Publié le 12 janvier 2016

Quarterly Activities Report

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Europe | K Street |

Quarterly Activities Report

15efc95a-b66e-4620-a06d-6f4668e5f572.pdf


Magnes um

ABN 52 009 173 611


QUARTERLY ACTIVITIES REPORT

31 December 2015


LATROBE MAGNESIUM PROJECT



  1. Patents granted


    In October and November 2015, LMG was informed that the United States of America and the Chinese patents for its unique hydromet process had been granted on 22 September 2015 and 23 September 2015 respectively.


    The Australian patent was granted on 26 September 2013 for 20 years starting from 27 August 2010.


    The process is owned 50% each by Ecoengineers Pty Ltd and Magnesium Investments Pty Ltd, a 100% owned subsidiary of LMG. LMG has the exclusive worldwide marketing rights for the commercialisation of this technology.


    Patent applications were lodged in March 2013 for additional international territories being all countries within the European Union, India and Indonesia. All these countries are known to have large lignite / brown coal deposits.


    The progress of the patent applications in each of these countries is summarised in the table below:


    Country/Region

    Number

    Status

    Expected date of grant

    Australia

    2011293107

    Granted

    26 September 2013

    United States

    9139892 (13/818788)

    Granted

    22 September 2015

    China

    201180040099.2

    Granted

    23 September 2015

    Europe

    11819208.7

    Response filed to Search Opinion

    By end 2016

    India

    577/MUMNP2013

    Examination requested

    By end 2016

    Indonesia

    W00201300844

    Examination requested

    By end 2016


  2. Further Cementitious Material Test Results


    In October 2015, LMG completed further cementitious test results that showed LMG's material continues to outperform fly ash. Additional applications in the ultrafine fly ash market, where product sells for over $200 per tonne, is also being assessed.


    Suite 307, 20 Barrack Street, Sydney, NSW 2000 Phone: +61 (0)2 8097 0250

    Postal Address: GPO Box 4729, Sydney, NSW 2001 Fax: +61 (0)2 9279 3854


    There is a major shortage of fly ash in Victoria. Victorian users import up to 300,000 tonnes per annum from New South Wales and Queensland and some users are importing fly ash from overseas.


    The cementitious testing was conducted by BG&E at the TSE Laboratory in Sydney and also at Cement Australia's Laboratory in Brisbane.


    TSE conducted shotcrete mortar tests with a control cement, cement incorporating 30% of a fly ash, the cementitious material produced in China and three other residues including, a SR6 sample, for setting times and compressive strength over 24 hours. The SR6 sample is representative of what LMG expects to produce in a commercial plant. TSE found that the strength of material using the LMG residues were significantly higher than those using fly ash but some 23% down on the cement control mix. These tests showed better initial set times for the SR6 residue mix over cement by 19% and better final set times of 8%. TSE conducted these tests on shotcrete because it is a high value product.


    TSE conducted concrete tests on a concrete mix, and two other mixes with 30% substitution with fly ash and the China sample. While the initial set times and strengths of the China sample were somewhat slower than the fly ash and the cement mixes in the early stages it progressively caught up to both over the 3, 7, 14, 28 and 56 day tests. LMG believes the slower initial set times were due to problems with the China sample. The slower set times were not evident in the above mentioned mortar tests.


    Cement Australia conducted concrete tests on a concrete mix and three other mixes with 20% substitution with two SR6 samples and the China sample. Cement Australia found the relative strength performance close to that of the cement mix with strengths at both 7 and 28 days being 0.9 of the reference cement.


    Cement Australia also found the LMG residue performance is slightly better than a number of the fly ashes currently available in the New South Wales market.


  3. Offtake Agreements


    In September 2015, LMG's CEO and Chairman met with potential German and Japanese trading partners with a view of firming up our earlier stage negotiations about marketing LMG's future magnesium production. Both countries have identified the metal, Magnesium, as a critical raw material for their own needs and their respective national industry strategies reflect the special role which magnesium is expected to play.


    The trading partners expect industrial demand to grow strongly and are keen to advance to a formal agreement with LMG to contract for magnesium deliveries in 2017. The two potential partners informed us that they would also assist us in obtaining finance for our project from their respective national Development Banks.


    The potential German and Japanese trading partners confirmed that once we have completed our feasibility study they would be in a position to commit to formal offtake agreements. We believe that we will be able to complete the feasibility study in April 2016 and finalise the off take agreements shortly thereafter.


  4. Test Work and Engineering Study


    LMG is looking to use vertical retorts in its initial plant. It has a commercial design from China which it intends to test on a small scale at CSIRO to confirm its suitability for LMG's fly ash feedstock. LMG will also finalise its iron reduction and test work on its TEOA regeneration circuit whilst this work is being completed.


    This work meant that the main body of the design and engineering work was pushed back for three months and should now be completed in April 2016. The initial work on the mass balance, draft plant layout and production flowsheet has been completed.


  5. Fund Raising


In September 2015, LMG received an Australian R&D tax incentive of $421,651 following its lodging of its FY2015 tax return.


In October 2015, LMG raised $600,000 of debt funding from Platinum Road to progress the development of its Latrobe Valley magnesium project. This funding will allow LMG to complete its vertical retort, hydromet and cement test work and also commence its design and engineering studies for its initial 5,000 tonnes per annum magnesium plant.

LMG arranged the loan through Platinum Road. The key terms of the facility are: Term 12 months to 16 October 2016

Repayment Cash in full from the 2016 R&D tax rebate refund Interest Rate 15% per annum

Conversion The lenders have the right to convert any part of their loan at a share price of 1.5 cent during the term of their loan


David Paterson

Chief Executive Officer 12 January 2016


About Latrobe Magnesium

Latrobe Magnesium is developing a magnesium production plant in Victoria's Latrobe Valley using its world-first patented extraction process. LMG intends to extract and sell magnesium metal and cementitious material from industrial fly ash, which is currently a waste stream from brown coal power generation.

LMG has completed a pre-feasibility and an adjustment study validating its combined hydromet / thermal reduction process that extracts the metal. Production from its initial 5,000 tonne per annum magnesium plant is due to start in the middle of 2017. The plant will then be expanded to 40,000 tonne per annum magnesium 18 months later. The plant will be in the heart of Victoria's coal power generation precinct, providing immediate access to feedstock, infrastructure and labour.

LMG plans to sell the refined magnesium under long-term contracts to Australian and overseas customers. Currently, Australia imports 100% of the 10,000 tonnes annually consumed.

Magnesium has the best strength-to-weight ratio of all common structural metals and is increasingly used in the manufacture of car parts, laptop computers, mobile phones and power tools.

The LMG project is at the forefront of environmental benefit - by recycling power plant waste, avoiding landfill and is a low CO² emitter. LMG adopts the principles of an industrial ecology system.

Lire la suite de l'article sur www.noodls.com

Latrobe Magnesium Limited

CODE : LMG.AX
ISIN : AU000000LMG2
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Latrobe Magnesium est une société de production minière basée en Australie.

Latrobe Magnesium est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 70,4 millions AU$ (46,9 millions US$, 43,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2014 à 0,00 AU$, et son plus haut niveau récent le 19 novembre 2021 à 0,18 AU$.

Latrobe Magnesium possède 1 256 599 936 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de Latrobe Magnesium Limited
12/01/2016Quarterly Activities Report
12/01/2016Quarterly Cash Flow Report
15/12/2015LMG appoints General Manager Operations
15/09/2015Appendix 4G
15/09/2015Annual Report to Shareholders
03/08/2015Quarterly Activities Report
03/08/2015LMG signs ash supply term sheet with Hazelwood Power
15/04/2015Share Placement and Share Purchase Plan Annoucemen
15/04/2015Cleansing Statement and Appendix 3B
15/04/2015Share Purchase Plan Offer and Application Form
23/03/2015Additional strong cement results from sample tested in China
16/03/2015Half Yearly Report and Accounts
05/03/2015Strong Initial Cement Test Results
04/03/2015Well respected company director Jock Murray appointed Chairm...
30/01/2015Quarterly Activities Report
09/12/2014Notice of Change of Interest of Substantial Holder
05/11/2014LMG successful commercial tests in China smelter
22/10/2014LMG receives $396K R&D Tax Incentive
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
Australia (LMG.AX)BERLIN (L2Q.BE)
0,056+1.82%0,039+14.71%
Australia
AU$ 0,056
17/05 15:44 -
1,82%
Cours préc. Ouverture
0,055 0,055
Bas haut
0,055 0,060
Année b/h Var. YTD
0,047 -  0,060 -6,67%
52 sem. b/h var. 52 sem.
0,040 -  0,070 -15,15%
Volume var. 1 mois
3 001 854 12,00%
24hGold TrendPower© : -2
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-6,67%0,070,05
2023-22,08%0,080,04
2022-19,79%0,140,05
2021317,39%0,180,02
202091,67%0,030,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,55 AU$-1,69%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,33 US$+6,89%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,72 GBX+0,84%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+10,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,59 CA$+1,17%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
17,50 CA$+4,48%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,53 CA$+13,45%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
49,62 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :