Publié le 23 juin 2009

Releases Independent Preliminary Economic Assessment Report; Mining of More Than 2 Million Ounces of

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | G Mexico | Zinc |
=======================================================================
Re:   Press Releases - Tuesday, June 23, 2009
      Arian Silver Releases Independent Preliminary Economic Assessment
      Report; Mining of More Than 2 Million Ounces of Silver Proposed
=======================================================================

LONDON, ENGLAND--(Marketwire - June 23, 2009) - Arian Silver
Corporation (TSX VENTURE:AGQ)(AIM:AGQ)(PLUS:AGQ)(FRANKFURT:I3A)
("Arian" or the "Company") is pleased to announce the results of a
Preliminary Economic Assessment ("PEA") for its San Jose Project in
Zacatecas State, Mexico. The PEA, undertaken by A.C.A. Howe
International Limited ("Howe"), reviewed the economics of entering into
contract mining and toll milling on three silver blocks with lead and
zinc credits that were previously reported in the technical report
referred to below.

Arian's Chief Executive Officer, Jim Williams, commented today, "We are
very encouraged by the robust economics to support contract mining and
milling, illustrated by this report, at our San Jose Project. The
results of the PEA validate our plans to move forward in the near-term
with underground mechanized mining using contract mining and toll
milling, subject to funding. Utilizing the underground workings
developed by the former operators and the infrastructure on site, we
plan to advance development to the relatively easily accessible mining
blocks on the San Jose Vein in a very cost effective way. The cash flow
generated from initial mining will be used towards building further
infrastructure onsite to support larger commercial silver production
and to conduct further detailed exploration, including drilling, along
the extensive known strike length at San Jose.

HIGHLIGHTS

- Howe concluded that Arian's approach and mining plan is achievable
and realistic

- Up to four years of contracted mechanized mining, with concurrent
exploration and development on the rest of the property

- Operating 250 days per year at 500 tonnes per day ("tpd") will
produce an average of approximately 125,000 tonnes per year ("tpy")
using three selected mining blocks

- Sub-level open stoping and full mechanization, accessible via either
the San Jose West or East ramp

- Mining and milling of approximately 500,000 tonnes of resources
estimated to recover approximately 2.15 million ozs of silver, 1,800
tonnes of lead and 3,100 tonnes of zinc

- Operating cash costs of US$32.00 per tonne

- Project net present value ("NPV") of US$13.44 million based on an 8%
discount rate

- Project internal rate of return ("IRR") of 159%

Based upon the assumptions contained within the PEA, the exploitation
of three identified remnant mining blocks utilizing contract mining and
toll milling is projected to be viable at production rates of 500 tpd,
and returning undiscounted cumulative cash flows of approximately
US$17.0 million.

Arian is in further discussions with contract miners and toll millers
to seek improvement on the costs used in the PEA and are planning on
undertaking additional metallurgical testwork to better define the
process technology route.

San Jose Project Overview

The San Jose Property (the "Property") has excellent access. The
Property comprises significant infrastructure, including a 3 kilometres
("km") long main haulage ramp, a 500 tpd vertical shaft extending down
to approximately 400 metres, various mine storage buildings and offices
and an upgradeable electrical substation supplying 3-Ph electrical
power to the mine. Zacatecas, the nearest city, is connected to the
Property by 55 km of paved and divided highway and 2.5 km of two-lane
paved road. Once on the Property, access is by a network of dirt
tracks. Total driving time to the Property from Zacatecas is less than
one hour. A railway passes through the city of Zacatecas as do major
highways. The city also hosts an international airport.

The Property consists of two contiguous concessions, which total
6,279.56 Hectares.

Mineral Resources

An initial in-house study of San Jose's NI 43-101 resource areas
identified seven blocks of silver ("Ag"), lead ("Pb") and zinc ("Zn")
mineralization with the potential to support mining production rates of
around 500 tpd. Of the seven, three blocks were chosen to satisfy the
required time frame of the proposed initial mining operation, namely:

- Ramal Norte;

- San Jose 75 m Level Central Zone; and

- Santa Ana.

A summary of these block resource tonnages is presented in Table 1
below.




                       Table 1: Block Resource Tonnages
----------------------------------------------------------------------
-----
----------------------------------------------------------------------
-----
                            Category    Tonnes(1)  Ag (g/t)   Pb(%) 
Zn(%)
----------------------------------------------------------------------
-----
                           Indicated      82,461    209.70    0.14  
0.30
Block                    
------------------------------------------------
 1             Ramal Norte  Inferred      24,523    161.90    0.10  
0.31
                         
------------------------------------------------
                               Total     106,984    198.80    0.13  
0.30
----------------------------------------------------------------------
-----
                           Indicated      65,542    155.90    1.20  
2.05
Block                    
------------------------------------------------
 2    San Jose 75m Central  Inferred       7,290    110.10    0.40  
0.66
                         
------------------------------------------------
                               Total      72,832    151.30    1.12  
1.91
----------------------------------------------------------------------
-----
                           Indicated     208,332    192.30    0.80  
1.31
Block                    
------------------------------------------------
 3               Santa Ana  Inferred      63,380    180.40    0.30  
0.62
                         
------------------------------------------------
                               Total     271,712    189.50    0.68  
1.15
----------------------------------------------------------------------
-----
----------------------------------------------------------------------
-----


(1) Undiluted tonnes
(2) Diluted tonnes - Ramal Norte - 117,682 tonnes;
    San Jose 75m Central - 80,115 tonnes and
    Santa Ana - 298,883 tonnes


 


Mine Plan

Arian's mine plan, based on Canadian National Instrument 43-101 ("NI
43-101") Indicated and Inferred Mineral Resources delineated to date
and contained in the technical report referred to below, has been
validated by Howe as realistic and achievable. The three blocks are of
sufficient grade and thickness to be suitable for sub-level open
stoping and full mechanization mining. The underground workings are all
partially developed, or will be readily accessible via either the San
Jose West or East ramp.

Mining Block Viability Assessments

The assumptions utilized in the assessment of the viability of the
various identified potential mining blocks are presented in Table 2,
below.

The estimates presented in the PEA and reported below are based on the
principle that the mining contractor would provide all necessary mining
and mining support equipment. On this basis, the total capital
requirement to initiate contract mining at San Jose, based upon a
production rate of 500 tpd, is estimated to be approximately US$0.8
million, which includes a 50% contingency factor.




                    Table 2: Operating Assumptions
----------------------------------------------------------------------
---
----------------------------------------------------------------------
---
Item                        Units                             
Comments
----------------------------------------------------------------------
---
Days of operation       days/week          5
                     
--------------------------------------------------
                        days/year        250
----------------------------------------------------------------------
---
Production rate               Tpd        500
                     
--------------------------------------------------
                              Tpy    125,000
----------------------------------------------------------------------
---
Metal prices            Ag US$/oz      15.18
----------------------------------------------------------------------
---
                        Pb US$/lb       0.65
----------------------------------------------------------------------
---
                        Zn US$/lb       0.65
----------------------------------------------------------------------
---
Process recoveries             Ag         75%
----------------------------------------------------------------------
---
                               Pb         65%
----------------------------------------------------------------------
---
                               Zn         65%
----------------------------------------------------------------------
---
Operating costs/t         Stoping       7.00     Quote (2008) from
Arian)
----------------------------------------------------------------------
---
                        Transport       7.00     Quote (2008) from
Arian)
----------------------------------------------------------------------
---
                          Milling      15.00         Estimate from
Arian
----------------------------------------------------------------------
---
                        Overheads       3.00            Estimate by
Howe
----------------------------------------------------------------------
---
                            Total      32.00
----------------------------------------------------------------------
---
----------------------------------------------------------------------
---


 


Additional information in respect of the San Jose Project is contained
in a technical report prepared by A.C.A. Howe International Limited
dated 15 August, 2008 and entitled "Resource Estimation Update for the
San Jose Silver-Lead-Zinc Deposit, Zacatecas, Mexico". A copy of this
report can be obtained at SEDAR at www.sedar.com.

The "Qualified Person", as such term is defined in NI 43-101, who
prepared the PEA in respect of the San Jose Project, is Mr. Julian
Bennett who is an associate employee of A.C.A. Howe International
Limited. Mr. Bennett has reviewed and approved the contents of this
release.

Mr. Jim Williams, Eur Ing, Eur Geol, BSc, MSc, D.I.C., FIMMM, the Chief
Executive Officer of Arian, is a "Qualified Person" as defined in the
AIM guidelines of the London Stock Exchange, and a "Qualified Person"
as such term is defined in NI 43-101. This press release has been
prepared under Mr Williams' supervision. Mr Williams has verified the
data disclosed by this release.

About the Company

Arian Silver Corporation is a silver exploration and development
company and is listed on London's AIM; trades on London's "PLUS"
market; is listed on Toronto's TSX Venture Exchange and on the
Frankfurt Stock Exchange. Arian Silver is active in Mexico, the world's
second largest silver producing country. The Company's main projects
are the Calicanto and San Jose projects in Zacatecas State and the
Tepal project in Michoacan State. Part of Arian Silver's
forward-looking strategy lies in the envisaged use of large scale
mechanized mining techniques over wider mineralized structures, which
reduces the overall unit operating cost of metals, and to build up NI
43-101 compliant resources.

Further information can be found by visiting Arian's website:
www.ariansilver.com or the Company's publicly available records at
www.sedar.com.

For further information please contact:
Arian Silver Corporation
Carlyle House
235-237 Vauxhall Bridge Road
London SW1V 1EJ
England

Jim Williams - CEO
(London) +44 (0)20 7963 8670 / email: jwilliams@ariansilver.com

Graham Potts -- CFO & Corporate Secretary
(London) +44 (0)20 7963 8670 / email: gpotts@ariansilver.com

Bishopsgate Communications Limited
Nick Rome
(London) +44 (0)20 7562 3350 / email:
Nick.Rome@bishopsgatecommunications.com

Grant Thornton UK LLP
Gerry Beaney
(London) +44 (0)20 7385 5100 / email: gerry.d.beaney@gtuk.com

CHF Investor Relations
Alison Tullis
(Canada) +1 416 868 1079 Ext. 233 / email: Alison@chfir.com


Forward-Looking Statements

This press release contains certain "forward-looking statements". All
statements, other than statements of historical fact, that address
activities, events or developments that the Company believes, expects
or anticipates will or may occur in the future (including, without
limitation, statements contained in this press release regarding future
funding, mineral resource estimates, exploration results, potential
mineralization, potential mineral resources, future production and the
Company's exploration, development and operational plans and
objectives) are forward-looking statements. These forward-looking
statements reflect the current expectations or beliefs of the Company
based on information currently available to the Company.
Forward-looking statements are subject to a number of risks and
uncertainties that may cause the actual results of the Company to
differ materially from those discussed in the forward-looking
statements, and even if such actual results are realized or
substantially realized, there can be no assurance that they will have
the expected consequences to, or effects on the Company. Factors that
could cause actual results or events to differ materially from current
expectations include, among other things, failure to establish
estimated mineral reserves, the possibility that future exploration
results will not be consistent with the Company's expectations,
uncertainties relating to the availability and costs of financing
needed in the future to meet its ongoing obligations, changes in
commodity prices, changes in equity markets, political developments in
Mexico, changes to regulations affecting the Company's activities,
delays in obtaining or failures to obtain required regulatory
approvals, the uncertainties involved in interpreting exploration
results and other geological data, and the other risks involved in the
mineral exploration and development industry. Any forward-looking
statement speaks only as of the date on which it is made and, except as
may be required by applicable securities laws, the Company disclaims
any intent or obligation to update any forward-looking statement,
whether as a result of new information, future events or results or
otherwise. Although the Company believes that the assumptions inherent
in the forward-looking statements are reasonable, forward-looking
statements are not guarantees of future performance and accordingly
undue reliance should not be put on such statements due to the inherent
uncertainty therein.

The mineral resource figures disclosed in this press release are
estimates and no assurances can be given that the indicated levels of
minerals will be produced. Such estimates are expressions of judgment
based on knowledge, mining experience, analysis of drilling results and
industry practices. Valid estimates made at a given time may
significantly change when new information becomes available. While the
Company believes that the resource estimates included in this press
release are well established, by their nature resource estimates are
imprecise and depend, to a certain extent, upon statistical inferences,
which may ultimately prove unreliable. If such estimates are inaccurate
or are reduced in the future, this could have a material adverse impact
on the Company.

Mineral resources are not mineral reserves and do not have demonstrated
economic viability. There is no certainty that mineral resources can be
upgraded to mineral reserves through continued exploration.

No stock exchange, securities commission or other regulatory authority
has approved or disapproved the information contained in this release.
Neither the TSX Venture Exchange nor its Regulation Services Provider
(as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.

=======================================================================
Copyright (c) 2009 ARIAN SILVER CORPORATION (AGQ)  All rights reserved.
 For more information visit our website at http://www.ariansilver.com/
or send mailto:info@ariansilver.com
Message sent on Tue Jun 23, 2009 at 6:22:18 AM Pacific Time
=======================================================================
.
<
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Arian Silver Corporation

PRODUCTEUR
CODE : AGQ.V
ISIN : VGG0472G1063
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Arian Silver est une société de production minière d'argent basée au Royaume-Uni.

Arian Silver est productrice d'argent, d'or, de plomb et de zinc au Mexique, et détient divers projets d'exploration au Mexique.

Son principal projet en production est SAN JOSÉ ZACATECAS au Mexique et ses principaux projets en exploration sont SAN CELSO et CALICANTO au Mexique.

Arian Silver est cotée au Canada, au Royaume-Uni, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 41,4 millions CA$ (39,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 12 décembre 2008 à 0,03 CA$, et son plus haut niveau récent le 07 janvier 2011 à 8,90 CA$.

Arian Silver possède 318 491 926 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Arian Silver Corporation
18/01/2008Recommendation and Summary
Dans les médias de Arian Silver Corporation
11/10/2007MineralSTOX Interview with Jim Williams
Rapports annuels de Arian Silver Corporation
Results For The Financial Year Ended December 31, 2007
Annual Report 2006
Financements de Arian Silver Corporation
24/09/2015Financing Update
01/10/2014Financing Update
23/08/2013Update on Financing
10/12/2009 Private Placement to Raise up to Cdn$3 Million
Nominations de Arian Silver Corporation
15/10/2013Appoints New Chief Financial Officer
07/01/2013Appoints New Chief Financial Officer
06/04/2011Appoints New CFO
17/03/2011CHIEF FINANCIAL OFFICER STEPS DOWN
04/08/2010Appoints New Broker
04/02/2008Appoints Chief Operating Officer
Rapports Financiers de Arian Silver Corporation
29/06/2016Financial Results for the Year Ended 31 December 2015
14/10/2011Dundee Securities says Arian Silver Corp. (AGQ) is a Buy!
22/08/2011MD&A and Results for the Six Months Ended 30 June 2011
31/05/2011MD&A and Results for the Three Months Ended 31 March 2011
27/04/2011MD&A and Results for the Financial Year Ended 31 December 20...
01/12/2009MD&A and Financial Results for the Three and Nine Months End...
27/08/2009Financial results for the three and six months ended
28/05/2009Md&A and financial results for the three months ended 31 Mar...
Projets de Arian Silver Corporation
13/05/2016Arian Silver progresses metallurgical and mineralogical test...
14/03/2012Upgraded resources
16/01/2012(San José Zacatecas)Reports Further Encouraging Exploration Progress at San Jose
25/10/2011(San José Zacatecas)Reports Encouraging Progress on Phase 4 Drilling at San Jose
22/07/2011(San José Zacatecas)Announces Significant Increase in Mineral Resources at San J...
27/06/2011(San José Zacatecas)Reports Wide High-Grade Silver and Base Metal Intercepts
08/06/2011(San José Zacatecas)PROGRESS UPDATE ON SAN JOS CUSTOM MILLINGOPERATION THEFT OF ...
12/04/2011(San José Zacatecas)Announces Progress Update at San Jose; Increase in Concentra...
05/04/2011(San José Zacatecas)Continuing Exploration Drilling Intercepts High-Grade Silver...
14/03/2011(San José Zacatecas)Clarifies Its Disclosure
21/02/2011(San José Zacatecas)Intersects Widest Economic Silver Grades Yet 6 km West of Sa...
30/06/2010(San José Zacatecas)San José Production Statement
10/02/2010(San José Zacatecas)Progresses San José Property Towards Production
29/01/2010(Tepal)Executes Definitive Option Agreement with Geologix for Tepal...
19/01/2010(Tepal)Notified of Geologix's Intention to Exercise Tepal Option
06/11/2008(San José Zacatecas)Reports Phase-2 Assays on Initial 19 Holes at San Jose
24/09/2008(Tepal)Upgrades Tepal Resource Estimate
02/07/2008(San José Zacatecas)Exploration Update - San Jose Project
14/04/2008(Tepal)Drilling Intersects 110 Metres Grading 1.13 g/t AuEq at Tepa...
10/03/2008(Tepal)Initial NI 43-101 Resource Calculation at Tepal
03/03/2008Initial NI 43-101 Resource Calculation at San Jose
12/12/2007(San José Zacatecas)San Jose update
13/11/2007(Tepal) announces Tepal drilling results
30/10/2007(San José Zacatecas)San Jose Drilling Results
08/08/2007(Tepal)Reports Initial Drill Results at Tepal and Confirms Historic...
26/07/2007(San José Zacatecas)Drill Results Confirm and Discover Additional Mineralised Zo...
16/04/2007(Calicanto)Calicanto Drilling Report
Communiqués de Presse de Arian Silver Corporation
01/08/2016Result of Annual General Meeting
30/06/2016Notice of Annual General Meeting
04/05/2016Exclusive Option over Tailings Project in Mexico
28/04/2016Placing to raise £700,000
28/01/2016Placing and directors’ dealings
26/01/2016Final Closing of Settlement with Quintana Achieved
15/12/2015Trading to resume on AIM
03/11/2015Arian Silver Corporation - Receipt of Default Notice
29/10/2015Trading To Resume on TSX-V
29/10/2015IIROC Trading Resumption - AGQ
29/10/2015IIROC Trading Halt - AGQ
08/10/2015Notification Of Major Interest In Shares
05/10/2015Updated Mineral Resource Estimate
05/10/2015Arian Silver Corporation - Updated Mineral Resource Estimate
24/09/2015IIROC Trading Resumption - AGQ
24/09/2015Arian Silver - Financing Update
22/09/2015Arian Silver Corporation - Company Update
21/09/2015TSX-V Trading Halt; AIM unaffected
21/09/2015IIROC Trading Halt - AGQ
15/09/2015Company Update
14/09/2015Arian Silver Corporation - Company Update
03/09/2015Directorate Change – clarification
01/09/2015Arian Silver Corporation - Directorate Change - clarificatio...
01/09/2015Arian Silver’s Md&a and Financial Statements for the Three a...
31/08/2015Arian Silver's MD&A and Financial Statements for the Three a...
31/08/2015Directorate Change
10/08/2015Holding(s) in company
10/08/2015TR-1: Notification of Major Interest in Shares
02/08/2015July 15th, 2015Change of Advisor (More)
31/03/2015Arian Silver's MD&A and Results for the Financial Year Ended...
31/03/2015Arian Silver Achieves First Concentrate Production at San Jo...
30/03/2015Arian Silver Achieves First Concentrate Production at San Jo...
09/02/2015Arian Silver Acquires 2% Net Smelter Return Royalty on San J...
02/02/2015Arian Silver Commences a 5,000m Drilling Programme at San Jo...
23/01/2015Director/PDMR Shareholding
23/01/2015Arian Silver Corporation: Director/PDMR Shareholding
14/01/2015Operations Update
14/01/2015Arian Silver presents at Canadian Investor Conference
14/01/2015Arian Silver Presents at Canadian Investor Conference
14/01/2015Arian Silver Operations Update
07/01/2015Holding(s) in company
07/01/2015Arian Silver Corporation: Holding(s) in company
07/01/2015Grant of Share Options
07/01/2015Arian Silver Grant of Share Options
16/12/2014Appointment of Broker
16/12/2014Appointment of Non-Executive Directors
16/12/2014Arian Silver's MD&A And Results For The Three And Nine Month...
16/12/2014Result of General Meeting
09/12/2014Arian Silver Corporation: Result of General Meeting
26/11/2014Arian Silver's MD&A and Results for the Three and Nine Month...
18/11/2014Arian Silver Appointment of Non-Executive Directors
17/11/2014Arian Silver Appointment of Broker
12/11/2014Arian Silver Corporation: Notice of General Meeting
30/10/2014Arian Silver Restructures Quintana Loan Note
15/10/2014Arian Silver Raises $32 Million for San Jose
09/10/2014Arian Silver Corporation: Issue of Equity
01/10/2014Arian Silver Corporation: Financing Update
18/09/2014Arian Silver Corporation: Issue of Equity
16/09/2014Arian Silver Corporation: Significant Progress at San José P...
29/08/2014Arian Silver's MD&A and Results for the Three and Six Months...
29/08/2014Arian Silver Corporation: Financing Update
28/11/2013MD&A and Results for the Three and Nine Months Ended 30 Sept...
04/11/2013Progresses Refurbishment of the El Bote Processing Plant in ...
31/10/2013Director/PDMR Shareholding
02/09/2013Completes Financing and Acquisition of Company-Owned Mill
30/08/2013Consolidation of Shares
29/08/2013MD&A and Results for the Three and Six Months Ended 30 June ...
09/08/2013Share Consolidation-Timetable of Principal Events
05/08/2013Issue of Shares
01/08/2013Notice of General Meeting
26/07/2013Proposed Share Conso =?ISO-8859-1?Q?lidation,=20Mailing=20of...
12/07/2013Issue of Shares
25/06/2013Operations Update
10/06/2013Holding(s) in company
30/05/2013CEO Jim Williams Q&A: Market Fundamentals, Manipulation and ...
24/05/2013Files Technical Report
23/05/2013MD&A and Results for the Three Months Ended 31 March 2013
15/05/2013Result of Annual General Meeting
08/05/2013Issue of Shares
18/04/2013Notice of Annual General Meeting
16/04/2013"Transformed!" says Edison about Arian Silver Corporation
16/04/2013(TSXV, AIM: AGQ; FSE: I3A) Updated Research Report
15/04/2013Transformed!
05/04/2013Issue of Shares
14/03/2013Issue of Shares
19/02/2013Operations Update
31/01/2013Issue of Shares
10/01/2013(AGQ), Booth #2027, Vancouver Cambridge House
09/01/2013Issue of Shares
12/12/2012Issue of Shares
09/11/2012Issue of Shares
01/11/2012MD&A and Results for the Three and Nine Months Ended 30 Sept...
01/10/2012Can Boost Silver Recoveries says Independent Metallurgical R...
27/09/2012Enters SEDA Agreement
06/07/2012New Research Coverage on Arian Silver Corporation
13/06/2012Confirmation of Filing of Fixed Share Option Plan
03/05/2012Notice of Annual General Meeting
25/04/2012Files San Jos=E9 Technical Report Update
12/04/2012Director's Share Purchase
12/03/2012Increases Contained Silver at San Jos=E9 by 32% to More Than...
23/01/2012Issue of Shares
18/01/2012Drilling results
14/06/2011Director's Share Purchase
08/06/2011- AGM Result
20/04/2011Issue of Shares
01/03/2011share interest of Mr R Humphreys has fallen below 3% of the...
24/08/2010MD&A and results for the six months ended 30 June 2010
13/08/2010Issue Of Shares
29/07/2010Edison Research initiating coverage on Arian Silver
29/07/2010Initiation of coverage
23/06/2010AGM Result and Statement
27/05/2010MD&A and results for the three months ended 31 March 2010
18/05/2010announces Notice of Annual General Meeting
30/04/2010MD&A and Results for the Financial Year Ended 31 December 20...
21/04/2010Reports on Progress at San Jose
20/04/2010Reports Share Interest change and Issue of Shares
12/04/2010Share interest change and AGM date
25/03/2010reports on change in share interest
19/03/2010Directorate Change
05/02/2010Reports on Share Capital, Voting Rights and Share Interests
22/01/2010announces closing of transactions with Grafton
09/12/2009Announces a Reconstruction of its Share Relationship with Gr...
23/06/2009Reports on Annual General Meeting of Shareholders; Change to...
23/06/2009Releases Independent Preliminary Economic Assessment Report;...
26/02/2009ANNOUNCES FIRST STAGE CLOSING OF SHARE EXCHANGE TRANSACTION ...
24/02/2009Editorial from Minesite (February 16, 09)
27/01/2009Announces Share Exchange Transaction With Grafton Resource I...
20/01/2009Change of Address & Registered Office
01/09/2008Reports Results For The Three And Six Months Ended June 30, ...
21/08/2008Upgrades San Jose Resource Estimate
11/08/2008Exploration Update - San Jose
08/07/2008Provides Near-Term Production Potential on the San Jose Proj...
24/06/2008Engages CHF Investor Relations
13/09/2007Shoots for the Stars with International Mining Magazine
11/09/2007San Jose Exploration Results
05/09/2007Aquisition of Additional Concession Areas at San Jose
30/08/2007Q2 Press Release
13/08/2007New Near-Surface Silver Oxide Mineralization Discovered at S...
29/05/2007Calicanto Phase-One Drill Results
23/04/2007Tepal Drilling
26/05/2006is admitted to AIM
24/03/2006Newsletter March 2006
25/01/2006Newsletter Jan 2006
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (AGQ.V)LSE (AGQ.L)
0,130-7.14%0,170-0.58%
TSX-V
CA$ 0,130
01/12 15:57 -0,010
-7,14%
Cours préc. Ouverture
0,140 0,140
Bas haut
0,130 0,140
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,130 -%
Volume var. 1 mois
153 875 -%
24hGold TrendPower© : -15
Produit Lead - Silver - Zinc
Développe
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :