Q1 2016 operations and production update, Gedabek

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Azerbaijan | Cash | Copper | Mines | Zinc |

Q1 2016 operations and production update, Gedabek

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

13 April 2016

Anglo Asian Mining plc

Quarter 1 2016, operations and production update - Gedabek gold, copper and silver mine, Azerbaijan

Anglo Asian Mining plc ('Anglo Asian' or 'the Company'), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to provide an operations and production update from its Gedabek gold, copper and silver mine ('Gedabek') in western Azerbaijan for the three months to 31 March 2016 ('Q1 2016'). Note that all references to '$' are to United States dollars.

Production overview

· Gold production for Q1 2016 totalled 14,172 ounces with 13,383 ounces contained within gold doré, 12 ounces from SART processing and 777 ounces from flotation (Q4 2015: total 17,930 ounces)

· Copper production for Q1 2016 totalled 432 tonnes, 181 tonnes from SART processing and 251 tonnes from flotation (Q4 2015: total 335 tonnes)

· Silver production for Q1 2016 totalled 34,342 ounces with 1,958 ounces contained within gold doré, 7,789 ounces from SART processing and 24,595 ounces from flotation (Q4 2015: total 17,710 ounces)

· Gold production target for the year to 31 December 2016 ('FY 2016') is a total of between 73,000 ounces and 77,000 ounces (which includes approximately 4,000 ounces to 5,000 ounces of production from the flotation plant)

· Copper production target for FY 2016 is between 1,700 tonnes and 2,100 tonnes, comprising between 700 tonnes to 800 tonnes from SART processing and between 1,000 tonnes to 1,300 tonnes from flotation

Operational update

· First full quarter of production from flotation plant - plant produced 251 tonnes of copper and 777 ounces of gold

· Gold doré production lower than Q4 2015 due to harder ore with lower grades encountered and severe winter weather. Second SAG mill for the agitation leach plant now contracted for and expected to begin operation in Q3 2016. This will increase amount of ore that can be processed to offset slower milling of harder ore

· Additional underground equipment purchased from Atlas Copco (drill machine, loader and truck) to improve productivity of the Gadir underground mine

· New contract signed with Industrial Minerals S.A. for the sale of copper concentrate produced by the flotation plant

Sales

· Q1 2016 gold doré sales of 12,058 ounces of gold at an average of $1,184 per ounce (Q4 2015: 15,759 ounces at an average of $1,108 per ounce)

· Q1 2016 copper concentrate shipments to the customer totalled 1,330 dry metric tonnes ('dmt') with a sales value of $2.1m (excluding Government of Azerbaijan profit share) (Q4 2015: 817 tonnes with a sales value of $1.3 million)

Company financials

· Net debt, being interest-bearing loans and borrowings, less cash and cash equivalents, totaled $47.5 million at 31 March 2016 ($49.2million at 31 December 2015)

Anglo Asian CEO Reza Vaziri commented, 'Following record gold production in 2015 when we produced 72,032 ounces of gold, the first quarter of 2016 has unfortunately seen a slow-down in production. Ordinarily, the first quarter of the year has always had lower production due to the difficult winter weather conditions. However, the harder rock that has been encountered together with its lower grade has also further lowered production compared to the previous quarter. To combat this harder rock, we have contracted for a second SAG mill to be installed in the agitation leach plant and we expect the SAG mill to be operational in Q3 2016.

'We are very pleased to report the first full quarter's production from the flotation plant. We look forward to its production ramping up in the months ahead. In addition, we have seen the gold price rising sixteen per cent. in the quarter, its best performance in thirty years. We look forward to seeing this positively impact our revenues in quarter two and beyond as we continue on our path to build a mid-tier gold and copper producer in Azerbaijan.'

Full details

During Q1 2016, the Company mined 344,171 tonnes of ore from its Gedabek open pit. 17,756 tonnes of ore with an average grade of 7.91 grammes per tonne was mined from its Gadir underground mine. The Company has recently purchased an MT2010 mine truck, a TD1 underground drill machine and a ST7 Scooptram loader from Atlas Copco for EUR 1.2 million to improve the productivity of the Gadir mine. The majority of this equipment is already at site with the remaining items expected within the next 10 days.

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the agitation leaching plant.

During Q1 2016, Anglo Asian stacked 91,450 tonnes of dry crushed ore on to heap leach pads with an average gold content of 1.46 grammes per tonne. The Company also heap leached uncrushed (Run of Mine - 'ROM') ore. During Q1 2016, Anglo Asian stacked 114,508 tonnes of ROM ore on to heap leach pads with an average gold content of 0.88 grammes per tonne.

During the quarter, the Company processed 131,930 tonnes of ore with an average gold content of 2.93 grammes per tonne through the agitation leaching plant.

There was a 70per cent. gold recovery in agitation leaching for Q1 2016, a decrease from 78 per cent. seen in the previous quarter. The lower gold recovery was as a result of the lower grade of ore processed.Gold doré is produced from both heap and agitated leach intermediate solutions, which are combined for final processing and also recirculated around the plant, heap leach pads and tailings dam. Heap leaching is a long term process and recoveries are therefore only estimates calculated from available metallurgical statistics.

During Q1 2016, the Company produced gold doré containing 13,383 ounces of gold and 1,958 ounces of silver at Gedabek. The agitation leach plant produced 8,683 and 1,267 ounces of gold and silver, respectively, and the heap leach operations produced 4,700 and 691 ounces of gold and silver, respectively. The reduced gold doré production from agitation leaching was due to the lower amount of crushed ore feedstock processed by the plant because of the harder rock encountered, the lower grade of the ore, and the reduced recoveries.

The following tablesummarisesgold doré production and sales at Gedabek for FY 2015 and Q1 2016:

Gold produced*

(ounces)

Silver

Produced*

(ounces)

Gold sales**

(ounces)

Gold Sales price

($/ounce)

Quarter ended

31 March 2015

17,185

597

17,206

1,214

30 June 2015

18,739

900

16,088

1,193

30 Sept 2015

18,158

907

14,871

1,123

31 Dec 2015

17,588

1,858

15,759

1,108

FY 2015 - total

71,670

4,262

63,924

1,161

31 March 2016

13,383

1,958

12,058

1,184

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

During Q1 2016, the Company produced copper concentrate from both its SART and flotation plants as follows:

Concentrate

Copper

Gold

Silver

production*

content*

content*

content*

(dmt)

(tonnes)

(ounces)

(ounces)

SART processing

441

181

12

7,789

Flotation

1,458

251

777

24,595

Total

1,899

432

789

32,384

* including Government of Azerbaijan's share

During Q1 2016, 108,381 dry metric tonnes of agitation leach plant tailings were processed by the flotation plant. The gross metal contained within this feed-stock was 3,146 ounce of gold, 64,612 ounces of silver and 570 tonnes of copper.

Anglo Asian has a strategic three year sales partnership in place with Industrial Minerals S.A. which commenced in May 2014 for the sale of Anglo Asian copper concentrates from its SART plant. In March 2016, the Company signed a further contract with Industrial Minerals S.A. for the sale of copper concentrate produced from its flotation plant. This contract is for the period 15 March 2016 to 31 December 2018. The contract is on the same terms as the Company's existing contract with the exception of improved terms for any penalty due to the concentrate containing zinc. Concentrate can be sold containing up to 12 per cent. zinc subject to a sliding scale of penalties for a zinc content between 1 to 12 per cent.

The following tablesummarisescopper concentrate production and sales from SART and flotation processing (which commenced in Q4 2015) at Gedabek for FY 2015 and Q1 2016:

Concentrate

Copper

Gold

Silver

Concentrate

Concentrate

production*

content*

content*

content*

sales**

sales**

(dmt)

(tonnes)

(ounces)

(ounces)

(dmt)

($000)

Quarter ended

31 March 2015

298

182

8

1,354

234

660

30 June 2015

391

236

6

3,627

372

1,076

30 Sept 2015

406

216

7

3,532

279

661

31 Dec 2015

955

335

341

15,851

817

1,285

FY 2015 - total

2,050

969

362

24,364

1,702

3,682

31 March 2016

1,899

432

789

32,384

1,330

2,137

* including Government of Azerbaijan's share

** excludes Government of Azerbaijan's share

The Company had net debt at 31 March 2016 of $47.5 million, a reduction of $1.7 million since 31 December 2015. The net debt at 31 March 2016 was as follows:

$m

Amsterdam Trade Bank - Agitation plant loan

24.7

International Bank of Azerbaijan - loan

International Bank of Azerbaijan - credit line

9.7

2.9

Atlas Copco equipment finance loan

YapiKredit

Pasha Bank

Director

1.5

1.2

4.6

3.9

Total Loans

48.5

Cash on hand and at bank

(1.0)

Net debt

47.5

**ENDS**

For further information please visitwww.angloasianmining.comor contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Ewan Leggat

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Laura Harrison

SP Angel Corporate Finance LLP

Tel + 44 (0) 20 3470 0470

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Susie Geliher

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gedabek is an open cast mine with a series of interconnected pits. The Company is also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

Gold production for the year ended 31 December 2015 from Gedabek totaled 72,032 ounces with 969 tonnes of copper also produced. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015. This is initially processing tailings from the agitation leach plant.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

Lire la suite de l'article sur www.publicnow.com

Anglo Asian Mining plc

PRODUCTEUR
CODE : AAZ.L
ISIN : GB00B0C18177
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Anglo Asian Mining est une société développant des projet miniers d'or et de cuivre basée au Royaume-Uni.

Anglo Asian Mining est productrice d'or, de cuivre, d'argent en Azerbaidjan.

Son principal projet en production est GEDABEK en Azerbaidjan et ses principaux projets en exploration sont GOSHA et ORDUBAD en Azerbaidjan.

Anglo Asian Mining est cotée au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 7,8 milliards GBX (9,1 milliards US$, 8,5 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 10 juillet 2009 à 10,00 GBX, et son plus haut niveau récent le 03 avril 2020 à 99,80 GBX.

Anglo Asian Mining possède 113 761 024 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Anglo Asian Mining plc
14/07/2016(Gedabek)Substantial increase in gold production at Gedabek mine, Aze...
25/05/2016FY2015 Results - Record gold production of 72Koz; 28.6Koz si...
28/05/2013Live alert - Market Movers: Leyshon Resources, Northcote Ene...
02/06/2006(Gedabek)encouraging results at Gedabek
Communiqués de Presse de Anglo Asian Mining plc
14/07/2016Q2 & H1 2016, Production Update, Operations Review
29/06/2016Hedging of gold sales for remainder of 2016
28/06/2016Result of AGM
27/06/2016AGM Statement
25/05/2016Final Results
13/04/2016Q1 2016 operations and production update, Gedabek
21/12/2015Floating exchange rate regime
24/11/2015Copper Concentrate Shipment from Floatation Plant
14/10/2015Q3 2015 Production Update
31/07/2015Total Voting Rights
22/07/2015Issue of Shares / Directors Dealing
14/04/2015Q1 2015 Gedabek Update
19/03/2015Director Dealing
16/03/2015Flotation Plant Update - Gedabek Mine Azerbaijan
16/03/2015Director Dealing
05/11/2014Q3 2014 Production and Operational Update
12/04/2006(Gosha)Preliminary results for the 11 month period ended 31 Dec 200...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (AAZ.L)
68,50+0.00%
LSE
GBX 68,50
19/04 17:36 -
0%
Cours préc. Ouverture
68,50 67,90
Bas haut
67,00 71,00
Année b/h Var. YTD
51,50 -  68,50 14,17%
52 sem. b/h var. 52 sem.
42,00 -  114,50 -35,68%
Volume var. 1 mois
219 881 24,55%
24hGold TrendPower© : -31
Produit Copper - Gold - Silver
Développe
Recherche Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-0,72%
2023-29,23%99,00100,00
2022-13,33%99,75100,00
2021-14,45%165,00104,60
2020-14,05%99,80102,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :