Receives Positive Pre-Feasibility Study on Reno Creek Uranium Project, Wyoming

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

http://www.bayswateruranium.com/Images/ENRImages/ENewsRelease-Header.jpg

http://www.bayswateruranium.com/Images/ENRImages/Blank.jpg

 

 

 

 

 

Bayswater Receives Positive Pre-Feasibility Study on Reno Creek Uranium Project, Wyoming

Demonstrates Excellent Technical and Economic Feasibility for Development

Vancouver, BC, October 5, 2009 ? Bayswater Uranium Corporation (TSX-V: BAY), (OTC: BYSWF) is pleased to announce that it has received a positive NI 43-101 compliant Pre-Feasibility Study report (PFS) from TREC, Inc. on the technical and economic feasibility of the Reno Creek Uranium Project (the Project) in Wyoming. The PFS is based on the Project's NI 43-101 measured and indicated resources of 10.9 million pounds with an in situ recovery mine (ISR) and central processing plant facility (CPP) designed to produce up to 2 million pounds per year of U3O8. The design will also allow for the processing of uranium-containing leach solutions or loaded resin from other nearby resources within the Reno Creek Project not incorporated into this study.

The economic analysis demonstrates the following:

  • Expected start of production no later than the beginning of 2015, subject to approval by State and Federal government authorities.
  • Recovery of approximately 7.6 million pounds, based on an estimated 70% recovery factor.
  • Production is planned to occur over six years.
  • Capital Cost: US$48.2 million.
  • Cash Operating Costs: US$13.72 per pound U3O8
  • Operating Costs (Includes all-in operating & capital costs): US$26.39 per pound U3O8.
  • Operating Cash Flow: US$311 million, or US$41.18 per pound U3O8, based on average product price of US$67.57.
  • Internal Rate of Return (IRR): 79%
  • Net Present Value (NPV): US$164 million using an 8% discount rate.

TREC prepared the designs and economic evaluation based on the development of five wellfields surrounding a central processing plant. The wellfields will be connected to the plant via pipelines. The initial capital cost, including the initial two wellfields, central processing plant, and pre-production capital costs related to environmental, permitting, and engineering is projected to be US$48.2 million. Operating costs, including return of capital and reclamation/decommissioning, are expected to be approximately US$26/lb U3O8. The uranium price projection for long term contracts used in the study is based on UxC's U3O8 Price Projection Comparison for the period 1987 to 2020, as published in their Uranium Market Outlook report for the first Quarter of 2009. The average projected price for the period of production, from 2015 through 2020, was estimated to be US$67.57.

The NPV for the project, at a discount rate of 8% is projected to be approximately US$164 million, and the IRR is 79%. Payback is expected to take approximately two years from commencement of construction. The PFS incorporates a sensitivity analysis, which demonstrates that:

  • The Project's economics are highly sensitive to the price of uranium. For example, the NPV for an average price of uranium of $80 is approximately US$204 million.
  • The Project's economics are only slightly sensitive to variations in capital and operating costs. For example, a five percent variation in the capital costs changes the NPV by approximately US$2 million and a five percent variation in operating costs changes the NPV by approximately US$2.3 million.

The PFS does not assess the economics of the 4.73 MM lb of 43-101 compliant inferred resources nor the 8.4 MM lb of historical resources that are also part of the Reno Creek Project, and which are located within approximately five miles of the proposed location of the central processing plant. This historical resource estimate is not compliant with NI 43-101 and should not be relied upon. Bayswater's plans are to mine these additional resources and process them at the CPP.

Following closing of the acquisition by the Company of the Reno Creek Project as announced August 24, 2009, the Company plans detailed scoping sessions with the regulatory agencies in preparation for completing baseline environmental, hydrological, and engineering activities during 2010 and 2011. Environmental baseline studies that have been previously started and will be completed by the Company include flora and fauna, soils, archaeological and cultural resources, surface and ground water hydrology, wetlands, water and air quality and meteorology. The Project has previously received a permit to install baseline ground water monitoring wells which will be used for both hydrologic and water quality studies, including any necessary pump tests. Additional mine and plant facility engineering required for licensing will be completed during the time period. The Company plans to submit its applications for permits and licenses by the end of 2011. The Project should advance to the feasibility stage during 2014 with construction to follow and production to commence in 2015.

The Pre-Feasibility Study, dated September 28, 2009, was prepared by TREC, Inc., and authored by Douglass H. Graves, P.E., who is a Qualified Person as defined by National Instrument 43-101 and has reviewed the contents of this News Release. The Company intends to file the 43-101 compliant report with the TSX on SEDAR and post a summary of the PFS on its website.

As reported earlier, Bayswater has signed letters of intent with Strathmore Resources (US) Ltd., a wholly owned subsidiary of Strathmore Minerals Corp (TSX-V: STM), and American Uranium Corp (OTC: ACUC) to acquire the Reno Creek Uranium Project ("the Project") and its holding company, AUC LLC. The Project comprises NI 43-101 compliant resources of 10.96 million pounds of U3O8 contained in 8,268,872 tons at an average grade of 0.066% U3O8 measured and indicated and 4.73 million pounds of U3O8 contained in 3,796,930 tons at an average grade of 0.063% U3O8 inferred. In addition, Reno Creek contains approximately 8.41 million pounds of U3O8 in historical resources contained in 5,066,265 tons grading approximately 0.083% U3O8 (Pathfinder Resources, 1980; Rocky Mountain Energy, 1986). The Project also has excellent potential to significantly increase resources through low-risk exploration. An extensive database, deep well injection permit and a disposal well are being acquired in conjunction with the Reno Creek property and resources.

The Reno Creek Project encompasses approximately 17,500 acres of claims and leases, including 563 unpatented mining claims, four Wyoming State mineral leases, four fee (private) mineral leases, and five surface access agreements. The near-ideal geological characteristics of the uranium deposits which make the resources conducive to low-cost, minimal-impact ISR mining, combined with the benefits of nearby infrastructure within a highly favorable political jurisdiction for uranium mining, are among the chief reasons that the Reno Creek Project is one of the best and lowest cost undeveloped major uranium deposits in the western United States.

The Project assets being acquired also include a deep well injection permit (i.e. UIC Permit in the renewal process) for two disposal wells for the wastes from the ISR operation, plus an abandoned dry oil well that will serve as one of the deep injection wells. Also included in the Project assets are complete electronic and paper logs on approximately 1100 drill holes, additional data on up to 900 more drill holes, and several geologic, hydrologic, and engineering studies on the Reno Creek and Reno Creek Southwest deposits. Additional drill hole data is also available for historical drilling on the Pine Tree Trend.

Bayswater has a strong management and technical team, cumulatively with over 120 years of combined experience in exploration, permitting, development and operation of uranium production, plus a group of industry-leading consultants with uranium experience in the U.S.A, Canada, and overseas.

George M. Leary, President of Bayswater stated, "TREC's Pre-Feasibility Study demonstrates the robust economic viability of the Reno Creek Project. The report's recommendations are consistent with the Company's proposed development schedule and it affirms the work of our in-house staff. The Project will form the basis, once the acquisition as announced closes, for building a major uranium company."

Bayswater's exploration activities are conducted under the supervision of George M. Leary, M.Sc. P. Eng. (BC), President of the Company, and Victor Tanaka, B.Sc. P.Geo. (B.C.), Chief Operating Officer of the Company. Both are qualified persons under NI 43-101. George Leary is the qualified person responsible for the technical information in this news release.

About Bayswater Uranium Corporation - The Super Junior Uranium CompanyT

Bayswater Uranium Corporation is an international uranium exploration and development company. The Company owns several advanced uranium properties in the United States with significant historical resources that may be amenable to ISR and/or conventional mining. As well, Bayswater is the only uranium company to have major landholdings in each of Canada's most important producing and exploration regions - the Athabasca Basin, the Central Mineral Belt, and the Thelon Basin. Bayswater combines a balanced portfolio of advanced and exploration projects with the uranium expertise of its technical and managerial teams. To capitalize on current market conditions and strong growth of the nuclear industry, the Company is pursuing acquisition opportunities of advanced-stage uranium projects with near-term production potential. Bayswater's vision is to build a major international uranium company. Shares of the Company are listed on the TSX Venture Exchange under the symbol "BAY". For further information visit www.bayswateruranium.com.

On behalf of the Board of:
BAYSWATER URANIUM CORPORATION
George M. Leary
President                     

For further information contact:      
John Gomez
Manager, Investor Relations   
Telephone: (604) 687-2153

Statements in this press release other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, constitute forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in the Company's business, including risks inherent in mineral exploration, development and mining. There can be no assurance that such forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on such statements. The Company does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Home

About Us

Projects

Investors

Uranium

Contact

 

< 

Bayswater Uranium Corp.

EXPLORATEUR
CODE : BAY.V
ISIN : CA0731731067
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Bayswater est une société d’exploration minière d'uranium basée au Canada.

Bayswater détient divers projets d'exploration au Canada et au Mali.

Ses principaux projets en exploration sont AVOCA en Irlande, NORTH THELON, SOUTH THELON, ALZADA, JUNIPER PROPERTY, MOUNTAIN WEST, BRUDELL LAKE, COLLINS BAY EXTENSION, COIN CANYON, VIKING (BAYSWATER), CENTRAL MINERAL BELT (BAYSWATER), TEJANA MESA, ANNA LAKE, RENO CREEK PROJECT, WISKER VALLEY et BOITEAU LAKE au Canada, NIGER au Niger et SAMIT au Mali.

Bayswater est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 6,8 millions CA$ (5,0 millions US$, 4,6 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 2,47 CA$, et son plus bas niveau récent le 19 décembre 2022 à 0,02 CA$.

Bayswater possède 59 520 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Bayswater Uranium Corp.
13/10/2009 Announces Drill Results from Otis Gold Joint Venture at Kil...
18/03/2008Gold Newsletter report
Rapports annuels de Bayswater Uranium Corp.
2008 Annual report
Annual Report 2007
Financements de Bayswater Uranium Corp.
19/11/2008Closes Non-Brokered Private Placement
06/11/2008Announces Flow-Through Financing
07/08/2008Seeks Approval to Amend the Terms of its Outstanding Warrant...
Nominations de Bayswater Uranium Corp.
06/05/2008Appoints Ricardo Campoy as Advisor
Projets de Bayswater Uranium Corp.
03/06/2010(Reno Creek Project)Bayswater Commences Baseline Environmental Studies at Reno C...
05/10/2009(Reno Creek Project)Receives Positive Pre-Feasibility Study on Reno Creek Uraniu...
10/09/2009(Reno Creek Project)Commissions Pre-Feasibility Study for Reno Creek Uranium Pro...
24/08/2009(Reno Creek Project)Acquire Reno Creek Uranium Project, Wyoming
23/07/2009(Tejana Mesa)Swaps Adjoining Uranium Claims at Tejana Mesa Property in Ne...
21/07/2009(Boiteau Lake)Begins Exploration at Boiteau Lake in Central Mineral Belt, ...
15/07/2009(Collins Bay Extension)Grants Option on Collins Bay Extension Project in Athabasca ...
30/06/2009(Tejana Mesa)Tejana Mesa Property & Immediate Region has Potential for Up...
25/06/2009(Labrador)Provides Review of Land Position and Significant Results Fro...
10/06/2009(Avoca)Intersects 9.5% Zinc & 3.3% Lead over 1.8 m in Drill Hole at...
06/06/2009Encounters Anomalous Metal Values in Drill Hole at Brudell L...
03/03/2009(Elkhorn)Announces Results from Phase 4 Drilling at Elkhorn Project, ...
17/02/2009(Anna Lake)’s 2008 Drilling Program Significantly Expands Anna Lake Ura...
30/09/2008(Labrador)Commences Drilling Program on Newly Discovered Minisinakwa L...
05/08/2008(Athabasca)Confirms Discovery of Strong Uranium Targets at Brudell Lake...
07/08/2008(Elkhorn)Drilling Further Expands Elkhorn Uranium Project, Wyoming
06/08/2008(Anna Lake)Drilling Continues to Expand Anna Lake Uranium Deposit, Cent...
12/05/2008(Anna Lake)Commences Major Drilling Program on its Anna Lake Uranium Pr...
30/04/2008(North Thelon)Receives Consultant's Report Defining High Priority Targets ...
06/03/2008(Elkhorn)Launches Drilling Program at Elkhorn Project, Wyoming
20/02/2008(Athabasca)Launches Drill Program at Collins Bay Extension Project, Ath...
29/10/2007(South Quinn Lake)Drilling Leads to Major Uranium Discovery in Labrador
Communiqués de Presse de Bayswater Uranium Corp.
15/10/2009Baywater Provides Resource Estimate for the Anna Lake Deposi...
15/09/2009To Retain Dr. Robert Rich to Sell Reno Creek Uranium Product...
28/07/2009to Sell Uranium Interests in Mali
16/07/2009Advisory: Bayswater Launches New Website
30/06/2009’s Revised News Release on Tejana Mesa Property=2C New Mexic...
20/01/2009to Exhibit at Resource Conference
12/12/2008Sells Select Claims in South Dakota and Wyoming
14/11/2008and Commander Sell Uranium Royalty and Bayswater to Sell Gol...
02/09/2008to Exhibit & Present at Hard Assets Conference in Las Vegas
29/07/2008Continues to Explore Uranium Potential at Wisker Valley Proj...
28/07/2008Discovers Uranium at North Thelon Basin Project
24/07/2008Gold Joint Venture Approved
20/05/2008Completes Phase 3 Drilling at Elkhorn Project, Wyoming
09/05/2008to Present at New York Investment Conference
07/05/2008Establishes Corporate Governance System
28/04/2008Reassesses Priorities & Targets Labrador and Wyoming to Fuel...
09/04/2008Business As Usual For Bayswater On Its Labrador Central Mine...
27/03/2008Launches Corporate Video
05/03/2008 in Uranium Market Roundtable Discussion
21/02/2008Commences Drilling on Its Wisker Valley Uranium/Gold Project...
31/01/2008Purchases Balance of Interest in Uranium Properties in Saska...
08/01/2008 Aims to Significantly Increase Uranium Resources in 2008
18/12/2007Discovers Five Uranium Targets for Drill Testing on Athabasc...
10/12/2007Additional Drilling Significantly Expands Anna Lake Uranium ...
05/12/2007Expands Amanda Uranium Zone-Part of a Potentially Large Uran...
26/11/2007 Granted Two Concessions in Niger, West Africa
22/11/2007 Executes Agreement to Acquire Northern Canadian Uranium
14/11/2007 on Uranium Panel "Rebooting the Uranium Price: Navigating a...
13/11/2007Retains Windward to Expand PR
16/10/2007to Acquire Northern Canadian Uranium Inc.
15/10/2007 Resumes Drilling in Labrador with Two Rigs
04/09/2007on James Dines' Uranium Picks Panel
23/08/2007Confirms Cash Position
17/08/2007Purchases Uranium Properties in New Mexico and Utah
16/08/2007Upgraded to Tier 1 Issuer Status
03/08/2007& Silver Spruce/Universal Uranium Joint Venture Claims Cover...
02/08/2007 Provides Project and Corporate Update
01/08/2007 & Ucore Joint Venture Mutual Claims in Previously Exempt Ar...
25/07/2007Completes Merger to Acquire U.S. Uranium Assets
18/07/2007and Kilgore Shareholders Approve Merger
12/07/2007Starts Drilling for Uranium in Central Mineral Belt, Labrado...
10/07/2007Enters Into Agreement with Stornoway to Explore Diamond Targ...
10/07/2007Acquires Extensive Database for Mountain West Uranium Proper...
06/07/2007Airborne Survey Commences at Cochrane Pond Uranium Property,...
07/06/2007Signs Arrangement Agreement with Kilgore
08/05/2007Provides Update on Kilgore Merger
03/05/2007Commences Surveys in Labrador; Drilling Planned Next Month
18/04/2007Completes Major Survey at Athabasca Basin Uranium Property
13/04/2007and Commander Option Cochrane Pond Property, Newfoundland
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BAY.V)FRANKFURT (R9U1.F)
0,115+4.55%0,0570
TSX-V
CA$ 0,115
03/05 15:44 0,010
4,55%
Cours préc. Ouverture
0,110 0,115
Bas haut
0,110 0,115
Année b/h Var. YTD
0,060 -  0,160 91,67%
52 sem. b/h var. 52 sem.
0,030 -  0,305 187,50%
Volume var. 1 mois
238 019 -8,00%
24hGold TrendPower© : -44
Produit
Développe
Recherche Copper - Gold - Lead - Molybdenum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202491,67%0,160,06
2023200,00%0,340,02
2022-66,67%0,080,02
202133,33%0,090,04
2020-40,00%0,120,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,49 AU$+0,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,76 US$+1,29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-0,92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,59 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,15 CA$+0,80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-7,84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-2,72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,54 US$+0,40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :