RC Drilling in Banana Zone Intersects 3.40% Cu and 48.0 g/t Ag Over 6 Metres, 2.51% Cu and 36.0 g/t

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Botswana | Copper |
Thursday, August 05, 2010
NEWS RELEASE
 
Hana Mining RC drilling in Banana Zone intersects 3.40% Cu and 48.0 g/t Ag over 6 metres, 2.51% Cu and 36.0 g/t Ag over 4 metres, and 3.35% Cu and 1.0 g/t Ag over 2 metres, in South Limb.


August 5th, 2010 (Vancouver, British Columbia). Hana Mining Ltd., ("Hana" or the "Company") - (TSX-V: HMG) (Frankfurt: 4LH) is pleased to announce its most recent drilling results based on the completion of 71 new RC drill holes in the Banana Zone at its Ghanzi sediment hosted Copper-Silver Project in Botswana. The 71 new RC holes extend the mineralized strike length of the Banana Zone by 10,200 metres. These results are from new holes and are in addition to those used in the most recent NI 43-101 compliant inferred mineral resource calculation. The mineralization remains open along strike and at depth.

Highlights of recent drilling results:
  • Mineralized strike length for the Banana Zone has been increased by 10.2 kilometres for a total of 58.7 kilometres. The Banana Zone, which contains 2.38 billion pounds of copper and over 45 million ounces of silver, at 0.75% copper cut-off, has a total strike length of 64 kilometres.
  • Drilling is progressing as scheduled to complete 80,000 metres in 2010. Total drilling to date is at approximately 44,800 metres.
  • These latest results completely closed out two strike length gaps surrounding section 52000 on the North Limb and from sections 47500 to 51000 on the South Limb. It partially closed out two other strike length gaps that existed between previous drill results from section 65000 on the South Limb and from sections 45000 to 49000 on the North Limb. Further drilling is on going to close out all gaps along the Banana strike length.
  • High grade intercepts of 3.40% Cu and 48.0 g/t Ag over 6.0 metres in hole HA-400-R, 2.51% Cu and 36.0 g/t Ag over 4.0 metres in hole HA-401-R, 3.35% Cu and 1.0 g/t Ag over 2.0 metres in hole HA-406-R, 2.79% Cu and 37.0 g/t Ag over 3.0 metres in hole HA-412-R and 2.30% Cu and 24.0 g/t Ag over 2.0 metres in hole HA-415-R was drilled on the South Limb.
  • Drilling continues on the Banana Zone to confirm the known strike length and close gaps along the mineralization within the Zone.
Discussion of Results:

The results have increased the known strike length by 10.2 kilometres of mineralization to the Banana Zone; to date a total of 58.7 kilometres of the 64 kilometre strike length of the Banana Zone have been reported. The mineralization is continuous along strike and down dip.Figure 1: Drill Hole Location - Banana Zone.


* Please note all figures are now showing section grid lines that are referenced in the result tables.

Table 1: Drill Results of NE South Limb, Section 65000 - Interval indicates down hole interval

Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu (%) Ag (g/t)
65000 South Limb
HA-400-R 64750 South Limb 63.00 78.00 15.00 1.48 20.0
  includes     71.00 78.00 7.00 2.96 42.0
  includes     71.00 77.00 6.00 3.40 48.0
HA-401-R 64750 South Limb 121.00 133.00 12.00 1.03 13.0
  includes     126.00 132.00 6.00 1.90 25.0
  includes     128.00 132.00 4.00 2.51 36.0
HA-406-R   South Limb 38.00 43.00 5.00 1.46 1.0
  includes 64925   40.00 42.00 2.00 3.35 1.0
      50.00 52.00 2.00 0.11 1.0
HA-412-R 65125 South Limb 42.00 49.00 7.00 1.40 17.0
  includes     45.00 48.00 3.00 2.79 37.0
HA-413-R 65150 South Limb 96.00 104.00 8.00 0.74 10.0
  includes     100.00 104.00 4.00 1.37 18.0
  includes     101.00 104.00 3.00 1.53 22.0
HA-414-R 65325 South Limb 57.00 70.00 13.00 0.41 5.0
  includes     63.00 70.00 7.00 0.63 6.0
  includes     68.00 69.00 1.00 1.05 14.0
HA-415-R 65525 South Limb 102.00 114.00 12.00 0.66 6.0
  includes     108.00 112.00 4.00 1.49 15.0
  includes     109.00 111.00 2.00 2.30 24.0


Figure 2: Drill Hole Location of NE South Limb, Section 65000



Table 2: Drill Results of SW South Limb, Section 49000 - Interval indicates down hole interval
Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu (%) Ag (g/t)
49000 South Limb
HA-344-R 50650 South Limb 78.00 121.00 43.00 0.39 4.0
  includes     101.00 109.00 8.00 0.49 5.0
  includes     115.00 121.00 6.00 1.01 11.0
  includes     117.00 119.00 2.00 1.79 20.0
HA-348-R 47750 South Limb 84.00 90.00 6.00 0.58 6.0
  includes     87.00 89.00 2.00 0.95 11.0
  includes     88.00 89.00 1.00 1.08 14.0
HA-349-R 47950 South Limb 95.00 102.00 7.00 0.86 8.0
  includes     97.00 102.00 5.00 1.11 11.0
  includes     98.00 101.00 3.00 1.38 14.0
HA-354-R 47550 South Limb 131.00 146.00 15.00 0.36 3.0
  includes     135.00 139.00 4.00 0.70 6.0
HA-359-R 47950 South Limb 131.00 141.00 10.00 0.59 5.0
  includes     136.00 141.00 5.00 1.01 8.0
  includes     138.00 140.00 2.00 1.55 14.0
HA-360-R 48150 South Limb 81.00 95.00 14.00 0.41 4.0
  includes     89.00 95.00 6.00 0.74 8.0
  includes     90.00 92.00 2.00 1.16 13.0
Hole # Section Mineralized From To Interval Cu (%) Ag (g/t)
    Zone (m) (m) (m)    
HA-367-R 48350 South Limb 69.00 102.00 33.00 0.40 4.0
  includes     90.00 102.00 12.00 0.80 9.0
  includes     95.00 98.00 3.00 1.46 15.0
HA-368-R 48350 South Limb 113.00 143.00 30.00 0.54 6.0
  includes     131.00 143.00 12.00 1.00 10.0
  includes     137.00 143.00 6.00 1.49 14.0
HA-369-R 48550 South Limb 62.00 90.00 28.00 0.27 3.0
  includes     89.00 90.00 1.00 1.43 14.0
HA-375-R 48750 South Limb 127.00 148.00 21.00 0.29 3.0
  includes     141.00 143.00 2.00 0.70 8.0
HA-379-R 48750 South Limb 57.00 77.00 20.00 0.30 3.0
  includes     70.00 72.00 2.00 0.79 8.0
HA-380-R 48950 South Limb 80.00 97.00 17.00 0.35 3.0
  includes     89.00 96.00 7.00 0.44 4.0
HA-381-R 49125 South Limb 93.00 110.00 17.00 0.29 3.0
  includes     98.00 102.00 4.00 0.56 6.0
HA-382-R 49125 South Limb 142.00 163.00 21.00 0.32 3.0
  includes     158.00 160.00 2.00 0.73 7.0
HA-389-R 49325 South Limb 91.00 111.00 20.00 0.34 3.0
  includes     97.00 101.00 4.00 0.56 6.0
  includes     108.00 111.00 3.00 0.53 5.0
HA-392-R 49550 South Limb 99.00 103.00 4.00 1.00 10.0
  includes     99.00 102.00 3.00 1.28 12.0
      73.00 99.00 26.00 0.33 4.0
  includes     85.00 88.00 3.00 0.78 8.0
  includes     101.00 102.00 1.00 2.60 25.0
HA-393-R 49550 South Limb 119.00 146.00 27.00 0.32 3.0
  includes     142.00 143.00 1.00 1.70 17.0
HA-394-R 49750 South Limb 84.00 115.00 31.00 0.50 6.0
  includes     96.00 99.00 3.00 0.57 7.0
  includes     104.00 115.00 11.00 0.79 9.0
  includes     110.00 112.00 2.00 1.31 15.0
HA-395-R 49950 South Limb 95.00 127.00 32.00 0.39 4.0
  includes     112.00 124.00 12.00 0.78 7.0
  includes     119.00 124.00 5.00 1.17 10.0
HA-396-R 49950 South Limb 112.00 149.00 37.00 0.40 4.0
  includes     136.00 149.00 13.00 0.88 9.0
  includes     141.00 148.00 7.00 1.12 12.0
HA-397-R 50150 South Limb 44.00 66.00 22.00 0.56 6.0
  includes     53.00 66.00 13.00 0.79 8.0
  includes     60.00 66.00 6.00 1.15 12.0
HA-403-R 50325 South Limb 54.00 77.00 23.00 0.35 4.0
  includes     72.00 77.00 5.00 0.90 10.0
  includes     73.00 75.00 2.00 1.45 17.0
HA-407-R 50325 South Limb 111.00 132.00 21.00 0.42 5.0
  includes     124.00 132.00 8.00 0.78 10.0
  includes     125.00 132.00 7.00 0.84 11.0
HA-408-R 50500 South Limb 53.00 81.00 28.00 0.37 4.0
  includes     64.00 71.00 7.00 0.46 6.0
  includes     77.00 81.00 4.00 0.90 10.0
  includes     79.00 80.00 1.00 1.98 23.0


Figure 3: Drill Hole Location of SW South Limb, Section 49000



Table 3: Drill Results of SW North Limb, Section 40500 - Interval indicates down hole interval

Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu (%) Ag (g/t)
40500 North Limb
HA-416-R 40350 North Limb 89.00 102.00 13.00 0.24 2.0
  includes     97.00 100.00 3.00 0.61 5.0
HA-417-R 40550 North Limb No Significant Values        
HA-418-R 40550 North Limb 136.00 162.00 26.00 0.33 3.0
  includes     145.00 161.00 16.00 0.40 3.0
HA-420-R 40750 North Limb 66.00 81.00 15.00 0.38 3.0
  includes     76.00 81.00 5.00 0.72 6.0
  includes     80.00 81.00 1.00 1.23 9.0


Figure 4: Drill Hole Location of SW North Limb, Section 40500



Table 4: Drill Results of SW North Limb, Section 47000 - Interval indicates down hole interval

Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu (%) Ag (g/t)
47000 North Limb
HA-332-R 48150 North Limb 93.00 96.00 3.00 0.17 1.0
HA-357-R 49350 North Limb 74.00 79.00 5.00 0.70 5.0
  includes     76.00 78.00 2.00 1.33 11.0
HA-358-R 49350 North Limb 101.00 105.00 4.00 0.93 10.0
  includes     102.00 105.00 3.00 1.15 13.0
HA-361-R 49150 North Limb 67.00 70.00 3.00 0.56 5.0
  includes     68.00 70.00 2.00 0.69 8.0
HA-362-R 48950 North Limb 100.00 103.00 3.00 0.49 7.0
  includes     101.00 103.00 2.00 0.64 9.0
HA-363-R 46750 North Limb 73.00 75.00 2.00 1.08 16.0
  includes     74.00 75.00 1.00 1.66 26.0
HA-364-R 46950 North Limb 77.00 82.00 5.00 0.68 9.0
  includes     79.00 82.00 3.00 0.94 14.0
  includes     79.00 80.00 1.00 1.07 15.0
HA-365-R 46950 North Limb 103.00 105.00 2.00 0.12 1.0
      132.00 137.00 5.00 0.67 7.0
  includes     133.00 137.00 4.00 0.77 8.0
Hole # Section Mineralized From To Interval Cu (%) Ag (g/t)
    Zone (m) (m) (m)    
HA-366-R 46550 North Limb 71.00 73.00 2.00 0.58 6.0
HA-370-R 48950 North Limb 150.00 153.00 3.00 0.45 6.0
HA-371-R 48750 North Limb 56.00 57.00 1.00 1.51 4.0
      101.00 103.00 2.00 0.58 7.0
HA-372-R 48550 North Limb 98.00 101.00 3.00 0.47 4.0
HA-373-R 48550 North Limb 119.00 124.00 5.00 0.53 7.0
HA-376-R 48350 North Limb 92.00 97.00 5.00 0.28 2.0
HA-377-R 48150 North Limb 120.00 124.00 4.00 0.46 3.0
HA-378-R 47950 North Limb 94.00 97.00 3.00 0.56 6.0
  includes     95.00 97.00 2.00 0.67 9.0
HA-383-R 47750 North Limb 83.00 85.00 2.00 0.40 2.0
HA-384-R 47750 North Limb 75.00 77.00 2.00 0.30 1.0
      102.00 105.00 3.00 0.64 13.0
  includes     103.00 105.00 2.00 0.90 19.0
  includes     103.00 104.00 1.00 1.19 28.0
HA-385-R 47550 North Limb 67.00 78.00 11.00 0.46 5.0
  includes     75.00 78.00 3.00 1.18 16.0
  includes     75.00 77.00 2.00 1.39 19.0
HA-386-R 47350 North Limb 74.00 82.00 8.00 0.44 5.0
  includes     78.00 82.00 4.00 0.69 8.0
  includes     80.00 81.00 1.00 1.16 14.0
HA-387-R 47350 North Limb 107.00 112.00 5.00 0.26 1.0
      131.00 138.00 7.00 0.35 5.0
  includes     135.00 137.00 2.00 0.62 8.0
HA-388-R 47150 North Limb 70.00 79.00 9.00 0.56 8.0
  includes     76.00 79.00 3.00 1.46 21.0
  includes     77.00 79.00 2.00 1.93 26.0
HA-390-R 46550 North Limb 117.00 121.00 4.00 0.33 4.0
HA-391-R 46350 North Limb 77.00 82.00 5.00 0.53 5.0
  includes     80.00 82.00 2.00 0.87 12.0
  includes     81.00 82.00 1.00 1.12 14.0
HA-398-R 46150 North Limb 83.00 88.00 5.00 0.69 8.0
  includes     85.00 87.00 2.00 1.25 18.0
HA-399-R 46150 North Limb 139.00 144.00 5.00 0.51 6.0
  includes     141.00 143.00 2.00 0.85 12.0
  includes     141.00 142.00 1.00 1.24 17.0
HA-402-R 45950 North Limb 87.00 91.00 4.00 0.84 11.0
  includes     88.00 91.00 3.00 1.05 14.0
  includes     90.00 91.00 1.00 1.97 28.0
HA-404-R 45750 North Limb 80.00 90.00 10.00 0.55 7.0
  includes     86.00 90.00 4.00 1.06 14.0
  includes     87.00 90.00 3.00 1.28 17.0
HA-405-R 45750 North Limb 137.00 146.00 9.00 0.26 3.0
HA-409-R 45550 North Limb 80.00 88.00 8.00 0.32 4.0
HA-410-R 45350 North Limb 103.00 111.00 8.00 0.23 2.0
HA-411-R 45350 North Limb 132.00 139.00 7.00 0.26 3.0
HA-419-R 45150 North Limb 105.00 115.00 10.00 0.25 3.0
HA-423-R 44950 North Limb 116.00 123.00 7.00 0.33 4.0
  includes     119.00 123.00 4.00 0.45 6.0


Figure 5: Drill Hole Location of SW North Limb, Section 47000



Table 5: Drill Results of Central North Limb, Section 52000 - Interval indicates down hole interval

Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu (%) Ag (g/t)
52000 North Limb
HA-353-R 52200 North Limb 67.00 89.00 22.00 0.32 4.0
  includes     86.00 88.00 2.00 1.02 12.0
  includes     86.00 87.00 1.00 1.37 18.0
HA-355-R 52000 North Limb 60.00 83.00 23.00 0.34 4.0
  includes     66.00 69.00 3.00 0.82 12.0
  includes     68.00 69.00 1.00 1.05 16.0
HA-356-R 51650 North Limb 49.00 71.00 22.00 0.41 4.0
  includes     53.00 54.00 1.00 2.75 48.0
  includes     69.00 71.00 2.00 0.87 10.0
  includes     70.00 71.00 1.00 1.16 13.0


Figure 6: Drill Hole Location of Central North Limb, Section 52000



Development Update:

The following engineering activities are ongoing to fulfill the goal of completion of a PEA by Q4 2010:
  • Mine open pit modeling has been carried out using the April 2010 resource as a basis to define parameters to be used in the revised model to be completed after the 2010 drilling has been incorporated;
  • Metallurgical work is ongoing for the Banana Zone at Mintek in Johannesburg, and at Metcon Research in Tucson, Arizona;
  • Field work for water exploration is ongoing with drill targets being identified;
  • Environmental and socioeconomic baseline work is ongoing and the company anticipates initial public meetings with stakeholders in the fall.
Hana Mining's CEO and Chairman, Marek Kreczmer, commented as follows:

"Progress on this drill campaign has been accelerating with excellent progress on the resource development drill program. The Ghanzi project mineral deposition remains highly predictable, which is confirmed with the copper horizon being encountered in every hole drilled. Completion of the initial resource development stage of the Banana Zone is now within sight. As drilling progresses the focus will shift to interpreting the data in anticipation of completing a revised resource estimate in support of the ongoing preliminary economic assessment (PEA). Engineering studies are progressing and we are on track to completing this important study by year end.

We recognize that the value of the Ghanzi project will increase from demonstrating the potential for more mineralization outside of the Banana Zone. A geochemical soil and a high resolution helicopter aeromagnetic survey are underway covering most of the Ghanzi property. The results of these surveys will soon allow us to drill test other sections of the highly predictable Ghanzi copper-silver bearing horizon."

Qualified Person and Quality Assurance/Quality Control

The drilling program and results are reviewed and approved by Vivian Park, P.Geo., Senior Geologist/Database Manager for Hana Mining. She is the qualified person as defined in NI 43-101 and has reviewed the technical information in this press release.

The Company has implemented an industry-standard QA/QC program. For RC drill samples, a 35-40 kilogram sample is collected from the cyclone discharge at 1 meter intervals. Samples are then split 75/25; 75% of the sample is archived and the other 25% provides material for analysis. All samples are double bagged, sealed and transported in secured wooden crates and shipped to Scientific Services Laboratory in Cape Town, South Africa. Standards, duplicates and blanks are inserted into the sample stream. The analytical method for the total Cu, Ag, Pb, and Zn is acid digestion and Atomic Absorption Spectroscopy ("AAS"). The analytical method for soluble Cu is 5% sulfuric acid cold leach followed by AAS. The analytical method for Mo assays is XRF (full matrix correction).

About Hana Mining's Ghanzi Copper-Silver Project in Botswana:

The Ghanzi Project is located in the center of the Kalahari Copper Belt in northwestern Botswana. The Ghanzi property covers 2,169 sq Km, and contains sediment-hosted copper-silver deposits with a demonstrated cumulative tested strike length of 58.7 kilometres. This favorable geology extends over an estimated strike length of 600 kilometres. Hana Mining released results of its most recent NI 43-101 compliant resource estimate for the Ghanzi Project on April 21, 2010, announcing an inferred mineral resource of 3.9 billion pounds of copper and 62.1 million ounces of silver from 177 million tonnes. This mineral resource estimate consists of 73.5 million tonnes grading 1.5% Cu and 19 g/t Ag in the Banana Zone, 13.4 million tonnes grading 1.7% Cu and 12 g/t Ag in Zone 5, 6.3 million tonnes grading 1.5% Cu and 7 g/t Ag in Zone 6; all at a cut-off grade of 0.75% Cu. Also included is 83.6 million tonnes grading 0.46% Cu and 3.6 g/t Ag at a cut-off grade of 0.30% in the Chalcocite Zone.

The Banana Zone exhibits certain areas of higher grade Cu and Ag mineralization, particularly between sections 49700 to 52000 on the North limb and sections 63000 to 71000 on both the North and South limbs, which represent an opportunity to locate starter pits and mine initial tonnages at higher than average grades. These higher grade pockets tend to be well within open pit depth parameters and represent opportunities to improve early cash flow and overall returns in development.

The project will benefit from proposed rail and power infrastructure expansions, along with proximity to local population centers and workforce. A feasibility study is currently underway (funded by the World Bank and the governments of Botswana and Namibia) to support completion of a rail line link that would connect Botswana with the Namibian port of Walvis Bay, on the Atlantic coast. The closest existing railhead to port is at Gobabis, in Namibia, approximately 550 km from our property. Construction has begun on the 600MW expansion of the government-owned Moropule Power Plant, having secured US$825 million project funding in May 2009. The Ghanzi Copper- Silver Project is currently accessed by the paved Trans-Kalahari highway, which passes within 15 km of the property.

The Ghanzi property is one of Africa's premier future copper-silver resources.

For Further Information, contact:
Marek Kreczmer
CEO
Hana Mining Ltd.
Tel: (604) 676-0824
Email: info@hanamining.com
Website: www.hanamining.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.


View News Release in PDF Format:
Associated File: http://www.hanamining.com/i/pdf/2010-08-05_NR.pdf
758 KB in size, approx. 2 minutes, 22 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.hanamining.com/s/NewsReleases.asp?ReportID=413181
 

Home    Corporate    Projects    Investors    News    Reports    Contact    Disclaimer    Subscribe    
Données et statistiques pour les pays mentionnés : Botswana | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Botswana | Tous

Hana Mining Ltd.

EXPLORATEUR
CODE : HMG.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Hana Mining est une société développant des projet miniers de cuivre et d'argent basée au Canada.

Hana Mining détient divers projets d'exploration au Botswana.

Son principal projet en exploration est GHANZI au Botswana.

Hana Mining est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 80,6 millions CA$ (78,4 millions US$, 58,5 millions €).

La valeur de son action a atteint son plus bas niveau récent le 27 mars 2009 à 0,06 CA$, et son plus haut niveau récent le 17 décembre 2010 à 5,68 CA$.

Hana Mining possède 99 494 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Hana Mining Ltd.
07/02/2012Announces Completion of Non-Brokered Financing and Investmen...
30/01/2012Announces Final Allocation of Previously Announced Financing
27/01/2012Announces Non-Brokered Financing
20/05/2010Closing of Bought-Deal Private Placement
30/04/2010Arranges $21Million Bought-Deal Private Placement
27/05/2009has closed the first tranche of its brokered private placeme...
Nominations de Hana Mining Ltd.
07/11/2012New Hana Mining Builds the Corporate Structure with Appointm...
05/05/2011Appoints New Chief Financial Officer
05/04/2011shareholders overwhelmingly approve the appointment of three...
21/03/2011Announces the Nomination of Three Highly Experienced Candida...
19/07/2010Appointment of Pat Donnelly, former mining analyst, as VP Co...
Projets de Hana Mining Ltd.
08/02/2013Receives Approval from Botswana Minister of Minerals, Energy...
10/01/2013(Ghanzi)Receives Renewal of Ghanzi Project Prospecting Licenses
25/10/2012Agrees To C$0.82 Per Share All-Cash Acquisition By Cupric Ca...
20/08/2012Expands Zone 5 at Depth with Strong Drill Results
13/08/2012Continues to Hit High-Grade Copper-Silver Mineralization at ...
29/06/2012(Ghanzi)Files Ghanzi Preliminary Economic Assessment Technical Repor...
17/04/2012continues to hit high-grade copper-silver mineralization at ...
21/02/2012(Ghanzi)Infill drilling at the Northeast Fold confirms new geologica...
13/06/2011(Ghanzi)Comments on Share Price - Drilling Continues
26/05/2011(Ghanzi)Provides Update on Banana Zone
14/03/2011(Ghanzi)Provides Update on Banana Zone Preliminary Economic Assessme...
05/08/2010(Ghanzi)RC Drilling in Banana Zone Intersects 3.40% Cu and 48.0 g/t ...
14/07/2010(Ghanzi)Expands Banana Zone at Ghanzi Copper-Silver Project by 4.2 K...
18/06/2010(Ghanzi)Expands Banana Zone by 7 Kilometres
03/06/2010(Ghanzi)Expands Chalcocite Zone - New Drilling Increases Strike Leng
19/05/2010Files NI 43-101
30/03/2010(Ghanzi)RC drilling in Banana Zone intersects 1.63% Cu and 39.5 g/t ...
04/03/2010(Ghanzi)RC drilling in Banana Zone intersects 1.90% Cu and 17.4 g/t ...
05/01/2010(Ghanzi)New VP Engineering to Support Ghanzi Copper-Silver Project P...
08/12/2009drilling intersects 1.84% Cu and 23.6 g/t Ag over 7 metres i...
01/10/2009(Ghanzi)Announces New President and COO to Drive Ghanzi Copper-Silve...
28/09/2009(Ghanzi)RC drilling intersects 2.53% Cu and 32 g/t Ag over 17 metres...
15/09/2009(Ghanzi)Reports Positive Results From a Preliminary Groundwater Inve...
26/08/2009(Ghanzi)Letter from the CEO-Hana Mining Ltd.
15/07/2009(Ghanzi)Agrees to Purchase 100% of Ghanzi Copper-Silver Project in B...
25/06/2009(Ghanzi)43-101 Technical Report for Ghanzi Copper-Silver Deposit, Bo...
28/05/2009(Ghanzi)New results at Ghanzi Copper-Silver Project in Botswana
Communiqués de Presse de Hana Mining Ltd.
20/02/2013Completes Arrangement with Cupric Canyon Capital LP
14/02/2013Receives Approval From Botswana Competition Authority
05/02/2013Intersects 4.03% Cu and 50.7g/t Ag over 14 m Further Increas...
04/02/2013Provides Update on Arrangement with Cupric Canyon Capital
07/01/2013Receives Final Court Order for Arrangement with Cupric Canyo...
11/12/2012Advises Regarding Shareholder Meeting
01/11/2012Discovers New Mineralization Further Increasing the Size of ...
26/10/2012from DML's Neighbour, Hana Mining
23/10/2012Reports Consistent High Grades over Thick Intersections at Z...
22/10/2012New Hana Mining Builds Corporate Advisory Team
24/09/2012Finds Strong Copper-Silver Mineralization from New Drill Pro...
18/09/2012Welcomes Two New Board Members
27/08/2012Reports More Strong Results from Zone 5 including 4.54% CuEq...
01/08/2012Drilling continues to encounter down-dip mineralization and ...
24/07/2012Diamond Drilling Extends Down Dip Extension and Confirms Thi...
16/07/2012announces high-grade copper-silver mineralization from Zone ...
23/05/2012Shares Commence Trading on the Botswana Stock Exchange
14/05/2012(Ghanzi)Announces Positive Preliminary Economic Assessment for the G...
28/03/2012Diamond Drilling Extends the Strike and Down Dip Extension o...
27/03/2012to Cancel the Issuance of Stock Options
12/03/2012Diamond drilling encounters consistent high-grade copper-sil...
27/02/2012Infill drilling continues to encounter consistent high-grade...
24/01/2012Infill drilling encounters some of the best intercepts of co...
09/01/2012Infill drilling encounters consistent high-grade copper-silv...
28/11/2011Infill Drilling Again Encounters Consistent High-Grade Coppe...
24/10/2011(Ghanzi)announces the appointment of a highly experienced Technical ...
03/10/2011announces exceptional silver recoveries from oxide-transitio...
20/09/2011(Ghanzi)announces the appointment of highly experienced and successf...
13/09/2011Infill drilling again encounters consistent high-grade coppe...
29/08/2011Infill drilling continues to encounter consistent high-grade...
22/08/2011Infill drilling encounters high-grade copper-silver minerali...
15/08/2011(Ghanzi)announces the appointment of a highly experienced Project Di...
26/07/2011Infill Drilling Again Encounters Thick Intersections of Copp...
11/07/2011Infill drilling still continues to encounter thick intersect...
16/06/2011Infill drilling continues to encounter thick intersections o...
13/06/2011Comments on Share Price-Drilling Continues
19/04/2011Infill Drilling Extends Copper-Silver Mineralization by 300 ...
08/07/2010Comments on Share Price-Drilling Continues
25/05/2010Revisions to Arrangement for Spin-out of New Hana Copper Min...
29/04/2010Letter to Shareholders
19/03/2010New Advisory Board Member
05/03/2010New Chief Financial Officer
22/01/2010Spin-Out of Kuke Property to New Hana Copper Mining Ltd.
13/07/2009Botswana ranked as most favourable mineral investment climat...
01/06/2009completion of inferred resource estimate - Ghanzi Copper-Sil...
30/05/2009Completes $3.2 Million Placement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (HMG.V)FRANKFURT (4LH.F)
0,810+0.00%0,144+132.26%
TSX-V
CA$ 0,810
19/02 16:59 -
0%
Cours préc. Ouverture
0,810 0,810
Bas haut
0,810 0,810
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,810 -%
Volume var. 1 mois
61 000 -%
24hGold TrendPower© : 27
Produit
Développe
Recherche Copper - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 06/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,01 US$-2,22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,44 CA$-2,01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,28 CA$-0,84%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,23 CA$-4,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-7,14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,74 CA$+0,87%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,15 US$-1,01%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :