Quarterly Activities & Cashflow Report

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Quarterly Activities & Cashflow Report

Microsoft Word - 20150930_20151027_Quarterly and cashflow_final.docx


Quarterly Activities Report

and Appendix

5B

For the period

ending 30 September

2015

ASX: ARU

HIGHLIGHTS


Testwork demonstrates removal of all cerium in the RE Intermediate Plant, presenting an opportunity for lower capital expenditure for the RE Separation Plant


Independent engineering report identifies significant opportunities for capital expenditure savings


EIS on track for submission in Q1 CY2016 as flora, fauna and archaeology surveys and reports are being advanced


Nolans Community and Stakeholder Engagement program underway in Central Australia


Implementation of strategies to preserve cash reserves and manage Project advancement


Cash balance at end of reporting period A$13.5 million


NOLANS PROJECT


RARE EARTH EXTRACTION PROGRAM


One of the significant optimisation opportunities examined in the Company's Australia‐based rare earth ('RE') extraction program has been in separating cerium ('Ce') from the other REs in intermediate stage processing. Recent work shows all Ce will now report as a Ce carbonate product at the RE Intermediate Plant, eliminating the need to process Ce in the downstream RE Separation Plant. In the current Q2 FY2016, Arafura is conducting a detailed review of capital expenditure for the Nolans Project (see Engineering section below), including re‐estimating the capital requirement for the offshore RE Separation Plant to account for reduced processing volumes resulting from Ce removal.


The China‐based Stage 1 flowsheet optimisation program with two Beijing institutes has been completed.


During the quarter the Company and one of the institutes convened a workshop to discuss results and to assess flowsheet development opportunities arising from the use of an alternative reagent to sulphuric acid in the RE extraction pre‐leach circuit, which appeared to work very efficiently with the Nolans concentrate. The Company understands a number of established Chinese producers have been testing this alternative reagent as a substitute for sulphuric acid.


+ See chapter 19 for defined terms.


Quarterly Activities Report and Appendix 5B - 30 September 2015

Page 1 of 15


There is the potential this alternative reagent may result in a simplified flowsheet and consequently lower capital and operating expenditure for the RE Intermediate Plant area. The Company has completed a focused testwork program in Australia to better understand this pre‐ leach opportunity and to test the downstream acid bake options for the flowsheet. However, the Company has decided that due to the advanced nature of its work using the known sulphuric acid pre‐leach ('SAPL') flowsheet, it will not continue investigations into the alternative reagent at this stage. Arafura's testwork is being documented for future reference in the event an appropriate industry partner is interested in examining this opportunity under a mutually acceptable development arrangement.


Flowsheet optimisation testwork with the second Beijing institute was also completed during the quarter. The Company has recently received the final report from this institute. In October the institute conducted a workshop to provide the Company with a better understanding of the optimisation opportunities being targeted. In Q2 FY 2016 the Company will further analyse these results to determine if further work beyond Stage 1 with this institute is warranted..


BENEFICIATION OPTIMISATION STAGE 2 & VARIABILITY TESTWORK


The Chengdu Analytical and Testing Centre for Minerals and Rocks ('CTC') completed the beneficiation variability test program during the period. A draft report is in review; however additional testwork data will be incorporated before the report is finalised. The Company has decided not to progress to Stage 3 beneficiation testwork / integrated pilot plant ('IPP') immediately. The reasons for this are discussed in greater detail below (see Corporate ‐ Project Focus section).


ENGINEERING


During the quarter Arafura commissioned an independent engineering analysis of the Nolans Project to review the beneficiation and RE extraction flowsheets for capital expenditure savings and to examine various alternative production options. This process included a review of individual equipment costs, waste treatment facilities, infrastructure and a high level examination of plant layout. The results of this analysis are being used in the current December 2016 quarter to support a detailed examination of engineering cost reduction opportunities for both the Nolans Site and the offshore RE Separation Plant.


The Company looks forward to providing updates on these activities during the current quarter.


REGULATORY APPROVALS - ENVIRONMENTAL IMPACT STATEMENT STUDIES


Several Environmental Impact Statement ('EIS') studies, analysis and draft reporting were advanced during the September quarter.


Field work for flora and archaeology were completed, with draft reports in review. A draft fauna study report is in preparation and is expected to be received during October.



+ See chapter 19 for defined terms.


Quarterly Activities Report and Appendix 5B - 30 September 2015

Page 2 of 15



Images 1 and 2: Biodiversity survey activities at the Nolans Site.


Work on the establishment of additional baseline monitoring stations for radiation and dust was completed during the reporting period. The analysis of testwork aimed at measuring radioactive gas emissions from mineralised and waste rock types is at an advanced stage.



Image 3 (left): Air quality sampling station at the Nolans Site. Image 4 (right): Radioactive gas emission testwork on mineralised and waste rock samples being completed offsite.


Work continues on the consolidation of all analytical and monitoring data for the final report for the Southern Basins. Modelling of the data shows that the bore field aquifer system is very robust, the extraction of groundwater for the proposed mining and processing operations will have only minor localised impacts during operations, and the long term impacts on the aquifer system are anticipated to be minimal.



Image 5: Rising stage sampler installed at the Nolans Site for the collection of water samples from an ephemeral creek.


+ See chapter 19 for defined terms.


Quarterly Activities Report and Appendix 5B - 30 September 2015

Page 3 of 15


Geochemical analysis work has commenced to characterise and predictably model un‐mineralised waste rocks from the proposed Nolans mining operation to better understand the short and long‐ term risks associated with placement of large quantities of waste rock into waste rock dumps. This information will be a key input for the EIS.


COMMUNITY AND STAKEHOLDER ENGAGEMENT


During the period Arafura provided an update on the Nolans Project to the Anmatjere Local Authority of the Central Desert Regional Council in Ti Tree, and to participants at the Mining the Territory Conference in Darwin. In addition, the Company established an access portal for the Nolans Project using the Industry Capability Network ('ICN') Gateway. A large focus of stakeholder engagement has been on the impact footprint of the proposed development and on the benefits to the community, in particular employment and opportunities for local businesses.


EXPLORATION


AILERON - REYNOLDS (Rare Earths; Water; Extractive Minerals)


NOLANS REVISED RESOURCE STATEMENT


During the quarter work on a revised estimate of Mineral Resources for the Nolans Project was advanced, and is expected to be reported during the December quarter. The Nolans Bore block model now incorporates waste rocks whose detailed modelling was necessary to advance their geochemical and geotechnical characterisation as part of the EIS.


CARBONATE RESOURCES EMEL 30510


Reconnaissance mapping of the carbonate area has been completed on EMEL 30510. Prospecting in the southern end of the EMEL demonstrated good outcrops of quality carbonate (marble) beneath a veneer of calcrete and alluvium. Work to date indicates this area has the potential to supply the life of mine carbonate requirements for the RE Intermediate Plant. Trenching of this target area will be undertaken during the next six months.


YALYIRIMBI (Iron)


Ferrowest Limited ('Ferrowest'; ASX: FWL) and the Company recently entered into a Deed of Cancellation in respect of all future Ferrowest iron ore rights in the Yalyirimbi Iron Project on EL 24548. The Company is the owner of the underlying mineral tenement, and iron rights are held through Arafura Iron Pty Ltd ('AIPL'). The Deed of Cancellation was executed in September and unwinds Ferrowest's participation in Yalyirimbi and results in the following:


  • Transfer of the 51% of the shares in AIPL held by Ferrowest back to the Company. AIPL now being a wholly owned subsidiary of the Company;


  • Resignation of the two Ferrowest nominated directors from the AIPL Board;


+ See chapter 19 for defined terms.


Quarterly Activities Report and Appendix 5B - 30 September 2015

Page 4 of 15

Lire la suite de l'article sur www.noodls.com

Arafura Resources

EN DÉVELOPPEMENT
CODE : ARU.AX
ISIN : AU000000ARU5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Arafura Res. est une société d’exploration minière d'or et de nickel basée en Australie.

Arafura Res. est en développement de projets d'or, de nickel, de rare earth et d'uranium en Australie, et détient divers projets d'exploration en Australie.

Son principal projet en développement est NOLANS BORE en Australie et ses principaux projets en exploration sont AILERON / REYNOLDS RANGE, JERVOIS, KURINELLI, MT PORTER / FRANCES CREEK et HAMMER HILL en Australie.

Arafura Res. est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 101,2 millions AU$ (64,8 millions US$, 60,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 avril 2007 à 2,16 AU$, et son plus bas niveau récent le 19 décembre 2014 à 0,04 AU$.

Arafura Res. possède 546 900 032 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Arafura Resources
20/05/2008The Nolans Project
Nominations de Arafura Resources
08/12/2008today - Appointment of Chairman - Mr. Ian Laurance
Projets de Arafura Resources
01/12/2010(Nolans Bore)Presentation of the Nolans Project
18/11/2008(Nolans Bore)NOLANS RARE EARTHS PROJECT, NORTHERN TERRITORY
12/11/2008(Nolans Bore)Nolans Resource Upgrade
05/08/2008(Nolans Bore)New Mineralization at Nolans returns outstanding assays.
11/07/2008(Nolans Bore)NOLANS PROJECT RARE EARTHS MARKET UPDATE
04/07/2008(Hammer Hill)Hammer Hill update 040708
20/05/2008(Hammer Hill)Sulphine mineralisation intersected in early drilling
Communiqués de Presse de Arafura Resources
14/07/2016Response to ASX Price Query
28/06/2016BRR Webcast - Nolans Review and Major Improvements
20/06/2016AHK: Progress Report
25/05/2016Webcast Nolans OPEX and EIS Update
23/05/2016Nolans Environmental Approvals Update
08/01/2016RE Separation MOU Executed with OCI
23/12/2015$3.0 Million R&D Tax Refund Received
25/11/2015RXL: Drilling to Commence at Bonya
19/11/2015Chairman's Address 2015 AGM
19/11/2015AGM 2015 Presentation
29/10/2015Increase Nolans Project Mineral Resources
27/10/2015Quarterly Activities & Cashflow Report
09/10/2015Notice of Annual General Meeting/Proxy Form
06/10/20152015 Annual Financial Report
22/09/2015FWL: Deed of Cancellation
17/09/2015Annual Report to shareholders
17/09/2015Appendix 4G - Corporate Governance
27/07/2015AHK: Frances Creek MMP Approved
27/07/2015Quarterly Activities & Cashflow Report
03/03/2015Initial Director's Interest Notice
18/02/2015Half Year Accounts
16/02/2015Change of Share Registry Notification
05/11/2014Letter to Shareholders
30/10/2014Quarterly Activities and Cashflow Report
30/10/2014FWL: 51% of Arafura Iron Pty Ltd Secured
23/10/2014NT Major Projects Presentation
20/10/2014RXL: Exceptional Copper Assays From Bonya Mine Drilling
25/11/2013BRR Webcast- Arafura AGM
08/11/2013Mulga Drilling Results
31/07/2009Quarterly Report
15/06/2009Settlement of Chinese Share Subscription List
29/05/2009FIRB Approval for Nolans Project
19/02/2009Strategic Investment in Arafura Resources Ltd
26/08/2008Incitec Heads of Agreement
16/05/2008Phosphate Project Recoveries
28/04/2008Releases Flotation Demonstration Results
09/07/2007Releases Outstanding REO and Uranium Results
19/03/2007Nu Power lists at 300% Premium
14/03/2007releases Nolans Phosphate Test Work
01/03/2007releases Lagoon Creek Results for March 2007.
16/02/2007Results of General Meeting
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (ARU.AX)FRANKFURT (REB.F)
0,185-2.63%0,116-5.69%
AUSTRALIA
AU$ 0,185
19/04 15:55 -0,010
-2,63%
Cours préc. Ouverture
0,190 0,190
Bas haut
0,185 0,190
Année b/h Var. YTD
0,120 -  0,260 8,82%
52 sem. b/h var. 52 sem.
0,120 -  0,465 -60,64%
Volume var. 1 mois
2 932 582 -7,50%
24hGold TrendPower© : 44
Produit
Développe Uranium
Recherche Copper - Gold - Iron - Titanium - Vanadium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 10/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-30,71%
2023-42,58%0,700,23
2022121,43%0,550,18
202168,00%0,270,12
202035,87%0,130,05
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :