Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Les hommes se battent pour la liberté. Puis ils commencent à accumuler des lois pour se la retirer
.  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1396,408,80
Silver 22,580,09
Platinum 1454,00-3,50
Palladium 736,301,30
MARCHES MONDIAUX
DOWJONES 15295-6
NASDAQ 3459-4
NIKKEI 14841358
ASX 5041-101
CAC 40 3967-84
DAX 8352-179
HUI 2592
XAU 97-3
MONNAIES (€)
AUS $ 1,3342
CAN $ 1,3338
US $ 1,2925
GBP (£) 0,8560
Sw Fr 1,2498
YEN 130,9200
RATIOS & INDEXES
Gold / Silver61,84
Gold / Oil14,54
Dowjones / Gold10,95
MATIERES PREMIERES
Copper 3,300,01
WTI Oil 96,05-0,11
Nat. Gas 4,280,02
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

Marketwire

 
 
Forsys Metals Corp.
TSX:FSY
Other Recent News

January 15, 2008
Forsys Reports Drilling Results and Resumes Drilling at Valencia
TORONTO, ONTARIO--(Marketwire - Jan. 14, 2008) - Forsys Metals Corp. ("Forsys" or the "Company")(TSX:FSY) is pleased to report drill results and commencement of the 2008 resource definition and exploration drilling campaign on the Company's 100% owned Valencia Uranium deposit ("Valencia") located in Namibia, Africa.


Highlights of the drill results include:

Best hole VAL26-139 returning:
   - 21.95m of 0.125Kg/T U3O8 from 26.27m to 48.22m
     93.40m of 0.179Kg/T U3O8 from 64.12m to 157.52m
     Including 14.75m of 0.332Kg/T U3O8 from 99.43m to 114.18m
     27.95m of 0.238Kg/T U3O8 from 250.27m to 278.22m

Single highest grade intersect from hole VAL26-131 returning:
   - 2.81m of 0.467Kg/T U3O8 from 88.39m to 91.20m
 
The Valencia property is an advanced stage uranium development project located 35km from Rio Tinto's Rossing Uranium Mine and approximately 50km north of Paladin's Langer Heinrich Uranium Mine. In June 2007, the Company released a National Instrument 43-101 compliant Prefeasibility Study Technical Report ("PFS") on the Valencia project, outlining a mineral resource (measured, indicated and inferred) of 62.1M lbs U3O8 and a mineral reserve of 30.2M lbs U3O8.

Since delivery of the PFS, a total of eight additional exploration drill holes were completed in late 2007 targeting near surface mineralization between the Main and East zones (refer to Figure 1). The drilling results confirm uranium mineralization is continuous over the tested length towards the east and below the current pit bottom design of the East Arm, with grades both similar to and locally better than the current Valencia production profile.

To view the Figure 1 Long Section showing Valencia Pit Shell and Drilling Locations map, please visit the following link: http://www.ccnmatthews.com/docs/forsysfig1.pdf.

The Company will commence a 10,000m percussion drilling program designed to expand resources to the North, South and East as well as beyond the Main zone pit floor. Historically few drill holes have been completed beyond a 200-250m depth in these areas.

In addition, a deep vertical hole will be drilled in the centre of the deposit to a depth of 650m. This drill hole will verify the potential to add resources in an area where higher grade mineralization has been identified.

Following completion of the drill program, the Company anticipates delivering by the end of Q2, a revised "measured block" and resource calculation which will include all data gathered since the June 2007 PFS.


Assay results from the eight 2007 drill holes are as follows:

VAL26-134:  -39.31m of 0.112Kg/T from 16.46m to 55.77m including
            -13.37m section of 0.194Kg/T
            -84.65m of 0.069Kg/T from 51.85m to 236.50m.

VAL26-135:  -31.19m of 0.104Kg/T from 74.76m to 105.95m

VAL26-136:  -7.77m of 0.271Kg/T from 54.99m to 62.76m
            -5.57 m of 0.117Kg/T from 75.08m to 80.65m
            -23.43m of 0.090Kg/T from 177.81m to 201.24m

VAL26-137:  -12.44m of 0.144 Kg/T from 38.01 to 50.45m
            -2.81m of 0.467 Kg/T from 88.39m to 91.20m
            -17.91m of 0.072 Kg/T from 160.46m to 178.37m
            -6.94m of 0.107 Kg/t from 200.91m to 207.85m

VAL26-138:  -8.23m of 0.221mKg/T from 23.15m to 31.38m
            -15.93m of 0.140Kg/T from 186.45m to 202 38m
            -12.96m of 0.203Kg/T from 345.54m to 358.50m

VAL26-139:  -21.95m of 0.125Kg/t from 26.27m to 48.22m
            -93.40m of 0.179Kg/T from 64.12m to 157.52m including
                  14.75m of 0.332Kg/T from 99.43m to 114.18m
            -27.95m of 0.238 Kg/T from 250.27m to 278.22m

VAL26-140:  -3.28m of 0.098Kg/T from 102.57m to 105.85m
            -18.31m of 0136Kg/T from 224.07m to 256.62m
            -16.01m of 0.126Kg/T from 265.51m to 281.52m

VAL26-141:  -4.34m of 0.091Kg/T from 64.81m to 68.55m
            -7.84m of 0.115Kg/T from 110.62m to 118.46m
            -13.69m of 0.098Kg/T from 125.07m to 138.76m

VAL26-141 partial results reported and assays below 140m are still pending.
 
Analytical results are reported to Forsys by Set Point Laboratories which is located in Johannesburg, South Africa. Set Point was unconditionally accredited by the South African National Accreditation System (SANAS) for the uranium pressed pellet technique (M053) on May 4, 2006. Forsys is also managing an intensive quality control program designed to monitor and independently verify the laboratory results.

Dr. Roger Laine, Chief Geologist of Forsys, is the designated Qualified Person responsible for all of Forsys' exploration programs as well as the person responsible for the contents of this news release.

On Behalf of the Board of Directors of Forsys Metals Corp.

Duane Parnham, President and CEO

For further information visit our web site at www.forsysmetals.com

Sedar Profile #00008536

Shares Outstanding: 76,838,998

CONTACT INFORMATION:

Forsys Metals Corp.
Bruce Hall
Chief Communications Officer
(905) 844-4646
Email: bhall@forsysmetals.com

or

In Namibia
Forsys Metals Corp.
+264 61 219 462
Email: wrn@forsysmetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Tweet

Forsys Metals Corp.

EN DÉVELOPPEMENT
CODE : FSY.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Forsys Metals Corp.
24/01/2013Forsys Metals consolidates Namibia projects
09/02/2010Forsys Metals CEO to step down, will stay on board
08/02/2010Forsys Metals hires new CEO
Rapports annuels de Forsys Metals Corp.
2008 Annual Report
Annual Report 2007
Financements de Forsys Metals Corp.
28/11/2011Announces Completion of Private Placement
Nominations de Forsys Metals Corp.
15/08/2012Appoints Martin Hirsch as Chief Geologist
11/06/2012Appoints Director Finance and Establishes Office in Perth
22/11/2011Appoints Johan de Bruin as Chief Geologist
28/07/2008Appoints Valencia General Manager
07/03/2008Appoints New Chief Financial Officer
Rapports Financiers de Forsys Metals Corp.
14/11/2011Announces Third Quarter 2011 Operational Results and Outlook
15/08/2011Announces Second Quarter 2011 Financial and Operational Resu...
Projets de Forsys Metals Corp.
28/09/2012(Namibplaas)Announces: Updated Namibplaas Resource
02/02/2011(Namibplaas)Announces Additional Positive Namibplaas Drilling Results an...
08/11/2010(Namibplaas)Announces Initial Results From Its 2010 Namibplaas Drilling ...
31/03/2010(Ondundu)TECHNICAL REPORT ON THE ONDUNDU GOLD PROJECT EPL3195, NAMIB...
21/08/2008(Valencia Uranium)Valencia Uranium Project, Namibia Mining Licence Granted
06/08/2008(Valencia Uranium) Confirms Deeper Uranium Mineralization at Valencia
22/07/2008(Valencia Uranium) Continues Drilling at Valencia Expanding Pit Bottom and Ove...
27/06/2008(Valencia Uranium) Adds Fourth Drill Rig to Test North Anomaly at Valencia
13/06/2008(Valencia Uranium)Mineralization Expansion and Grade Improvement at Valencia-F...
04/06/2008(Valencia Uranium)Receives Environmental Clearance for Valencia
29/04/2008(Valencia Uranium) Expands Uranium Zones at Valencia
01/04/2008(Ondundu)Increases Ownership of Ondundu Gold Project in Namibia to 90...
29/01/2008(Valencia Uranium) Provides Joly Zone Update
14/01/2008(Valencia Uranium)Reports Drilling Results and Resumes Drilling at Valencia
26/03/2007(Valencia Uranium)Significant Increase for the Valencia Uranium Resource
Communiqués de Presse de Forsys Metals Corp.
02/05/2013(Valencia Uranium)Announces Results of Positive Engineering Cost Study for Its...
19/03/2013Reports Positive Exploration Drilling Results and Confirms H...
23/01/2013Significant New Exploration Results at Recently Discovered V...
15/05/2011Proposed Changes to Namibian Mineral Policy Will Not Affect ...
13/03/2009 Update on Plan of Arrangement
11/12/2008Corporate Quarterly Update
14/11/2008George Forrest International Afrique S.P.R.L. to Acquire For...
14/10/2008 in Exclusive Negotiations Regarding Potential Sale of Compa...
16/09/2008Corporate Quarterly Update
27/06/2008Clarifying Press Release-Mineral Resource and Mineral Reserv...
16/06/2008Corporate Quarterly Update
23/04/2008Clarifies Uranium Project on Track
11/04/2008Namibia to Build Second Desalination Plant for Uranium Mines
06/03/2008Prepares for Contract Mining at Valencia
25/02/2008Receives Water Permits
06/02/2008Uranium Exploration Licences Renewed
23/03/2007Completes Acquisition of Remaining 10% of Valencia Uranium D...
28/02/2007Completes $47.5 Million Financing
26/02/2007Acquires 70% of Ancash Investments and 5 Additional Uranium ...
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FSY.TO)FRANKFURT (F2T.F)
0,620-1.59%0,452-1.09%
TORONTO
CA$ 0,620
23/05 14:27 -0,010
-1,59%
Cours préc. Ouverture
0,630 0,620
Bas haut
0,620 0,620
Année b/h Var. YTD
0,570 -  0,850 -22,50%
52 sem. b/h var. 52 sem.
0,570 -  0,960 -27,91%
Volume var. 1 mois
12 000 6,90%
24hGold TrendPower© : 5
Produit
Développe Uranium
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
20133,33%
2012-9,09%1,140,53
2011-75,28%3,500,50
2010-34,72%4,851,40
2009-28,25%6,702,76
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois