Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Constantine Metal Resources Ltd.

Publié le 20 septembre 2011

Reports Final Drill Results at Munro-Croesus Gold Project, Ontario

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Constantine Metal Resources Ltd.
Constantine Metal Resources Ltd.

Constantine Reports Final Drill Results at Munro-Croesus Gold Project, Ontario

(18.79 g/t gold over 4.10 meters including 166.5 g/t gold over 0.40 meters)

Vancouver, BC � Constantine Metal Resources Ltd. (TSX Venture � CEM) ("Constantine" or the "Company") is pleased to announce the final round of results, with several new high-grade gold intersections, from the 100% owned Munro-Croesus Gold Project drill program located 75 kilometers east of Timmins, Ontario. The 7280 meter drill program tested the Croesus Mine target at shallow and moderate depths, and the Four Corners property at the Canamax and Perry Pond targets (Figure 1).

Near surface high-grade veins have been intersected in both the hanging wall and footwall to the main high-grade Croesus Mine vein structure, including intercepts of 18.79 g/t gold over 4.10 meters in MC11-C38 and 18.03 g/t gold over 1.24 meters in MC11-20. These intersections highlight the potential for more high-grade Croesus type ore that was only mined historically to a depth of 40 meters and that could be accessible by a shallow (< 50 meter deep) open pit. Drilling has also outlined the 200 Zone target for more detailed exploration 175-200 meters below the Croesus Mine workings (9.56 g/t gold over 1.31 meters in MC11-17 and 12.2 g/t gold over 0.46 meters in MC08-10). Five kilometers to the east at the Canamax Zone, wide spaced drilling has identified broad intervals of gold mineralization within a robust carbonate +/- silica+/- fuchsite alteration zone (e.g. 25.50 meters grading 0.30 g/t gold in CMX11-01 and 10.05 meters grading 0.55 g/t gold in CMX11-03A). Details on each target area are provided below.

Garfield MacVeigh, President and CEO of the Company states: �The 2011 Munro Croesus drill program has documented significant gold mineralization in multiple different areas of the greater Munro Croesus project. Combined with the potential for extensions of Lake Shore Gold�s Fenn-Gib deposit (acquired from Barrick for $60 million) immediately along strike onto Constantine ground, the project area offers a great opportunity to build shareholder value.�

Figures, photos and maps, including those showing the relationship between the Fenn-Gib property and the Munro Croesus property, can be found on the Company�s website (www.constantinemetals.com/projects/croesus/

Munro Croesus Project Drill Highlights

G Vein and Croesus Vein Hanging wall-Footwall Targets
The 2011 program completed a total of 38 short holes (average length of 36 meters) on shallow targets in both the hanging wall and footwall to the main Croesus vein. New assay results are presented for the final 27 of these holes (MC11-C12 to MC11-C38) and are summarized in Table 1. The majority of these holes tested a new vein structure, the G Vein, located approximately 25 meters into the footwall and west of the historically mined Croesus vein. Several holes also targeted the hanging wall and footwall to the high-grade Croesus vein structure that required drilling through the old Croesus Mine workings. New assay highlights include:

  • 6.01 g/t gold over 0.5 meters in MC11-C13 (shaft pillar)
  • 11.55 g/t gold over 0.20 meters in MC11-C14 (shaft pillar)
  • 5.47 g/t gold over 0.40 meters in MC11-C15 (shaft pillar)
  • 10.65 g/t gold over 0.25 meters in MC11-C18 (Croesus vein footwall)
  • 25.0 g/t gold over 0.15 meters in MC11-C20 (G-Vein)
  • 5.77 g/t gold over 0.40 meters in MC11-C25 (Croesus footwall vein)
  • 5.21 g/t gold over 0.40 meters in MC11-C34 (Croesus vein in pillar)
  • 7.65 g/t gold over 0.40 meters in MC11-C35 (Croesus footwall vein)
  • 7.60 g/t gold over 0.50 meters in MC11-C37 (Croesus vein in pillar)
  • 18.79 g/t gold over 4.10 meters in MCll-C38 including 166.5 g/t gold over 0.40 meters (hanging wall vein structure above Croesus stope)

Previously announced assays in hanging wall vein structures include:

  • 5.88 g/t gold over 4.65 meters, including 11.87 g/t gold over 1.34 meters in MC11-19
  • 13.29 g/t gold over 1.78 meters, including 18.03 g/t gold over 1.24 meters in MC11-20

This mineralized area in the hanging wall to the main Croesus vein has not been drill defined and is open for delineation and expansion over a 60-70 meter dip length within the favourable upper contact area of the Croesus flow north of the Croesus fault.

200 Zone
Five of the last 9 holes drilled to test the 200 Zone intersected the zone in the favourable Croesus flow unit 175-225 meters below the Croesus Mine workings, while 2 holes deviated into the overlying mafic flow at target depth and 2 holes were abandoned at shallow depths. Table 1 provides a tabulation of the 2011, 200 Zone results. One hole (MC11-28) intersected 7.08 g/t gold over 1.60 meters (including 18.15 g/t gold over 0.40 meters) in a new shallow vein structure with visible gold, 12.4 meters above the Croesus Mine workings. This vein structure is 30 meters east of the MC11-38 intersection described above and is part of the favourable mineralized hanging wall area that requires delineation.

The 2011, 200 Zone drilling has provided a suitable drill spacing for down-hole geophysics to map out the chemically and structurally favourable, sulphide-carbon rich host rocks and potentially directly target zones of high-grade gold for which the Croesus Mine was famous.

Four Corners Property Drilling

Drilling on the nearby Four Corners property tested two separate target areas referred to as the Canamax zone and the Perry Pond prospect. The Four Corners property forms part of the Munro-Croesus project and is located 1.2 kilometers east of the Munro Croesus property, with Lake Shore Gold's Fenn-Gib property located in between.

Canamax Zone
At the Four Corners Canamax Zone, 3 holes were drilled on 100 meter spaced sections. All holes intersected very robust carbonate +/- silica+/- fuchsite alteration with gold values. The two most easterly holes intersected the strongest gold mineralization over wide widths. Selected results are highlighted below and a more complete listing is provided in Table 1.

  • 0.34 g/t gold over 18.25 meters, including 0.611 g/t over 5.40 meters and 5.94 g/t over 0.25 meters in CMX11-01(Zone I)
  • 0.30 g/t gold over 25.50 meters, including 0.59 g/t gold over 8.00 meters and 1.10 g/t over 2.80 meters in CMX11-01(Zone II)
  • 3.97 g/t gold over 0.95 meters in CMX11-03A
  • 0.75 g/t gold over 5.20 meters, including 2.31 g/t over 1.00 meters in CMX11-03A
  • 0.55 g/t gold over 10.05 meters

 

The best result from previous drilling by Canamax Ltd. in 1987 is 2.28 g/t gold over 4.00 meters.

Perry Pond Prospect
Two holes were drilled on section that tested shallow to moderate south dipping shear zones and steep north dipping contacts between tholeiite-komatiite rocks. The best assay intersection from the current drilling is 0.64 g/t gold over 4.05 meters. Additional results are provided in Table 1.

Previous drilling by St. Andrews on the Perry Pond prospect intersected 9.37 g/t gold over 1.25 meters within a south dipping deformation zone that cuts tholeiitic and komatiitic volcanic rocks.

Future Munro Croesus Exploration

A surface trenching/excavating program is being planned to expose the bedrock immediately overlying the Croesus mine workings for mapping and sampling. The program would provide essential information to evaluate and design an open pit to extract gold mineralization within and in the immediate hanging wall and footwall of the shallow Croesus Mine workings. Now that a suitable drill spacing has been established in the deeper 200 Zone gold mineralization, a down-hole geophysical program as previously proposed is planned to map out the chemically and structurally favourable sulphide-carbon rich host rocks and potentially directly target zones of high-grade gold that the Croesus Mine is famous for.

Wide zones of gold mineralization intersected in the 2011 drilling at the Canamax Zone documents a large robust gold system that requires more drilling on strike and at depth

The western strike extension of the Fenn-Gib deposit located immediately adjacent to the Munro Croesus property is an obvious high priority target that has not yet been tested. The deposit is localized along the Pipestone Fault on a major sediment-volcanic contact that projects through the Munro Croesus property. A VTEM airborne geophysical survey flown by Constantine in 2008, clearly defines the Fenn-Gib deposit horizon and its extension onto the adjacent Munro-Croesus claims.

There are several other surface prospects on the Munro Croesus property that will be evaluated for drill testing. Four grab samples of broken trench rock and outcrop collected from the No. 4 Flow prospect located 1 kilometer west of the Croesus mine returned values ranging from 7.08 g/t to 18.75 g/t gold.

 

Background on Adjacent Fenn-Gib Property

The Fenn-Gib property is located between Constantine's Munro-Croesus and Four Corners properties. Past drilling on Fenn-Gib defined a large mineralized envelope with minimum one kilometer strike length and widths up to 250 meters. Lake Shore has reported that it is targeting an initial bulk tonnage resource of at least 2 to 3 million ounces at Fenn-Gib based on historic drilling and Whittle pit shell.* The structural and geological controls on mineralization at Fenn-Gib are interpreted to project westward onto underexplored parts of the Munro-Croesus property, which is located within 300 meters and along trend of the historic Fenn-Gib gold resource.

About the Historic Croesus Mine

The Munro-Croesus property lies within the influence of the prolific Porcupine Destor Deformation Zone and includes the formerly producing Croesus mine (1914-1933) known to have produced some of the highest grade gold ever mined in Ontario.** Five Croesus gold specimens held by the Royal Ontario Museum weigh 85 pounds collectively and contain 480.7 ounces of gold or 11,310 ounces gold per short ton (387,771 grams per tonne). Except for a few brief option periods to publicly traded companies, the Croesus mine property has been in private hands since its discovery in 1914, prior to acquisition by Constantine in 2007.

Other Corporate News

The Company is pleased to announce the appointment of new, independent director Mr. Ross McDonald to the board of directors. Mr. McDonald is a chartered accountant with over 30 years of professional experience. Mr. McDonald received his Bachelor of Commerce degree from the University of British Columbia in 1964 and his designation as a Chartered Accountant from the Institute of Chartered Accountants of British Columbia in 1968. For the past 15 years, Mr. McDonald worked principally with clients related to mining and mineral exploration, until his retirement from public practice last year. He is currently involved as director of several junior resource companies.

The Company announces that it has extended for six months the investor relations agreement with San Diego Torrey Hills Capital Inc. that was first announced in Constantine's news release dated February 22, 2011. Torrey Hills Capital will continue to assist the Company in gaining exposure to investors through the dissemination of corporate information to a network of brokerage firms, financial institutions and private investors.

About the Company

Constantine is a gold and copper exploration company that has multiple active projects located in premier North American exploration environments. These are highlighted by the 100% owned Palmer Project, located in a very accessible part of southeast Alaska, that is host to a NI43-101 compliant 4.12 million tonne inferred resource grading 2.01% copper, 4.79% zinc, 0.30 g/t gold and 31 g/t silver (using an NSR cut-off of US$75/t; see news release dated January 20, 2010), the 100% owned Timmins area Munro-Croesus Project that includes a past-producing mine property that yielded some of the highest grade gold ever mined in Ontario, the Trapper Gold Project in northern British Columbia that is optioned to Ocean Park Ventures Ltd. who are carrying out a $4.9 million, 10,000 meter drill program on the property in 2011, and a 50/50 Joint Venture with Carlin Gold Corporation exploring a 1000 sq. km land position in an emerging new Carlin-type gold district in Yukon.

On Behalf of Constantine Metal Resources Ltd.

�Garfield MacVeigh�

President

Investor relations enquiries please contact:
R.E. (Bob) Jeffery
Phone: 250-335-2011
Email: bob@constantinemetals.comor Email: info@constantinemetals.com
or
Jim MacDonald, Torrey Hills Capital
Phone: 858-456-7300, Email: jm@sdthc.com

 

* As reported in May 5th, 2001 news release by Lake Shore Gold Corp.
** As reported in the 60th Annual Report of the Ontario Department of Mines, Geology of Munro Township, J. Satterly vol. LX, Part VIII, 1951

Notes:

Samples of drill core were cut by a diamond blade rock saw, with half of the cut core placed in individual sealed polyurethane bags and half placed back in the original core box for permanent storage. Sample lengths typically vary from a minimum 0.1 meters to a maximum 1.0 meter interval with an average 0.5 meter sample length. Drill core samples were delivered directly, by Constantine personnel, to the ALS Chemex prep lab in Timmins Ontario in sealed woven plastic bags. Prepared pulps were shipped by ALS Chemex to their North Vancouver Lab where gold was determined by fire-assay fusion of a 30 g sub-sample with atomic absorption spectroscopy (AAS) finish. A subset of samples were also screened and analyzed for metallics gold. All samples were analyzed for multi-element inductively-coupled plasma (ICP) atomic emission spectroscopy, following multi-acid digestion.

Darwin Green, VP Exploration for Constantine, and a qualified person as defined by Canadian National Instrument 43-101, has reviewed the information contained in this news release and has also verified the analytical data for drill core samples disclosed in this release by reviewing the blanks duplicates and certified reference material standards and confirming that they fall within limits as determined by acceptable industry practice.

Forward looking statements:  This news release includes certain �forward-looking information� within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively "forward looking statements").� Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as �seek�, �anticipate�, �believe�, �plan�, �estimate�, "forecast", �expect�, "potential", "project", "target", "schedule", budget" and �intend� and statements that an event or result �may�, �will�, �should�, �could� or �might� occur or be achieved and other similar expressions and includes the negatives thereof.  All statements other than statements of historical fact included in this release, including, without limitation, statements regarding expected completions of financings and the use of proceeds thereof, potential mineralization, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, and future plans and objectives of the Company are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.  Forward-looking statements are based on a number of material factors and assumptions.  Important factors that could cause actual results to differ materially from Company�s expectations include actual exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators.  Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated.  There can be no assurance that forward-looking statements will prove to be accurate and accordingly readers are cautioned not to place undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Table 1. 2011 MUNRO CROESUS DRILL INTERSECTIONS

Shallow Target Drill Results - Croesus Mine Area

Hole

From (m)

To (m)

Width (m)

Width (ft)

Au g/t

Target

MC11-C1

no significant values

MC11-C2

15.00

16.02

1.02

3.4

4.03

G vein

Includes

15.85

16.02

0.17

0.6

13.30

G vein

MC11-C3

15.90

16.10

0.20

0.7

6.46

G vein

MC11-C4

18.09

18.29

0.20

0.7

35.60

G vein

MC11-C5

16.84

17.02

0.18

0.6

3.91

G vein

MC11-C6

5.50

5.90

0.40

1.3

2.59

FW to stope

MC11-C7

24.82

25.10

0.28

0.9

23.70

G vein

MC11-C8

3.70

4.30

0.60

2.0

2.98

HW to stope

MC11-C9

no significant values

MC11-C10

20.21

20.43

0.22

0.7

3.95

G vein

MC11-C11

no significant values

MC11-C12

no significant values

MC11-C13

2.00

6.00

4.00

13.1

2.05

shaft pillar/FW vein

includes

5.10

5.60

0.50

1.6

6.01

FW vein

MC11-C14

2.50

3.20

0.70

2.3

4.84

shaft pillar

includes

3.00

3.20

0.20

0.7

11.55

shaft pillar

MC11-C15

1.00

7.30

6.30

20.7

0.62

shaft pillar

includes

4.60

7.30

2.70

8.9

1.07

shaft pillar

includes

4.60

5.00

0.40

1.3

5.47

shaft pillar

MC11-C16

no significant values

MC11-C17

no significant values

MC11-C18

3.60

3.85

0.25

0.8

10.65

FW Croesus vein

MC11-C19

19.15

19.40

0.25

0.8

2.74

G-vein

MC11-C20

20.23

20.38

0.15

0.5

25.00

G-vein

MC11-C21

24.95

25.20

0.25

0.8

2.68

other

MC11-C22

19.00

19.30

0.30

1.0

2.93

G-vein

MC11-C23

no significant values

MC11-C24

no significant values

MC11-C25

6.10

7.10

1.00

3.3

3.30

FW to stope

Includes

6.10

6.50

0.40

1.3

5.77

FW to stope

MC11-C26

no significant values

MC11-C27

no significant values

MC11-C28

no significant values

MC11-C29

no significant values

MC11-C30

12.70

13.10

0.40

1.3

1.59

FW to stope

MC11-C31

15.90

16.20

0.30

1.0

2.18

HW to stope

MC11-C32

no significant values

MC11-C33

no significant values

MC11-C34

15.80

16.75

0.95

3.1

2.47

Croesus Vein

Includes

16.35

16.75

0.40

1.3

5.21

Croesus Vein

MC11-C35

16.80

17.20

0.40

1.3

7.65

FW to stope

MC11-C36

16.75

17.55

0.80

2.6

2.62

Croesus Vein

MC11-C37

17.10

17.60

0.50

1.6

7.60

Croesus Vein

MC11-C38

11.40

15.50

4.10

13.5

18.79

HW to stope

includes

12.10

12.50

0.40

1.3

166.50

new HW vein

includes

13.60

15.50

1.90

6.2

3.76

HW to stope

Main Target Drill Results - Croesus Mine Area

Hole

From (m)

To (m)

Width (m)

Width (ft)

Au g/t

Target

MC11-14

no significant values

MC11-15

hole abandoned

MC11-16

207.05

207.25

0.20

0.7

4.48

200 Zone

MC11-16

241.12

242.21

1.09

3.6

2.06

200 Zone

MC11-17

210.64

211.95

1.31

4.3

9.56

200 Zone

includes

211.73

211.95

0.22

0.7

43.00

200 Zone

MC11-18

14.20

14.80

0.60

2.0

1.13

HW to stope

MC11-18

17.00

20.45

3.45

11.3

1.49

FW to stope

includes

17.00

17.50

0.50

1.6

4.91

FW to stope

MC11-19

13.95

18.60

4.65

15.3

5.88

HW to Stope

includes

15.28

16.62

1.34

4.4

11.87

HW to stope

MC11-19

19.50

20.50

1.00

3.3

3.55

FW to stope

MC11-20

14.57

16.35

1.78

5.8

13.29

HW to stope

includes

14.85

16.09

1.24

4.1

18.03

HW to stope

MC11-21A

137.15

137.65

0.50

1.6

3.59

Other

MC11-21

130.00

130.50

0.50

1.6

1.50

Other

MC11-22

hole abandoned

MC11-23

210.60

211.10

0.50

1.6

1.29

200 Zone

MC11-23

218.30

218.60

0.30

1.0

2.05

200 Zone

MC11-24

no significant values

MC11-25

no significant values

MC11-26A

no significant values

MC11-27

no significant values

MC11-28

8.90

10.50

1.60

5.3

7.08

new HW vein

Includes

10.00

10.40

0.40

1.3

18.15

new HW vein

MC11-28A

10.20

10.60

0.40

1.3

2.42

new HW vein

MC11-29

no significant values

Four Corners Property Drill Results

Hole

From (m)

To (m)

Width (m)

Width (ft)

Au g/t

Target

CMX11-01

126.95

145.20

18.25

59.9

0.34

Canamax

Includes

126.95

132.35

5.40

17.7

0.61

Canamax

includes

131.70

131.95

0.25

0.8

5.94

Canamax

CMX11-01

160.20

185.70

25.50

83.7

0.30

Canamax

includes

160.20

168.20

8.00

26.3

0.59

Canamax

includes

161.10

163.90

2.80

9.2

1.11

Canamax

includes

163.30

163.90

0.60

2.0

2.58

Canamax

CMX11-02A

126.00

127.60

1.60

5.3

0.60

Canamax

CMX11-03A

102.40

103.40

1.00

3.3

0.92

Canamax

CMX11-03A

133.80

134.75

0.95

3.1

3.97

Canamax

CMX11-03A

164.30

169.50

5.20

17.1

0.75

Canamax

includes

165.00

166.00

1.00

3.3

2.31

Canamax

CMX11-03A

240.00

250.05

10.05

33.0

0.55

Canamax

FC11-10

73.80

77.85

4.05

13.3

0.64

Perry Pond

FC11-11

173.00

174.00

1.00

3.3

1.50

Perry Pond

FC11-11

188.00

189.60

1.60

5.3

1.45

Perry Pond

FC11-11

226.00

227.00

1.00

3.3

1.47

Perry Pond

FC11-11

265.90

266.45

0.55

1.8

1.67

Perry Pond

FC11-11

458.00

460.00

2.00

6.6

0.53

Perry Pond

Intersections in italics previously reported. Significant intersections included in table are defined as those intersections with a grade thickness product of greater than 2 g/t gold foot. Bold denotes intersections greater than 5 g/t.

 

Constantine Metal Resources Ltd.
About Constantine Metal Resources Ltd.CorporateConstantine Metal Resources ProjectsConstantine Metal Resources NewsInvestorsContactsConstantine Metal Resources Ltd.Constantine Metal Resources Ltd.

Constantine Metal Resources Ltd.

EXPLORATEUR
CODE : CEM.V
ISIN : CA2103171039
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Constantine Metal est une société d’exploration minière d'or et de cuivre basée au Canada.

Constantine Metal détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont CROESUS, PALMER, CONSTANTINE CARLIN MAYO CLAIMS et AZTEC PROPERTY au Canada.

Constantine Metal est cotée au Canada. Sa capitalisation boursière aujourd'hui est 40,5 millions CA$ (32,4 millions US$, 28,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 0,91 CA$, et son plus bas niveau récent le 30 août 2013 à 0,04 CA$.

Constantine Metal possède 117 340 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Constantine Metal Resources Ltd.
2007 Annual report
2006 Annual report
Financements de Constantine Metal Resources Ltd.
20/03/2011Closes $2.25 Million Flow-Through Share Financing
13/03/2011Announces $2.25 Million Guaranteed Agency Financing
14/01/2010Exercised Warrants Raise $2.4 Million Cash For Constantine
17/06/2009$3,000,000 Non-Brokered Financing Announced
Projets de Constantine Metal Resources Ltd.
27/07/2017(Palmer)Reports New Silver-Gold Discovery at Nunatak and High-Grade ...
06/07/2016(Palmer)Commences Drill Program at Palmer Copper-Zinc-Silver-Gold Pr...
09/05/2016(Palmer)Announces Plans and Budget for 2016 Palmer Copper-Zinc-Silve...
04/05/2016Critics question mine exploration near Alaska eagle preserve
19/02/2014Announces Winter Drill Program Underway at Golden Mile Prope...
28/01/2014(Palmer)Announces US$6.2 Million Budget for 2014 Palmer Copper-Zinc-...
04/11/2013(Palmer)Reports Positive Metallurgical Results for the Palmer Projec...
12/06/2013(Palmer)Commences Drilling on the Palmer VMS Project, Alaska $3.0 Mi...
04/02/2013Signs Option & Joint Venture Agreement with Dowa Metals & Mi...
17/01/2013(Palmer)Announces Signing Date for Option and Joint Venture Agreemen...
05/11/2012(Palmer)Signs Letter Agreement with Dowa Metals and Mining on the Pa...
08/08/2012Finds Horseshoe Zone on Trend with Lake Shore’s Fenn-Gib Dep...
07/08/2012Announces Election by Major to Proceed with Golden Mile Prop...
05/03/2012Acquires Golden Mile Property
28/12/2011VP of Exploration Darwin Green to appear on the Next Biggest...
30/11/2011Reports Drill Assays for Trapper Gold Project, British Colum...
23/08/2011’s Partner Reports Update On 25 Hole Drill Program At Trappe...
23/06/2011Carlin JV Commences Work Program On Sixteen Yukon Gold Prope...
16/06/2011Reports Commencement Of $4.0 Million Exploration Program At ...
14/04/2011Carlin JV Expands Property Position In Yukon’s New Carlin-Ty...
31/03/2011(Croesus)Adds Second Drill At Munro-Croesus Gold Project, Ontario
13/03/2011(Croesus)Commences Drill Program At Munro-Croesus Bonanza Grade Gold ...
28/02/2011(Constantine Carlin Mayo Claims)Carlin JV Acquires Strategic Claim Block In Yukon’s New Carl...
17/02/2011(Aztec Property)Carlin JV Expands Yukon Gold Portfolio Aztec Property Acquis...
09/02/2011Acquires Hornet Creek Gold-Copper Property In Idaho, USA
04/08/2010(Palmer)Intersects 3.1% Copper Over 4.2 Meters within 7.1 Meters of ...
19/11/2009(Palmer)Positive Mineralogy And Metallurgical Projections For Palmer...
22/10/2009(Palmer)Expands Area Of Massive Sulphide And Reports Significant Off...
10/09/2009(Palmer)Intersects 6.1 Meters Of 1.5% Copper And 9.2% Zinc In Deepes...
28/07/2009(Palmer)Completes Financing And Commences Drilling At Palmer VMS Pro...
10/02/2009(Croesus)Commences Drill Program at Munro-Croesus Gold Project
09/02/2009(Croesus)and Wahgoshig First Nation Enter into Exploration Agreement
02/12/2008(Palmer)Reports More Wide Intersections At The South Wall Zone
Communiqués de Presse de Constantine Metal Resources Ltd.
06/07/2016Constantine Commences Drill Program at Palmer Copper-Zinc-Si...
30/06/2016Constantine Issues Stock Options
24/11/2015Constantine Reports 2015 Exploration Program Results from Pa...
28/07/2015Constantine Signs Selection Agreement with Dowa on Land Trus...
26/06/2015Constantine Files NI-43-101 Report for Updated Inferred Mine...
25/06/2015Constantine Files NI-43-101 Report for Updated Inferred Mine...
09/03/2015Constantine Issues Finder’s Fee Shares and Stock Options
09/03/2015Issues Finder's Fee Shares and Stock Options
09/03/2015Constantine Issues Finder's Fee Shares and Stock Options
03/03/2015Constantine Announces US$5.0 Million Budget for 2015 Palmer ...
23/02/2015Constantine 2014 Year-end Financial Information Released
05/02/2015Constantine Receives US $250,000 Option Payment from Dowa
26/01/2015Constantine Reports Final Drill Results and Provides 2014 Ex...
29/09/2014Constantine Intersects 89 Meters of 5.0% Zinc, 0.8% Copper, ...
09/09/2014Constantine Signs Mining Lease on Land Package Surrounding t...
19/08/2014Constantine Reports Japan Oil, Gas and Metals National Corpo...
22/07/2014Constantine Reports Significant 150 meter Step-Out Drill Int...
29/05/2014Constantine Crews Mobilize for US$6.2 Million +10,000 Meter ...
09/05/2014Constantine Completes Drill Program at Golden Mile Property ...
16/04/2014Constantine to Acquire Major Land Package Surrounding the Pa...
08/10/2013(Palmer)Intersects 24.7 Meters of 2.0% Copper and 8.5% Zinc in Addit...
12/08/2013(Palmer)Intersects 21.7 Meters of 2.4% Copper and 9.1% Zinc in Step-...
08/08/2013Acquires Insider Share Position in Dunnedin Ventures Inc.
09/07/2013to Sell Interest in Trapper Gold Property to Ocean Park Vent...
03/05/2013The Company Announces Adoption of Advance Notice Policy for ...
19/03/2013Notice of TSX Acceptance of Option & Joint Venture Agreement...
09/05/2012Announces Strategic Financing and Property Rights Agreements...
27/02/2012to Spin-Out Yukon Gold Assets into New Company
17/01/2012Reports Final Drill Results for Trapper Gold Project, Britis...
09/01/2012Upcoming Events
20/09/2011(Croesus)Reports Final Drill Results at Munro-Croesus Gold Project, O...
06/09/2011Carlin Yukon JV Defines 6.5 Km Long Gold And Arsenic Soil An...
09/08/2011Carlin JV Defines Multiple Soil/Silt Anomalies On Yukon Gold...
08/06/2011(Croesus)Reports Drill Results And New Developments At The Munro-Croe...
22/02/2011Signs New Investor Relations Agreement
22/06/2010Acquires Phoenix Lake Gold Property In South Timmins Area, O...
19/05/2010Acquires Trapper Lake Gold Property In Northern British Colu...
23/07/2009$3 Million Unit Financing Closed
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CEM.V)
0,345+4.55%
TSX-V
CA$ 0,345
04/11 14:29 0,020
4,55%
Cours préc. Ouverture
0,330 0,320
Bas haut
0,320 0,365
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,345 -%
Volume var. 1 mois
207 650 -%
24hGold TrendPower© : 18
Produit
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 17/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-40,00%0,770,24
2021223,53%0,670,17
2020-19,05%0,290,12
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,91 US$+0,37%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,37 CA$-0,42%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,33 CA$-2,91%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,78 CA$-4,30%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,95 US$-0,35%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :