Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Paladin Energy Ltd: Quarterly Activities Report for Period Ending-31 March 2011
Published : April 15, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Fukushima | Malawi | Niger | Uranium |

PERTH, WESTERN AUSTRALIA--(Marketwire - April 15, 2011) - Paladin Energy Ltd ("Paladin" or "the Company") (TSX:PDN)(News - Market indicators) is pleased to provide its Quarterly Activities Report for the three month period ended March 31, 2011.

HIGHLIGHTS

  • Lost time injury frequency rate (LTIFR) decreased from 2.0 to 1.2 during the quarter.
  • Record quarter sales of US$92.5M.
  • Record Kayelekera production of 606,034lb, an increase of 14% on previous quarter.
    • March production 253,036lb – 93% of nameplate.
    • project now essentially de-risked.
  • Langer Heinrich production impacted by adverse weather.
    • production of 795,808lb down 14% on 925,000lb target for quarter.
    • project expected back to nameplate for June quarter.
  • Langer Heinrich Stage 3 now 92% complete; frontend has entered commissioning phase.
  • Overall production for quarter down only 4% from previous quarter despite weather issues at Langer Heinrich and national diesel shortage stoppage at Kayelekera.
  • Guidance expected to hold at low end of the forecast range for FY11 of 6Mlb ±1% impacted by abnormal rainfall and the diesel shortage.
  • Bikini deposit in Mount Isa updated resources add 18% in contained metal with Indicated Resource now defined.

SAFETY

Safety throughout the Company continues to improve with the Company 12 month moving average Lost Time Injury Frequency rate (LTIFR) decreasing from 2.0 to 1.2 during the quarter, although one Lost Time Injury (LTI) was recorded at its Langer Heinrich Mine (LHM). The LTI involved an operator sustaining a finger injury when his thumb was severed in the process of unblocking the product centrifuge. There were no LTIs at Kayelekera Mine (KM) or within exploration. At LHM, a 4 Star Platinum rating with an improved overall performance was confirmed in an external safety, health and environment NOSA audit. Implementation of the NOSA safety system continues as the main focus at Kayelekera in preparation for a similar external safety, health and environmental audit in the fourth quarter of this fiscal year. 

QUARTERLY URANIUM SALES

Sales for the quarter were 1,395,500lb U3O8 generating record revenue of US$92.5M, representing an average sales price of US$66.28/lb U3O8 (average Ux spot price for the quarter was US$67.10/lb U3O8).

The Ux spot price moved in a range from US$62.50/lb U3O8 at the end of December 2010 to US$73.00/lb U3O8 in early February 2011 before closing back at US$62.50/lb U3O8 at the end of March 2011. The Ux long term price indicator rose from US$65/lb U3O8 to US$72/lb U3O8 during the quarter.

OVERALLPRODUCTION FOR QUARTER

The overall production for the March quarter of 1,401,812lb is a decrease of4% from the previous quarter production as shown in the table below.

LHM + KM Mar qtr June qtr Sept qtr Dec qtr Mar Qtr
Production lb U3O8 1,157,375 1,442,842 1,362,713 1,466,932 1,401,812

LANGER HEINRICH MINE (LHM), Namibia

Production

LHM June qtr Sept qtr Dec qtr Mar qtr
Production lb 927,373 899,735 932,731 795,808

Abnormal rainfall (10 times greater than the annual average) in the 3 months period ending March, particularly during the latter part of the quarter, impacted production due to restricted access to higher-grade mining areas and increased difficulty in treating wet ore. As a consequence, the lower run of mine grades could not be offset by higher throughput at the front end of the plant.

The production for the quarter was 795,815lb U3O8 versus nameplate 925,000lb, resulting in a shortfall of 14%. 

Mining

Mining activities have progressed prior to Stage 3 initiation, with three working areas expected to supply feed ore in 2011, namely pits B2 & B3 and the Pit A cutback.

  Oct Nov Dec Jan Feb Mar
Ore mined (t) 408,185 154,824 34,594 119,528 329,200 392,512
Grade (ppm) 790 690 593 597 717 645
             
Additional low grade ore mined (t) 116,270 59,424 41,602 54,169 128,797 177,479
Grade (ppm) 337 351 307 287 306 308
             
Waste/Ore ratio 1.77 6.62 33.01 8.53 2.46 1.85
             
Ore crushed, dt 173,100 187,900 214,800 206,500 180,000 185,700
Ore grade ppm U3O8 1036 915 844 804 792 740

Mining during the quarter was significantly impacted by wet weather because some of the planned mining areas were inaccessible at times and the mining plan could not be executed according to schedule. This resulted in an average run of mine ore grade of 779ppm U3O8to the plant compared to the design grade of 850ppmU3O8.

Process Plant

Operational Data

  Oct Nov Dec Jan Feb Mar  
Ore milled 173,070 187,920 214,760 206,548 180,323 185,700  
Grade 1037 915 844 804 792 740  
Scrub efficiency 89.5 89.1 84.9 89.9 90.9 90.3 %
Leach efficiency 88.9 92.9 94.2 95.5 95.4 93.4 %
Wash efficiency 81.7 72.5 65.9 67.4 76.9 68.7 %
Overall recovery 78.7 80.2 77.1 78.4 84.5 77.1 %

Tonnage through the process plant remained consistent with the previous quarter with a throughput of 572,500dt (dry tonnes) of ore crushed (575,700dt in the December quarter). In addition to maintaining throughput consistent with that of the previous quarter, even in these difficult conditions, the plant proved during the months of December and January that it is capable of processing at rates in excess of 200,000dt per month. The inclement weather, however, caused lower throughputs during February and March.

Performance of the front end circuits encountered some challenges during the quarter due to wet ore. These were mainly associated with occasional blockages of chutes and scrubbers, which were unable to operate as rainy conditions caused slippage of the drive mechanisms. The scrubbing efficiency improved from 87.8% in the December quarter to 90.3%.

The leaching circuit had an improved extraction rate of 94.8% due to permanent inclusion of the pilot flash splash heat exchanger in the Stage 2 leach circuit. The pilot plant had originally been installed to gather data for designing the larger Stage 3 unit, but has proved to be so successful that the decision was made to incorporate the equipment as a permanent feature to the existing leach circuit. 

Ion Exchange performance was slightly down for the quarter, with the wash efficiency reducing from 73.3% to 70.8%. This efficiency is expected to improve marginally until such time the Stage 3 NIMCIX equipment comes on line when wash efficiency is expected to improve significantly.

Tailings

The construction work on the first in-pit tailings facility (TSF 2) has progressed well during the quarter and is now 99% completed. The facility will be ready to receive material from the Stage 3expansiononce fully commissioned.

Stage 3

The Langer Heinrich Stage 3 expansion project is progressing and has entered the commissioning phase with the front end feed preparation, crushing and scrubbing circuit on track for production ramp-up during April. The increased throughput capacity and scrubbing efficiency at the frontend is expected to quickly add to the production capacity of the processing plant.

The project has achieved one million man hours without a lost time injury. Final construction works continue and commissioning activities in the CCD area will be next to commence staged ramp-up.

Construction works in the NIMCIX and associated processing areas are behind schedule due to a combination of wet weather and delays in delivery of the electrical control panels and some steam boiler ancillary equipment. Completion of the NIMCIX area is now scheduled for late in the June quarter.

The total project is 92% complete.

Stage 4

The Stage 4 Feasibility Study remains on schedule for completion in the December quarter 2011. The EIA documentation is almost ready for final submission and work on the process design of the new plant, targeting a combined 8.7Mlb pa production level, has advanced significantly. A new mining design and production schedule has been completed and a conceptual design for the tailings deposition is being reviewed.

KAYELEKERA MINE (KM), Malawi

Production

Kayelekera June qtr Sept qtr Dec10 qtr Mar qtr
Production/lb 515,478 462,977 534,201 606,034

Kayelekera had record production with a step-change in plant performance achieved during the quarter. The major breakthrough occurred in the RIP circuit and by late January resin management (material handling and screening) reached near-design performance resulting also in increased efficiencies in the elution section. The 6 days lost due to the national diesel shortage reduced February production by nearly 45,000lb U3O8.March production averaged 93% of nameplate.

Overall recovery levels continue to improve, significantly contributing to higher production levels and lower unit costs.

Mining

  Sept qtr Dec qtr Mar qtr
Ore mined (t) 319,882 228,358 123,626
Grade (ppm) 1813 1632 906
Additional low grade mined (t) 122,226 87,497 121,742
Grade (ppm) 513 514 526
Waste (t) 538,374 531,233 343,768

Process Plant

Operating data

  Oct Nov Dec Jan Feb Mar
Operating hrs 473 389 518 481 389 587
Mill feed, dry tons 78,143 67,706 82,915 73,767 58,860 89,806
Grade (ppm) 1377 1351 1476 1348 1613 1437
Leach extraction 90.1 90.1 90.1 88.3 90.5 90.0
RIP efficiency 90.5 86.8 87.9 92.9 94.6 91.7
Overall recovery 82.1 71.8 79.2 79.5 84.5 81.9

March production of 253,036lb U3O8 (nameplate 275,000lb U3O8/month) is indicative of the results that can be expected at Kayelekera with improved RIP performance and consistent plant uptime. The 587hrs of operating time achieved in March was the highest recorded, by a significant margin, over the past six months.

The plant maintenance programme was upgraded and this has already had a significant impact on production levels with additional improvement expected as this regime becomes fully implemented. 

The crushing/grinding circuit posed some throughput restriction due to rains associated with the current wet season. More importantly, mill modifications carried out during the February diesel shutdown period have significantly improved grinding availability, performance and efficiency.

Modified leach launders are to be installed by mid 2011. These will allow smoother operation at higher tonnages and improve extraction even further. Acid production on-site continues to run as per demand.

Resin-in-Pulp maintenance issues are decreasing, primarily due to a methodical approach to materials of construction failures, leading to an increased availability, smoother operation and improved results. Several tanks and pumps have been duplicated to provide redundancy and allow for repairs whilst maintaining operation. Resin movement is close to design levels enabling improved metal recovery and transfer of higher metal volumes. Minor changes to the back end of the plant (uranium precipitation and packaging) have led to an improved drumming rate. Modifications are also being investigated to allow a step change to enable achievement of design throughput in shorter operational hours. 

Lender's Test

The 90 day continuous testing of 10 specific operational parameters, including tonnage throughput, grade reconciliation to resource model, overall recovery, production targets and unit costs was re-started on 1 March. The first month of testing is producing satisfactory results.

Exploration

By the end of the March quarter the rainy season was still active, delaying the start of exploration drilling, which is now planned for early May. Initial work will test deeper uranium mineralisation previously identified west of the current open cut.

GUIDANCE STATUS

Guidance for FY2011 remains within the revised guidance range that has been given. The weather issues at Langer Heinrich hampering production and the loss of production due to the national diesel shortage at Kayelekera will push guidance to the lower limit of 6Mlb±1% U3O8 from the 6Mlb to 6.3Mlb U3O8 previously stated.

NIGER

A scout-drilling programme for the three tenements in Niger has commenced. Drilling is under the local direction of ULC, a French based company with extensive local experience, using Nigerien personnel. It is expected that at current drilling rates the 15,000m programme will be completed early in the second half of CY2011.

MOUNT ISA REGION PROJECTS, Queensland

The Mount Isa regional projects comprise Mount Isa Uranium Joint Venture (MIUJV) (Paladin Energy Ltd 50%, Summit Resources (Aust) Pty Ltd 50% Operator) and the Mount Isa North Uranium Project (MINUP) (Summit Resources (Aust) Pty Ltd 100% - Paladin holds 82% of Summit).

The persistence of the wet season has delayed the planned start of the drilling in the March quarter. However, the drill programme has now begun at the Skal deposit (MIUJV) and an updated resource estimate for Skal is expected in the third quarter of 2011.

Bikini Uranium Deposit

Following completion of drilling at the Bikini deposit (MINUP) in late 2010, an updated Mineral Resource estimate conforming to the JORC (2004) and NI 43-101 guidelines has been finalised. The resource dataset contains 180 drill holes for a total of 52,236m. The updated Mineral Resource estimate is 5.77Mt at a grade of 497ppm U3O8 for 2,868t (6.3Mlb) U3O8 in the Indicated Mineral Resource category and 6.7Mt at a grade of 493ppm U3O8 for 3,324t (7.3Mlb) U3O8 in the Inferred Mineral Resource Category. Resources are quoted at a cut-off grade of 250ppm U3O8 and represent an 18% increase in contained metal over the previous resource. The updated Mineral Resource represents the inaugural Indicated Mineral Resource estimate for the deposit. Modelling parameters and estimation techniques are similar to those used in the previous Mineral Resource estimate.

ANGELA JOINT VENTURE, Northern Territory - Australia (Paladin 50% - Cameco 50% Manager)

A trial mud rotary drilling programme had been planned and this work was delayed until early April 2011 due to weather. The trial is expected to last for 2-3 weeks and is aimed at confirming the quality, speed and cost effectiveness of this drilling type versus RC pre-collar and diamond drilling previously used. The extensive quantity of historic data has now been fully validated and incorporated into a resource dataset and an initial Mineral Resource estimate conforming to both JORC (2004) and NI 43-101 guidelines is expected during the June 2011 quarter.

BIGRLYI URANIUM JOINT VENTURE, Northern Territory - Australia (Paladin 41.71%)

During the March quarter a number of studies were substantially completed by the Manager (Energy Metals Limited) within the scope of the Bigrlyi Preliminary Feasibility Study. This included mining (both open pit and underground), metallurgy, engineering, process design and environment. It is expected that this study, along with a detailed economic assessment to the project, will be completed during the June quarter. In parallel with the prefeasibility studies, an updated Resource estimate will be completed at the same time as planning for additional drilling both along strike and at depth to existing deposits.

CORPORATE

Completion of the Acquisition of Aurora Uranium Assets

On 1 February 2011 Paladin completed the acquisition of the uranium assets of Aurora Energy Resources Inc. ("Aurora") from Fronteer Gold Inc. (TSX:FRG)(NYSE Amex:FRG) ("Fronteer") (see December 20, 2010 news release). Paladin now holds title to significant uranium assets within the highly prospective Central Labrador Mineral Belt of Eastern Canada, totalling 83.8Mlb of Measured and Indicated resources and 53.0Mlb of inferred resources across six deposits.

The transaction was completed for a total consideration of C$260.87M via the issuance of 52,097,937 ordinary shares in Paladin, valuing the current resources at US$1.90/lb.

With completion of this transaction, Fronteer held approximately 6.7% of Paladin's ordinary shares, subject to a four-month hold period under Canadian securities laws. Fronteer also entered into an agreement that set out procedures designed to ensure that any disposition of shares by Fronteer will occur in an orderly fashion. Following the announcement of the takeover of Fronteer by Newmont Mining Corporation (Newmont) the shareholding will transfer to Newmont which will also assume all obligations under the agreements.

URANIUM MARKET COMMENTS - Fukushima

The international media's obsession with the emergency at the Fukushima Dai-ichi nuclear power plants has cast a spotlight on the question of the safety of nuclear power out of context with the enormous tragedy of the natural events which caused such widespread death and destruction. The Japanese authorities' recent decision to upgrade the severity of the Fukushima emergency level 7 on the INES scale, which is the same category that covered the Chernobyl accident in 1986 (although the Fukushima events are not comparable to Chernobyl) has stimulated more ill-informed claims that nuclear power is inherently unsafe. No responsible person could assert that the Fukushima events in any way undermine the fundamental safety of more than 400 nuclear plants operating worldwide today.

The Fukushima event will cause a prudent review of reactor design and siting criteria where appropriate, and may result in some delays in some of the planned reactor builds. However, nuclear power still has an impressive safety record when judged alongside other energy sources. Nuclear power provides at least 14% of global electricity production today, and is the only technology that can produce large quantities of base load energy with minimal carbon emissions throughout its entire fuel cycle. The world cannot abandon nuclear power anymore than it can abandon economic growth or electricity production. The market for uranium will not change significantly in the aftermath of the Fukushima emergency unless financial markets temporarily withdraw support for new uranium producers, which will exacerbate present and predicted uranium supply shortfalls. The uranium supply/demand imbalance is real and will widen as existing and new plants under construction continue to consume current and future uranium production capacity.

Paladin is extremely well positioned in this context. It has two modern mining operations at the beginning of their life cycles with capital expenditure essentially completed for expansion from the current annual production nameplate of 7Mlb to 8.5Mlb U3O8.

Yours faithfully

Paladin Energy Ltd

JOHN BORSHOFF, Managing Director/CEO

Declaration

The information in this announcement that relates to mineral resources is based on information compiled by David Princep BSc MAusIMM for Mineral Resources. Mr Princep has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as Competent Persons as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and as a Qualified Person as defined in Canadian National Instrument 43-101. Mr Princep is full-time employees of Paladin Energy Ltd and consents to the inclusion of the information in this announcement in the form and context in which it appears.



In Australia: Paladin Energy Ltd
John Borshoff
Managing Director/CEO
+61 8 9381 4366 or Mobile: +61 419 912 571
john.borshoff@paladinenergy.com.au
or
In Canada: Paladin Energy Ltd
Greg Taylor
Investor Relations Contact
+1 905 337-7673 or Mobile: 416 605-5120 (Toronto)
greg.taylor@paladinenergy.com.au
Données et statistiques pour les pays mentionnés : Canada | Malawi | Niger | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Malawi | Niger | Tous

Paladin Energy Limited

PRODUCTEUR
CODE : PDN.AX
ISIN : AU000000PDN8
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Paladin Energy Ltd est une société développant des projet miniers d'or et de cuivre basée en Australie.

Paladin Energy Ltd est productrice d'or, de cuivre, d'uranium au Malawi et en Namibie, en développement de projets d'uranium au Canada, et détient divers projets d'exploration en Australie.

Ses principaux projets en production sont LANGER HEINRICH en Namibie et KAYELEKERA au Malawi, son principal projet en développement est MICHELIN au Canada et ses principaux projets en exploration sont ANGELA/PAMELA, OOBAGOOMA, SKAL, VALHALLA, BIGRLYI, MANYINGEE, MT LOFTY et SICCUS en Australie et NASH, JACQUES LAKE et RAINBOW LAKE au Canada.

Paladin Energy Ltd est cotée au Canada, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 23,5 milliards AU$ (15,3 milliards US$, 14,3 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 20 mars 2020 à 0,04 AU$, et son plus haut niveau récent le 24 avril 2024 à 13,72 AU$.

Paladin Energy Ltd possède 1 712 839 936 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Paladin Energy Limited
Printed Annual Report & AGM
30 June 2011 Annual Report
Nominations de Paladin Energy Limited
02/04/2012-Appointment of New CFO
10/07/2008Appoints New Chief Financial Officer
Rapports Financiers de Paladin Energy Limited
29/08/2013Financial Report for Year Ended 30 June 2013
30/08/2012Financial Report for Year Ended 30 June 2012
14/02/2012Financial Report for Six Months Ended 31 December 2011
22/07/2011Quarterly Activities Report For Period Ending-30 June 2011
15/02/2011Appendix 4D and Dec Half Yearly Financial Report and MDandA
Projets de Paladin Energy Limited
31/07/2013(Kayelekera)Kayelekera Mine, Malawi-Workplace Fatality
30/05/2013(Kayelekera)Kayelekera Mine-Alleged Eye Damage
04/10/2011(Kayelekera).-Kayelekera Mine, Malawi Acid Plant Restart-Temporary Proce...
12/09/2011(Langer Heinrich).- Langer Heinrich Mine, Namibia US$141M Project Finance Fac...
07/09/2011(Kayelekera).-Kayelekera Mine, Malawi; Update on Start-Up-1 Week Delay
13/05/2011(Langer Heinrich)-Proposed Changes to Namibian Mineral Policy Will Not Affect...
29/04/2011(Langer Heinrich).-Langer Heinrich to Be Unaffected by Reported Changes to Na...
22/02/2011(Kayelekera)-Kayelekera Mine Production Resumes
17/02/2011(Kayelekera)-Malawi Diesel Shortage
29/01/20082008 Technical report
Communiqués de Presse de Paladin Energy Limited
01/08/2016Reinstatement to official quotation
10/05/2016Paladin reports 3Q loss
10/05/2016March Quarter 2016 Conference Call and Investor Update Prese...
04/05/2016Third Quarter Conference Call and Investor Update
18/04/2016Clarification of Incorrect Media/Blog Reports Concerning Wat...
16/12/2015Response to the Daily Times (Malawi) Article of 15 December ...
16/12/2015Repurchase of US$6 Million of Convertible Bonds Due 2017
16/12/2015Paladin Energy Limited: Response to the Daily Times (Malawi)...
15/12/2015Repurchase of US$6 Million of Convertible Bonds Due 2017
25/11/2015Repurchase of US$11M of Convertible Bonds Due 2017
25/11/2015Paladin Energy Limited: Repurchase of US$11 Million of Conve...
15/10/2015Paladin Energy Limited: Quarterly Activities Report for the ...
08/09/2015Paladin Energy Limited: Repurchase of US$20 Million of Conve...
28/08/2015Edited Transcript of PDN.AX earnings conference call or pres...
27/08/2015Paladin Energy Limited: June 2015 Full Year Conference Call ...
27/08/2015Paladin Energy Limited: Financial Report for the Year Ended ...
10/08/2015Paladin Energy Ltd: Change of Chief Executive Officer
10/08/2015Change of Chief Executive Officer
30/07/2015Progress Update Material Reduction in Costs in FY16
16/07/2015Quarterly Activities Report for the Period ending 30 June 20...
13/07/2015Response to Recent Media/NGO Activity
02/07/2015Paladin Energy Ltd: Operations Update
24/04/2015Quarterly Activities Report for Period Ending 31 March 2015
31/03/2015Announces Closing of US$150M of 7.00% Convertible Bonds Due ...
30/03/2015Change in substantial holding
30/03/2015Results of General Meeting
25/03/2015Paladin Accepts CIC for Additional US$50M of Convertible Bon...
24/03/2015Accepts CIC for Additional US$50M of Convertible Bonds
13/03/2015Paladin Energy Ltd: Update on Issue of Convertible Bonds
13/03/2015Update on Issue of Convertible Bonds
24/02/2015Paladin Energy Ltd: Notice of General Meeting to Shareholder...
24/02/2015Notice of General Meeting to Shareholders
12/02/2015Paladin Energy Ltd Announces Successful Raising of Initial U...
12/02/2015Appendix 4D and December Half Yearly Financial Report and MD...
09/02/2015Paladin Energy Ltd: December Quarter and Half Year 2014 Conf...
09/02/2015December Quarter and Half Year 2014 Conference Call and Inve...
19/01/2015Quarterly Activities Report for Period Ending 31 December 20...
07/01/2015Paladin Energy Ltd.: Kayelekera - Minor Storm Damage
17/12/2014Paladin Energy Ltd.: Adjustment of Conversion Price of Conve...
02/12/2014Entitlement Offer Closing Date for Payment by Cheque
26/11/2014Successful Completion of A$50 Million Institutional Entitlem...
25/11/2014Paladin Energy Ltd Responds to Enquiries About Canadian Reta...
25/11/2014Paladin Energy Ltd: Appointment of Director-Mr Wendong Zhang
12/03/2014Sale of Shareholding by Newmont Mining Corporation
12/03/2014Paladin Energy Ltd: Sale of Shareholding by Newmont Mining C...
20/02/2014Paladin Energy Ltd: Shareholder Approval Not Required Regard...
18/02/2014Paladin Energy Ltd: Product Shipment Incident Near Kayeleker...
13/02/2014Paladin Energy Ltd: Second Quarter 2014 Conference Call Pres...
13/02/2014Paladin Energy: Financial Report for Six Months Ended 31 Dec...
12/02/2014Second Quarter 2014 Conference Call and Investor Update
12/02/2014Suspension of Production at Kayelekera Mine Malawi
11/02/2014Paladin Energy Ltd: Second Quarter 2014 Conference Call and ...
08/02/2014Uranium producer Cameco scraps production target
07/02/2014Paladin Energy Ltd: Suspension of Production at Kayelekera M...
30/10/2013(Langer Heinrich)Fatality Following Previously Reported Serious Incident at L...
15/10/2013Response to Media Reports
10/10/2013Quarterly Activities Report for Period Ending-30 September 2...
23/08/2013Year End June 2013 Conference Call and Investor Update-Augus...
13/08/2013Announces Completion of Placement
16/07/2013.: Quarterly Activities Report for Period Ending-30 June 201...
26/06/2013Strategic Initiative Update
10/05/2013.: Third Quarter Conference Call and Investor Update-15 May ...
17/04/2013Quarterly Activities Report For Period Ending-31 March 2013
13/03/2013Completes Repayment of US$325M Convertible Bond
11/02/2013.: Second Quarter/Half Year Conference Call and Investor Upd...
31/01/2013Final Tranche of US$150M Received
07/11/2012. Reports Targetted Cost Reductions of US$60M to US$80M Over...
26/10/2012. a Long Term Supplier of Yellowcake to Electricite de Franc...
16/10/2012.-Quarterly Activities Report for Period Ending-30 September...
02/10/2012.-Long Term Off-Take Contract With a US$200M Prepayment
07/09/2012.-Long Term Off-Take With US$200M Prepayment Supporting Secu...
15/08/2012-Long Term Off-Take Contract With a US$200M Prepayment
13/07/2012-Quarterly Activities Report for Period Ending-30 June 2012
30/05/2012Announces Settlement of Tender Offer
23/05/2012Announces Expiry of Deadline for Tender Offer
11/05/2012Third Quarter Conference Call and Investor Update-17 May 201...
01/05/2012Announces Settlement of Convertible Bond Issue of US$274 Mil...
10/04/2012-Transition of Government in Malawi
12/03/2012Labrador Inuit Lands Act Amendment-Aurora Uranium Assets, La...
08/02/2012Second Quarter/Half Year Conference Call and Investor Update...
17/01/2012Quarterly Activities Report for Period Ending-31 December 20...
15/12/2011Uranium Moratorium Lifted-Aurora Uranium Assets, Labrador, C...
24/11/2011Results of Annual General Meeting
12/10/2011.: Adjustment of the Conversion Price of Convertible Bonds
16/09/2011(Kayelekera).-Kayelekera Mine, Malawi-Production Resumes After Plant Upg...
22/08/2011-Uranium Sales Agreements Signed
10/06/2011-Clarifying Statement
15/04/2011Quarterly Activities Report for Period Ending-31 March 2011
15/02/2011-Correction to Share Information-Half Year Accounts
02/02/2011Completes Acquisition of Aurora Uranium Assets
21/01/2011Quarterly Activities Report for period ending 31 December 20...
27/11/2008Annual General Meeting Chairman's Address
15/05/2008March 2008 Quarterly Financial Report and MD&A
03/08/2007Settlement of Litigation by Summit
13/06/2007Kayelekera Status of Project Electricity Supply
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (PDN.AX)TORONTO (PDN.TO)
13,72-0.65%0,045+0.00%
AUSTRALIA
AU$ 13,72
24/04 11:00 -0,090
-0,65%
Cours préc. Ouverture
13,81 13,95
Bas haut
13,71 13,97
Année b/h Var. YTD
1,01 -  15,30 1 258,42%
52 sem. b/h var. 52 sem.
0,535 -  15,30 2 112,90%
Volume var. 1 mois
1 017 498 880,00%
24hGold TrendPower© : 31
Produit Uranium
Développe Uranium
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20241262,46%
202343,86%1,040,52
2022-20,45%0,970,55
2021252,00%1,060,26
2020165,96%0,290,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :