Golden Star Resources Publishes Positive Feasibility Study for Prestea Underground Mine West Reef Project
Published : June 11, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Ghana |

TORONTO--(Marketwired - June 11, 2013) - Golden Star Resources Ltd. (NYSE MKT: GSS) (TSX: GSC) (GHANA: GSR) ("Golden Star" or the "Company") is pleased to announce the results of a positive Feasibility Study prepared by an independent party, SRK (UK) Ltd., to develop its Prestea Underground Mine West Reef Project in Ghana. The Feasibility Study estimates the project will produce an average of 66,000 ounces ("oz") of gold per annum over its six year production life, with steady-state production of approximately 80,000 oz per annum for four of those years.

Highlights of Prestea Underground Mine West Reef Project 1, 2, 3, 4

  • Probable Mineral Reserve of 1.43 million tonnes ("Mt") at a grade of 9.61 grams per tonne ("g/t") for 443,000 oz of gold before recoveries;
  • Indicated Mineral Resource of 0.87 Mt at a grade of 18.3 g/t for 507,000 oz of gold inclusive of the Probable Mineral Reserves;
  • Inferred Mineral Resource of 0.51 Mt at a grade of 11.6 g/t for 190,000 oz of gold;
  • Total project capital costs of $150.1 million: comprising $90.6 million initial capital; $35.8 million capitalized operating cost; and $23.7 million sustaining capital;
  • Post-tax Internal Rate of Return ("IRR") of 23% at $1,500/oz gold (at $1,400/oz gold, IRR is 19%);
  • Net Present Value ("NPV") at a 5% discount rate of $114 million at $1,500/oz gold (at $1,400/oz gold, NPV is $87 million);
  • Total project life of 9 years, including a 3 year pre-development period prior to production;
  • Cash operating costs of $734/oz gold; and
  • Payback period is 3 years from the start of production.

The Feasibility Study demonstrates positive economics for the extraction of the West Reef steeply dipping, high-grade, narrow vein deposit using mechanized cut-and-fill mining with footwall ramp access. The mining target lies at a depth of 600 m to 950 m below surface, between 17L and 24L, about 2 km to the south of the Prestea Mine Central Shaft (Figure 1). Initial access to the orebody for preparation work will be via the Central Shaft and 17L. Two new raise-bored shafts are planned to be developed in the immediate vicinity of the West Reef to provide primary access, ore hoisting, and intake/exhaust ventilation.

Sam Coetzer, President and CEO of Golden Star, commented, "We are pleased with the encouraging results of the Feasibility Study. The West Reef is a high-grade mineralized zone with ore that is suitable for processing through our existing Bogoso oxide plant, reducing the risk associated with putting this project into production. We are also excited to have this project in the Company's pipeline as it demonstrates our ability to execute on our strategy, which is to grow our non-refractory production ounces at lower operating costs. The Feasibility Study also allows GSR to add to its non-refractory reserve base. Additionally, it should be noted that there continues to be upside in the down plunge direction on the West Reef."

Financial Analysis

Golden Star has used a base case gold price of $1,500/oz for the preparation of the Feasibility Study. The base case financial analysis indicates an IRR of 23%, an NPV at a 5% discount rate of $114 million and a payback period of 3 years from the start of production.

   
Financial Analysis  
Internal Rate of Return (IRR) 23%
Net Present Value at 5% discount (NPV5%) $114 million
Gold price assumption $1,500/oz
Sales revenue $598 million
Operating costs $257 million
Operating profit (EBITDA) $341 million
Capital Costs  
Capitalized operating cost $35.8 million
Total initial capital $90.6 million
Total sustaining capital $23.7 million
Operating Costs  
Mining $125.4/t-milled
Processing $20.5/t-milled
G&A $19.3/t-milled
Refining $1.5/t-milled
Contingency $16.7/t-milled
Royalty $20.9/t-milled
Total operating cost $204.3/t-milled
Total operating cost (excluding capitalized operating cost) $179.3/t-milled
Life of Mine Production Data  
Ore mined 1,434,000 tonnes
Ore dilution (waste/(waste+ore)) 43%
Development waste meters 18,007 m
Head grade (diluted) 9.61 g/t
Gold content in ore 443 koz
Metallurgical recovery 90%
Ounces sold 399 koz
   

Upside and downside sensitivities to gold price for NPV and IRR are presented on the table below:

     
Gold Price ($/oz) NPV5%($ million) IRR
1,700 169 29%
1,600 141 26%
1,500 (Base case) 114 23%
1,400 87 19%
1,300 59 15%
     

Project Location and Infrastructure

The Prestea concession is located in the western region of Ghana, approximately 200 km from the capital Accra and 50 km from the coast of the Gulf of Guinea. The Prestea Underground Mine West Reef Project is in an area where mining has occurred continuously since the late 1800s. The Prestea Underground Mine West Reef Project is the expansion of an existing underground mining operation. Therefore, most of the required services, infrastructure and community support are already in place:

  • Surface access to the mine is via the public road network that extends onto the site;
  • Surface infrastructure in the area consists of a variety of government, municipal and other roads with good overall access;
  • Electricity and water are available - electricity from the Ghanaian national grid is currently used to power the existing Prestea Mine surface and underground infrastructure, water comes from surface and underground sources;
  • Processing of the mineralized material is planned to be carried out at Golden Star's existing oxide plant at Bogoso, 16 km to the northeast of the Prestea Mine; and
  • Tailings storage will be in Golden Star's existing and permitted Bogoso Mine tailings storage facility.

Mining

The primary access to the orebody will be via a new 4.7 m diameter raise-bored access shaft from surface equipped with man/material and skip hoists. The raise-bore chips will be removed from the mine via the Central Shaft which will also provide access to the area for pre-development work. A 3.8 m diameter shaft will also be raise-bored to provide exhaust ventilation for the project.

The proposed ore extraction method is a mechanized cut and fill underground method utilizing waste rock fill material sourced from underground development and cemented waste fill in areas where a level will be undercut by future stoping.

A footwall ramp, footwall bypass drifts and stope ramps will provide access to the stopes as shown in Figure 2.

Single boom jumbos will be implemented for production ore drilling and blasting and ground support will be installed with hand-held drilling equipment. Small 1.5 m3 underground load haul dump machines ("LHDs") will be used to clean broken ore from the stopes and to introduce backfill material. Larger LHDs will be used for development mucking and for loading ore into 30 t trucks for haulage up to the loading pocket.

The hoisting system has a capacity of 1,500 tonnes per day ("tpd"), which provides for: 800 tpd of ore; waste as required by the mining cycle; and additional capacity for expansion in the future.

Metallurgy and Processing

Metallurgical test work, carried out at Lakefield SGS under SRK (UK) Ltd. supervision, indicates that the diluted Prestea Underground Mine West Reef Project ore can be processed through the Bogoso oxide plant in a blend with Bogoso non-refractory open pit ore where it is expected to achieve recoveries in excess of 90%.

Given the high-grade (~10 g/t Au) and production rate (800 tpd) of the West Reef ore, compared to the Bogoso oxide plant capacity (~3,000 tpd) and design feed grade (< 2 g/t Au), the preferred processing strategy for treating the West Reef ore through the Bogoso oxide plant will be as a blend with other, lower-grade non-refractory ore sources. As the West Reef ore is not highly preg-robbing (gold re-absorbing) it will be readily amenable to blending with other non-refractory ore sources.

The test work has indicated that the processing cost for the West Reef ore should not be significantly different to the current Bogoso oxide plant processing cost.

Mineral Reserves

The Probable Mineral Reserves reported here have been estimated in compliance with definitions set out in NI 43-101.

             
West Reef Reserves   Tonnes   Gold Grade   Oz
    (M)   (g/t)   (000's)
Proven   -   -   -
Probable   1.434   9.61   443
             

Notes to the Mineral Reserve table:

(i) The Prestea Underground Mine West Reef Mineral Reserve was estimated using a $1,500/oz gold price and an economic gold cut-off of 4.7 g/t.
(ii) The Qualified Person reviewing and validating the estimation of the Mineral Resources is Michael Beare, Corporate Consultant, SRK (UK) Ltd.
(iii) Since Golden Star reports its Mineral Reserves to both NI 43-101 and SEC Industry Guide 7 standards, it is possible for the Company's Mineral Reserve figures to vary between the two. Where such variance occurs it will arise from the differing requirements for reporting Mineral Reserves. For the Mineral Reserves reported here, there is no difference between the Mineral Reserves as disclosed under NI 43-101 and those disclosed under SEC Industry Guide 7, and therefore no reconciliation is provided.

Mineral Resources

The Indicated and Inferred Mineral Resources have been estimated in compliance with definitions set out in National Instrument 43-101 of the Canadian Securities Administrators ("NI 43-101").

The following table summarizes Prestea Underground Mine West Reef Project's estimated Indicated Mineral Resources and Inferred Mineral Resources as of year-end 2012:

             
West Reef Resources   Tonnes   Gold Grade   Oz
    (M)   (g/t)   (000's)
Indicated   0.862   18.27   507
Inferred   0.508   11.62   190
             

Notes to the Indicated Mineral Resource and Inferred Mineral Resource table:

(i) The Prestea Underground Mine West Reef Project's Mineral Resource was estimated using a $1,750/oz gold price and an economic gold cut-off of 3.08 g/t.
(ii) The Qualified Person reviewing and validating the estimation of the Mineral Resources is Dr John Arthur, Principal Consultant, SRK (UK) Ltd.
(iii) Indicated Mineral Resources are inclusive of Probable Mineral Reserves.

Cautionary Note to Investors Concerning Estimates of "Indicated Mineral Resources" and "Inferred Mineral Resources"

This section uses the terms "Indicated Mineral Resources" and "Inferred Mineral Resources." The Company advises US investors that while these terms are recognized and required by NI 43-101, the US Securities and Exchange Commission ("SEC") does not recognize them. US Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into a higher category or into Mineral Reserves. Inferred Mineral Resources have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. US Investors are cautioned not to assume that any part or all of the Inferred Mineral Resource exists, or is economically or legally mineable. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Also, disclosure of contained ounces is permitted under Canadian regulations; however the SEC generally requires Mineral Resource information to be reported as in-place tonnage and grade.

Environmental, Permitting and Community Relations

The Prestea Underground Mine West Reef Project enjoys broad community support. The longer term socio-economic benefits to the community of employment and the associated socio-economic spin-offs are broadly acknowledged by Prestea residents as a crucial economic engine for the community. The development of some of the mitigation strategies for the surface expression of the project involved a community committee that guided the approach and provided successful outcomes. The environmental controls proposed for the construction and mining phases of the project mean that noise, vibration, and air quality (valued socio-economic community components), and all other regulated parameters are expected to meet all the regulatory requirements.

The resettlement action plan for Golden Star's Prestea projects was submitted to the regulatory authority for review and approval in November 2012. The environmental impact statement is being finalized and will be submitted to the Ghana Environmental Protection Agency for review and approval.

Financing

With the Feasibility Study now completed, discussions will commence with a number of project debt, equity, equipment, and other finance providers to fund the Prestea Underground Mine West Reef Project to full production.

Opportunities

Underground drilling in the West Reef area is currently underway to upgrade Inferred Mineral Resources and to identify extensions of the known gold mineralization to the north following the high-grade shoot down plunge below 24 Level.

Qualified Persons

The scientific and technical data contained in this news release pertaining to the Prestea Underground Mine West Reef Project has been reviewed and approved by the following Qualified Persons under NI 43-101, who consent to the inclusion of their names in this release. The Feasibility Study was prepared by SRK (UK) Ltd., under the supervision of the following personnel:

  • Michael Beare, C.Eng. - Overall FS compilation, mining, reserve estimate and financial;
  • Dr. John Arthur, C.Geol. - Mineral Resource estimate;
  • Neil Marshall, C.Eng., - Underground geotechnical;
  • Dr. John Willis, MAusIMM (CP) - Metallurgical and process;

The personnel listed above have reviewed and approved the scientific and technical contents of this press release.

Notes to this press release:

1. All currency figures are expressed in US dollars, unless noted otherwise.
2. Base case gold price for the Feasibility Study is $1,500/oz.
3. Indicated and Inferred Mineral Resources have been estimated at an economic cut-off grade based on a gold price of $1,750 per ounce for December 31, 2012, and on economic parameters deemed realistic.
4. Cash operating costs per ounce represent the mine site operating costs such as mining, processing, ore transport, refining and site general and administration expenses, and are exclusive of amortization, reclamation, capital, and exploration and development costs.

Detailed Report

The NI 43-101 Technical Report, Prestea Underground West Reef Feasibility Study, will be filed within 45 days on SEDAR at www.sedar.com and will be also available at that time on Golden Star's corporate website at www.gsr.com.

Company Profile

Golden Star Resources holds the largest land package in one of the world's largest and most prolific gold producing provinces. The Company holds a 90% equity interest in Golden Star (Bogoso/Prestea) Limited and Golden Star (Wassa) Limited, which respectively own the Bogoso/Prestea and Wassa/HBB open-pit gold mines in Ghana, West Africa. In addition, Golden Star has an 81% interest in the currently inactive Prestea Underground mine in Ghana, as well as gold exploration interests elsewhere in Ghana, in other parts of West Africa and in Brazil in South America. Golden Star has approximately 259 million shares outstanding.

Statements Regarding Forward-Looking Information:

Some statements contained in this news release are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Such statements include plans for the development of the Prestea Underground Mine; estimates of mineral reserves and mineral resources; estimates concerning cash operating costs, gold prices, recovery rates, ounces of gold produced, net present values (including assumed discount rates), the internal rate of return, payback periods, life of mine and production data, levels of investment and capital cost necessary to bring the Prestea Underground Mine into production; mining methods and access plans at the Prestea Underground Mine and expected processing of mined material and tailings storage; and the submission of the environmental impact statement. Investors are cautioned that forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause actual facts to differ materially, including timing of and unexpected events at the Prestea Underground Mine; variations in grade of mineralized material; delay or failure to receive government approvals and permits; the availability and cost of electrical power and key inputs; timing and availability of external financing on acceptable terms; technical, permitting, mining or processing issues; fluctuations in gold price and costs; and general economic conditions. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these and other factors in our Form 10-K for 2012. The forecasts contained in this press release constitute management's current estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will change as new information is received. While we may elect to update these estimates at any time, we do not undertake to update any estimate at any particular time or in response to any particular event.



For further information, please contact:

GOLDEN STAR RESOURCES LTD.

Jeff Swinoga
Executive Vice President and Chief Financial Officer
1-800-553-8436

INVESTOR RELATIONS
Belinda Labatte
The Capital Lab, Inc.
647-427-0208

Greg DiTomaso
The Capital Lab, Inc.
647-427-0208

Données et statistiques pour les pays mentionnés : Ghana | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Ghana | Tous

Golden Star Resources

PRODUCTEUR
CODE : GSC.TO
ISIN : CA38119T1049
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Golden Star est une société de production minière d'or basée aux Etats-Unis D'Amerique.

Golden Star détient divers projets d'exploration au Burkina Faso.

Ses principaux projets en production sont BOGOSO / PRESTEA, WASSA, HWINI-BUTRE (FATHER BROWN) et BENSO au Ghana et ses principaux projets en exploration sont MANO RIVER en Sierra Leone, SARAMACCA et AMÉLIKIA au Suriname, AKROPONG TREND et DUNKWA au Ghana et GOULAGOU - ROUNGA au Burkina Faso.

Golden Star est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 2,9 milliards CA$ (2,3 milliards US$, 2,1 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 28 novembre 2003 à 9,94 CA$, et son plus bas niveau récent le 24 décembre 2014 à 0,20 CA$.

Golden Star possède 584 169 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Golden Star Resources
14/10/2006Insiders Go for Ghanese Gold Play Called Golden Star
16/05/2006Résistance des 3.80 à surveiller !
Financements de Golden Star Resources
26/07/2016GSR - Golden Star Announces Pricing of US$30 Million Offerin...
25/07/2016GSR - Golden Star Announces US$65 Million Private Offering o...
28/04/2016 Announces US$15 Million Bought Deal Financing
17/05/2012Contemplates Exchanging Its Existing Convertible Debentures ...
Nominations de Golden Star Resources
18/07/2016GSR - Golden Star Announces Appointment of Gil Clausen to Bo...
06/05/2016GSR - Golden Star Announces Election of Directors
25/02/2014Announces Changes to Board of Directors and Adopts Advance N...
17/09/2013Announces Appointment of Investor Relations Director
13/06/2012Enhances Board of Directors With Addition of Mining Executiv...
31/01/2012Names Roger Palmer Chief Financial Officer, Replacing John L...
05/10/2011Strengthens Board of Directors With Addition of Veteran Audi...
13/03/2011Appoints Sam Coetzer as Chief Operating Officer
09/03/2011Golden Star Appoints Sam Coetzer as Chief Operating Officer
02/04/2008 Appoints Scott Barr as Chief Operating Officer
07/03/2008Appoints President and CEO
20/12/2007Appoints Interim CEO
Rapports Financiers de Golden Star Resources
18/07/2016GSR - Golden Star Announces Second Quarter 2016 Operational ...
09/05/2016GSR - Golden Star Resources Completes US$15 Million Bought D...
04/05/2016GSR - Golden Star Reports First Quarter 2016 Results
13/04/2016GSR - Golden Star First Quarter Operational Results Exceed E...
23/02/2016GSR - Golden Star Reports Fourth Quarter and Full Year 2015 ...
29/10/2015GSR - Golden Star Reports Third Quarter 2015 Results
30/07/2015GSR - Golden Star Second Quarter 2015 Financial Results
20/02/2014Reports Fourth Quarter and Full Year 2013 Financial Results
04/11/2013Reports Financial Results for the Third Quarter of 2013
12/08/2013Reports Financial Results for the Second Quarter of 2013
09/05/2013Reports Financial Results for the First Quarter of 2013
08/01/2013Reports Preliminary Fourth Quarter Operational Results and 2...
07/11/2012Reports Third Quarter and Nine Month Financial Results
09/05/2012Reports First Quarter Financial Results
23/02/2012Reports 2011 Fourth Quarter and Full Year Results
05/01/2012Reports Preliminary Fourth Quarter Operational Results
08/08/2011Reports Second Quarter 2011 Financial Results
19/07/2011Reports Preliminary Operational Results and Guidance and Sch...
11/05/2011Reports First Quarter 2011 Financial Results
24/02/2011Reports Fourth Quarter and Year-End 2010 Financial Results
18/01/2008REPORTS RECORD OPERATING RESULTS FOR 2007 AND GUIDANCE FOR 2...
Projets de Golden Star Resources
10/02/2014Announces Mineral Reserves and Resources Estimates as at Dec...
07/11/2013(Wassa)Announces a 45% Increase in Gold Ounces of Wassa Main Indica...
08/07/2013Reports Preliminary Second Quarter 2013 Production Results
16/01/2013(Wassa)Drilling at Wassa Mine Yields Further Encouraging Results Th...
25/07/2012(Wassa)Announces Continued Drilling Success at Wassa Main and Adds ...
01/09/2011(Bogoso / Prestea)Announces Pampe Pit Re-Opening and Commencement of Mining Op...
28/04/2011(Wassa)Excellent Grades and Widths From Buesichem South Drilling: G...
24/02/2011(Wassa)Increases Mineral Reserves by 24%; Increases Measured and In...
24/02/2011(Bogoso / Prestea)Reports Fourth Quarter and Year-End 2010 Financial Results
24/02/2011(Wassa)Reports Fourth Quarter and Year-End 2010 Financial Results
25/01/2011(Bogoso / Prestea)Golden Star Achieves Full Certification by ICMI at Bogoso/Pr...
14/01/2008(Bogoso / Prestea) Increases Resources at Prestea South
11/07/2007(Bogoso / Prestea)Declares Commercial Production at Bogoso Sulfide Processing ...
03/06/2003(Wassa)2003 Technical report
Communiqués de Presse de Golden Star Resources
03/08/2016Golden Star Announces Closing of Public Offering of Common S...
03/08/2016Golden Star Announces Closing of Public Offering of Common S...
03/08/2016Golden Star Announces Closing of Public Offering of Common S...
26/07/2016Golden Star Announces Pricing of Private Offering of US$65 M...
26/07/2016Golden Star Announces Pricing of US$30 Million Offering of C...
25/07/2016Golden Star Announces US$65 Million Private Offering of Conv...
25/07/2016Golden Star Announces US$30 Million Offering of Common Share...
25/07/2016Golden Star Reports Second Quarter 2016 Results
25/07/2016Golden Star reports 2Q loss
26/01/2016Golden Star Resources (GSS) Looks Good: Stock Jumps 7%
15/01/2016Golden Star Announces Filing of Feasibility Study for Preste...
11/01/2016Golden Star Exceeds 2015 Production Guidance, Provides Opera...
04/01/2016Edited Transcript of GSC.TO earnings conference call or pres...
31/12/2015Golden Star Announces Amendment to the May 2015 Stream Agree...
09/12/2015Should You Stay Away From FX Energy, Inc. (FXEN)?
01/12/2015Golden Star Announces Positive Feasibility Study Results for...
30/11/2015Hedge Funds Are Dumping A M Castle and Co (CAS)
24/11/2015Is Golden Star Resources Ltd. (USA) (GSS) A Good Stock To Bu...
28/10/2015Should You Buy Golden Star Resources (GSS) Ahead of Earnings...
22/10/2015Golden Star Third Quarter 2015 Results Conference Call
04/09/2015Edited Transcript of GSC.TO earnings conference call or pres...
26/08/2015Edited Transcript of GSC.TO earnings conference call or pres...
29/07/2015Golden Star Second Quarter 2015 Financial Results
29/07/2015Golden Star successfully closes Royal Gold Financing
22/07/2015Golden Star Second Quarter 2015 Results Conference Call
21/07/2015Blues for the Yellow Metal: 3 Dull Gold Stocks - Analyst Blo...
07/07/2015Golden Star Gives Update on Bogoso Refractory Operations - A...
03/07/2015Update on Bogoso Refractory Business
27/04/2015Golden Star Announces First Quarter Results Conference Call ...
26/03/2015Golden Star Announces Mineral Reserves and Resources Estimat...
26/03/2015Golden Star Announces Wassa Mine Feasibility Study Results
30/01/2014(Wassa)Wassa Drilling Program Extends High Grade Mineralized Zone 2...
09/01/2014Achieves 2013 Production Guidance, Provides 2014 Guidance an...
19/11/2013Chairman to Become Non-Executive
23/10/2013Third Quarter 2013 Conference Call Details
03/10/2013Announces Preliminary Third Quarter 2013 Production Results
30/07/2013Announces the Closing of a US$50 Million Secured Medium Term...
26/07/2013Announces Filing of Feasibility Study for Prestea Undergroun...
18/07/2013(Wassa)Wassa Gold Mine Q2 2013 Step Out and Infill Drilling Results...
17/06/2013Provides Operational Update on Cost Reduction Measures, Mine...
11/06/2013Publishes Positive Feasibility Study for Prestea Underground...
30/04/2013(Wassa)Wassa Gold Mine Drilling Campaign Completes an Additional 32...
04/04/2013Reports Preliminary First Quarter 2013 Production Results an...
21/03/2013(Wassa)Files Updated NI 43-101 Technical Report for its Mineral Res...
20/02/2013Announces Extension of Scheduled Maintenance at Bogoso Mine ...
11/02/2013Announces Fourth Quarter and Full-Year 2012 Earnings Release...
05/02/2013Announces Mineral Reserves and Resources Estimates as at Dec...
15/10/2012(Wassa)Continues to Generate Encouraging Intercepts at Wassa Mine S...
05/10/2012Reports Preliminary Third Quarter 2012 Production Results
17/07/2012Reports Preliminary Second Quarter 2012 Production Results
31/05/2012Completes Sale of $77.5 Million Convertible Senior Unsecured...
02/05/2012(Wassa)Announces Drilling Results From Wassa Mine in Ghana
19/04/2012Reports Preliminary First Quarter 2012 Production Results
21/03/2012Announces Positive Preliminary Economic Assessment for Prest...
28/12/2011Announces Exercise of Goulagou-Rounga Option by Riverstone R...
14/09/2011Announces Third Quarter Production Update
13/04/2011Schedules First Quarter 2011 Results Conference Call
28/11/2008Files New Shelf Registration Statement to Replace Expiring R...
27/06/2008Reports Increased Power Costs
01/02/2008ANNOUNCES COMPLETION OF GHANAIAN OFFERING
05/12/2007 Completes EURO Ressources Transactions
07/11/2007 Reports Q3 2007 Results.pdf
26/10/2007 Announces Start of HBB Project
22/10/2007Schedules 3Q2007 Results
16/10/2007Options its Goulagou-Rounga Properties to Riverstone
08/08/2007Reports Q2 2007 Results
07/08/2007Reports CEO to Step Down at end 2007
24/02/2006(Mano River)Announces new date for filing form 10-K for 2005
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (GSC.TO)FRANKFURT (GS5.F)
4,96-0.80%0,616-1.12%
TORONTO
CA$ 4,96
31/01 16:00 -0,040
-0,8%
Cours préc. Ouverture
5,00 4,99
Bas haut
4,96 4,99
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  4,96 -%
Volume var. 1 mois
124 627 -%
24hGold TrendPower© : 4
Produit Gold
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20225,76%5,004,68
2021-0,42%5,122,58
2020-0,63%6,892,56
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,31%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :