Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Vista Gold Corp

Publié le 22 mai 2013

Publishes Mt. Todd Gold Project Metallurgic Test Results and Schedules Release of Preliminary

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | G Mexico | Report |

Vista Gold Corp. Publishes Mt. Todd Gold Project Metallurgic Test Results and Schedules Release of Preliminary Feasibility Study Results for May 29, 2013

DENVER, May 22, 2013 /PRNewswire/ -- Vista Gold Corp. ("Vista" or the "Company") (NYSE MKT and TSX: VGZ) today published the significant results of feasibility-level metallurgic test work supporting the comminution circuit design and estimated gold recovery rates for the Batman deposit at the Mt. Todd gold project in Northern Territory, Australia.  The test work was based on HQ core samples from the Company's 2011 and 2012 drilling programs and included extensive variability testing.  This test work, combined with the findings of previous test work programs, supports (1) ore hardness estimates at the Batman deposit that are consistent and do not change at depth; (2) the selection of High Pressure Grinding Roll ("HPGR") technology as part of the comminution circuit; (3) gold recovery rates for freshly mined ore of 81.7% based on optimized grind size and leach conditions; and (4) the processing of material from the historic heap leach pad at the end of the proposed mine life.  Results of this test work are being incorporated into the Company's preliminary feasibility study ("PFS"), the results of which will be released prior to market open on May 29, 2013.  Vista will host a conference call that afternoon to discuss the results of the PFS.

Vista's President and Chief Executive Officer, Frederick H. Earnest, commented, "These metallurgic test results are key milestones in the optimization of the Mt. Todd gold project.  Since purchasing the project in 2006, Vista has completely re-evaluated the entire project with a methodical, systematic and exhaustive focus on the metallurgical process.  The feasibility-level metallurgic testing program has added significantly to our understanding of the metallurgical behavior of the Batman deposit and independently validated more than six years of technical analysis of the project.  We are confident that material from the Batman deposit can be efficiently processed by proven, 'off the shelf' technologies to achieve good gold recoveries."

Full technical reports are available under the "Technical Reports" header of the Mt. Todd section of the Vista Gold website at http://www.vistagold.com/mt_todd.php?subpage=technical_study.  The key findings are summarized below.

Ore Hardness: ore in the Batman deposit is hard, but consistent and does not change at depth

Samples used for the test work program were sourced from eight holes from the Company's 2010 and 2011 drilling program that were oriented to intersect the main Batman deposit beneath the existing pit and are believed to be representative of the ore within the limits of the preliminary feasibility pit.

Twenty of the samples were subjected to Bond ball mill work index ("BWi") tests, the SMC Test (drop-weight and specific gravity tests) as well as Compressive Strength Tests and Crushing Work Index ("CWI") tests.  The results of the BWi tests show an average BWi value of 26.2 kWh/t with a maximum value of 28.2 kWh/t and a minimum value of 23.6 kWh/t.

The results of this test work support two main conclusions: (1) that the hardness of ore at the Batman deposit is relatively constant; and (2) that ore at the Batman deposit does not change at depth.

This test work validates the Company's prior test work and supports Vista's comminution circuit design, which is designed to crush and grind ore with an average BWi of 27.4 kWh/t, a 5% factor of safety above the average BWi and closer to the 75th percentile of BWi test results.

HPGR Selection: use of HPGRs provides more desirable feed for ball mills and saves on energy consumption compared to a Semi-Autogenous Grinding ("SAG") mill

Prior operators of the Mt. Todd project processed approximately 7.5 million tonnes through a five-stage comminution circuit that incorporated a gyratory crusher and cone crushers as the primary and secondary-stage crushers..  Historic operating data indicates that the primary and secondary crushers worked well, although may have been inappropriately sized (too small or under-powered).  The third and fourth-stages of crushing, which incorporated the use of 19 Barmac crushers, were the bottleneck of the historic operation.

Vista's proposed comminution circuit incorporates the use of a large gyratory crusher and two large cone crushers for the primary and secondary stages, but contemplates the use of HPGRs as the third-stage of the crushing circuit.  Much of Vista's test work has focused on confirming the use of HPGRs.

Initially, Vista ran a series of parallel tests comparing a SAG/ball mill circuit with an HPGR crushing and ball mill circuit.  Based on the test work completed, HPGR technology was selected.  Industry experience has shown HPGRs to produce micro-fracturing in particles that reduce the overall particle strength and generate a greater distribution of fine material in the ball mill feed, reducing downstream ball mill energy requirements..  The ore at the Batman deposit consists of silicified greywackes/shales/siltstones and test work has shown the HPGRs tend to fracture ore at the Batman deposit along the bedding planes more than micro-fracturing.  The result, however, is consistent with other industry HPGR applications in that the HPGR product produces a lower BWi feed for the ball mills.  The test results indicate the SAG mill circuit produced a product with an average BWi of 26.4 kWh/t compared to the HPGR crushed product with an average BWi of 24.8 kWh/t, a reduction of over 6%.

Additionally, material crushed in the HPGR test resulted in up to 10% of the HPGR product being fine enough to by-pass the ball mills entirely and proceed straight to the leach circuit.  Vista has incorporated this HPGR advantage in its comminution circuit design.

The test work also assessed the difference in power requirements between a primary/SAG/ball mill circuit, a conventional 3-stage crush/ball mill circuit, and a 3-stage HPGR/ball mill circuit to generate a 90 �m P80 product.  The assessment concluded that the 3-stage HPGR/ball mill circuit has a significantly lower specific energy requirement than the primary/SAG/ball mill option and that a finer grind size can be achieved with the HPGR crushed material compared to conventionally crushed material ground for the same period of time.

This test work also confirms the Company's prior test work and supports Vista's comminution circuit design.  The use of HPGRs is anticipated to (a) produce a product that can be ground more efficiently (lower BWi) in the ball mills; and (b) reduce energy requirements when compared to a SAG mill design.

Gold Recoveries: gold recovery rates expected to be 81.7% for freshly mined ore and not negatively impacted by presence of copper in ore

Vista's focus was to solve the high reagent consumption, poor gold recovery and copper leaching issues encountered by previous operators.  Historic core samples indicated the presence of cyanide soluble secondary copper mineralization (chalcocite and bornite) in ore at the Batman deposit, and as such, Vista's initial focus was to develop a flowsheet that incorporated the production of a copper concentrate.

However, Vista's drill programs from 2007�2012 indicated a significant change in the mineralogy of ore at the Batman deposit with depth with copper mineralogy changing from cyanide soluble secondary copper to non-cyanide soluble primary copper mineralization (chalcopyrite).  The change in mineralogy occurs at approximately 40 meters below surface and the majority of the ore containing cyanide soluble secondary copper was mined by previous operators.  As a result, more than 96% of ore at the Batman deposit contains low-to-non-cyanide soluble primary copper mineralization.  Therefore, Vista's recovery circuit has been simplified and focuses only on recovering gold from ore at the Batman deposit through a conventional Carbon in Leach ("CIL") circuit.

The remainder of Vista's test work relating to gold recovery focused on optimal grind size, pre-conditioning of ore with lime (to reduce cyanide consumption), the identification of a reagent to suppress copper leaching (lead nitrate was selected), and optimal cyanide concentration.

After determining the optimal leach conditions, 99 samples covering a range of head grades from throughout the Batman deposit were subjected to leach tests resulting in gold extraction between 75% and 85%, with an average of 81.7%, net of solution losses.  Cyanide consumption was estimated at 0.77kg/t and lime consumption was estimated at 0.91kg/t.

This test work validates the Company's prior recovery estimates (82%), indicates little gold recovery variability throughout the Batman deposit, and supports Vista's recovery plant design utilizing a conventional, industry-proven, CIL circuit.

Deepak Malhotra, President of Resource Development Inc., who is a "qualified person" within the meaning of Canadian National Instrument 43-101 � Standards of Disclosure for Mineral Projects, has verified and approved the data and approved the scientific and technical information disclosed in this press release.

Existing Heap Leach Pad: material to be processed through mill at end of mine life

In addition to analysis of freshly-mined ore from the Batman deposit, Vista has analyzed the potential to incorporate nearly 13.35 million tonnes of material on the existing heap leach pad into the Mt. Todd gold project.  The original Mt. Todd project started as a heap leach operation with historic records indicating that the average grade of  material placed on the pad was 0.96 g Au/t.  Although the material was partially leached in the mid-1990s, Vista has drilled 24 air-rotary holes into the heap leach pad and assayed 361 samples, and created a 3D resource model that has an average grade of 0.54 g Au/t.

Initial evaluation efforts focused on re-starting the heap leach pad.  Bottle roll and column tests were completed, both of which supported the leachability of the material with gold recovery rates around 35%.  However, poor in situ permeability rates caused Vista to ultimately abandon plans to re-start the heap.

Vista subsequently submitted two heap leach variability composites and two drill hole composites from the leach pad for CIL cyanidation leach test work.  The samples were ground to P80 passing 90 �m and pre-treated with lime and 100g/t of lead nitrate to suppress copper leaching.  The material was then leached for 24 hours.  These results support recovery rates of 70% for this material when processed through the CIL plant.

Vista's upcoming pre-feasibility study will incorporate processing this material through the plant at the end of the mine life.  The heap leach material will be listed as a separate resource from the Batman deposit.  A separate technical report relating to the heap leach CIL cyanidation test work has been completed and posted to the Vista website along with the additional reports referenced above.

About Vista Gold Corp.

Vista is focused on the development of the Mt. Todd gold project in Northern Territory, Australia, to achieve its goal of becoming a gold producer. Vista has completed a preliminary economic assessment on its Guadalupe de los Reyes gold/silver project in Mexico and has granted Invecture Group, S.A. de C.V. a right to earn a 62.5% interest in the Los Cardones gold project, in Mexico. Vista's other holdings include the Awak Mas gold project in Indonesia, subject to One Asia Resources Ltd.'s right to earn an 80% interest, and the Long Valley gold project in California. For more information about our projects, including technical studies and resource estimates, please visit our website at www.vistagold.com.

For further information, please contact Connie Martinez at (720) 981-1185.

Forward Looking Statements

This press release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933, as amended, and U.S. Securities Exchange Act of 1934, as amended, and forward-looking information within the meaning of Canadian securities laws. All statements, other than statements of historical facts, included in this press release that address activities, events or developments that Vista expects or anticipates will or may occur in the future, including such things as, the completion and release of the PFS as scheduled, the expected efficiencies from the use of HPGR's in Vista's plant design, Vista's expected gold recovery rate at the Mt. Todd project, Vista's ability to recover gold using a CIL recovery circuit and Vista's goal of becoming a gold producer and other such matters are forward-looking statements and forward-looking information. The material factors and assumptions used to develop the forward-looking statements and forward-looking information contained in this press release include the following:  timing and completion of the preliminary feasibility and feasibility studies, timing and the ability to obtain the necessary permits, keeping expenditures at a minimum while taking advantage of the estimated mineral resources at the Mt. Todd gold project, the amount of expenditures required to increase the plant capacity and timing and schedule of consultants' work  and other such matters are forward-looking statements and forward-looking information.  When used in this press release, the words "optimistic," "potential," "indicate," "expect," "intend," "hopes," "believe," "may," "will," "if," "anticipate," and similar expressions are intended to identify forward-looking statements and forward-looking information.  These statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Vista to be materially different from any future results, performance or achievements expressed or implied by such statements.  Such factors include, among others, uncertainty of resource estimates, estimates of results based on such resource estimates; risks relating to completing metallurgical testing; risks relating to cost increases for capital and operating costs;  risks related to the timing and the ability to obtain the necessary permits, risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of gold; the inherently hazardous nature of mining-related activities; potential effects on Vista's operations of environmental regulations in the countries in which it operates; risks due to legal proceedings; risks relating to political and economic instability in certain countries in which it operates; as well as those factors discussed under the headings "Note Regarding Forward-Looking Statements" and "Risk Factors" in Vista's Annual Report Form 10-K as filed on March 14, 2013 and other documents filed with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities.  Although Vista has attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended.  Except as required by law, Vista assumes no obligation to publicly update any forward-looking statements or forward-looking information; whether as a result of new information, future events or otherwise.



 




You are receiving this transmission from PR Newswire on behalf of the issuer of the information contained in this email. If you would like to stop receiving information of this nature via email for this issuer, click here, for auto-removal.
.

Vista Gold Corp

EN DÉVELOPPEMENT
CODE : VGZ.TO
ISIN : CA9279263037
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Vista Gold est une société basée aux Etats-Unis D'Amerique.

Vista Gold détient divers projets d'exploration au Mexique et en Australie.

Ses principaux projets en développement sont CONCORDIA au Mexique et MT. TODD en Australie et ses principaux projets en exploration sont AWAK MAS en Indonesie, GUADALUPE DE LOS REYES et GUADALUPE DE LOS REYES au Mexique et YELLOW PINE, LONG VALLEY et MT TODD MINE en Australie.

Vista Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 61,3 millions CA$ (44,9 millions US$, 42,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 22 décembre 2000 à 0,04 CA$, et son plus haut niveau récent le 17 novembre 2006 à 9,89 CA$.

Vista Gold possède 82 904 132 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Vista Gold Corp
02/10/2012Advises Warrant Holders of Second Year Exercise Price Expira...
14/03/2011Announces Repayment of Its 10% Senior Secured Convertible No...
02/03/2011Announces Listing of Warrants
07/03/2008Announces Closing of US$30 Million Brokered Private Placemen...
13/02/2008Announces Proposed US$32 Million Brokered Private Placement
Nominations de Vista Gold Corp
10/07/2012Appoints VP Corporate Development
30/05/2012Announces Appointment of John F. Engele as Sr. Vice Presiden...
03/01/2012Announces Retirement of Michael B. Richings and Appointment ...
05/08/2011Announces Addition of New Independent Director to its Board ...
19/05/2011Announces Appointment of Interim Chief Financial Officer
Rapports Financiers de Vista Gold Corp
02/08/2016Vista Gold Corp. Announces Second Quarter 2016 Results
31/10/2014. Announces Third Quarter 2014 Results
02/05/2014. Announces First Quarter 2014 Results and Provides Update o...
30/10/2013Announces Third Quarter 2013 Results And Provides Update On ...
03/08/2013Announces Second Quarter 2013 Results, Cost Reductions, And ...
07/05/2013Announces First Quarter 2013 Results And Provides Update On ...
05/11/2012Announces Third Quarter 2012 Financial Results and Provides ...
08/08/2012Announces Second Quarter 2012 Financial Results and Provides...
15/03/2012Recaps 2011 Financial Results and Provides Update on Recent ...
17/03/2011Recaps 2010 Financial Results and Provides Update on Recent ...
11/05/2010Reviews Project Activities, Announces First Quarter 2010...
10/11/2009Announces Third Quarter 2009 Results and Conference Call...
11/08/2008Announces Second Quarter Financial Results
13/05/2008Announces First Quarter Financial Results
17/03/2008Announces Year-End Financial Results
Projets de Vista Gold Corp
31/01/2014Grants Purchasers A Six Month Extension For Final Payment Fo...
18/12/2013(Awak Mas)Announces The Closing Of The Transaction To Convert Its Inte...
12/12/2013(Awak Mas)Announces An Agreement To Convert Its Interest In The Awak M...
06/11/2013(Mt. Todd)Announces Submission Of Final Environmental Impact Statement...
07/10/2013Announces Binding Agreement to sell the Los Cardones Project...
01/07/2013(Mt. Todd)Submits Initial Environmental Impact Statement And Files 43-...
18/03/2013(Mt. Todd)Announces Updated Mt. Todd Gold Resource Containing 7.4 Mill...
15/02/2013(Mt. Todd)Announces Water Treatment Results and Water-related Permits ...
25/09/2012(Mt. Todd)Reports Additional Mt. Todd Drilling Results, Including 1.49...
04/09/2012(Mt. Todd)Grows Mt. Todd Estimated Measured & Indicated Gold Resources...
29/08/2012(Mt. Todd)Reports Additional Mt. Todd Drilling Results, including 1.03...
16/05/2012(Mt. Todd)Reports Drilling and Initial Metallurgical Test Results for ...
30/03/2012(Mt. Todd)Provides Update on Mt. Todd Feasibility Study Status and Rep...
27/02/2012(Guadalupe De Los Reyes)Announces Additional Results from Drilling at the Guadalupe ...
08/02/2012(Concordia)Announces Transaction with Invecture Group to Advance the Co...
19/01/2012Announces Initial Results from Guadalupe de los Reyes Drilli...
07/12/2011(Mt. Todd)Provides Update on Feasibility Study and Drilling at its Mt....
06/09/2011(Mt. Todd)Announces Increased Estimated Gold Resources at the Batman D...
28/06/2011(Mt. Todd)Announces Initial Results of Ongoing Mt. Todd Exploration an...
28/04/2011(Guadalupe De Los Reyes)Announces Start of Exploration at the Guadalupe de los Reyes...
02/03/2011(Yellow Pine)Announces Combined Mineral Resource Estimate for the Yellow ...
23/02/2011(Yellow Pine)& Midas Gold Enter Into Combination Agreement in Respect of ...
09/02/2011(Mt. Todd)Reviews Mt. Todd Development Plans With Northern Territory O...
24/01/2011Comments on Concordia Gold Project Permitting Process
01/12/2010(Mt. Todd)Announces Renewal of Mt. Todd Agreement by the Northern ...
19/08/2010(Mt. Todd)Announces Estimated Mineral Reserves of Two Million Ounces ....
19/02/2010(Concordia)Announces Dismissal of Change of Forest Land Use Permit ...
28/12/2009(Awak Mas)Announces Joint Venture Agreement for Awak Mas Gold Project ...
23/12/2009(Mt. Todd)Announces Commencement of New Drilling Program at the Mt. .....
05/11/2009(Concordia)Update for Paredones Amarillos Gold Project
28/10/2009(Concordia)Announces Receipt of Temporary Occupation Permits for Paredo...
04/09/2009(Guadalupe De Los Reyes)Updated Mineral Resources for the Guadalupe de los Reyes Gol...
03/09/2009(Concordia)Paredones Amarillos Gold Project Feasibility Study Update Re...
13/01/2009(Concordia)Update on Activities at its Paredones Amarillos Project
09/09/2008Announces Paredones Amarillos Feasibility Study Results
22/07/2008(Mt Todd Mine)Provides Update on Exploration and Metallurgical Testing Res...
22/05/2008(Concordia)Report on Status of Change of Land Use Permit for Paredones ...
09/05/2008(Concordia)Updates Status of Permit for Paredones Amarillos Project
30/04/2008(Concordia)Announces Status of Permit for Paredones Amarillos Project
25/04/2008(Mt. Todd)2008 Drilling Program Commences and Resource Estimate Comple...
18/04/2008(Concordia)Announces Completion of Purchase
27/02/2008(Mt. Todd)Mt. Todd Gold Project - Updated Resource Calculation Ounces ...
14/02/2008(Concordia)Announces Updated Capital and Operating Cost Estimates for i...
25/01/2008(Guadalupe De Los Reyes)Announces Completion of Acquisition of Properties
17/01/2008(Awak Mas) Announces Results From a Preliminary Assessment of Its Awak...
08/01/2008(Concordia)Announces Signing of Agreement to Purchase Equipment for Par...
20/12/2007(Guadalupe De Los Reyes)Announces Agreements
Communiqués de Presse de Vista Gold Corp
02/08/2016Vista Gold Corp. Announces US$15 Million Bought Deal Offerin...
01/08/2016Vista Gold posts 2Q profit
27/06/2016Why These Five Stocks Are Gaining Ground on Monday?
02/05/2016Vista Gold Corp. Announces First Quarter 2016 Results
27/04/2016Vista Gold Corp. Announces Voting Results from Annual Genera...
29/03/2016Vista Gold Corp. Announces Receipt of Additional A$992,000 N...
22/10/2015Vista Gold Corp. Warrants Expiring October 22, 2015
04/08/201510-Q for Vista Gold Corp.
03/08/2015Vista Gold Corp. Announces Second Quarter 2015 Results and P...
03/08/2015Vista Gold posts 2Q profit
27/07/2015Vista Gold Corp. Announces Receipt of an Additional A$5.9 Mi...
27/07/2015. Announces Receipt of an Additional A$5.9 Million Net Tax R...
11/05/201510-Q for Vista Gold Corp.
16/03/2015Vista Gold Corp. Completes The Sale Of 8,000,000 Shares Of M...
04/03/2015Vista Gold Corp. Announces 2014 Results and Provides Update ...
25/02/2015Vista Gold Corp. Enters Into An Agency Agreement For The Sal...
30/01/2015Vista Gold Corp. Amends the Payment Terms for the Los Cardon...
31/10/2014Vista Gold Corp. Announces Third Quarter 2014 Results
28/07/2014. Grants Six Month Extension For Final Payment For The Los C...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014. Announces Filing of Preliminary Short Form Base Shelf Pros...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
05/06/2014Vista Gold Corp. Announces Filing of Preliminary Short Form ...
27/02/2014(Mt. Todd)Provides Update On Mt. Todd Gold Project (Agreement With Nor...
14/02/2014Vista Gold Corp. Announces The Completion Of The Sale Of 16,...
07/02/2014Vista Gold Corp. Announces Filing Of Notice And Confirmation...
06/02/2014Vista Gold Corp. Enters Into An Agency Agreement For The Sal...
11/12/2013(Mt. Todd)Provides Update On Mt. Todd Gold Project Environmental Impac...
12/11/2013Announces The Closing Of The Loan Extension
11/11/2013Announces Consolidation of Senior Corporate Responsibilities
18/10/2013. Announces The Closing Of The Sale Of The Los Cardones Proj...
26/09/2013Comments On Recent Trading Activity
23/09/2013Provides Strategic Update And Announces Loan Extension
29/05/2013(Mt. Todd)Announces Mt. Todd Gold Project Preliminary Feasibility Stud...
22/05/2013(Mt. Todd)Publishes Mt. Todd Gold Project Metallurgic Test Results and...
02/05/2013Announces the Results of its 2013 Meeting of Shareholders
13/03/2013Announces 2012 Results and Provides Update on Recent Activit...
15/02/2013To Attend BMO Capital Markets Conference
11/02/2013(Mt. Todd)Announces Final Mt. Todd 2012 Drilling Program Results and P...
22/10/2012(Mt. Todd)Announces Mt. Todd Development Strategy and Technical Report...
09/08/2012(Guadalupe De Los Reyes)Reports 3.52 g/t Gold and 132.0 g/t Silver over 23.7m at its...
30/07/2012Announces Closing of Private Placement Financing
12/07/2012(Mt. Todd)Reports Assay Results for Ongoing Resource Conversion Drilli...
27/06/2012Announces US$15.0 Million Private Placement of Units
06/06/2012(Mt. Todd)Revises the Scope of the Mt. Todd Feasibility Study to Incor...
26/04/2012(Mt. Todd)Reports Drilling Results and Provides Update on Ongoing Expl...
20/04/2012Announces Filing of Final Short Form Base Shelf Prospectus a...
16/03/2012Announces Filing of Preliminary Short Form Base Shelf Prospe...
12/03/2012(Mt. Todd)Announces Recent Drilling Results and Update on Mt. Todd Dev...
08/10/2011Clarifies Disclosure
13/09/2011States That Its Policy is Not to Comment on Unusual Market A...
01/09/2011Announces Initial Results from Guadalupe de los Reyes Field ...
06/05/2011Vista Gold Corp. Announces Appointments to the Board of Dire...
06/05/2011Announces Effectiveness of Resale Registration Statement
20/04/2011Announces Closing of Offering of Common Shares
12/04/2011. Announces C$29,700,000 Bought Deal Offering
07/04/2011Vista Gold Corp. Announces Closing of Combination and Invest...
17/03/2011Announces Filing of Resale Registration Statement
23/02/2011Vista Gold & Midas Gold Enter Into Combination Agreement in ...
21/05/2010Announces Closing of Repurchase of US$5,667,000 in Principal...
25/09/2009 Closing of Over-Allotment of Common Share Offering
16/09/2009Pricing of Common StockOffering
09/09/2009Common Stock Offering
27/08/2009Press Release
08/08/2009Press Release
05/08/2009Press Release
24/06/2009Press Release
05/06/2009Press Release
27/01/2009Press Release
04/09/2008Press Release
03/07/2008Press Release
07/04/2008 Announces Sale of Amayapampa Project (Bolivia) to Republic ...
07/02/2008Discusses Recent Corporate Developments
02/01/2008Announces Agreement to Purchase Gold Processing Equipment Me...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (VGZ.TO)AMEX (VGZ)
0,740-1.33%0,539-2.88%
TORONTO
CA$ 0,740
26/04 16:49 -0,010
-1,33%
Cours préc. Ouverture
0,750 0,740
Bas haut
0,740 0,740
Année b/h Var. YTD
0,430 -  0,820 27,59%
52 sem. b/h var. 52 sem.
0,410 -  1,03 -15,91%
Volume var. 1 mois
4 358 -3,90%
24hGold TrendPower© : -6
Produit
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202417,46%
2023-3,08%1,030,61
2022-24,42%1,390,63
2021-36,76%1,710,77
202040,21%1,900,51
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :