Silvermet Reports 2012 Third Quarter Results and Provides an Update on Turkish Operations Expansion Plan
Published : November 05, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Zinc |

TORONTO, ONTARIO--(Marketwire - Nov. 5, 2012) -

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Silvermet Inc. ("Silvermet" or the "Company") (News - Market indicators) is pleased to announce its Q3, 2012 results and provide an update of development activities in the Adana and Izmir regions of Turkey.

Highlights (in US$)

  • During Q3, 2012, Silvermet's BST joint venture continued to develop its two new projects in the Adana and Izmir regions of Turkey. Activities during the quarter included:
    • Environmental Impact Assessments ("EIA") for the Izmir and Adana plants are underway with EIA permits expected to be received during the first quarter of 2013.
    • Preliminary engineering has been completed and detailed engineering is continuing.
    • Long-term contracts for EAFD supply from steel producers are under negotiation, and expected to be signed in Q4, 2012.
    • An Engineering, Procurement and Construction ("EPC") contract is being negotiated and a final EPC contract is expected to be signed in Q1, 2013.
    • Tendering from local Turkish and international suppliers has commenced.
  • Silvermet is debt free, cash flow positive and profitable. At September 30, 2012, it has cash and credit facility receivable of $3.5 million, or $0.022 per common share. This cash position is after having paid a final settlement amount on the fixed and contingent liabilities that had remained owing to the original owners of the Iskenderun plant.
  • Q3, 2012 sales increased to 4,477 Dry Metric Tonnes ("DMT") of zinc concentrate, containing 6.5 million pounds of zinc, a 25% increase from the 5.2 million pounds of zinc sold in 2011. The cash cost1 has declined to $0.58 per pound in Q3, 2012, from $0.61 per pound in 2011.
  • EBITDA in Q3, 2012 increased by 26% to $0.96 million (at 100%) compared to $0.76 million in Q3, 2011, reflecting primarily increased zinc concentrate shipments.

1 Cash cost per pound is defined as "treatment & transportation costs + direct operating costs / pounds zinc sold".

The following table summarizes comparative quarterly results and reconciles net income, an IFRS measure, to EBITDA.

   Three months ended September 30,   Nine months ended September 30,  
    2012   2012   2011   2011   2012   2012 2011   2011
    100%   49%   100%   49%   100%   49% 100%   49%
REVENUE $ 4,853,442 $ 2,378,187 $ 4,042,257 $ 1,980,706 $ 14,957,368 $ 7,329,110 $ 12,839,562 $ 6,291,385
EBITDA(1) $ 965,073 $ 434,927 $ 763,110 $ 317,294 $ 2,661,294 $ 1,115,986 $ 2,845,732 $ 1,366,522
NET INCOME     $ 130,370     $ 114,429     $ 228,590     $ 727,825
   
(1) EBITDA is a non-IFRS measure, does not have a standardized meaning prescribed by IFRS and may not be comparable to similar terms and measures presented by other issuers. EBITDA comprises net income before income taxes, interest and financing expense (including accretion of liabilities), amortization expense and stock option expense. The Company believes it is appropriate to exclude stock option expense from EBITDA as a measure of operating performance that excludes non-recurring items.

Outlook

Silvermet continues to generate positive cash flows with a strengthening working capital balance, no debt, relatively stable zinc prices and lower smelter treatment charges. Performance at the Iskenderun plant continues to improve with fewer maintenance shutdowns, higher throughputs and better zinc recovery rates. Cash costs per pound of zinc should continue to decline and EBITDA improve.

The previously announced expansion plans in the Adana and Izmir regions of Turkey are progressing well. Each plant will have annual EAFD processing capacity of 110,000 DMT and is estimated to cost $60 million, for a total investment of $120 million. The two new facilities will have significantly higher EBITDA margins than the existing Iskenderun plant, with the use of improved technology. When all three facilities are in production, the total EAFD processing capacity will increase from the current 60,000 DMT per annum to 280,000 DMT and annual zinc concentrate production will increase to 90,000 DMT containing 134,000,000 pounds of zinc.

Project Financing

Indicative term sheets have been received from several senior lenders on project financing and discussions are on-going. The environmental permitting process is underway with a target of obtaining all necessary environmental and construction permits by March, 2013. Simultaneously, detailed engineering and costing is being completed. Construction of each plant is estimated to require 18 months. At present, it is anticipated that construction of the Adana plant will begin in Q2, 2013, with the Izmir plant to follow shortly thereafter.

With various announced zinc mine closures, most zinc industry analysts are forecasting a tightening of zinc concentrate supply in the coming years. The resulting downward pressure on smelter charges and upward pressure on zinc prices are expected to be felt at a time coincident with the commissioning of the new plants.

About Silvermet

Silvermet's principal business activity is the recycling of electric arc furnace dust ("EAFD") obtained from steel companies through a Waelz kiln to produce an oxide zinc concentrate that is sold to zinc smelters throughout the world. The Company owns 49% of BST, which operates a Waelz kiln facility located in Iskenderun, Turkey.

Additional Information

Additional information can be accessed at the Company's website www.silvermet.ca or through the Company's public filings at www.sedar.com.

Caution concerning forward-looking statements: The information in this release may contain forward-looking information under applicable securities laws. This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those implied by the forward-looking information. Factors that may cause actual results to vary include, but are not limited to, inaccurate assumptions concerning the exploration for and development of mineral deposits, political instability, currency fluctuations, unanticipated operational or technical difficulties, changes in laws or regulations, the risks of obtaining necessary licenses and permits, changes in general economic conditions or conditions in the financial markets and the inability to raised additional financing. Readers are cautioned not to place undue reliance on this forward-looking information. The Company does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events except as may be required under applicable securities laws. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Silvermet Inc.
Stephen G. Roman
Chairman, President & CEO
1 (416) 203-8336
info@silvermet.ca
or
Silvermet Inc.
Ian D. Atacan
Chief Financial Officer
1 (416) 203-8336
iatacan@silvermet.ca
or
Silvermet Inc.
8 King St. East, Suite 1700,
Toronto, ON, M5C 1B5, Canada
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Silvermet Inc.

EXPLORATEUR
CODE : SYI.V
ISIN : CA8284251086
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Silvermet est une société d’exploration minière de zinc et d'argent basée au Canada.

Silvermet détient divers projets d'exploration au Canada et en Turquie.

Ses principaux projets en exploration sont MUSKOX et LUMBY LAKE au Canada et WAELZ KILN en Turquie.

Silvermet est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 17,1 millions CA$ (13,4 millions US$, 11,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 avril 2007 à 0,63 CA$, et son plus bas niveau récent le 09 octobre 2015 à 0,02 CA$.

Silvermet possède 142 100 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Silvermet Inc.
2007 Annual report
Financements de Silvermet Inc.
24/06/2008FRAME MINING CORPORATION EXERCISES WARRANTS
Nominations de Silvermet Inc.
19/06/2008APPOINTS W.S. (STEVE) VAUGHAN AS A DIRECTOR
04/06/2008APPOINTS REIN LEHARI AS CHIEF FINANCIAL OFFICER
Rapports Financiers de Silvermet Inc.
05/11/2012Reports 2012 Third Quarter Results and Provides an Update on...
Projets de Silvermet Inc.
10/04/2013Announces Record Production and Sales in 2012
10/01/2008(Muskox)REPORTS ON MUSKOX 2007 DRILL RESULTS AND LAKEFIELD MINERALOG...
Communiqués de Presse de Silvermet Inc.
16/03/2015to Extend Normal Course Issuer Bid
29/05/2013Reports 2013 Q1 Results
11/03/2013to Extend Normal Course Issuer Bid
27/06/2011Announces 2011 Q1 Results
04/05/2011Reports Significantly Improved Results for 2010
14/08/2008ANNOUNCES RETIREMENT OF THE CHAIRMAN
11/06/2008Announces Change to Board of Directors
05/06/2008RECEIVES SNC LAVALINS CAPITAL
29/02/2008Advancing to Production
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SYI.V)OTHER OTC (SYIFF)
0,120+4.35%0,350-2.78%
TSX-V
CA$ 0,120
22/12 15:10 -
4,35%
Cours préc. Ouverture
0,115 0,115
Bas haut
0,115 0,120
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,120 -%
Volume var. 1 mois
63 500 -%
24hGold TrendPower© : 27
Produit
Développe
Recherche Chromium - Cobalt - Copper - Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,67 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :