Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Stornoway Diamond Corporation

Publié le 31 juillet 2007

Reports 1,642 Carats Recovered from Renard 2 Including a 15.46 Carat Stone

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |
TSX: SWY
SWY 07-29
July 31, 2007

STORNOWAY REPORTS 1,642 CARATS RECOVERED FROM RENARD 2 INCLUDING A 15.46 CARAT STONE

Stornoway Diamond Corporation (TSX-SWY) is pleased to provide complete diamond recovery results from the Renard 2 kimberlite, the second individual kimberlite bulk sample to be completed as part of the Renard bulk sample program in north-central Qu�bec.  Stornoway, and 50:50 joint venture partner SOQUEM INC. ("SOQUEM"), are currently engaged in a program of sampling at Renard designed to recover a minimum 6,000 carats of diamonds from three separate kimberlite pipes.  Renard 2 has now returned a total of 1,602 carats of diamonds from 15 separate sub-samples with a combined dry sample weight of 2,449 tonnes. Diamond recovery from individual sub-samples varied between 26 carats per hundred tonnes (cpht) and 144 cpht for stones retained on a +1 DTC screen, with the largest diamond weighing 15.46 carats. Complete Renard 2 diamond data, after utilizing both x-ray sorter and grease table recovery circuits, are as follows:  

Sub-Sample

Dry
Weight
(tonnes)

Stones
(retained on +1
DTC screen)

 Carats
(retained on +1
DTC screen) 

Diamond
Content1 (cpht)2

Largest
Diamond
(carats)

R2-2004
140.4
512
58.17
41
4.47
R2-2005
157.4
495
68.47
43
3.04
R2-2006
140.4
461
60.62
43
4.27
R2-2007
184.8
946
125.08
68
4.90
R2-2008
144.2
573
70.98
49
3.89
R2-2009
163.7
505
53.01
32
2.51
R2-2010
138.9
347
36.07
26
3.18
R2-2011
210.6
981
106.53
51
2.08
R2-2016
146.9
559
62.98
43
2.09
R2-2017
193.4
742
92.31
48
2.78
R2-2103
157.6
1,129
123.64
78
2.61
Sub-Total, Kimb2a Samples3
  1,778.3
7,250
857.83
48
 
R2-2104
183.9
1,691
202.75
110
15.46
R2-2105
162.3
2,066
233.64
144
8.42
R2-2108
154.8
888
97.44
63
3.23
R2-2109
169.5
1,889
210.32
124
2.61
Sub-Total, Kimb2b Samples3
670.5
6,534
744.15
  111
 
Total
2,448.9
  13,784
1,601.98
  65
 

1 The estimated diamond content, expressed as carats per hundred tonnes, may not be representative of the overall diamond content of the body due to a number of factors, including location/size of the underground samples and processing parameters
2 Carats per hundred tonnes
3 Based on predominant kimberlite lithology sampled

CEO Eira Thomas stated, "We continue to be encouraged by the results of the Renard bulk sample program. The latest diamond recovery data from Renard 2, when related to pipe geology, are consistent with previous sampling. We are also particularly impressed by the incidence of large stones in these latest results. The unusually strong distribution of large diamond sizes in Renard 2 promises to be an important driver of overall rock value .

We remain very optimistic about the potential of the Renard Project to become Quebec's first diamond mine."

The five largest diamonds recovered from Renard 2 are a 15.46 carat light off-colour gem octahedron, an 8.80 carat brown clivage, an 8.42 carat brown clivage, a 6.91 carat top light brown gem makeable, and a 6.10 carat colourless gem rounded octahedron. These five diamonds were recovered from samples of, predominantly, "kimb2b" kimberlite, as defined below. The five largest diamonds recovered from samples of, predominantly, "kimb2a" kimberlite are a 4.90 carat top light brown gem octahedron, a 4.47 carat brown octahedron, a 4.27 light off-colour gem octahedron, a 3.89 carat light off-colour gem octahedron and a 3.58 carat light off-colour gem octahedron. Photographs of these diamonds can be found on the Stornoway website at http://stornowaydiamonds.com/news/2007/july/

As of the end of June, a total of 6036 dry tonnes of kimberlite has been processed at the 10 tonne per hour Dense Media Separation (DMS) plant located at the Renard Project site. This comprises 1,929 dry tonnes of Renard 3, 2,449 dry tonnes of Renard 2 and 1,659 dry tonnes of Renard 4.  On-site processing at the DMS plant is now complete. Final diamond recovery of the Renard 3 sample produced 2,681 carats of diamonds for an estimated diamond content of 139 cpht as reported by Stornoway on June 20, 2007. The result of a full market valuation exercise on the complete bulk sample parcel of approximately 6,000 carats is expected early in the fourth quarter.

Comparative Historical Data

Between 2004 and 2005, Stornoway's wholly owned subsidiary Ashton Mining of Canada Inc. ("Ashton") and its JV partner SOQUEM collected a 162 tonne mini-bulk sample from Renard 2 by reverse circulation drilling that yielded a recovered diamond content of 90 cpht (Ashton press release of February 8, 2005).  The largest diamond recovered during that program was a 2.27 carat pale grey composite crystal.

Historical diamond recovery results now reported from Renard 2 are as follows:

Disclosure Date

Dry Weight
(tonnes)

Carats

Diamond
Content
2 (cpht)3

Largest Diamonds
(carats)

July 26, 2007

                 2,448.9

1,601.984

65

15.46, 8.80, 8.42

February 8, 20051

                     162.0

1465

90

2.27, 2.05, 1.87

December 13, 20041

                       11.5

13.35

115

1.18, 0.94, 0.76

February 11, 20041

                         8.6

5.416

63

0.91

January 24, 20031

                         4.9

3.316

67

0.38


1 Reported by Ashton Mining of Canada Inc.
2 The estimated diamond content, expressed as carats per hundred tonnes, may not be representative of the overall diamond content of the body due to a number of factors, including location and size of the samples or drill holes
3 Carats per hundred tonnes
4 Represents only stones retained on a +1 or greater DTC screen, as discussed below.  Reported by Stornoway Diamond Corp.   
5 Represents only stones retained on a +1.18 mm square mesh screen
6 Represents only stones retained on a +0.85 mm square mesh screen

Renard 2 Geology

The fifteen individual samples from Renard 2 reported above were collected by underground decline 55m below surface at the 455m level.  Underground mapping has outlined several coherent geological units, including two distinct fragmental kimberlite breccias units, hypabyssal kimberlite in the form of dykes,  a  hypabyssal kimberlite breccia, and country-rock dominated contact breccias marginal to the pipe. Distinct diamond contents are apparent within the two fragmental breccia units (typical tuffisitic kimberlite breccia to tuffisitic transitional kimberlite breccia), referred to as kimb2a ("Blue") and kimb2b ("Brown") kimberlite. Sub-samples 2004 to 2103 sampled predominantly kimb2a and returned a weighted average diamond content of 48 cpht.  Sub-samples 2104 to 2109 sampled predominantly kimb2b and returned a weighted average diamond content of 111 cpht.

Recovered diamond content from individual sub-samples, and the complete Renard 2 underground sample, does not conform to the definition of a "mineral resource" grade established by National Instrument ("NI") 43-101.  The Renard 2 samples processed to date have been selected from each of the geological units encountered in the underground drifts.  The number of sub-samples acquired from each specific rock type is not indicative of the relative abundance of those rock types within the Renard 2 body.  Stornoway is in the process of establishing detailed geological models for each of the Renard kimberlites to be utilized in a subsequent NI 43-101 compliant resource calculation.  As a component of this work, individual geologic units observable within the pipes will be reconciled with diamond recovery information. 

Scientific and Technical Data

Diamond results reported in this release are based on sample processing by a 10 tph DMS plant owned by Stornoway (through Ashton) and SOQUEM in joint venture, and operated by Stornoway, and on the recovery of diamonds from concentrate at Stornoway's wholly owned and operated mineralogical laboratory in North Vancouver, British Columbia.  Quality assurance protocols and actual operating procedures for the processing, transport and recovery of diamonds under the Renard bulk sample program, including arms-length security provisions, conform to industry standard Chain of Custody provisions and are subject to the review of AMEC Americas Ltd. who have been contracted to provide third party accreditation for program data. 

For the Renard bulk sample program, individual kimberlite samples are prepared through a primary jaw crusher prior to introduction to the 10 tph DMS. To facilitate production of a heavy mineral concentrate, -20mm material is fed directly into the DMS and +20mm material is reduced through a secondary cone crusher set at 10mm. DMS coarse reject "floats" are re-crushed to -6mm and re-circulated through the DMS.  Samples were processed utilizing a 1.0mm by 12.0mm slotted screen.  Following delivery to North Vancouver, the resultant DMS concentrate was then processed twice through x-ray sorter equipment to generate a final concentrate which was hand sorted to extract diamonds. A grease table finish was used to recover diamonds from all x-ray sorter rejects.  Diamonds were recovered from (a) two x-ray sorter passes and (b) the grease table recovery circuit.  Diamond recovery reported above pertains only to stones retained on a +1 DTC screen, approximately equivalent to a 0.85mm square mesh screen. However, the bottom cut-off screen sizes used on the DMS will result in under-recovery of smaller diamonds and will not allow a direct comparison with previously reported diamond contents.  As part of Stornoway's ongoing QA/QC program, DMS tails, concentrate residues and other materials are also subject to audit.  Any significant changes to the recovered diamond grades provided above will be reported when available.  The Renard bulk sample program is managed by Dave Skelton, P.Geol., Senior Project Manager. Stornoway's diamond exploration programs are conducted under the direction of Robin Hopkins P.Geol, Vice President, Exploration, a Qualified Person under NI 43-101.

Stornoway Diamond Corporation

Stornoway Diamond Corporation is one of Canada's leading diamond exploration and development companies, involved in the discovery of over 150 kimberlites in six Canadian diamond districts. The Company benefits from a diversified diamond property portfolio, a strong financial platform and management and technical teams with experience in each segment of the diamond "pipeline" from exploration to marketing.

SOQUEM INC.

SOQUEM is a wholly-owned subsidiary of Soci�t� g�n�rale de financement du Qu�bec ("SGF"). The SGF, the Quebec industrial and financial holding company, has as its mission to undertake economic development projects in the industrial sector in cooperation with partners and in compliance with the economic development policies of the Government of Quebec.

On behalf of the Board
STORNOWAY DIAMOND CORPORATION
/s/ "Eira Thomas"
Eira Thomas
Chief Executive Officer

For further information, please contact Nick Thomas at 604-331-2259 or (877) 331-2232
** Website: www.stornowaydiamonds.com Email: info@stornowaydiamonds.com **

This news release may contain forward looking statements, being statements which are not historical facts, including, without limitation, statements regarding potential mineralization, exploration results, resource or reserve estimates, anticipated production or results, sales, revenues, costs, "best-efforts" financings or discussions of future plans and objectives. There can be no assurance that such statements will prove accurate. Such statements are necessarily based upon a number of estimates and assumptions that are subject to numerous risks and uncertainties that could cause actual results and future events to differ materially from those anticipated or projected. Important factors that could cause actual results to differ materially from the Company's expectations are in Company documents filed from time to time with the Toronto Stock Exchange and provincial securities regulators, most of which are available at www.sedar.com . The Company disclaims any intention or obligation to revise or update such statements.

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Stornoway Diamond Corporation

EN DÉVELOPPEMENT
CODE : SWY.TO
ISIN : CA86222Q8065
CUSIP : 86222Q806
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Stornoway Diamond est une société d’exploration minière d'or et de cuivre basée au Canada.

Stornoway Diamond est en développement de projets d'or, de cuivre, de diamants et de nickel au Canada, et détient divers projets d'exploration au Botswana et au Canada.

Son principal projet en développement est RENARD (FOXTROT) au Canada et ses principaux projets en exploration sont RAVEN, CHURCHILL, KINGORA, LDG, DARING LAKE, JEWEL, STARFISH, WALES ISLAND, SCEPTRE AND TIARA, HAMMER, QILALUGAQ, PORTAGE MINE, MELVILLE PENIN. et MELVILLE PENINSULA (AVIAT PROJECT) au Canada.

Stornoway Diamond est cotée au Canada. Sa capitalisation boursière aujourd'hui est 16,6 millions CA$ (12,6 millions US$, 11,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 14 mai 2004 à 9,80 CA$, et son plus bas niveau récent le 06 septembre 2019 à 0,01 CA$.

Stornoway Diamond possède 828 659 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Stornoway Diamond Corporation
10/04/2019Stornoway Diamond halts open pit operations at Quebec mine
15/11/2018Stornoway Diamond shares down on $37 million loss, departure...
Rapports annuels de Stornoway Diamond Corporation
LAUNCHES 2008 ONLINE ANNUAL REPORT: Posts Presentation from ...
Financements de Stornoway Diamond Corporation
11/07/2016Stornoway Receives C$82.72 Million from Warrant Exercise
31/03/2016Stornoway Announces Funding Of Third Tranche Of Stream Finan...
01/10/2015Stornoway Announces Funding of Second Tranche of Stream Fina...
13/11/2013Announces Increase To Bought Flow-Through Financing
19/04/2012Closes Private Placement of Units
08/03/2012Announces Bought Deal Equity Financing
01/08/2011Announces Financing Agreements With Québec For the Route 167...
29/05/2009Announces Closing of Flow-Through Financing
14/11/2008Announces Closing of Financings
05/11/2008Increases Previously Announced Private Placement
04/11/2008Announces Flow-Through Financing
01/08/2008Closes $22 Million Private Placement and Redeems Convertible...
28/07/2008Announces $22 Million Private Placement To Close Within 21 D...
16/07/2008ARRANGES $22 MILLION PRIVATE PLACEMENT Proceeds To Redeem Co...
Nominations de Stornoway Diamond Corporation
15/08/2013Announces Appointment to Board of Directors
25/06/2013Announcement of Appointment
03/08/2011Announces Changes To The Board Of Directors
20/07/2011Announces New Appointments to the Board of Directors
03/05/2010Announces Appointment Of Chief Operating Officer
01/03/2010Announces Management Appointments
Rapports Financiers de Stornoway Diamond Corporation
10/08/2017Second Quarter Results
27/07/2017Stornoway Announces Second Quarter Release Date
17/05/2016Stornoway Announces Results From Annual General Meeting
10/05/2016Stornoway Announces FY2016 First Quarter Results
05/05/2016Annual General Meeting
15/09/2009First Quarter Financial Results Posted, Matt Manson’s AGM Pr...
Projets de Stornoway Diamond Corporation
15/07/2016(Renard (foxtrot))Stornoway Commences Ore Processing At Renard Diamond Project
28/01/2014Provides Update On Exploration Joint Ventures
10/10/2013To Commence Early Construction Of Renard Mine Airport
03/09/2013First Vehicle Arrives At Renard Project Site Via New Permane...
07/08/2013Provides Update On Exploration Joint Ventures
23/07/2013Announces Updated Renard Mineral Resource Estimate
16/07/2013Receives Federal Government Authorisation For Renard Project
03/06/2013Provides Renard Project Update
14/03/2013Options Non-Core Exploration Projects
14/02/2013Reports Arrival Of Winter Road At Renard Project Site
28/01/2013Reports Optimized Renard Mine Design And Cost Estimates
01/06/2012Exhibiting at the World Resource Investment Conference: Vanc...
27/03/2012Signs Impacts And Benefits Agreement For The Renard Diamond ...
17/02/2012Renard Diamond Project Digital Fly-Through Video
04/01/2012Files NI 43-101 Technical Report For The Renard Feasibility ...
10/12/2011Renard Diamond Project Community Relations Video
03/10/2011Provides Update On Pipeline Projects
25/05/2011(Hammer)Announces Exploration Drill Program at Hammer Property, Nuna...
28/04/2011(Renard (foxtrot))Provides Renard Project Update Feasibility Study on Track fo...
01/04/2011(Renard (foxtrot))Announces Closing Of Agreement To Acquire Remaining 50% Of R...
07/03/2011(Aviat)Announces New Microdiamond Results From the Aviat Project, N...
23/02/2011(Renard (foxtrot))Announces Positive Microdiamond Results from Renard 1
23/02/2011(Renard (foxtrot))annonce des résultats microdiamantifères positifs pour Renar...
10/02/2011(Renard (foxtrot))Shareholders Overwhelmingly Approve Acquisition Of Remaining...
07/02/2011(Renard (foxtrot))Files NI 43-101 Technical Report On The Recently Revised Res...
24/01/2011(Renard (foxtrot))Announces Increased Ni 43-101 Mineral Resource Estimate For ...
14/12/2010(Renard (foxtrot))Stornoway Announces Acquisition Of Remaining 50% Of Renard P...
22/03/2010(Renard (foxtrot))Renard Updated Economic Assessment Teleconference Archive No...
08/12/2009Announces Revised Ni 43-101 Mineral Resource Estimate For Re...
09/03/2009(Renard (foxtrot))Provides Renard Drilling Update: Renard 2 Kimberlite Greatly...
19/02/2009(Aviat)Reports Initial Diamond Results From Aviat 200 Tonne Bulk Sa...
15/12/2008Reports Filing of NI 43-101 Technical Report for Renard Prel...
28/11/2008(Churchill)Reports Diamond Counts From Two Kimberlites At Churchill
24/09/2008(Churchill)And Shear Announce 9 New Kimberlites At Churchill Diamond Pr...
15/09/2008(Churchill)and Shear Announce New Killiq Kimberlite at Churchill Diamon...
08/09/2008(Aviat)Doubles Size of Aviat’s Highly Diamondiferous AV267 Sheet
04/09/2008(Qilalugaq)Discovers New Kimberlite at Qilalugaq
02/07/2008(Churchill)and Shear Announce 2008 Program Underway at the Churchill Di...
27/06/2008(Churchill)And Shear Report Additional High Interest Mineral Dispersion...
15/05/2008(Aviat) Provides Aviat Project Spring Update Increases Project Inte...
28/04/2008(Renard (foxtrot))New Renard Diamond Valuation Results and Pre-Feasibility Upd...
13/03/2008(Aviat)Improves On Diamond Content of Aviat Kimberlites AV1 and AV2...
20/02/2008(Churchill)and Shear Report Additional Diamonds from Kahuna Drilling
31/01/2008(Churchill) and Shear Report High Diamond Counts from Four Kimberlites ...
29/01/2008(Aviat)Reports Diamond Content of 162 Cpht from 20.6 Tonne Aviat Sa...
28/01/2008(Renard (foxtrot))HIGH DIAMOND CONTENT CONFIRMED AT HIBOU DYKE 126 Cpht from 3...
12/12/2007(Melville Peninsula Aviat 1)Third Kimberlite Pipe At Aviat Proves Diamondiferous
14/11/2007(Churchill Project) and Shear Recover a 5.43 Carat Diamond fromChurchill?sKahun...
25/09/2007(Sua Pan (stornoway/motapa Jv))and Motapa Commence Drilling at Sua Pan Project, Botswana
25/07/2007 Commences Pre-Feasibility Study on Renard Diamond Deposit
Communiqués de Presse en Français de Stornoway Diamond Corporation
18/02/2011Les actions regroupées de Stornoway commenceront à se négoci...
Communiqués de Presse de Stornoway Diamond Corporation
29/06/2016Stornoway Reminds Warrantholders Of Upcoming Exercise Deadli...
22/06/2016Stornoway commences plant commissioning at Renard Diamond Pr...
06/06/2016Stornoway Provides Renard Operational Readiness Update
05/05/2016Stornoway Intersects Kimberlite At Adamantin Project
30/03/2016Stornoway Announces Updated Renard Mine Plan and Mineral Res...
14/10/2015Stornoway Files Renard NI 43-101 Technical Report
08/09/2015North Arrow Confirms High Diamond Counts From Pk150 Kimberli...
30/03/2015North Arrow Discovers Three New Kimberlites at the Pikoo Dia...
24/03/2015Stornoway Announces Third Quarter 2015 Results
24/03/2015Stornoway Commences Pre-Stripping at Renard 2-Renard 3 Open ...
11/03/2015Stornoway Announces Third Quarter 2015 Results
26/02/2015North Arrow Reports Initial Diamond Recoveries From First 60...
12/02/2015Stornoway to Attend Upcoming Investor Conferences
11/02/2015North Arrow Drilling Program Underway at Pikoo, Saskatchewan
21/01/2015North Arrow Updates Qilalugaq Project Bulk Sample Processing
16/12/2014Stornoway Announces Second Quarter 2015 Results
15/12/2014Stornoway Announces Second Quarter 2015 Results
17/11/2014Stornoway Completes Field Portion Of 2014 Renard Drill Progr...
17/11/2014Stornoway Completes Field Portion of 2014 Renard Drill Progr...
10/11/2014Stornoway Lists Convertible Debentures
10/11/2014Stornoway Lists Convertible Debentures
22/10/2014Stornoway Announces Results From Annual General Meeting
22/10/2014Stornoway Announces Results From Annual General Meeting
20/10/2014Stornoway Adds Large Diamond Recovery Capacity To Renard Dia...
20/10/2014Stornoway Adds Large Diamond Recovery Capacity to Renard Dia...
23/09/2014North Arrow Identifies New Targets at the Pikoo Diamond Proj...
22/09/2014Stornoway Announces Notice of 2014 Annual Meeting of Shareho...
15/09/2014Stornoway Announces First Quarter 2015 Results
25/08/2014Stornoway Provides Renard Project Update
21/07/2014Stornoway Awards EPCM Contract to SNC-Lavalin Inc.
16/07/2014Stornoway Announces Appointment of Douglas Silver to Board o...
10/07/2014Stornoway Announces Formal Production Decision at Renard
08/07/2014Announces Closing Of Comprehensive Financing Package To Fund...
08/07/2014Stornoway Announces Closing of Comprehensive Financing Packa...
27/06/2014Shareholders Overwhelmingly Approve Resolutions Relating To ...
26/06/2014Stornoway Shareholders Overwhelmingly Approve Resolutions Re...
27/03/2014Stornoway Confirms Negotiations For Project Financing
13/11/2013Announces Flow-Through Financing For Renard Resource Expansi...
05/11/2013Hosts Québec Minister of Natural Resources at Montreal Press...
24/10/2013Announces Results From Annual General Meeting
21/10/2013to Proceed With Liquefied Natural Gas (LNG) Power Plant for ...
02/10/2013Arranges $20M Bridge Facility for Renard Diamond Project
25/06/2013Reports Quebec Strike Action Settled
19/06/2013Provides Renard Mine Road Update
07/05/2013Welcomes Clarity On Future Quebec Mining Taxation
11/04/2013Reports Positive Renard 65 Diamond Valuation Result
27/03/2013Provides Construction Update on the Renard Mine Road
12/03/2013Reports Fatality In Accident On The Winter Road
25/02/2013Completes Renard 65 Diamond Recovery
11/12/2012Recovers High Value 9.78 Carat Stone From Renard 65 Bulk Sam...
29/10/2012Provides Update on the Route 167 Extension
18/10/2012Receives Renard Mining Lease
25/09/2012Annual Summary
11/09/2012Announces Results From Annual General Meeting
06/09/2012Executes Mandate Letter With Lead Arrangers For Renard Proje...
30/08/2012Announces The Successful Completion Of The Final Public Hear...
23/07/2012to Commence Bulk Sampling of Renard 65 Kimberlite
05/07/2012Signs Partnership Accord With Chibougamau And Chapais
04/07/2012Provides Update On Renard Powerline Study
04/07/2012Presentation from the RBC Diamond Conference in London, June...
12/06/2012(Qilalugaq)Reports Initial 26.1 Million Carat Mineral Resource Estimate...
08/06/2012Announces the Successful Completion of Federal Public Consul...
31/05/2012Announces Establishment Of Head Office In Montreal
24/05/2012Video of the Mecheshoo Agreement Signing Ceremony
23/05/2012Announces $28.4m Renard Pre-Development Capital Program
04/05/2012Arranges a $20 Million Unsecured Debt Facility for Renard Di...
22/03/2012Conducts Successful Open Houses in Chibougamau and Mistissin...
03/02/2012Announces Commencement Of Construction Of Route 167 Extensio...
12/01/2012Corporate Video, Social Media, and Upcoming Events
28/12/2011Announces Filing of the Renard Environmental and Social Impa...
07/12/2011Québec Releases Certificate Of Authorization For The Constr
05/12/2011Video Presentation from the 2011 Scotia Capital Mining Confe...
26/10/2011Annual Summary
20/09/2011Provides Renard Project Update
12/09/2011Announces Addition to S&P/TSX SmallCap Index
06/08/2011English Language Media Attention Regarding Route 167 Road Ag...
01/08/2011Announces FinancingAgreements With Québec For Th
11/07/2011Announces Acquisition of "Aeon" Claims in Northern Quebec
13/06/2011Announces 56% Increase in Renard Diamond Price Estimate
27/04/2011Announces 2011 Exploration Program And Budget
20/03/2011Welcomes Quebec Budget Announcement of Financing for the Rou...
18/02/2011to Commence Trading on Consolidated Basis at Market Opening ...
07/04/2010Matt Manson on CBC's the Lang and O'Leary Exchange
22/03/2010Reports Updated Renard Preliminary Assessment Pre-Tax NPV In...
08/03/2010Reports Overall Diamond Recovery Of 86.2 CPHT From Notch Sam...
12/02/2010Files Renard “Notice Of Intent”
15/01/2010Upcoming Conferences in Vancouver
28/11/2009Presentation from the Quebec Exploration Conference: the 200...
06/10/2009s Announces Fourfold Tonnage Increase In Renard 2 Following ...
10/08/2009And Shear Option Chesterfield Inlet Claims, Nunavut
30/07/2009(Hammer)Reports Discovery Of Hammer Kimberlite
08/07/2009is now on Twitter
08/06/2009Renard Summer Drill Program Commences
24/01/2009Upcoming Events
15/01/2009Reports 144 Cpht In Large Tonnage Hibou Dyke Sampling
07/01/2009Provides 2009 Exploration Outlook
17/12/2008Provides Corporate Update
14/07/2008Related News
01/05/2008 is Attending the CIM Conference in Edmonton, May 4-6
04/03/2008Additional Diamond Results From Renard 65 and North Anomaly ...
21/01/20083.64 Carat Diamond Recovered from AV2 Kimberlite at Aviat
14/12/2007 Announces Additional Renard Diamond Recovery Results
03/12/2007 And Shear Recover 337 Carats From 356 Tonne Kahuna Bulk Sam...
22/10/2007 Announces Positive Valuation Results From Renard Bulk Sampl...
19/09/2007Yves Harvey Appointed Member of Stornoway Board of Directors
18/09/2007And Shear Confirm High Commercial Diamond Content AtChurchil...
11/09/2007Qilalugaq Diamond Exploration Program Update
06/09/2007Aviat's Eastern Sheet Complex Points To Significant Tonnage
23/08/2007New Kimberlite Pipe Discovered At Aviat
14/08/2007 Reports 2,213 Carats Recovered From Renard 4
01/08/2007Reports an Additional 31 Diamonds Weighing 1.74 Carats from ...
31/07/2007Reports 1,642 Carats Recovered from Renard 2 Including a 15....
17/07/2007and Shear Announce Closing of BHP Billiton Diamond Inc's Int...
10/07/2007Enters Into Agreement with Bayswater to Explore Diamond Targ...
20/06/2007Reports 2,681 Carats Recovered From Renard 3 Including A 10....
17/05/2007Reports an Initial Diamond Content of 150 cpht from Renard 3...
14/05/2007Provides Exploration Update - On Schedule For First Renard D...
14/05/2007Provides Exploration Update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SWY.TO)
0,020+100.00%
TORONTO
CA$ 0,020
06/09 17:15 0,010
100%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,020 -%
Volume var. 1 mois
15 947 741 -%
24hGold TrendPower© : -33
Produit
Développe Diamonds
Recherche Diamonds - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :