated Black Fox Mine Technical Report and Update ...
Communiqués de Presse de Brigus Gold Corp.
31/01/2014Primero - Primero and Brigus Announce Mailing of Information...
31/01/2014Primero And Brigus Announce Mailing Of Information Circulars...
16/12/2013Primero - Primero to Acquire Brigus Gold and Create a Divers...
16/12/2013Primero To Acquire Brigus Gold And Create A Diversified, Ame...
12/12/2013(Grey Fox)Discovers New Zone at Grey Fox
17/10/2013Brigus Drills 40.71 gpt Gold Over 26.75 Metres at Black Fox ...
12/08/2013Brigus Gold Reports Second Quarter Financial Results and Inc...
09/07/2013Brigus Gold Reports Q2 Production Results
19/06/2013Brigus Reports High Grade Drilling Results at the 147 Zone
31/05/2013Brigus Gold Resumes Milling Operations
22/05/2013Brigus Gold Reports Temporary Suspension of Milling Operatio...
09/01/2013Brigus Gold Intersects High Grades at 147 Zone
12/11/2012Brigus Gold Reports Q3 Financial Results
25/10/2012Brigus Gold Provides Exploration Update
10/10/2012Brigus Gold Reports Q3 Production and Goldstream Repurchase
06/09/2012Brigus Gold Provides Corporate Update
31/08/2012Brigus Gold Completes Sale of Calais Notes
18/07/2012Brigus Gold Reports 11.68 GPT Gold Over 26.0 Meters from 147...
30/05/2012(Black Fox)Brigus Reports High Grade Gold Results at the Contact Zone o...
28/05/2012(Black Fox)Brigus Gold Resumes Milling Operations at Black Fox
25/05/2012Brigus Gold Reports Temporary Suspension of Milling Operatio...
07/05/2012Brigus Gold Agrees to Sell Calais Notes for USD $6.0 Million
03/05/2012Brigus Gold is on Track to Hit Q2 Production Target
17/04/2012Brigus Gold Reports 5.95 Grams Per Tonne Gold over 56.7 Metr...
10/04/2012Brigus Reports 26.83 Grams Per Tonne Gold over 15.50 Metres ...
20/03/2012(Black Fox)Brigus Gold Reports Continued Progress at Black Fox
21/02/2012Brigus Gold Provides Operations Update
11/01/2012Brigus Reports Additional High-Grade Gold Assays from the 14...
03/01/2012Brigus Announces Management Changes
21/12/2011Brigus Gold Provides Fourth Quarter Update
15/12/2011Brigus Increases Black Fox Complex Resource by More Than 50%...
14/12/2011Adopts New Shareholder Rights Plan
29/11/2011Brigus Reports Additional High-Grade Gold Assays
16/09/2011Added to S&P/TSX Indices
06/07/2011Brigus Expands New 147 Gold Zone at Depth at Black Fox Compl...
06/07/2011Brigus Gold Corp. Press Release: Brigus Expands New 147 Gol...
19/05/2011Brigus Shareholder Meeting, CEO's Letter to Shareholders & N...
16/05/2011from Brigus Gold
16/05/2011ISS Recommends Approval of All of Brigus Gold's Proxy Propos...
13/05/2011Announces Changes to Two Proxy Items for Approval at its Ann...
26/04/2011from Brigus Gold
30/03/2011Sandstorm Gold Announces the Completion of Underground Const...
10/02/2011Brigus at the MoneyShow Orlando
27/01/2011and GLR Resources Agree on Equipment Contract
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AMEX (BRD)
10,72-0.41%
AMEX
US$ 10,72
11/10 16:26 -0,040
-0,41%
Cours préc. Ouverture
10,76 10,79
Bas haut
10,72 10,79
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
10,40 -  10,89 3,18%
Volume var. 1 mois
2 203 -%
24hGold TrendPower© : -31
Produit Gold
Développe Gold
Recherche Copper - Gold - Molybdenum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 04/08/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,19%
20235,00%11,2510,20
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+10,53%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :