Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique
Quadra FNX Announces a 9% Increase in Q3 2011 Copper Production
Published : October 14, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Nickel | Precious Metals |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 14, 2011) - Quadra FNX Mining Ltd. ("Quadra FNX" or the "Company") (News - Market indicators) announces that consolidated payable production for the three months ended September 30 increased 9% compared to Q2 2011 and 30% compared to Q1 2011 and totaled 60 million pounds of copper, 26 thousand ounces of total precious metals ("TPMs") and 3 million pounds of nickel.

Paul Blythe, President & CEO comments; "This is our strongest quarter since 2009, driven by Robinson and continuing strong performance from our Sudbury operations. We are seeing continuing and significant improvements in production at Robinson. The various measures that we have taken are delivering increased flexibility and productivity. The result is that in September we broke both the daily mining record and monthly milling record. However, we did experience slope stability issues that required remediation and adjustments to the mine plan that have affected our ability to reach a portion of the higher grade material at the bottom of the pit.

"With approximately US$1.0 billion dollars in cash we remain comfortably positioned to weather the current downturn in the copper price. We will continue to develop Sierra Gorda and Victoria and to increase operating flexibility, so that we are well positioned to take advantage of the higher copper prices that we believe will inevitably return."

  Production   Sales
  Q1 2011 Q2 2011 Q3 2011 YTD 2011   Q3 2011
Copper (Million lbs)              
Robinson (1) 20 21 27 68     28
Carlota (2) 4 6 7 17     7
Franke (2) 7 9 9 25     10
Morrison (3) 9 10 10 29     10
Podolsky (3) 5 7 6 18     6
McCreedy West (3) 1 2 1 4     1
Total 46 55 60 161     62
 
Copper price at beginning of period ($/lb) (4)           $ 4.22
Copper price at end of period ($/lb) (4)           $ 3.24
 
TPM (kozs)              
Robinson (1) 6 7 9 22     9
Morrison (3) 6 8 8 22     8
Podolsky (3) 7 6 7 20     7
McCreedy West (3) 7 6 2 15     2
Total 26 27 26 79     26
Total Nickel (Million lbs) (3) 2 2 3 7     3
 
Total Copper Equivalent (Million lbs)(5) 62 73 78 213      
1. Payable Cu and Au produced in concentrate
2. Payable Cu produced in cathode
3. Shipped payable metal
4. The average price used to value provisionally priced copper
5. Cu Equivalent amo unts are based on previously announced LOM commodity prices: Cu at $2.50/lb, Ni at $7/lb, Pt at $1500/oz, Pd at US$400/oz, Au at $1000/oz and Mo at $12/lb and excludes the impact of the Franco Nevada Agreement
Note: All amounts are in US dollars.

THIRD QUARTER OVERVIEW:

Production from the Robinson operation was impacted by localized slope stability issues but continued to improve as mining transitioned into the lower benches of the Ruth pit and begun to access higher grade ores. The five trucks that were moved from Carlota to Robinson are now fully operational. In September the mine achieved a one day record ex-pit mining rate of 257 thousand tonnes (284 thousand tons) and a record monthly average milling rate of approximately 44,000 tonnes (48,500 tons) per day.

In Sudbury, copper production at all three operations continues to be at or above expectations. The Company delivered approximately 55,000 tonnes of contact nickel ore from McCreedy West to Xstrata, which was milled in August as a trial lot. Discussions with Xstrata for the treatment of additional ore are ongoing. The Company continues to mine this material and the 2012 business plan includes the mining and shipment of McCreedy West nickel ores, providing nickel prices are favourable.

Mining volumes at Franke have returned to planned levels and the new stacker is on site and currently undergoing dry commissioning. Recovery optimization programs and metallurgical testing of lower acid consuming ore from the nearby the China deposit are also progressing. At Carlota, the planned changes to improve the cost structure (i.e., reduced mining rate, reduced manpower, conveyor stacking) are in place.

2011 PRODUCTION GUIDANCE:

The Company expects 2011 consolidated copper production to be at the lower end of its previously stated guidance range of 240 million pounds +/- 10%.

Annual production from Robinson is now estimated to total approximately 95 – 100 million pounds of payable copper, below the previous guidance range of 105 to 120 million pounds due to the slope stability issues experience in Q3 2011 which resulted in a re-sequencing of the mine plan and delays in accessing a portion of the higher grade material originally expected to be mined in Q4 2011.

PROVISIONAL PRICING ADJUSTMENTS:

As a result of declining metals prices, the Company estimates a pricing adjustment related to prior quarter shipments will decrease Q3 2011 revenue by approximately US$6 million. Based on the Q3 2011 quarter end copper price of US$3.24/lb, Quadra FNX estimates a cash repayment of approximately US$20 million for provisional payments received from customers for the Q3 2011 shipments.

CONFERENCE CALL DETAILS:

A conference call to discuss the Craig Access Arrangement (see separate Press Release) and Q3 2011 operating results has been scheduled for Friday, October 14 2011, at 11:30am ET (8:30am PDT). The North American toll free number for this conference call is 1-800-355-4959; all other participants please call 1-416-695-6616. The playback version of the call will be available October 21, 2011 at 1-905-694-9451 or North American toll free 1-800-408-3053 and using the pass code: 3086132.

The Q3 2011 financials will be issued on November 10, 2011 prior to market open. A conference call to discuss the second financial results has been scheduled for November 10, 2011, at 10am ET (7am PDT). Dial in details of the accompanying conference call will be issued under separate press release.

ABOUT QUADRA FNX LTD. (News - Market indicators)

Quadra FNX Mining Ltd. is a leading mid-tier copper mining company with corporate offices in Vancouver, B.C. and Toronto, Ontario. Quadra FNX produces copper, nickel and precious metals from its operating mines: Robinson in Nevada, Carlota in Arizona, Franke in northern Chile, and Levack, which includes the Morrison Deposit, Podolsky and McCreedy West in Sudbury, Ontario. The Company has two key development projects: the Sierra Gorda project, a copper-molybdenum project in Chile, and the Victoria project, a polymetallic project in Sudbury, Ontario. Quadra FNX employs approximately 2,500 people in North and South America.

FORWARD-LOOKING INFORMATION

This Press Release contains "forward-looking information" that is based on Quadra FNX's expectations, estimates and projections as of the dates as of which those statements were made. This forward-looking information includes, among other things, statements with respect to the Company's future recovery levels, future production levels, cash and total costs of production of copper, gold and other minerals, timing of expected sales and final pricing of concentrate sales. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as "outlook", "anticipate", "project", "target", "believe", "estimate", "expect", "intend", "should", "scheduled", "will", "plan" and similar expressions. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause Quadra FNX's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, and developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to:

  • risks associated with the mineralogy and block model assumptions at all mines and projects including, in particular the complex Robinson mine;
  • uncertainties related to the extent to which historical mining activities at Robinson have removed mineral material expected to be present;
  • uncertainty relating to the leaching rate achieved at Carlota;
  • risks associated with Quadra FNX's off-take agreement with Vale, including the risk of potential adjustment to final payable metal and processing cost terms;
  • uncertainties related to the Quadra FNX's ability to secure a third party processing for high magnesium oxide (MgO) contact nickel ores from McCreedy West;
  • uncertainties relating to availability of updated equipment for Franke and the leach recovery rate achieved at Franke;
  • uncertainties related to the construction quality and structural design at Franke;
  • risks relating to the performance of the mining rate at Franke;
  • risks relating to the test work underlying the Feasibility Study described in the Sierra Gorda Feasibility Study Technical Report;
  • risks associating with ongoing litigation at Sierra Gorda and with potential future litigation at Sierra Gorda and other projects;
  • uncertainties related to the amount of funding required to achieve full production levels at Franke and Carlota and at the Morrison deposit;
  • risks that Quadra FNX's title to its property could be challenged, including potential challenges from First Nations with respect to the Sudbury operations;
  • risks associated with Quadra FNX's dependence on transportation facilities and infrastructure;
  • risk associated with labour relations;
  • risks associated with fluctuations in costs of operating supplies and other inputs;
  • uncertainties related to actual capital costs, operating costs and expenditures, production schedules and economic returns from the Company's mining projects;
  • inherent hazards and risks associated with mining operations;
  • inherent uncertainties associated with mineral exploration;
  • risks associated with Quadra FNX being subject to government regulation, including changes in regulation;
  • risks associated with Quadra FNX being subject to extensive environmental laws and regulations, including changes in regulation;
  • increases in off-site transportation and concentrate processing costs;
  • risks related to the stability of mine pit walls;
  • uncertainties related to fluctuations in copper and other metal prices;
  • uncertainties related to the current global financial conditions; and
  • uncertainties related to fluctuation in foreign currency exchange rates.

A discussion of these and other factors that may affect Quadra FNX's actual results, performance, achievements or financial position is contained in the filings by Quadra FNX with the Canadian provincial securities regulatory authorities, including Quadra FNX's Annual Information Form. Forward-looking statements are based on assumptions management believes to be reasonable. Although Quadra FNX has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate. Accordingly, readers should not place undue reliance on forward-looking statements. Quadra FNX disclaims any intent or obligations to update or revise publicly any forward-looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.



Investor Relations and Media Contacts:
Quadra FNX Mining Ltd.
Derek White
Executive Vice President, Corporate Development
(604)-699-3063
or
Quadra FNX Mining Ltd.
Nawojka Wachowiak
Vice President, Investor Relations
(416) 985-8317

QuadraFNX Mining

PRODUCTEUR
CODE : QUX.TO
ISIN : CA74733X1069
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

QuadraFNX est une société de production minière de nickel et d'or basée au Canada.

QuadraFNX est productrice de nickel, d'or, d'argent, de cuivre, de palladium et de platine au Canada et au Chili, et détient divers projets d'exploration au Canada et en Guinee.

Ses principaux projets en production sont MCCREEDY WEST MINE, ROBINSON MINE, LEVACK MINE, PODOLSKY, VICTORIA - INCO, CARLOTA MINE, VICTORIA, LEVACK, FALCONBRIDGE MINE, MORRISON DEPOSIT (LFD) LEVACK FOOTWALL et KIRKWOOD au Canada et FRANKE MINE au Chili et ses principaux projets en exploration sont TYRANITE, NORMAN, FAWCETT TWP et FOOTWALL au Canada.

QuadraFNX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 2,9 milliards CA$ (2,2 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 05 décembre 2008 à 1,97 CA$, et son plus haut niveau récent le 07 mars 2012 à 14,99 CA$.

QuadraFNX possède 191 502 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports Financiers de QuadraFNX Mining
27/04/2011Quadra FNX Mining Ltd.-Conference Call: 2011 First Quarter F...
13/05/2010Announces Strong 2010 First Quarter Financial Results
26/04/2010Conference Call: 2010 First Quarter Financial Results
08/03/2010Announces 2009 Year End And Fourth Quarter Financial Results
27/07/2009Conference Call: Second Quarter 2009 Financial Results
Projets de QuadraFNX Mining
14/10/2011Quadra FNX Announces a 9% Increase in Q3 2011 Copper Product...
24/01/2011Quadra FNX Announces Fourth Quarter and 2010 Production Resu...
19/05/2010(Morrison Deposit (lfd) Levack Footwall)FNX's Renames the Levack Footwall Deposit the Morrison Depos...
20/04/2010Announces First Quarter 2010 Production Results
02/02/2010(Carlota Mine)Provides Update On The Carlota Operation Following Recent St...
11/01/2010Production Results For The 4Th Quarter 2009 Exceed Expectati...
23/07/2009(Sierra Gorda)Positive Results From Sierra Gorda Scoping Study
13/07/2009Announces Second Quarter 2009 Production Results
Communiqués de Presse de QuadraFNX Mining
05/03/2012Quadra FNX & KGHM Complete Arrangement
29/02/2012Investment Canada Approval Received for Arrangement With KGH...
20/02/2012Quadra FNX Securityholders Approve Plan of Arrangement With ...
01/02/2012Quadra FNX & Atikameksheng Anishnawbek Sign Memorandum of Un...
16/01/2012(Victoria)Quadra FNX Announces Q4 2011 Production & Victoria Resource ...
06/12/2011Quadra FNX Agrees to C$15.00 Per Share All-Cash Acquisition ...
14/09/2011Quadra FNX Completes Joint Venture With Sumitomo for Develop...
31/08/2011Quadra FNX Receives Anti Trust Approval for Sierra Gorda Joi...
10/08/2011Quadra FNX Mining Announces Earnings of $64 Million in the S...
25/07/2011Quadra FNX Announces a 20% Increase in Second Quarter 2011 P...
06/07/2011Quadra FNX Receives Environmental Impact Assessment (EIA) Ap...
28/06/2011Quadra FNX Renews Labour Agreement at Sudbury Operations
17/06/2011Quadra FNX Announces Closing of Its Senior Notes Offering
06/06/2011Quadra FNX Announces Offering of Senior Notes
15/05/2011Quadra FNX Partners With Sumitomo & Announces Feasibility St...
06/05/2011Quadra FNX Mining Announces Earnings of $168 Million in the ...
19/04/2011Quadra FNX Announces First Quarter 2011 Production Results
15/02/2011Quadra FNX to Take-Over Mining Operations at Franke
19/05/2010and FNX Shareholders Approve Merger
11/05/2010Announces Modifications to Proposed Rights Plan
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (QUX.TO)
14,99+0.00%
TORONTO
CA$ 14,99
07/03 17:00 -
0%
Cours préc. Ouverture
14,99 14,99
Bas haut
14,99 15,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  14,99 -%
Volume var. 1 mois
8 050 869 -%
24hGold TrendPower© : 24
Produit Copper - Gold - Nickel - Palladium - Platinum - Silver
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+10,53%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :