Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
VMS Reports 37.10 Metres of 5.60% Copper From In-Fill Hole RLD024 at Reed Lake Joint Venture
Published : February 23, 2011

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 23, 2011) - VMS Ventures Inc. (News - Market indicators) ("VMS") is pleased to announce the latest drill and assay results from the in-fill diamond drill program at the Reed Lake copper-zinc-gold-silver deposit, near Snow Lake, Manitoba, Canada. These latest results including holes RLD023 to RLD026, were testing Zone 20. The in-fill program for the upper two lenses is now complete and the next in-fill drilling will focus on Zone 10 between the 300 and 530 metre levels.

Reed Lake Joint Venture Results

Two drills are currently operating at the Reed Lake Joint Venture site. Both drills are conducting in-fill drilling on the copper-rich lens (Zone 10) to define the extent of mineralization up-plunge from hole RLD015. This drill hole intersected significant copper mineralization and was announced in a press release dated December 10, 2010.

Neil Richardson, VMS' Chief Operating Officer states: "We are pleased with the latest results for the upper lenses (Zones 20 and 30) that confirm the extent of mineralization and provide us with definition required to complete a resource estimate. Geological models are being updated in preparation for a NI 43-101 technical report slated for completion in the latter part of Q1 2011."

The program is the first phase of drilling at the Reed Lake project under a joint venture formed between VMS and HudBay Minerals Inc. (TSX:HBM)(NYSE:HBM) ("HudBay"). The Reed Lake deposit is a base metal, polymetallic, massive sulphide-type deposit and is located approximately 100 kilometres from HudBay's concentrator in Flin Flon, Manitoba. The program is proceeding on schedule with the completion of 30 drill holes.

Assays have been received for holes RLD023 to RLD026 and are tabled below:

Reed Lake Assay Data:

Hole Number From (m) To (m) Length (m) Cu % Zn % Au (g/t) Ag (g/t) Zone
RLD023 290.90 293.78 2.88 5.00 0.31 0.43 7.63 20
 
RLD024 189.60 226.70 37.10 5.60 0.72 0.46 6.62 20
 
RLD025 156.75 184.12 27.37 4.66 0.61 0.25 4.75 20
240.62 244.20 3.58 4.76 0.11 0.01 2.64 10
 
RLD026 141.14 149.49 8.35 4.93 0.86 0.36 7.90 20
*True widths unknown*

Reed Lake Collar Information:

Hole Number UTM East (1) UTM North (1) UTM Elevation (1) Azimuth (2) Dip Length (metres)
RLD023 393968.5 6048943.3 295.4 225.0 -74.4 401.0
RLD024 393968.2 6048942.8 295.6 225.0 -65.0 434.0
RLD025 393952.9 6048928.8 295.6 225.0 -58.0 302.0
RLD026 393938.7 6048916.4 296.4 225.0 -48.0 224.0
(1) Universal Transverse Mercator / North American Datum 1983 / Zone 14
(2) "Azimuth" is degrees from True North

On July 6, 2010 VMS and HudBay announced they had entered into a joint venture agreement in which HudBay and VMS have 70% and 30% interests, respectively, in the Reed Lake property and two claims immediately south of the deposit. The parties have also entered into four option agreements which grant HudBay the right to earn a 70% interest in properties held by VMS and adjacent to the Reed Lake property.

For additional details on exploration at the Reed Lake deposit, see VMS press releases issued between September 17, 2007 and December 10, 2008, available at www.sedar.com.

Qualified Person

All technical information in this release has been reviewed by Dr. Mark Fedikow, P.Geo, who is the Qualified Person for the Company and Vice President of Exploration and Technical Services, VMS Ventures Inc.

Quality Assurance and Quality Control

Exploration core drilling was NQ size. The core was logged and mineralized intersections were marked for sampling and assaying by geologists and geotechnicians employed by HudBay's Hudson Bay Exploration and Development Company Limited (HBED) subsidiary. The marked intersections or intervals were sawn in half by a diamond saw and one half of the core was placed in plastic bags and tagged with unique sample numbers, while the second half was returned to the core box and stored. Each bagged core sample was transported to HudBay's Hudson Bay Mining and Smelting Co., Limited (HBMS) subsidiary's assay laboratory in Flin Flon, Manitoba where it was dried, crushed and pulverized and a 250-gram sample was prepared for assaying at Acme Analytical Laboratories Ltd., an independent company in Vancouver, B.C., or the HBMS assay laboratory. From each 250 gram sample 0.25 grams was removed and leached in aqua regia and analyzed by ICP-AES for Ag, Cu, Zn, As, Pb, Ni and Fe. Also from the 250 gram sample, 30 grams were removed for gold determination by fire assaying with an ICP-AES or gravimetric finish at the Acme laboratory or an Atomic Absorption or gravimetric finish at the HBMS laboratory.

Assaying integrity is monitored internally with a quality control program, which includes the use of assay sample standards, blanks, duplicates and repeats and externally through national and international programs. In addition, within each group of 20 core samples, one core sample has a second 250 gram split collected that was check assayed at a different laboratory, either the HBMS laboratory in Flin Flon or at the Acme laboratory in Vancouver, B.C. This news release provides core lengths and estimates of vertical thickness only. True widths are not provided. Where metal assays are provided for intersections they are either a single assay of a sample of the entire intersection length or a composite of assays calculated from interval weighted assays over the intersection length.

About VMS Ventures Inc.

VMS Ventures Inc. is focused primarily on acquiring, exploring and developing copper-zinc-gold-silver massive sulphide deposits in the Flin Flon-Snow Lake VMS Belt of Manitoba. The Company's VMS project property portfolio consists of the Reed Lake Project, Copper Project, McClarty Lake Project, Sails Lake Project, Puella Bay Project and Morton Lake Project. Outside of the Snow Lake camp, the Company holds massive sulphide prospective properties near the past producing Fox Lake and Ruttan copper-zinc mines, near the communities of Lynn Lake and Leaf Rapids in northern Manitoba. These properties are located in the mining friendly province of Manitoba, Canada. The Company also has optioned three properties in the Sudbury mining camp. They are Terra Incognita, Golden Pine and Black Creek.

Forward-Looking Statement

Some of the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward-looking statements that involve various risks. The following are important factors that could cause the Company's actual results to differ materially from those expressed or implied by such forward-looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. There can be no assurance that forward-looking statements will prove to be accurate as actual results and future events may differ materially from those anticipated in such statements. VMS Ventures Inc. undertakes no obligation to update such forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on such forward-looking statements.

ON BEHALF OF THE BOARD OF DIRECTORS

John Roozendaal, President, VMS Ventures Inc.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For more information, please contact

VMS Ventures Inc.
Keith Patey
Director of Communications
(604) 986-2020 or Toll Free: 1-866-816-0118
www.vmsventures.com
or
Launch IR
Matt Harrington
(613) 882-7467
or
Launch IR
Dean Hanisch
(613) 882-7467
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

VMS Ventures Inc.

EXPLORATEUR
CODE : VMS.V
ISIN : CA91828R1091
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

VMS Ventures est une société d’exploration minière de zinc et d'or basée au Canada.

VMS Ventures détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont REED LAKE, LYNN LAKE GABBROS, PUELLA BAY et COVER au Canada.

VMS Ventures est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 13,9 millions CA$ (10,1 millions US$, 9,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,76 CA$, et son plus bas niveau récent le 22 janvier 2016 à 0,05 CA$.

VMS Ventures possède 146 480 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de VMS Ventures Inc.
05/03/2011VMS Ventures – Focused on Discovery
Financements de VMS Ventures Inc.
09/11/2007ANNOUNCES COMPLETION OF A PRIVATE PLACEMENT
Nominations de VMS Ventures Inc.
05/07/2011Appoints John Pattison Chief Geologist
Projets de VMS Ventures Inc.
20/01/2014Provides Reed Mine December Update
23/09/2013Canada's Next Copper Mine
18/09/2013Reed on plan; exploration stock cycles
21/08/2013(Copper Project)Reed Copper Project Update
24/07/2013(Copper Project)Reed Copper Project Update/New VMS website
24/07/2013(Copper Project)s Progress at the Reed Copper Project
24/05/2013(Copper Project)APRIL AT REED COPPER PROJECT; PRODUCTION EXPECTED IN Q4/13
15/02/2013Reed Mine Tour Pictures
31/01/2013CONTRACTS WESTCORE DRILLING FOR 2013 WINTER DRILL PROGRAM
09/11/2012Global Copper Production Under Stress
31/10/2012Reed Copper Mine Update; Winter Drilling Budget Set
31/10/2012(Copper Project)s the Reed Copper Project Which Remains Within Budget and on...
18/09/2012ANNOUNCES TRENCHING RESULTS AND SURFACE TDEM SURVEY ON ITS S...
13/09/2012(Copper Project)Provides Update on Reed Copper Project in Manitoba
21/08/2012(Copper Project)Reed Copper Project
14/08/2012and Hudbay Break Ground at New Copper Mine in Manitoba
19/07/2012(Copper Project)S PROGRESS AT THE REED COPPER PROJECT NEAR SNOW LAKE, MANITO...
21/06/2012ACQUIRES LARGE LAND PACKAGE ADJACENT TO THE REED COPPER MINE...
16/05/2012(Reed Lake)FILES PREFEASIBILITY STUDY FOR THE REED LAKE DEPOSIT, NEAR S...
10/05/2012Harvest Gold Signs Letter of Intent(LOI) on Esker Project in...
10/05/2012VMS Ventures Updates Progress on the Development of the Reed...
26/04/2012and the Reed Deposit
25/04/2012(Copper Project)REED COPPER PROJECT AND REED NORTH AREA EXPLORATION UPDATE, ...
03/04/2012(Copper Project)Reed Copper Project Positive Pre-Feasibility Study Completed
22/02/2012100% Owned Cowan River Project Drilling begins
15/02/2012Drills 8.90 Metres of 1.00 g/t Gold/NAN PowerPoint
06/02/2012HudBay CEO on Production at Reed and Copper Demand
27/10/2011Introduces Exploration Programs for its Sudbury, Ontario Pro...
28/07/2011INTERSECTS SECOND COPPER OCCURANCE AT COWAN RIVER, SNOW LAKE...
08/06/2011(Sails)Drills 13=2E41 Metres of 1=2E48 g/t Go =?ISO-8859-1?Q?ld=20a...
13/05/2011(Reed Lake)FILES NI 43-101 MINERAL RESOURCE FOR THE REED LAKE DEPOSIT A...
20/04/2011(Cover)Reports on Two Additional Holes at Its Cowan River Copper-Zi...
13/04/2011(Cover)Discovers High Grade Copper Zone Near Surface: 9.81% Copper ...
01/04/2011(Reed Lake)Announces NI 43-101 Mineral Resource for the Reed Lake Depos...
22/03/2011s Progress With Ongoing Exploration Programs on Its 100% Own...
17/03/2011(Reed Lake)Reports 50.08 Metres of 6.85% Copper in Hole RLD030 at Reed ...
23/02/2011(Reed Lake)Reports 37.10 Metres of 5.60% Copper From In-Fill Hole RLD02...
10/03/2008(Reed Lake)Rising on Reed Lake Results
29/01/2008(Reed Lake)6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TW...
27/10/2007(Reed Lake) DISCOVERY EXTENDED, DRILL EQUIPMENT ARRIVES ON REED LAKE PR...
16/10/2007(Reed Lake)2ND DRILL PROGRAM PLANNED AT REED LAKE DISCOVERY ZONE, SNOW ...
05/10/2007(Reed Lake)10.50 METRES of 11.19% COPPER WITHIN 43.05 METRES OF 4.38% C...
18/09/2007(Reed Lake)EXPLORATION UPDATE AT REED LAKE PROPERTY, MANITOBA
09/08/2007(Reed Lake)ANNOUNCES PROPERTY AGREEMENT DEAL WITH HUDBAY MINERALS INC.
Communiqués de Presse de VMS Ventures Inc.
27/04/2016Vms Announces Completion of Plan of Arrangement
25/04/2016VMS Announces Shareholder Approval for Plan of Arrangement
01/04/2016VMS Reports Update on Reserves and Resources at Reed Mine
31/03/2016VMS Files Materials in Connection with Special Meeting of Sh...
01/02/2016VMS Ventures Announces Plan of Arrangement With Royal Nickel
04/11/2015VMS Ventures Announces Drill Program Update on Exploration T...
02/11/2015VMS Considers Strategic Options
09/09/2015VMS Ventures Adopts Fixed Option Plan
28/07/2015VMS Ventures Inc. Patrick Evans and Blair Schultz Join VMS B...
15/04/2015VMS Provides Reed Mine Operations Update
15/04/2015Provides Reed Mine Operations Update
10/04/2015VMS Announces Closing of Acquisition of Assean Lake Claims
10/04/2015Announces Closing of Acquisition of Assean Lake Claims
01/04/2015VMS Reports Update on Reserves and Resources at Reed Mine
01/04/2015Reports Update on Reserves and Resources at Reed Mine
19/03/2015Provides Reed Mine Operations Update
19/03/2015VMS Provides Reed Mine Operations Update
25/02/2015VMS Provides Reed Mine Operations Update
25/02/2015VMS Provides Reed Mine Operations Update
18/02/2015VMS ANNOUNCES ACQUISITION OF ASSEAN LAKE CLAIMS
22/01/2015VMS Provides Reed Mine Operations Update
18/12/2014VMS Provides Reed Mine Update
18/12/2014VMS Provides Reed Mine Update
03/12/2014VMS Provides Reed Mine Update
03/12/2014VMS Provides Reed Mine Update
24/11/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
24/11/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
19/11/2014VMS Announces Third Quarter Reed Mine Financial Performance
19/11/2014VMS Announces Third Quarter Reed Mine Financial Performance
30/10/2014VMS Provides Reed Mine Update
30/10/2014VMS Provides Reed Mine Update
26/08/2014VMS Appoints Two New Directors to Its Board
11/07/2014VMS Ventures Grants Incentive Stock Options
24/06/2014VMS Reports Reed Mine Update
17/06/2014VMS Ventures Announces Management Changes
05/06/2014VMS Ventures Completes Ore Sales and Purchase Agreement With...
29/05/2014VMS Ventures Inc.: North American Nickel Inc. Closes $9.38M ...
13/02/2014Announces Annual Meeting, Record Date and Adopts Advance Not...
13/11/2013Ahead of the Herd: Copper Catch Up
01/11/2013Provides Update on Reed Mine
23/10/2013(Cover)North American Nickel Discovers High Grade Nickel Sulphide M...
10/10/2013High Grade Nickel-Copper-Cobalt Sulphides Confirmed at Imiak...
01/10/2013(Copper Project)Reed Copper Project Commences Initial Production
30/09/2013Dr. Tony Naldrett, Internationally Acclaimed Expert on Magma...
12/09/2013Mid=2DDay Breaking News From VMS Ventures=2C Freegold=2C Nat...
10/09/2013Base Metals and Bulk Commodities - TOP 10 Reasons the Next U...
15/08/2013(Cover)Media Coverage
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
17/06/2013ROCK TALK WITH RICK MARK AND NEIL RICHARDSON/PODCAST #5 WITH...
11/06/2013(Cover)Potential for High Nickel Recoveries at Imiak and Spotty Hil...
06/06/2013Mining matters to us all
04/06/2013Jaclyn Ruptash Joins NSMG Team
30/05/2013Ahead of the Herd - Riding A Copper Horse
24/05/2013(Copper Project)s Progress in April at the Reed Copper Project; Production E...
16/05/2013/NAN 2013 Podcast Series: Introduction to John Roozendaal
08/05/2013Introduction to Neil Richardson, COO of VMS and NAN
01/05/2013s 2013 Winter Drill Programs, Snow Lake, Manitoba and Sudbur...
25/04/2013and North American Nickel Inc. in the Metals Report
24/04/2013/North American Nickel Podcast Series
22/04/2013Exercises Full Right of First Refusal Allocation in North Am...
11/04/2013(Copper Project)REED COPPER PROJECT ON TIME/BUDGET FOR Q4 PRODUCTION
26/03/2013(Cover)Media Coverage
05/02/2013Kevin Puil: $4/lb Copper Is on Its Way
17/01/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
17/01/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
09/01/2013(Copper Project)REED COPPER PROJECT: CONSTRUCTION ON SCHEDULE
06/11/2012Dundee Capital Markets: HudBay Minerals Inc. - three mines u...
23/10/2012Announces Reed Exploration Properties Joint Venture With Hud...
16/10/2012Copper Price Rising?
07/06/2012Files Statement of Defense
09/05/2012Media and Social Media exposure
03/05/2012The TSX Venture is Trading at the Same Level it Did Nearly 9...
27/04/2012Announces Filing of Statement of Claim in Manitoba
27/04/2012Letter to Shareholders Regarding the Dunlop Legal Claim
23/02/2012(Cover)and Media Coverage
16/02/2012Secutor Capital Management Reports on VMS Ventures Inc.
08/02/2012(Sails)Trenching Program Returns Assays of Up To 61.73 g/t Gold at ...
31/01/2012Copper Continues to Confound the Commodities Crowd
30/01/2012Dundee Rates VMS a BUY
24/01/2012Mentioned in The Gold Report, January 18, 2012
18/01/2012Provides Exploration Target Update at the Reed Copper Deposi...
20/12/2011Merry Christmas from the North Shore Mining Group of Compani...
19/12/2011Reed Mine Decision Made/New Geophysical Targets at Reed Copp...
25/10/2011COO,Neil Richardson, is interviewed
20/09/2011ENGAGES HUASHAN CAPITAL TO PROVIDE ADVISORY SERVICES IN ASIA
18/08/2011(Copper Project)Intersects 1.61 Metres Grading 2.13 G/T Gold in Hole CP-11-0...
09/08/2011REPORTS 5.94% COPPER OVER 2.23 METRES IN DRILL HOLE RLE007 F...
07/07/2011Reports HudBay Minerals Completes Exploration Expenditures f...
19/05/2011Commodity Bulls speak; NAN close to trading
17/05/20117=2E44% Copper Over 7=2E18 Metres in Hole RLE006 Located 1=2...
09/05/2011s Progress on its 2011 Exploration Programs in the Flin Flon...
27/04/2011(Copper Project)Discovers Massive Sulphide Horizon With Zinc-Silver-Gold Min...
20/04/2011(Cover)Reports on Two Additional Holes =?ISO-8859-1?Q?=20at=20Its=2...
07/04/2011Al O'Grady interviews Rick Mark
17/03/2011Reports 50=2E08 Metres of 6=2E85% Copp =?ISO-8859-1?Q?er=20i...
23/02/2011(Reed Lake)Reports 37=2E10 Metres of 5=2E60% Copper from In-Fill Hole R...
18/02/2011HudBay Minerals Acquires 6,667,000 Shares of VMS Ventures In...
14/05/2009Discusses exploration strategy and project plans through 201...
28/02/2009(Video) NEW INTERVIEW WITH CEO CLIPS
12/06/2008Proposes to Spin Off Nickel Assets
09/04/2008Discovery Zone Page Launched on VMS Website
27/02/2008Don Coxe's, "The Music of the Metal Markets"
19/02/2008-Holes RD 08-25, RD 08-26 and RD 08-30-30 Intersect Near Sol...
08/02/2008Stock Market Volatility
14/12/2007Additional Information about a VMS Opportunity
10/11/2007(Audio) Interview with President John Roozendaal
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (VMS.V)FRANKFURT (R4E.F)
0,095-9.52%0,018-21.74%
TSX-V
CA$ 0,095
18/04 16:53 -0,010
-9,52%
Cours préc. Ouverture
0,105 0,105
Bas haut
0,090 0,105
Année b/h Var. YTD
0,080 -  0,110 -5,00%
52 sem. b/h var. 52 sem.
0,080 -  0,165 -36,67%
Volume var. 1 mois
973 003 5,56%
24hGold TrendPower© : 34
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-13,64%
2023-26,67%0,190,09
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,90 AU$+2,73%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :