Orvana Min. reports annual results for fiscal 2010

 

 

 

 

 

Orvana Minerals Corp. (TSX:ORV - News) announced operating results today for the year ended September 30, 2010. Dollar amounts are in U.S. dollars unless stated otherwise, and fine troy ounces of gold are referred to as "ounces". Highlights for the year are:




--  Revenues of $32.3 million on sales of 28,341 ounces for the year ended
    September 30, 2010 compared to $56.0 million on sales of 63,230 ounces
    for the same period a year ago, with lower ounces of gold sold
    contributing to most of the decline, which was somewhat offset by higher
    average gold prices realized;
   
--  Net loss of $2.4 million ($0.02 per share) for the 2010 fiscal year
    compared to net income of $13.4 million ($0.12 per share) for the year
    ended September 30, 2009;
   
--  Cash from operations before changes in working capital was $2.5 million
    for fiscal 2010 compared to $22.8 million for fiscal 2009;
   
--  Capital expenditures were $37.5 million for fiscal 2010 compared to $7.7
    million for the same period last year. Expenditures included $11.1
    million on the development of the Upper Mineralized Zone ("UMZ") of the
    Don Mario Mine, $23.0 million on the development of the El Valle-
    Boinas/Carles ("EVBC") project, $3.1 million on the Copperwood project
    and $.3 million for systems improvements; and
   
--  Cash and cash equivalents amounted to $12.7 million at September 30,
    2010 compared to $58.0 million at September 30, 2009.

"Results for the fourth quarter and the year ended September 30, 2010, are in line with our expectations and we will continue to produce gold at our Las Tojas operation in Bolivia until early in 2011. Our focus though is on bringing the Spanish EVBC gold/copper mine and the Bolivian UMZ copper/gold/silver mine into production early in 2011. In addition we are working towards a pre-feasibility study on our Copperwood copper project in Michigan." said Roland Horst, Orvana's Chief Executive Officer.

Orvana has $12.7 million in cash and cash equivalents at year end. Subsequent to the end of the year, Orvana entered into a US$50 million five-year term corporate debt facility with Credit Suisse AG. After fully funding its capital requirements at the EVBC project and the UMZ, Orvana expects to have accumulated cash reserves from its operating free cash flows. Orvana will continue to seek gold and/or copper advanced stage properties in politically stable regions, utilizing its mining expertise to increase long-term value for shareholders.

Don Mario Mine Operations

All dollar amounts (except per unit amounts) in the remainder of this news release are in thousands of United States dollars unless otherwise stated.

The ore from the Lower Mineralized Zone ("LMZ") of the Don Mario Mine was exhausted during the last quarter of fiscal 2009 and the processing of the Las Tojas ores continued to the end of fiscal 2010. A total of 608,492 tonnes of ore were treated in fiscal 2010 compared to 331,506 tonnes a year ago as indicated in the table below:




                  ----------------------------------------------------------
                                        Quarters ended                     
                             ------------------------------------          
                  Year ended    Sept.     June    March     Dec. Year ended
                   Sept. 30,      30,      30,      31,      31,  Sept. 30,
                        2010     2010     2010     2010     2009       2009
----------------------------------------------------------------------------
Underground Tonnes                                                  153,212
mine       -----------------------------------------------------------------
             g/t                                                      11.49
----------------------------------------------------------------------------
            Tonnes   608,492  153,459  154,270  144,587  156,176    178,294
Las Tojas  -----------------------------------------------------------------
             g/t        1.73     1.41     1.66     1.70     2.13       1.87
----------------------------------------------------------------------------
            Tonnes   608,492  153,459  154,270  144,587  156,176    331,506
Total      -----------------------------------------------------------------
             g/t        1.73     1.41     1.66     1.70     2.13       6.32
----------------------------------------------------------------------------
Gold recovery rate      82.2%    73.5%    79.5%    83.3%    89.0%      93.1%
----------------------------------------------------------------------------
Gold production -                                                          
 ounces               27,751    5,114    6,545    6,565    9,527     62,644
----------------------------------------------------------------------------

Gold production for fiscal 2010 was 56% lower, at 27,751 ounces, compared to 62,644 ounces for fiscal 2009. This decline was due to processing of the tonnages from the lower grade ore of the Las Tojas deposit. The prior year results included the production from the now depleted higher grade ore of the Don Mario underground mine.

The following table shows the cash operating costs and total production costs for years ended September 30, 2010 and 2009. The Company prepares its financial statements in accordance with Canadian generally accepted accounting principles ("GAAP"). The calculations below represent non-GAAP information, which should not be construed as an alternative to GAAP reporting of operating expenses, and may not be comparable to similar measures presented by other issuers (see "non-GAAP measures" below).




                            ------------------------------------------------
                                Year ended September    Year ended September
                                      30, 2010                30, 2009     
                            ------------------------------------------------
                                   Costs    Cost/oz.       Costs    Cost/oz.
----------------------------------------------------------------------------
Direct mine operating costs   $   18,237  $   657.15  $   15,331  $   244.73
----------------------------------------------------------------------------
Third-party smelting,                                                      
 refining and transportation                                               
 costs                               153        5.52         273        4.36
----------------------------------------------------------------------------
  Cash operating costs            18,390      662.67      15,604      249.09
----------------------------------------------------------------------------
Royalties and mining rights        1,108       39.93       1,754       27.99
----------------------------------------------------------------------------
Mining royalty tax                 2,263       81.56       3,916       62.52
----------------------------------------------------------------------------
  Total cash costs                21,761      784.16      21,274      339.60
----------------------------------------------------------------------------
Depreciation, amortization                                                  
 and accretion                     3,716      133.90       9,948      158.80
----------------------------------------------------------------------------
  Total production costs      $   25,477  $   918.06  $   31,222  $   498.40
----------------------------------------------------------------------------
  Gold production                    27,751 ozs.           62,644 ozs.     
----------------------------------------------------------------------------

Cash operating costs at $662.67 per ounce were dramatically affected by the decline in gold production resulting from the transition from the LMZ to the lower grade Las Tojas deposit. These costs are not representative of the expected costs of the operation of the UMZ.

Financial Highlights

Orvana's financial highlights for the year ended September 30, 2010 compared to year ended September 30, 2009 are summarized below:




                                           ---------------------------------
                                                Year ended September 30    
                                           ---------------------------------
                                                       2010             2009
----------------------------------------------------------------------------
Revenue                                      $       32,344   $       56,005
----------------------------------------------------------------------------
Net (loss) income                                    (2,431)          13,400
----------------------------------------------------------------------------
Net (loss) income per share - basic and                                    
 diluted                                             ($0.02)  $         0.12
----------------------------------------------------------------------------
Cash (used) provided by operating                                          
 activities                                          (8,644)          19,631
----------------------------------------------------------------------------
Cash and cash equivalents                            12,700           58,036
----------------------------------------------------------------------------
Total assets                                        156,472          140,607
----------------------------------------------------------------------------
Long-term debt and obligations under                                       
 capital leases                                       5,104            4,144
----------------------------------------------------------------------------
Shareholders' equity                         $      109,402   $      110,367
----------------------------------------------------------------------------

The audited consolidated financial statements and Management's Discussion & Analysis for the period ended September 30, 2010 are available on SEDAR and at www.orvana.com.

Outlook

The forward looking statements made in this section are intended to provide an overview of management's expectations with respect to certain future operating activities of the Company and may not be appropriate for other purposes.

Orvana's focus is to use its cash resources and mining capability to build long-term value for its shareholders through organic growth and future strategic acquisitions of advanced-stage gold and/or copper properties.

In the short term, Orvana is focused on commencing production at both the EVBC gold/copper project in northern Spain and its Don Mario UMZ copper/gold operation in eastern Bolivia, as well as, advancing its Copperwood copper project in Michigan.

With the start up of operations at EVBC and the UMZ expected to occur in early 2011, Orvana expects annualized gold production to increase from about 28,000 ounces to approximately 120,000 ounces, early in 2012. Additionally, annualized copper and silver production are expected to increase substantially to over 12,000 tonnes and to 750,000 ounces respectively.

Over the longer term, Orvana will continue to seek gold and/or copper advanced stage properties in politically stable regions, utilizing our mining expertise to increase long-term value for shareholders.

The Company will hold a conference call on Tuesday December 14, 2010 at 10:00 a.m. (Eastern Time) to discuss the annual results. Following the presentation there will be a question and answer period for analysts and investors.

The conference call can be accessed at 1-416-695-7806 or the North American toll-free number at 1-888-789-9572, using the passcode 8416682 followed by the number sign.

About Orvana

Orvana Minerals is a gold producer with a strong balance sheet and is transforming itself into a multi-mine gold and copper producer. Orvana owns and operates the copper-gold Don Mario Mine in Bolivia and is bringing into production the El Valle Boinas/Carles gold-copper project in northern Spain and advancing the Copperwood copper project in Michigan, USA. Additional information is available at Orvana's website (www.orvana.com).

Forward Looking Disclaimer

Certain statements in this press release constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as "believes", "expects" "plans", "estimates" or "intends" or stating that certain actions, events or results "may", "could", "would", "might", "will" or "are projected to" be taken or achieved) are not statements of historical fact, but are forward-looking statements.

Forward-looking statements relate to, among other things, all aspects of the development of the Upper Mineralized Zone ("UMZ") deposit at the Don Mario Mine in Bolivia, the El Valle-Boinas/Carles project in Spain and the Copperwood project in Michigan and their potential operations and production; the outcome and timing of decisions with respect to whether and how to proceed with such development and production; the timing and outcome of any such development and production; estimates of future capital expenditures; mineral resource estimates; estimates of permitting time lines; statements and information regarding future feasibility studies and their results; production forecasts; future transactions; future metal prices; the ability to achieve additional growth and geographic diversification; future production costs; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development plans.

Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Orvana as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates and assumptions of Orvana contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in the Company's most recently filed Annual Information Form, or as otherwise expressly incorporated herein by reference as well as: there being no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at the UMZ deposit, El Valle-Boinas/Carles and the Copperwood projects being consistent with the Company's current expectations; political developments in any jurisdiction in which the Company operates being consistent with its current expectations; certain price assumptions for gold, copper and silver; prices for key supplies being approximately consistent with current levels; production and cost of sales forecasts meeting expectations; the accuracy of the Company's current mineral reserve and mineral resource estimates; and labour and materials costs increasing on a basis consistent with Orvana's current expectations.

A variety of inherent risks, uncertainties and factors, many of which are beyond the Company's control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include fluctuations in the price of gold, silver and copper; the need to recalculate estimates of resources based on actual production experience; the failure to achieve production estimates; variations in the grade of ore mined; variations in the cost of operations; the availability of qualified personnel; the Company's ability to obtain and maintain all necessary regulatory approvals and licenses; the Company's ability to use cyanide in its mining operations; risks generally associated with mineral exploration and development, including the Company's ability to develop the UMZ deposit, the Copperwood project or the El Valle-Boinas/Carles; the Company's ability to acquire and develop mineral properties and to successfully integrate such acquisitions; the Company's ability to obtain financing when required on terms that are acceptable to the Company; challenges to the Company's interests in its property and mineral rights; current, pending and proposed legislative or regulatory developments or changes in political, social or economic conditions in the countries in which the Company operates; general economic conditions worldwide; and the risks identified in Orvana's Management's Discussion and Analysis for the period ended September 30, 2010 under the heading "Risks and Uncertainties". This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements and reference should also be made to the Company's Annual Information Form for a description of additional risk factors.

Forward-looking statements are based on management's current plans, estimates, projections, beliefs and opinions and, except as required by law, the Company does not undertake any obligation to update forward -looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change. Readers are cautioned not to put undue reliance on forward-looking statements.

Non-GAAP Measures

The Company has used Non-GAAP measures, including direct mine operating costs, cash operating costs, total cash costs and total production costs, and related unit cost information, because it understands that certain investors use this information to determine the Company's ability to generate earnings as cash flow for use in investing and other activities. The Company believes that conventional measures of performance prepared in accordance with GAAP do not fully illustrate the ability of its operating mine to generate cash flow. Non-GAAP measures do not have any standardized meaning prescribed under Canadian GAAP, should not be construed as an alternative to GAAP reporting of operating expenses, and may not be comparable to similar measures presented by other companies. The measures are not necessarily indicative of cost of sales as determined under Canadian GAAP. Cash costs are determined in accordance with the former Gold Institute's Production Cost Standard. For a reconciliation of the non- GAAP costs and unit costs provided above with the Company's GAAP-based statement of operations, please see the Company's Management's Discussion & Analysis for the period ended September 30, 2010.

Contact:

Natalie Frame
Orvana Minerals Corp.
Investor Relations
(289) 200-7640

Malcolm King
Orvana Minerals Corp.
Vice President and Chief Financial Officer
(416) 369-1629

 

 

Orvana Minerals Corp

PRODUCTEUR
CODE : ORV.TO
ISIN : CA68759M1014
CUSIP : 68759M101
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Orvana Min. est une société de production minière de cuivre et d'or basée au Canada.

Orvana Min. est productrice de cuivre, d'or, d'argent en Bolivie et en Espagne, et détient divers projets d'exploration en Bolivie.

Ses principaux projets en production sont DON MARIO (CERRO PELADO) en Bolivie et EL VALLE-BOINÁS/CARLÉS en Espagne et son principal projet en exploration est COPPERWOOD en Bolivie.

Orvana Min. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,3 millions CA$ (19,8 millions US$, 18,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 29 décembre 2000 à 0,05 CA$, et son plus haut niveau récent le 24 décembre 2010 à 3,97 CA$.

Orvana Min. possède 136 623 171 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Orvana Minerals Corp
Correction and re-filing of its annual report
Financements de Orvana Minerals Corp
11/08/2011. Announces Completion of Equity Offering
26/07/2011. Announces Equity Offering
18/05/2011Obtains US$15 Million Bridge Loan Commitment and Amends Shar...
Nominations de Orvana Minerals Corp
30/03/2015Announces Appointment of New Chief Executive Officer
08/04/2013. Announces Appointment of New Interim Chief Executive Offic...
09/03/2012Announces Changes to Board of Directors
04/01/2012Appoints Ron Simkus to the Board of Directors
25/02/2010Appointment of Roland Horst as Chief Executive Officer
22/02/2010Appointment of new vice president, Mining
24/08/2009Appoints James Gilbert to board of Directors
Rapports Financiers de Orvana Minerals Corp
07/02/2014Orvana Reports Results for the First Quarter of Fiscal 2014 ...
08/02/2013Orvana Reports Results for the First Quarter of Fiscal 2013 ...
08/02/2013Reports Results for the First Quarter of Fiscal 2013 With Ad...
15/05/2012Reports Results for the Second Quarter Ended March 31, 2012
15/03/2012Announces Results for the First Quarter Ended December 31, 2...
01/03/2012Announces Revised Issue Date for Its Financial Statements fo...
14/02/2011Reports First Quarter Results for the Three Months Ended Dec...
16/02/2010Reports operating results for the first quarter ended decemb...
17/08/2009Operating results for the third quarter ended june 30, 2009
19/05/2009Operating results for the 2nd quarter ended march 31, 2009
13/02/2009reports operating results for the first quarter ended decemb...
15/08/2008Reports operating results for the third quarter ended june 3...
15/05/2008Reports Operating Results for the second Quarter ended March...
Projets de Orvana Minerals Corp
09/12/2014Reports Record Gold and Copper Production, Balance Sheet Sig...
11/02/2014Highland to Acquire Orvana's Copperwood Project
06/12/2013Orvana Reports Record Mine Performance and Fiscal 2013 Resul...
15/10/2013Orvana Surpasses 2013 Production Guidance
15/10/2013Surpasses 2013 Production Guidance
23/09/2013(Copperwood)Provides Update on Copperwood Project, Upper Peninsula, Mich...
25/02/2013Orvana Granted Wetlands Permit for Copperwood Project, Upper...
25/02/2013(Copperwood)Granted Wetlands Permit for Copperwood Project, Upper Penins...
18/10/2012Orvana Reports Production Results for the Fourth Quarter and...
30/04/2012(Copperwood)Receives Part 632 Mining Permit for Copperwood Project, Uppe...
07/02/2012(Copperwood)Announces Feasibility Study Results for Copperwood Project, ...
24/06/2011(Copperwood)Announces Prefeasibility Study Results for Copperwood Projec...
05/06/2011(El Valle-boinás/carlés)Announces Commissioning of El Valle-Boinas/Carles Gold/Coppe...
25/03/2011(El Valle-boinás/carlés)Provides Update from El Valle-Boinas/Carles Mine, Northern S...
07/03/2011(Don Mario (cerro Pelado)).: Construction Completed of Leaching-Precipitation-Flotatio...
25/02/2011(Copperwood)Reports Measured and Indicated Resources Increase of 50% for...
05/03/2010(El Valle-boinás/carlés)Updated resource estimate at El Valle-Boinás/Carlés Project
17/02/2010(El Valle-boinás/carlés)Provides update on El Valle-Boinas/Carles Project
20/01/2010(Copperwood)Reports final assay batch from its Copperwood Project
13/07/2009(Copperwood)Provides drill program update
19/05/2009(Don Mario (cerro Pelado))announces completion of updated feasibility study and decisi...
13/02/2009(Copperwood)New drill results from Copperwood
11/02/2009(Copperwood)Collection for environmental studies commenced at copperwood
09/02/2009(Don Mario (cerro Pelado))Progresse on a detalied Operation Study
Communiqués de Presse de Orvana Minerals Corp
18/12/2015Orvana Reports Year End, Fourth Quarter Fiscal Results and P...
01/10/2015Merger Market article from Sept 11, 2015
30/09/2015Orvana Announces Two New Mineral Resource Estimates at Don M...
16/09/2015Orvana on Track to Deliver Don Mario Mine Life Extension and...
07/08/2015Orvana Reports Third Quarter Fiscal Results
13/04/2015to Present at the European Gold Forum, Zurich and the 1-2-1 ...
13/04/2015Orvana to Present at the European Gold Forum, Zurich and the...
12/04/2015Orvana Reports Production for Second Quarter 2015 and Update...
08/04/2015Orvana Announces Appointment of Chief Financial Officer
30/03/2015Orvana Announces Appointment of New Chief Executive Officer
25/03/2015to Present at the John Tumazos Very Independent Research Met...
25/03/2015Orvana to Present at the John Tumazos Very Independent Resea...
27/02/2015Orvana Announces Results of Annual Shareholders' Meeting
24/02/2015Orvana to Exhibit at Prospectors and Developers Association ...
23/02/2015Announces Annual Shareholders' Meeting, Live Webcast Februar...
23/02/2015Orvana Announces Annual Shareholders' Meeting, Live Webcast ...
05/02/2015Orvana Reports First Quarter Fiscal 2015 Results, Strong Bal...
17/01/2015Continues to Deliver Results in the First Quarter 2015 and R...
17/01/2015Orvana Continues to Deliver Results in the First Quarter 201...
08/01/2015Orvana Minerals to Attend Vancouver Resource Investment Conf...
16/12/2014Orvana Receives $7.5 Million Additional Cash Payment for Cop...
09/12/2014Orvana Reports Record Gold and Copper Production, Balance Sh...
01/12/2014Orvana Announces Fourth Quarter Financial Results Release Da...
04/11/2013Orvana Minerals takes strides towards sustained profitabilit...
15/08/2013Midday Breaking News From Orvana and Eagle Hill
15/08/2013Reports Successful Completion of Annual Wage Negotiations at...
09/08/2013Orvana Achieves Strong Mine Performance in Fiscal Third Quar...
09/08/2013Achieves Strong Mine Performance in Fiscal Third Quarter
17/07/2013Reports Suspension of its Leach-Precipitation-Flotation Plan...
08/07/2013Midday Breaking News From Cavan=2C Orvana=2C and Pacific Pot...
08/07/2013Advises Production Guidance for Fiscal 2013 Remains on Targe...
17/06/2013Reports Hoist Incident and Provides Company Update
14/05/2013Mid-Day Breaking News From Orvana, Skyharbour, Zenyatta, Dig...
14/05/2013Achieves Strong Mine Performance In Fiscal Second Quarter
24/04/2013Celebrates 60 Years on the TSX
15/04/2013Mid-Day Breaking News From Orvana Minerals and Pacific Potas...
03/01/2013Reports Fiscal 2012 Conference Call Details
18/10/2012Reports Production Results for the Fourth Quarter and Fiscal...
21/08/2012Mid-Day Breaking News From Orvana, Great Panther, Lomiko, Tr...
13/08/2012Mid-Day Breaking News From Orvana, CanAm, Corazon, and Rio G...
13/08/2012Reports Results for the Third Quarter With Adjusted Earnings...
18/07/2012Announces June Operations Results for El Valle-Boinas/Carles...
10/07/2012Announces June Operations Update for the Upper Mineralized Z...
19/06/2012Announces May Operations Update for El Valle-Boinas/Carles G...
05/06/2012Announces Changes to Executive Management
09/05/2012Provides an Operations Update for the Upper Mineralized Zone...
17/04/2012Announces Operations Update at El Valle-Boinas/Carles Gold/C...
10/04/2012Announces Commercial Production and Increases Gold and Silve...
16/02/2012Completes a US$13.8 Million Increase in Its Credit Facility ...
18/01/2012Provides an Operations Update and Revised Reserve Estimate f...
13/12/2011Reports Results for the Year Ended September 30, 2011
06/12/2011. Announces Changes in Management
22/09/2011Announces Drill Results and Provides an Operations Update at...
11/07/2011on Orvana Operations
05/04/2011Announces Production at Don Mario UMZ Copper-Gold-Silver Min...
26/02/2010Additions to board of directors
15/01/2010Update on activities relating to El valle-Boinas/Carles
05/10/2009Amalgamation of kinbauri gold corp. and orvana minerals acqu...
25/09/2009Completes Compulsory Acquisition of Kinbauri Common Shares
18/08/2009Takes up Kinbauri shares and extends offer until august 28, ...
13/08/2009 Urges Kinbauri shareholders to tender their shares
04/08/2009Extends offer to acquire kinbauri to august 17, 2009
30/07/2009Supports Kinbauri's decision to let shareholders decide
30/07/2009Urges Kinbauri shareholders to tender to its all-cash offer
29/07/2009Issues reminder that its all cash offer
28/07/2009Kinbauri Shareholders Urged to Tender To The Orvana Offer by...
24/07/2009receives notification that Kinbauri has agreed to waive its ...
21/07/2009raises cash offer for Kinbauri to C$0,75 per share
15/07/2009Extends its offer to acquire Kinbauri Gold Corp.
02/07/2009Extends its Offer to Acquire Kinbauri Gold Corp. to July 13,...
25/05/2009Commences all-cash offer to acquire Kinbauri Glod Corp.
19/05/2009 to apply to OSC for relief relating to Kinbauri's recent ac...
14/05/2009Highlights risks and uncertainties surrounding Kinbauri's pr...
04/12/2008Reports Record Revenue, Cash Provided by Operating Activitie...
10/09/2008Enters into a minerals lease in the state of Michigan
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ORV.TO)OTHER OTC (ORVMF)
0,200-2.44%0,149-11.83%
TORONTO
CA$ 0,200
18/04 16:17 -
-2,44%
Cours préc. Ouverture
0,205 0,205
Bas haut
0,190 0,205
Année b/h Var. YTD
0,120 -  0,265 17,65%
52 sem. b/h var. 52 sem.
0,120 -  0,265 -2,44%
Volume var. 1 mois
205 210 33,33%
24hGold TrendPower© : -12
Produit Copper - Gold - Silver
Développe
Recherche Copper - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 14/05/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202421,21%
2023-19,51%0,230,14
2022-32,79%0,530,17
2021-11,59%0,540,23
2020115,63%0,360,11
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,69 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :