Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Helio Resource Corp

Publié le 10 novembre 2008

Reports Additional Excellent Drill Results from Porcupine Target, SMP Gold Project, Tanzania

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/misc/email_tsxv.gif

http://www.helioresource.com/i/misc/email_news.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif
http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif
http://www.helioresource.com/i/tdot.gif
news-pic.jpg (9KB)

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

Monday, November 10, 2008

Helio Reports Additional Excellent Drill Results From The Porcupine Target, SMP Gold Project, Tanzania


 

51.7m @ 2.1g/t Au
35.5m @ 2.3g/t Au
54.2m @ 1.0g/t Au
39.7m @ 2.3g/t Au
44.3m @ 1.8g/t Au

View News Release in PDF Format


Porcupine Target Drilling Update

Helio Resource Corp. ("Helio" or the "Company") (TSX-V: HRC) is very pleased to report the latest drill results from five diamond drill holes from the Porcupine Target at the SMP Gold Project, Lupa Goldfields, SW Tanzania. The results confirm management's view that Porcupine has the potential to host a very significant open-pittable gold resource.

Highlights

  • All five drill holes intersected wide zones of gold mineralisation, adding further confidence to the continuity of mineralisation both to depth and along strike laterally.
  • Mineralisation extended to a down-dip depth of approximately 250m from surface.
  • Mineralisation is still open to depth and along strike.
  • A further 21 diamond drill holes have been completed - results are pending.
  • The 2008 diamond drilling has been completed.
  • A 3,000m RC (reverse circulation) drill programme is due to commence, and should be completed before year-end. This programme will test a 1.5km strike length of the Porcupine Target, the objective being to demonstrate the potential for Porcupine to host a large open-pittable gold resource.

These results are from drill holes GPD 15 to GPD19, inclusive. Results are presented in more detail in the table below. Two new drill sections and updated long sections and plans are available below and have also been posted on the Company's website at www.helioresource.com.

Holes GPD15, 16 and 17 were drilled on the same section line as holes GPD1 (42.3m @ 4g/t Au) and GPD2 (49.8m @ 1.7g/t Au). The average true thickness of the mineralised zone along this section is 41 metres.

Holes GPD18 and GPD19 were drilled 50m away to the NE of holes GPD15, 16 and 17 on the same section line as hole GPD5 (52.2m @ 3.3g/t Au).


2008 Porcupine Diamond Drilling Programme Completed

All of the planned 2008 diamond drilling at the Porcupine Target has been completed. A total of 41 drill holes, totalling 8,380m, were completed on the Porcupine target this year. The Company is waiting for results from 21 drill holes from the Porcupine Target; results from the outstanding drill holes will be released once they are available.


3,000m RC Drill Programme Commences at Porcupine

A 3,000m RC drill programme is expected to commence within the next few days at the Porcupine Target. The programme will test a 1,500m strike length in order to demonstrate the resource potential of Porcupine. This programme is expected to be completed before the year-end.

Geological mapping has confirmed that the Porcupine target continues over a strike length of at least 1,000m. Furthermore, the historical Gap Mine is located approximately 2,000m away to the NE along strike from Porcupine. Soil geochemistry and airborne magnetic data indicates the Porcupine structure is continuous to Gap.

Correction

The Company made an error in the reporting of the drill intercept from GPD020. On October 6, 2008 the Company reported that GPD020 intersected 39.7m grading 2.3g/t Au. The correct result is 39.7m grading 1.9g/t Au. The table below and the updated long section for the Porcupine target show the correct results.


ABOUT THE SMP GOLD PROJECT

Helio, through its 100% owned subsidiary BAFEX Tanzania Ltd., can earn a 100% interest in five contiguous licences, which cover a 34km strike length of the Saza Shear Zone (see news releases dated December 19, 2005, September 11, 2006, and October 16, 2008). The project covers the New Saza Gold Mine, which operated between 1939 - 1956, producing approximately 270,000 ounces of gold at an average grade of 7.5g/t Au.

Since June 2006, the Company has drill-tested eleven targets, nine of which are hosted by the Saza Shear Zone. All eleven targets have intersected bedrock-hosted gold mineralisation, the most advanced being the Kenge Target, which has returned up to 22.0m grading 6.9g/t gold in the Main Zone (Company press release dated May 23, 2007). The thickest mineralised intercept at Kenge is from the Mbenge Zone (48.7m @ 2.1g/t Au - Company press release dated September 8, 2008). The thickest mineralised intercept to date at the SMP was drilled at the Porcupine target (52.2m grading 3.3g/t Au - Company press release dated July 21, 2008).

Recently, the Company announced excellent metallurgical results from the SMP project, where recoveries of up to 96% were achieved by conventional processes at the Kenge target (Company press release August 11, 2008).

Chris MacKenzie, M.Sc., C.Geol., Helio's COO and a Qualified Person as designated by NI 43-101, supervises the exploration at the SMP project, including the sampling and quality assurance / quality control programmes, and has reviewed the contents of this news release. Unless otherwise stated all drill holes were oriented at -48� or -60� and were drilled perpendicular towards the main structural trend. Intercepts are reported as drilled widths, and estimated true widths vary from 64-99%+ of drilled width. Core was halved with a rock saw and sample lengths between 0.3m and 2.0m within the mineralised zone were submitted to the lab (with the duplicate half being retained). QA/QC includes the use of blanks and standards (ave. 1 every 15 samples) and duplicates (ave. 1 every 24 samples). Samples were assayed at the SGS Laboratory in Mwanza, Tanzania by 50g gold fire assay. As well as the Company's internal QA/QC programme, SGS also applied their own internal QA/QC programme, consisting of insertion of standards and duplicates. Unless otherwise stated weighted average intercepts are calculated between the uppermost and lowermost samples within the main mineralised zone using a 0.5g/t cut-off and may include some internal waste.

Helio's main focus is the development of the SMP Gold Project in Tanzania. As part of its strategic approach to project development, Helio has optioned 9 of its Namibian licences to Desert Minerals (UK) Ltd. and continues to pursue joint venture partners for its other projects in Namibia.

For additional information, please contact Richard Williams or Irene Dorsman at +1 604 638 8007 or by e-mail to richard@helioresource.com or irene@helioresource.com.

ON BEHALF OF THE BOARD OF DIRECTORS

 

"Richard D. Williams"
Richard D. Williams, P.Geo
CEO

"Chris MacKenzie"
Christopher J. MacKenzie, C.Geol.
COO

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

Table of Drill Intercepts


Hole

Target

Intersection

GPD15

Porcupine

1.9m @ 9.4g/t Au from 25.5m

51.7m @ 2.1g/t Au from 142.1m

Incl. 32.42m @ 2.92g/t Au from 142.1m

Which incl. 1.74m @ 20.7g/t Au from 158.4m

GPD16

Porcupine

35.5m @ 2.3g/t Au from 165.1m

Incl. 0.9m @ 20.3g/t Au from 168.9m

GPD17

Porcupine

54.2m @ 1.0g/t Au from 198.8m

GPD18

Porcupine

39.7m @ 2.3g/t Au from 130.3m

Incl. 1.6m @ 19.2g/t Au from 161.2m

GPD19

Porcupine

44.3m @ 1.8g/t Au from 140.6m

Incl. 1.2m @ 21.9g/t Au from 151.4m

GPD20*

Porcupine

39.7m @ 1.9g/t Au from 67.7m

*Previously incorrectly reported

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM2sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM3sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM4sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM5sm.jpg

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gifHelio Home | Contact Us | Investors | Corporate

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/misc/email_tsxv.gif

http://www.helioresource.com/i/misc/email_news.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif
http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif
http://www.helioresource.com/i/tdot.gif
news-pic.jpg (9KB)

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

Monday, November 10, 2008

Helio Reports Additional Excellent Drill Results From The Porcupine Target, SMP Gold Project, Tanzania


 

51.7m @ 2.1g/t Au
35.5m @ 2.3g/t Au
54.2m @ 1.0g/t Au
39.7m @ 2.3g/t Au
44.3m @ 1.8g/t Au

View News Release in PDF Format


Porcupine Target Drilling Update

Helio Resource Corp. ("Helio" or the "Company") (TSX-V: HRC) is very pleased to report the latest drill results from five diamond drill holes from the Porcupine Target at the SMP Gold Project, Lupa Goldfields, SW Tanzania. The results confirm management's view that Porcupine has the potential to host a very significant open-pittable gold resource.

Highlights

  • All five drill holes intersected wide zones of gold mineralisation, adding further confidence to the continuity of mineralisation both to depth and along strike laterally.
  • Mineralisation extended to a down-dip depth of approximately 250m from surface.
  • Mineralisation is still open to depth and along strike.
  • A further 21 diamond drill holes have been completed - results are pending.
  • The 2008 diamond drilling has been completed.
  • A 3,000m RC (reverse circulation) drill programme is due to commence, and should be completed before year-end. This programme will test a 1.5km strike length of the Porcupine Target, the objective being to demonstrate the potential for Porcupine to host a large open-pittable gold resource.

These results are from drill holes GPD 15 to GPD19, inclusive. Results are presented in more detail in the table below. Two new drill sections and updated long sections and plans are available below and have also been posted on the Company's website at www.helioresource.com.

Holes GPD15, 16 and 17 were drilled on the same section line as holes GPD1 (42.3m @ 4g/t Au) and GPD2 (49.8m @ 1.7g/t Au). The average true thickness of the mineralised zone along this section is 41 metres.

Holes GPD18 and GPD19 were drilled 50m away to the NE of holes GPD15, 16 and 17 on the same section line as hole GPD5 (52.2m @ 3.3g/t Au).


2008 Porcupine Diamond Drilling Programme Completed

All of the planned 2008 diamond drilling at the Porcupine Target has been completed. A total of 41 drill holes, totalling 8,380m, were completed on the Porcupine target this year. The Company is waiting for results from 21 drill holes from the Porcupine Target; results from the outstanding drill holes will be released once they are available.


3,000m RC Drill Programme Commences at Porcupine

A 3,000m RC drill programme is expected to commence within the next few days at the Porcupine Target. The programme will test a 1,500m strike length in order to demonstrate the resource potential of Porcupine. This programme is expected to be completed before the year-end.

Geological mapping has confirmed that the Porcupine target continues over a strike length of at least 1,000m. Furthermore, the historical Gap Mine is located approximately 2,000m away to the NE along strike from Porcupine. Soil geochemistry and airborne magnetic data indicates the Porcupine structure is continuous to Gap.

Correction

The Company made an error in the reporting of the drill intercept from GPD020. On October 6, 2008 the Company reported that GPD020 intersected 39.7m grading 2.3g/t Au. The correct result is 39.7m grading 1.9g/t Au. The table below and the updated long section for the Porcupine target show the correct results.


ABOUT THE SMP GOLD PROJECT

Helio, through its 100% owned subsidiary BAFEX Tanzania Ltd., can earn a 100% interest in five contiguous licences, which cover a 34km strike length of the Saza Shear Zone (see news releases dated December 19, 2005, September 11, 2006, and October 16, 2008). The project covers the New Saza Gold Mine, which operated between 1939 - 1956, producing approximately 270,000 ounces of gold at an average grade of 7.5g/t Au.

Since June 2006, the Company has drill-tested eleven targets, nine of which are hosted by the Saza Shear Zone. All eleven targets have intersected bedrock-hosted gold mineralisation, the most advanced being the Kenge Target, which has returned up to 22.0m grading 6.9g/t gold in the Main Zone (Company press release dated May 23, 2007). The thickest mineralised intercept at Kenge is from the Mbenge Zone (48.7m @ 2.1g/t Au - Company press release dated September 8, 2008). The thickest mineralised intercept to date at the SMP was drilled at the Porcupine target (52.2m grading 3.3g/t Au - Company press release dated July 21, 2008).

Recently, the Company announced excellent metallurgical results from the SMP project, where recoveries of up to 96% were achieved by conventional processes at the Kenge target (Company press release August 11, 2008).

Chris MacKenzie, M.Sc., C.Geol., Helio's COO and a Qualified Person as designated by NI 43-101, supervises the exploration at the SMP project, including the sampling and quality assurance / quality control programmes, and has reviewed the contents of this news release. Unless otherwise stated all drill holes were oriented at -48� or -60� and were drilled perpendicular towards the main structural trend. Intercepts are reported as drilled widths, and estimated true widths vary from 64-99%+ of drilled width. Core was halved with a rock saw and sample lengths between 0.3m and 2.0m within the mineralised zone were submitted to the lab (with the duplicate half being retained). QA/QC includes the use of blanks and standards (ave. 1 every 15 samples) and duplicates (ave. 1 every 24 samples). Samples were assayed at the SGS Laboratory in Mwanza, Tanzania by 50g gold fire assay. As well as the Company's internal QA/QC programme, SGS also applied their own internal QA/QC programme, consisting of insertion of standards and duplicates. Unless otherwise stated weighted average intercepts are calculated between the uppermost and lowermost samples within the main mineralised zone using a 0.5g/t cut-off and may include some internal waste.

Helio's main focus is the development of the SMP Gold Project in Tanzania. As part of its strategic approach to project development, Helio has optioned 9 of its Namibian licences to Desert Minerals (UK) Ltd. and continues to pursue joint venture partners for its other projects in Namibia.

For additional information, please contact Richard Williams or Irene Dorsman at +1 604 638 8007 or by e-mail to richard@helioresource.com or irene@helioresource.com.

ON BEHALF OF THE BOARD OF DIRECTORS

 

"Richard D. Williams"
Richard D. Williams, P.Geo
CEO

"Chris MacKenzie"
Christopher J. MacKenzie, C.Geol.
COO

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

Table of Drill Intercepts


Hole

Target

Intersection

GPD15

Porcupine

1.9m @ 9.4g/t Au from 25.5m

51.7m @ 2.1g/t Au from 142.1m

Incl. 32.42m @ 2.92g/t Au from 142.1m

Which incl. 1.74m @ 20.7g/t Au from 158.4m

GPD16

Porcupine

35.5m @ 2.3g/t Au from 165.1m

Incl. 0.9m @ 20.3g/t Au from 168.9m

GPD17

Porcupine

54.2m @ 1.0g/t Au from 198.8m

GPD18

Porcupine

39.7m @ 2.3g/t Au from 130.3m

Incl. 1.6m @ 19.2g/t Au from 161.2m

GPD19

Porcupine

44.3m @ 1.8g/t Au from 140.6m

Incl. 1.2m @ 21.9g/t Au from 151.4m

GPD20*

Porcupine

39.7m @ 1.9g/t Au from 67.7m

*Previously incorrectly reported

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM2sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM3sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM4sm.jpg

 

Click to Enlarge
http://www.helioresource.com/i/maps/2008-11-10_NRM5sm.jpg

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gifHelio Home | Contact Us | Investors | Corporate

 

� 2005 Helio Resource Corp. All Rights Reserved.
Legal Disclaimer

http://www.helioresource.com/i/tdot.gif

 

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

http://www.helioresource.com/i/tdot.gif

 

Helio Resource Corp

EXPLORATEUR
CODE : HRC.V
ISIN : CA4232741096
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Helio est une société d’exploration minière d'argent et d'or basée au Canada.

Helio détient divers projets d'exploration en Tanzanie.

Ses principaux projets en exploration sont VREDELUS, MAKURU, ETJO NORTH, ETJO SOUTH, OTJIMBOJO, WILHELMSTAL, KUNJAS, OTJITOMBO SOUTH, TEVREDE NORTH, OTJITOMBO et DAMARA en Namibie et SAZA MAKONGOLOSI (SMP) en Tanzanie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Helio Resource Corp
2008 Annual report
Financements de Helio Resource Corp
09/05/2013Announces Closing of First Tranche of Non-Brokered Private P...
22/04/2013Announces Private Placement for up to $1.75 Million
15/02/2011Closes Private Placements for $10.0 Million
28/01/2010enters into $6,210,000 Private Placement Financing Agreement...
17/06/2008Closes $5,100,000 Bought-Deal Brokered Private Placement
21/01/2008Closes $5,250,000 Private Placement
05/12/2007 to Raise $5,250,000 by Way of Private Placement
26/02/2007Closes $4,900,000 Private Placement
Nominations de Helio Resource Corp
15/08/2013Announces Appointment of Investor Relations Consultant
Projets de Helio Resource Corp
25/02/2013Owns a 100% Interest in the SMP Gold Project in Tanzania Aft...
13/09/2012Reports PEA of SMP Gold Project, Tanzania
28/05/2012Reports Exploration Update On The Dgp Gold Project, Namibia
11/05/2012again included in Haywood Securities' Quarterly Junior Explo...
15/06/2011Haywood Securities features Helio Resource Corp. in mining f...
09/03/2011Commences 20,000m Drill Programme on the SMP Gold Project, T...
28/02/2011(Damara)Drilling, Geochemical and Geophysical Surveys Commence on th...
02/03/2009Intersects Widest Zones of Mineralisation to date from Porcu...
26/01/2009(Saza Makongolosi (smp))Drills 46 m of 2.1 g/t Au at Porcupine Target, SMP Gold Proj...
26/01/2009(Saza Makongolosi (smp))(HRC:TSX-V) Reports Drill Results from Porcupine Target - SM...
03/09/2008(Saza Makongolosi (smp))Adds Two Drill Rigs to SMP Gold Project, Tanzania; JV Partne...
22/07/2008(Saza Makongolosi (smp))Reports 52.2m@3.3g/t Au from Porcupine Target - SMP Gold Pro...
02/07/2008(Saza Makongolosi (smp))Reports Further Drill Results from Kenge Target, SMP Gold Pr...
23/06/2008(Saza Makongolosi (smp))Reports 42.3m @ 4.0g/t Au from Porcupine Target, SMP Gold Pr...
30/04/2008(Saza Makongolosi (smp))Starts Drilling at the Porcupine Target, SMP Gold Project, T...
14/04/2008(Saza Makongolosi (smp))REPORTS FURTHER DRILL RESULTS FROM THE KENGE TARGET =?iso-88...
31/01/2008Reports Remainder of 2007 Drilling Results - SMP Gold Projec...
19/11/2007First Drill Hole from Porcupine Target on the SMP Gold Proje...
15/10/2007Drilling Intersects 32m @ 2.35g/t Au at SMP Gold Project Tan...
18/09/2007Intersects 19.4m @ 3g/t Au at SMP Gold Project in Tanzania
23/05/2007Intersects 6.9G/T Gold Over 21.95M At The Kenge Target On Th...
Communiqués de Presse de Helio Resource Corp
19/08/2016Helio Announces Shares for Debt Settlement
20/06/2016Shareholder Update
31/05/2016Helio and Damara Merge Namibian Interests into Osino Resourc...
05/11/2015Helio Announces Exercise of Warrants
05/11/2015Helio (TSX-V:HRC) Announces Exercise of Warrants
22/09/2015Helio Reports AGM Results
22/09/2015Helio (TSX-V:HRC) Reports AGM Results
08/07/2015Helio Announces Exercise of Warrants
08/07/2015Helio (TSX-V:HRC) Announces Exercise of Warrants
26/03/2015Helio Increases Gold Grade of and Confidence in Mineral Reso...
26/03/2015Helio (TSX-V:HRC) Increases Gold Grade of and Confidence in ...
25/03/2015Helio Technical Disclosure Review
13/03/2015Helio (TSX-V:HRC) Technical Disclosure Review
10/02/2015Helio (TSX-V:HRC) Reports Drill Results from the Konokono an...
29/01/2015Helio (TSX-V:HRC) Reports Multiple High Grade Intercepts fro...
11/12/2014Helio (TSX-V:HRC) Intersects High-Grade Gold Mineralisation ...
28/10/2014Damara Gold (TSX-V:DMR) and Helio (TSX-V:HRC) Discover Four ...
03/10/2014Helio (TSX-V:HRC) Grants Incentive Stock Options and Retains...
09/09/2014Helio (TSX-V:HRC) Announces $1.5 Million Drill Program at SM...
09/09/2014(TSX-V:HRC) Announces $1.5 Million Drill Program at SMP Gold...
29/08/2014Helio (TSX-V:HRC) Reports AGM Results
28/07/2014Helio Announces Result of Special General Meeting, Closing o...
13/06/2014Helio (TSX-V:HRC) Completes First Tranche of Non-Brokered Pr...
29/05/2014Helio (TSX-V:HRC) Announces $4,000,000 Non-Brokered Private ...
14/05/2014Helio: Three Additional Retention Licences Granted at the SM...
14/05/2014Three Additional Retention Licences Granted at the SMP Gold ...
11/04/2014Retention Licence Granted at the SMP Gold Project, Tanzania
11/04/2014Helio: Retention Licence Granted at the SMP Gold Project, Ta...
27/03/2014Helio and Solomon Sign a Letter of Intent on the Damara Gold...
27/03/2014Helio and Solomon Sign a Letter of Intent on the Damara Gold...
21/03/2014Helio Files NI 43-101 Resource Report on SEDAR
21/03/2014Helio Files NI 43-101 Resource Report on SEDAR
03/02/2014Reports Updated Higher-Grade Resource for the Kenge and Porc...
29/11/2013Confirms Extension of High-Grade Shoot at Kenge Resource Are...
18/10/2013Commences Drill Programme at Kenge Resource Area, SMP Gold P...
28/08/2013Announces Results of its Annual General Meeting
30/10/2012Files Preliminary Economic Assessment of the Porcupine and K...
05/10/2012Clarifies Information for Public Disclosure
10/05/2012Grants Incentive Stock Options
03/04/2012Files NI 43-101 Mineral Resource Report for SMP Gold Project...
14/02/2012Announces Updated Mineral Resource Estimate at SMP Gold Proj...
06/02/2012Reports Drill Results from DGP Gold Project, Namibia, includ...
23/01/2012(Damara)Reports Results from a Soil Sampling Survey at the Gold Kop ...
17/01/2012Latest Drill Results Discover Multiple Zones of Mineralisati...
13/01/2012Interview with Jay Taylor
10/01/2012Drill Results Confirm Mineralisation over 1.4km Strike Lengt...
07/12/2011Intersects 7.4m Grading 6.1g/t Au at the Quill Zone, SMP Gol...
28/11/2011(Damara)Reports Additional Diamond Drill Results from the Gold Kop T...
22/09/2011discovers new gold mineralization over 1km strike length at ...
15/09/2011Corporate Update Alert
24/08/2011(Damara)Reports First Rc Drill Results from the Gold Kop Target, Dam...
12/07/2011Discovers Multiple Zones of Gold Mineralisation at SMP Gold ...
13/06/2011(Damara)Makes a Significant New Gold-Copper-Silver Discovery at the ...
14/04/2011(Damara)Commences 5,000m Drill Programme on the Gold Kop Target, Dam...
22/03/2011(Damara)Discovers New Targets at the Damara Gold Project in Namibia
26/07/2010(HRC:TSX-V): Latest Drill Results Confirm Main Zone Extensio...
10/11/2008Reports Additional Excellent Drill Results from Porcupine Ta...
11/08/2008Reports Excellent Metallurgical Testwork Results from SMP Go...
02/08/2008Terminates Agreement with TransAfrican Minerals Ltd.
13/03/2008OPTIONS EIGHT NAMIBIAN LICENCES TO TRANSAFRICAN MINERALS
13/11/2007 21.53m grading 3.62g/t Au Included in Additional Drill Resu...
06/11/200716.75m grading 3.93g/t Au included in latest drill results f...
29/10/2007Discovers Another New Gold Zone at the SMP Gold Project in T...
23/10/2007Discovers New Gold Zone on the SMP Gold Project, Tanzania
24/09/2007Options 9 Namibian Licences to Desert Minerals (UK) Ltd.
14/09/2007Update on Namibia Exploration Activities
11/09/2007Report on AGM and Update on Tanzania Drilling Activities
05/06/2007June 1/Helio announces warrant triggering event
21/03/2007reports more well-mineralised drill intercepts at the SMP go...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (HRC.V)
0,140+16.67%
TSX-V
CA$ 0,140
03/01 13:06 0,020
16,67%
Cours préc. Ouverture
0,120 0,135
Bas haut
0,135 0,140
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,140 -%
Volume var. 1 mois
26 500 -%
24hGold TrendPower© : -21
Produit
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/05/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20203,70%0,140,12
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :