Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Paladin Energy Ltd: Quarterly Activities Report For Period Ending-31 March 2013
Published : April 17, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Fukushima | Malawi | Report | Uranium |

PERTH, WESTERN AUSTRALIA--(Marketwired - April 17, 2013) - Paladin Energy Ltd ("Paladin" or "the Company") (TSX:PDN)(News - Market indicators) is pleased to provide its Quarterly Activities Report for the three month period ended 31 March 2013.

HIGHLIGHTS

  • Strong sales revenue of US$106M for the quarter, selling 1.92Mlb U3O8 at average price of US$55.22/lb.

  • Continued solid quarterly production, with year to date production for FY2013 versus FY2012 at a record high.

    • combined production for the March quarter of 1.992Mlb (904t) U3O8 was 95% of nameplate production, a decrease of 9% from the December record quarter.

    • year to date (9 months) production for FY2013 of 6.112Mlb (2,773t) U3O8 is a 26% increase over the previous FY2012 period, reflecting 96% of combined nameplate and in line with guidance.

  • Cost savings and optimisation initiatives continue successfully with unit production costs continuing to reduce at both mines for the quarter.

  • Langer Heinrich production of 1.230Mlb (558t) U3O8 achieving 96% of nameplate for the quarter.

    • production was influenced by temporary water constraints and some operational issues. Those are being resolved with improved water conservation measures in place and desalinated water scheduled to be introduced in May.

    • year to date production (9 months) for FY2013 remains slightly above nameplate.

    • strong recovery of 86.7% versus design of 85%.

    • feed grades of 810ppm U3O8 versus design of 800ppm.

    • production capacity remains robust and above nameplate.

  • Kayelekera production of 761,992lb (346t) U3O8 achieving 94% of nameplate for the quarter.

    • average daily production at an all-time high for the quarter.

    • feed grades of 1,094ppm U3O8 on track (design is 1,100ppm).

    • record recovery of 87.1%.

    • maintaining self sufficiency on acid requirements.

    • safety milestone of 365 lost time injury free days achieved.

  • Strategic initiative work advancing well with results expected mid June quarter.

  • FY2013 production guidance of 8.0 - 8.5Mlb U3O8 remains well on target.

SAFETY

The Company's high safety performance was impacted by two lost time injuries (LTIs) incurred during the period with the 12-month moving average Lost Time Injury Frequency Rate (LTIFR) increased from 1.1 to 1.2. One LTI occurred at Langer Heinrich Mine (LHM) and involved an operator suffering an injury to his back when he slipped and fell approximately 2m. The incident investigation revealed that the employee was not using a safety harness and procedures are being adjusted to mitigate further similar incidents. The other LTI was exploration related and involved a contractor suffering a crushed finger while handling fuel drums at the Michelin camp in Canada. 

During the period, the annual NOSA HSE grading audit for LHM confirmed a 4 Platinum Star rating. 

There were no LTIs at Kayelekera Mine (KM) for the period. KM also achieved a milestone 365 LTI free days on 28 March 2013.

QUARTERLY URANIUM SALES

Sales for the quarter were 1,920,230lb U3O8 generating revenue of US$106M, representing an average sales price of US$55.22/lb U3O8 (average Ux spot price for the quarter was US$42.71/lb U3O8). As foreshadowed in the last Quarterly Report, sales are now more closely aligned with production although some variations can be expected from quarter-to-quarter due to customer requirements.

LANGER HEINRICH MINE, Namibia (100%)

Production by quarter

LHM Jun 2012 Qtr Sep 2012 Qtr Dec 2012 Qtr Mar 2013 Qtr
U3O8 Production (lb) 1,322,480 1,290,462 1,418,583 1,230,081

Production totalled 1,230,081lb U3O8, which was 13% lower than the previous quarter. The plant continued to perform well and in accordance with the design parameters of the Stage 3 upgrade, which was designed around the limitations of the NamWater infrastructure that supplies water to the mine. Consequently, any disruption to the supply of water has a direct impact on production and during the quarter the supply was disrupted as NamWater acted to upgrade its supply infrastructure in the region to accommodate the additional water requirements associated with new mining developments (mainly the new Husab uranium mine).

This action is part of a long-standing initiative by NamWater to transition from aquifer water to desalinated water later in the year.

In order to overcome the current water supply constraint on production, an interim agreement is being concluded with NamWater and Areva, the owners of the desalination plant in Namibia, to access additional desalinated water, ahead of schedule, from May 2013. In addition to this, an increased focus on water conservation at site will mitigate against further disruptions. 

This combined strategy of a short-term agreement and water conservation measures will eliminate any further disruptions to the water supply in the interim and thus allow a resumption of nameplate or better production. 

Mining

The overall mined quantities decreased as planned over the quarter. The mining schedule was previously revised as part of the cost rationalisation programme. Ore mining and availability remained unaffected.

  Dec 2012 Qtr Mar 2013 Qtr
Ore mined (t) 1,191,756 829,366
Grade (ppm) 798 823
Additional low grade ore mined (t) 757,649 531,667
Grade (ppm) 320 314
Waste/ore ratio 2.54 3.88

Mining continued in three pits with sufficient ore exposed to fulfil plant feed requirements. 

ROM ore stocks have been maintained at around four weeks' supply while being supplemented by medium grade ores in line with the crusher blend requirements.

Process Plant

The plant experienced reduced throughput in the March quarter as reflected below:

  Dec 2012 Qtr Mar 2013 Qtr
Ore milled (t) 914,847 797,696
Grade (ppm) 805 810
Scrub efficiency (%) 92.7 91.1
Leach extraction (%) 95.1 95.8
Wash efficiency (%) 86.7 88.8
Overall recovery (%) 87.4 86.7

Ore feed tonnage through the process plant reduced by 12.8% with total throughput of 797,696t. The reduced throughput can be attributed to the temporary water constraints and some operational issues mainly in ion exchange. These issues have since been rectified. The water constraints, which influenced the general performance capability of the plant, were the most significant.

The scrub efficiency reduced to 91.1% (against a design of 93%). As reported previously, optimisation work in the screening area in order to further improve performance is ongoing, with the classification section remaining the focal area of these optimisation efforts.

The extraction in the leaching circuit continued to improve in line with expectations with a new quarterly record recovery of 95.8%. This improved performance is due to improved heat management and subsequent consistently higher leach temperatures as well as the previously reported initiatives on improving throughput consistency.

The efficiencies in the Counter-Current Decantation (CCD) circuit have improved as a result of the continuing optimisation efforts in this circuit. These improvements have had a further benefit of reducing overall water consumption and, as a consequence, reagent consumption leading to sustainable reductions in C1 operating costs. Further modifications and improved operating procedures are being implemented, which should lead to additional improvements.

The overall plant recovery reduced slightly to 86.7%. The most significant contributors were a result of lower scrub efficiency, lower ion exchange ("IX") efficiency and a reduction in the return solution from the tailings storage facility. The leach section achieved record recovery whilst the wash efficiency also showed a marked improvement from the previous quarter. 

Construction work on the newest tailings storage facility ("TSF3") (full in-pit tailing deposition area) continued during this period and is scheduled for completion in the December quarter. It is now envisaged that the tailings deposition to TSF2 will extend to the second half of CY2013. Construction of TSF2 extension also continued throughout the quarter.

Production Optimisation

Optimisation of the process continued during the quarter with material and sustainable gains being achieved:

  • Water consumption and, as a consequence, reagent consumption and soluble loss, have been significantly reduced;
  • CCD performance has been improved, with further improvements expected over the coming periods;
  • Operational stability has been improved, particularly the front end, with improved downstream performance; and
  • Heat recovery/management has been improved in the leach and flash circuits, resulting in higher average leach temperatures, and consequently, higher leach extractions.

The installation of the Hydrosort classification unit remains on track for commissioning early in the September quarter and is expected to improve front end ore beneficiation in the coming year.

Further optimisation targets are also being developed on the basis of expanded Stage 3 operating experience.

KAYELEKERA MINE, Malawi (85%)

Production by quarter 

KM Jun 2012 Qtr Sept 2012 Qtr Dec 2012 Qtr March 2013 Qtr
U3O8 Production (lb) 726,299 638,950 772,280 761,992

In the March quarter, total production fell slightly to 761,992lb; however, average daily production increased marginally to 8,467lb/day compared with 8,395lb/day during the December 2012 quarter.

Mining

Mining data

  Dec 2012 Qtr March 2013 Qtr
Ore mined (t) 404,261 29,192
Grade (ppm) U3O8 1,814 1,816
Additional low grade ore mined (t) 63,201 6,096
Grade (ppm) 521 471
Waste/ore ratio 1.54 17.95

Total material mined for the quarter was 29% below target due to poor equipment availability and wet ramps. The outlook for the upcoming quarter as the project enters the dry season is good with equipment availability set to improve as additional equipment is supplied by the mining contractor.

All mining quantities were down for the above reasons and, with the large stock piles in place, the focus was on waste stripping during the period, reflecting the high waste-to-ore ratio for the quarter. This will revert to normal for the coming dry season.

Ore availability on stockpiles (ROM pad) still remains in excess of five months of plant requirements at budget tonnes and grade.

Process Plant

Operating data

  Dec 2012 Qtr March 2013 Qtr
Operating time (hrs) 1,942 1,853
Mill feed(t) 356,764 364,381
Grade (ppm) U3O8 1,159 1,094
Leach extraction (%) 90.7 91.4
RIP efficiency (%) 93.9 96.6
Overall efficiency (%) 83.8 87.2

Leach recovery increased to 91.4% and acid consumption was maintained at budget with on site acid production meeting process requirements.

Resin management also remains a primary focus. Improvements in resin-in-pulp ("RIP") efficiency continued with 96.6% efficiency delivered. Improvements in RIP are largely the result of completion of the RIP Refurbishment Project, which allows additional contactors to be on line. In the coming quarter, continuous resin advance will be trialled with a view to full incorporation in the September quarter. It is expected that this will remove the RIP/Elution circuit as the principal process bottleneck and allow consistent performance at or above nameplate.

Overall recovery for the quarter increased to a record 87.2% as a result of the improved leach recovery and an improved RIP efficiency.

Production Optimisation

The two key optimisation projects identified in the last quarterly, grid power and acid recycling, are progressing well, although both have experienced minor delays. Notwithstanding the delays, costs remain within budget expectation.

Two further optimisation initiatives are also underway. As mentioned above, continuous resin advance will be trialled in the coming quarter with a view to full implementation in the following quarter. In addition to this initiative, the milling classification circuit is also being upgraded with a view to reducing milling power consumption and grind size. The reduced grind size will result in improved leach and RIP performance.

Exploration

Exploration concentrated on the preparation for the 2013 drilling programme. This programme will be larger than in previous years, with 20,000m of reverse circulation planned. Drilling will commence during this year's dry season.

UNIT COST IMPROVEMENT

Cost savings and optimisation initiatives through technical innovation continue to successfully reduce total costs and unit production costs at both mines.

  • At LHM, C1 cost of production remained steady in the March quarter compared to the December quarter C1 costs of production of US$29.60/lb U3O8. The underlying cost base reduced and C1 cost reductions would have been realised if nameplate production had been achieved. Unit cost reduction for the December and March quarters totalled 6.5%, in line with the Company's 17th November 2012 announcement - "Cost Reductions."
  • At KM, C1 cost of production continued to drop substantially with a reduction of 8.5% in the March quarter from the C1 cost of production of US$43.50/lb U3O8 for the December quarter. C1 cost of production reduction for the December and March quarters of 20% is significant and is better than forecast given in the November 2012 announcement.
  • Further improvements in C1 costs are expected as a number of the most significant cost saving initiatives at both sites have yet to be fully implemented.

PRODUCTION GUIDANCE FY2013

The continued solid and stable combined production over the past three quarters at LHM and KM of 6.11Mlb U3O8, with clear opportunities for continued improvement, place the Company in a good position to achieve its stated production target guidance of 8.0 to 8.5Mlb U3O8 for FY2013.

AURORA - MICHELIN URANIUM PROJECT, Canada (100%)

The Michelin winter infill drilling programme was completed with nine diamond holes for 3,272m. Uranium mineralisation occurs in strongly foliated felsic and mafic Aillik Group rocks in the N60°E-striking, 50°SE-dipping lenticular main zone and in two small hanging wall lenses. Drill intercepts from last summer and this winter targeting gaps in previous drilling generally showed more variable intercepts than expected. Hole M13-145 intersected 60m @ 1,012ppm eU3O8 to confirm the core of the Michelin ore body. The updated resource estimate is planned for late June/early July. Some large ~100m gaps still exist in the southwest portion of Michelin and these will be targeted for summer drilling. Significant results from the recent winter drilling include:

ID East   North RI Grid Azi-
muth
Dip EOH
Depth
From To Inter-
val
(m)
Grade
eU
3O8
(ppm)
M12-141 306873   6052094 333 NAD83_21 340 -74 419 347.0 358.0 11.0 1423
                  365.0 373.0 8.0 445
                  387.0 394.0 7.0 883
M12-143 306899   6052080 336 NAD83_21 340 -63 401 341.0 362.0 21.0 478
M13-144 306873   6052094 336 NAD83_21 332 -74 197        
M13-145 307020   6052353 333 NAD83_21 355 -85 339 217.0 222.0 5.0 274
                  238.0 298.0 60.0 1012
M13-146 306873   6052094 336 NAD83_21 338 -62 383 319.0 328.0 9.0 454
M13-147 306873   6052094 336 NAD83_21 338 -69 413 323.0 327.0 4.0 978
                  338.0 353.0 15.0 333
M13-148 306668   6052050 333 NAD83_21 355 -84 419 391.0 396.0 5.0 751
M13-149 306873   6052094 336 NAD83_21 338 -75 410 350.0 366.0 16.0 996
                  372.0 376.0 4.0 523
                  388.0 393.0 5.0 728
M13-150 306668   6052050 337 NAD83_21 355 -63 340 278.0 284.0 6.0 8467

Ground magnetic surveys were completed over swamps and lake areas not accessible in the summer period.

The complete ground survey will now help to develop new targets along the Michelin corridor, which extends 5km south west and northeast of the ore body.

MANYINGEE PROJECT, Australia (100%)

Evaluation of the 2012 drilling results is concentrating on developing an updated JORC-compliant resource and a new hydrogeological model to be used in any future in-situ recovery ("ISR") leach trial operations. An updated resource estimate is expected by June. Preparations have started for the 2013 drilling programme, which includes 10,000m rotary mud drilling to confirm and expand the resource base.

STRATEGIC INITIATIVE EFFORTS

Considerable effort has been applied to advancing the strategic initiative undertaken to unlock value from some of Paladin's assets. There is keen interest by the selected parties to become involved and the final phase has been entered.

As previously indicated, the proceeds from these initiatives will be applied to debt reduction and strengthening the balance sheet.

URANIUM MARKET COMMENTS

The Ux spot price moved in a narrow range during the quarter moving from a high of US$44.00/lb U3O8 in January before stabilising at US$42.25/lb U3O8 in March. The Ux term price was unchanged at US$56.00/lb U3O8 for the quarter.

Outlook

During this quarter, one new reactor, Hongyanhe-1, a 1000 MWe Pressurised Water Reactor (PWR) was connected to the grid in China, and formal construction started on Virgil C Summer-2 and Vogtle-3, both 1117 MWe PWR in the USA. Worldwide there are now 68 nuclear power plants under construction in 15 countries, which is six plants more than were under construction prior to the Fukushima accident in March 2011. With the exception of Japan, where there are still 48 plants offline pending the determination of new safety standards by the Nuclear Regulation Authority by July this year, the global nuclear fleet is performing well and is growing significantly in line with long-standing predictions.

Declaration

The information in this Announcement relating to exploration and mineral resources is, except where stated, based on information compiled by David Princep B.Sc who is a Fellow of the AusIMM. Mr Princep has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves", and as a Qualified Person as defined in NI 43-101. Mr Princep is a full-time employee of Paladin Energy Ltd and consents to the inclusion of this information in the form and context in which it appears.

ACN 061 681 098



In Australia:
Paladin Energy Ltd
John Borshoff, Managing Director/CEO
+61 8 9381 4366
Mobile: +61 419 912 571
john.borshoff@paladinenergy.com.au
or
In Canada:
Paladin Energy Ltd
Greg Taylor, Investor Relations Contact
+905 337-7673 or Mobile: 416 605-5120 (Toronto)
greg.taylor@paladinenergy.com.au
www.paladinenergy.com.au
Données et statistiques pour les pays mentionnés : Canada | Malawi | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Malawi | Tous

Paladin Energy Limited

PRODUCTEUR
CODE : PDN.AX
ISIN : AU000000PDN8
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Paladin Energy Ltd est une société développant des projet miniers d'or et de cuivre basée en Australie.

Paladin Energy Ltd est productrice d'or, de cuivre, d'uranium au Malawi et en Namibie, en développement de projets d'uranium au Canada, et détient divers projets d'exploration en Australie.

Ses principaux projets en production sont LANGER HEINRICH en Namibie et KAYELEKERA au Malawi, son principal projet en développement est MICHELIN au Canada et ses principaux projets en exploration sont ANGELA/PAMELA, OOBAGOOMA, SKAL, VALHALLA, BIGRLYI, MANYINGEE, MT LOFTY et SICCUS en Australie et NASH, JACQUES LAKE et RAINBOW LAKE au Canada.

Paladin Energy Ltd est cotée au Canada, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 26,2 milliards AU$ (16,8 milliards US$, 15,8 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 20 mars 2020 à 0,04 AU$, et son plus haut niveau récent le 18 avril 2024 à 15,30 AU$.

Paladin Energy Ltd possède 1 712 839 936 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Paladin Energy Limited
Printed Annual Report & AGM
30 June 2011 Annual Report
Nominations de Paladin Energy Limited
02/04/2012-Appointment of New CFO
10/07/2008Appoints New Chief Financial Officer
Rapports Financiers de Paladin Energy Limited
29/08/2013Financial Report for Year Ended 30 June 2013
30/08/2012Financial Report for Year Ended 30 June 2012
14/02/2012Financial Report for Six Months Ended 31 December 2011
22/07/2011Quarterly Activities Report For Period Ending-30 June 2011
15/02/2011Appendix 4D and Dec Half Yearly Financial Report and MDandA
Projets de Paladin Energy Limited
31/07/2013(Kayelekera)Kayelekera Mine, Malawi-Workplace Fatality
30/05/2013(Kayelekera)Kayelekera Mine-Alleged Eye Damage
04/10/2011(Kayelekera).-Kayelekera Mine, Malawi Acid Plant Restart-Temporary Proce...
12/09/2011(Langer Heinrich).- Langer Heinrich Mine, Namibia US$141M Project Finance Fac...
07/09/2011(Kayelekera).-Kayelekera Mine, Malawi; Update on Start-Up-1 Week Delay
13/05/2011(Langer Heinrich)-Proposed Changes to Namibian Mineral Policy Will Not Affect...
29/04/2011(Langer Heinrich).-Langer Heinrich to Be Unaffected by Reported Changes to Na...
22/02/2011(Kayelekera)-Kayelekera Mine Production Resumes
17/02/2011(Kayelekera)-Malawi Diesel Shortage
29/01/20082008 Technical report
Communiqués de Presse de Paladin Energy Limited
01/08/2016Reinstatement to official quotation
10/05/2016Paladin reports 3Q loss
10/05/2016March Quarter 2016 Conference Call and Investor Update Prese...
04/05/2016Third Quarter Conference Call and Investor Update
18/04/2016Clarification of Incorrect Media/Blog Reports Concerning Wat...
16/12/2015Response to the Daily Times (Malawi) Article of 15 December ...
16/12/2015Repurchase of US$6 Million of Convertible Bonds Due 2017
16/12/2015Paladin Energy Limited: Response to the Daily Times (Malawi)...
15/12/2015Repurchase of US$6 Million of Convertible Bonds Due 2017
25/11/2015Repurchase of US$11M of Convertible Bonds Due 2017
25/11/2015Paladin Energy Limited: Repurchase of US$11 Million of Conve...
15/10/2015Paladin Energy Limited: Quarterly Activities Report for the ...
08/09/2015Paladin Energy Limited: Repurchase of US$20 Million of Conve...
28/08/2015Edited Transcript of PDN.AX earnings conference call or pres...
27/08/2015Paladin Energy Limited: June 2015 Full Year Conference Call ...
27/08/2015Paladin Energy Limited: Financial Report for the Year Ended ...
10/08/2015Paladin Energy Ltd: Change of Chief Executive Officer
10/08/2015Change of Chief Executive Officer
30/07/2015Progress Update Material Reduction in Costs in FY16
16/07/2015Quarterly Activities Report for the Period ending 30 June 20...
13/07/2015Response to Recent Media/NGO Activity
02/07/2015Paladin Energy Ltd: Operations Update
24/04/2015Quarterly Activities Report for Period Ending 31 March 2015
31/03/2015Announces Closing of US$150M of 7.00% Convertible Bonds Due ...
30/03/2015Change in substantial holding
30/03/2015Results of General Meeting
25/03/2015Paladin Accepts CIC for Additional US$50M of Convertible Bon...
24/03/2015Accepts CIC for Additional US$50M of Convertible Bonds
13/03/2015Paladin Energy Ltd: Update on Issue of Convertible Bonds
13/03/2015Update on Issue of Convertible Bonds
24/02/2015Paladin Energy Ltd: Notice of General Meeting to Shareholder...
24/02/2015Notice of General Meeting to Shareholders
12/02/2015Paladin Energy Ltd Announces Successful Raising of Initial U...
12/02/2015Appendix 4D and December Half Yearly Financial Report and MD...
09/02/2015Paladin Energy Ltd: December Quarter and Half Year 2014 Conf...
09/02/2015December Quarter and Half Year 2014 Conference Call and Inve...
19/01/2015Quarterly Activities Report for Period Ending 31 December 20...
07/01/2015Paladin Energy Ltd.: Kayelekera - Minor Storm Damage
17/12/2014Paladin Energy Ltd.: Adjustment of Conversion Price of Conve...
02/12/2014Entitlement Offer Closing Date for Payment by Cheque
26/11/2014Successful Completion of A$50 Million Institutional Entitlem...
25/11/2014Paladin Energy Ltd Responds to Enquiries About Canadian Reta...
25/11/2014Paladin Energy Ltd: Appointment of Director-Mr Wendong Zhang
12/03/2014Sale of Shareholding by Newmont Mining Corporation
12/03/2014Paladin Energy Ltd: Sale of Shareholding by Newmont Mining C...
20/02/2014Paladin Energy Ltd: Shareholder Approval Not Required Regard...
18/02/2014Paladin Energy Ltd: Product Shipment Incident Near Kayeleker...
13/02/2014Paladin Energy Ltd: Second Quarter 2014 Conference Call Pres...
13/02/2014Paladin Energy: Financial Report for Six Months Ended 31 Dec...
12/02/2014Second Quarter 2014 Conference Call and Investor Update
12/02/2014Suspension of Production at Kayelekera Mine Malawi
11/02/2014Paladin Energy Ltd: Second Quarter 2014 Conference Call and ...
08/02/2014Uranium producer Cameco scraps production target
07/02/2014Paladin Energy Ltd: Suspension of Production at Kayelekera M...
30/10/2013(Langer Heinrich)Fatality Following Previously Reported Serious Incident at L...
15/10/2013Response to Media Reports
10/10/2013Quarterly Activities Report for Period Ending-30 September 2...
23/08/2013Year End June 2013 Conference Call and Investor Update-Augus...
13/08/2013Announces Completion of Placement
16/07/2013.: Quarterly Activities Report for Period Ending-30 June 201...
26/06/2013Strategic Initiative Update
10/05/2013.: Third Quarter Conference Call and Investor Update-15 May ...
17/04/2013Quarterly Activities Report For Period Ending-31 March 2013
13/03/2013Completes Repayment of US$325M Convertible Bond
11/02/2013.: Second Quarter/Half Year Conference Call and Investor Upd...
31/01/2013Final Tranche of US$150M Received
07/11/2012. Reports Targetted Cost Reductions of US$60M to US$80M Over...
26/10/2012. a Long Term Supplier of Yellowcake to Electricite de Franc...
16/10/2012.-Quarterly Activities Report for Period Ending-30 September...
02/10/2012.-Long Term Off-Take Contract With a US$200M Prepayment
07/09/2012.-Long Term Off-Take With US$200M Prepayment Supporting Secu...
15/08/2012-Long Term Off-Take Contract With a US$200M Prepayment
13/07/2012-Quarterly Activities Report for Period Ending-30 June 2012
30/05/2012Announces Settlement of Tender Offer
23/05/2012Announces Expiry of Deadline for Tender Offer
11/05/2012Third Quarter Conference Call and Investor Update-17 May 201...
01/05/2012Announces Settlement of Convertible Bond Issue of US$274 Mil...
10/04/2012-Transition of Government in Malawi
12/03/2012Labrador Inuit Lands Act Amendment-Aurora Uranium Assets, La...
08/02/2012Second Quarter/Half Year Conference Call and Investor Update...
17/01/2012Quarterly Activities Report for Period Ending-31 December 20...
15/12/2011Uranium Moratorium Lifted-Aurora Uranium Assets, Labrador, C...
24/11/2011Results of Annual General Meeting
12/10/2011.: Adjustment of the Conversion Price of Convertible Bonds
16/09/2011(Kayelekera).-Kayelekera Mine, Malawi-Production Resumes After Plant Upg...
22/08/2011-Uranium Sales Agreements Signed
10/06/2011-Clarifying Statement
15/04/2011Quarterly Activities Report for Period Ending-31 March 2011
15/02/2011-Correction to Share Information-Half Year Accounts
02/02/2011Completes Acquisition of Aurora Uranium Assets
21/01/2011Quarterly Activities Report for period ending 31 December 20...
27/11/2008Annual General Meeting Chairman's Address
15/05/2008March 2008 Quarterly Financial Report and MD&A
03/08/2007Settlement of Litigation by Summit
13/06/2007Kayelekera Status of Project Electricity Supply
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (PDN.AX)TORONTO (PDN.TO)
15,30+0.00%0,045+0.00%
AUSTRALIA
AU$ 15,30
18/04 11:00 -
0%
Cours préc. Ouverture
15,30 15,30
Bas haut
15,30 15,30
Année b/h Var. YTD
1,01 -  15,30 1 414,85%
52 sem. b/h var. 52 sem.
0,535 -  15,30 2 328,57%
Volume var. 1 mois
0 1 000,72%
24hGold TrendPower© : 31
Produit Uranium
Développe Uranium
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20241419,36%
202343,86%1,040,52
2022-20,45%0,970,55
2021252,00%1,060,26
2020165,96%0,290,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :