Detour Gold Reports Final Drill Results From Its 2010 Drilling Program at Detour Lake Project in Ontario
Published : March 15, 2011

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street |

TORONTO, ONTARIO--(Marketwire - March 15, 2011) - Detour Gold Corporation (News - Market indicators) ("Detour Gold" or the "Company") reports assay results for the last 34 holes totaling 16,923 metres (including 7 holes abandoned for 1,360 metres) from its 2010 drilling campaign at the Detour Lake gold project in northern Ontario. The 2010 drilling program totaled 107,003 metres and covered the western extension of the Detour Lake open pit deposit between section 17,460E and 18,000E on a 40 X 40 metre drill spacing.

These holes were not included in the mineral resource and reserve update announced on January 31, 2011. The positive assay results obtained are incremental to the current mineral reserves of 14.9 million ounces. The 2011 drilling program of 50,000 metres is underway to test the western extension of the Detour Lake deposit (up to 17,220E). It is anticipated that the 2011 drilling program will have a positive impact on the year-end mineral reserve and resource update.

The majority of the 34 drill holes were completed on sections 17,460E and 17,500E and continued to encounter significant gold mineralization over a 400 metre wide zone north of the contact with the Sunday Lake Deformation Zone ("SLDZ"). The majority of the gold mineralization is found within a folded sequence of pillow and massive flows that represent the extension of Domains 2 and 3 (which contain 57% of the current in-pit measured and indicated resources) and at the contact with the SLDZ. Of significance, hole DG-10-990B on section 17,740E intersected 3.13 g/t (uncut) or 2.70 g/t (cut) over 58 metres and 4.91 g/t (uncut) or 3.12 g/t (cut) over 31 metres, and hole DG-10-1018 on section 17,500E intersected 1.38 g/t (uncut) or 1.31 g/t (cut) over 90 metres, and DG-10-1025A on section 17,460E intersected 9.07 g/t (uncut) or 3.58 g/t (cut) over 22.7 metres.

Significant gold mineralized (uncut) intervals encountered are shown below.

Calcite Zone
             
DG-10-987   DG-10-990B   DG-10-1003   DG-10-1009
15.05 g/t over 12.8 m   3.13 g/t over 58.0 m   6.60 g/t over 24.0 m   7.28 g/t over 8.0 m
    4.91 g/t over 31.0 m       2.60 g/t over 38.5 m
             
DG-10-1014   DG-10-1017   DG-10-1022    
1.61 g/t over 43.0 m   3.97 g/t over 15.0 m   1.48 g/t over 35.0 m    
3.31 g/t over 24.0 m            
             
QK Zone (west of 17,500E)        
             
DG-10-1018   DG-10-1019   DG-10-1021   DG-10-1023
1.38 g/t over 90.0 m   2.30 g/t over 29.8 m   6.63 g/t over 22.1 m   5.20 g/t over 11.4 m
    8.05 g/t over 7.0 m        
             
DG-10-1024   DG-10-1025A   DG-10-1028   DG-10-1029A
4.38 g/t over 17.0 m   9.07 g/t over 22.7 m   5.33 g/t over 10.0 m   2.06 g/t over 24.8 m
             
DG-10-1029B            
9.05 g/t over 7.5 m            

Complete tables of results, surface and longitudinal plans and cross-sections for the Detour Lake deposit are posted on the Company's website on the home page "Explore Detour Lake" or http://www.detourgold.com/PROJECTS/Detour-Lake/Explore-Detour-Lake/default.aspx.

Detour Gold's delineation program is being managed by its Exploration Manager, Guy MacGillivray, P.Geo., a Qualified Person within the meaning of National Instrument 43-101. Mr. MacGillivray has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. Samples are now prepared at both SGS Minerals Services in Garson and Don Mills, Ontario, Canada and assayed at the Don Mills location. Analysis for gold is done on sawn half core samples using fire assay (AA finish). Samples with higher grade gold (>5 g/t) are re-assayed using the pulp and metallics procedures. Standard reference materials, blank and field duplicate samples are inserted prior to shipment from site to monitor the quality control of the assay data. For additional information on Quality Assurance and Quality Control ("QA/QC"), refer to the Technical Report filed in June 2010.

Forward-Looking Information

This news release contains certain forward-looking information as defined in applicable securities laws (referred to herein as "forward-looking statements"). Specifically, this news release contains forward-looking statements regarding the drill results having a positive impact on the year-end mineral reserve and resource update. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold's ability to predict or control and may cause Detour Gold's actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled "Description of Business - Risk Factors" in Detour Gold's 2009 annual information form. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour Lake gold project; the supply and demand for, and the level and volatility of the price of, gold; the results of the feasibility study and the assumptions on which the feasibility study is based; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Detour Lake Project - Highlights of Drill Results (West of Calcite Zone)
Hole No. Section
No.
  From
(m)
To
(m)
Length
(m)
Au
Uncut
(g/t)
Au
Cut to
20 g/t
(g/t)
Host
Rock
Unit
DG-10-987 17,700E   264.0 271.0 7.0 1.31 1.31  
      294.0 309.0 15.0 1.81 1.81 Upper Massive Flow
      323.0 335.8 12.8 15.05 2.98 Upper Massive Flow
      Inc. 335.0 335.8 0.8 213.00 20.00  
      376.0 385.0 9.0 1.86 1.86  
      416.0 440.0 24.0 1.50 1.50 Upper Pillow Flow
      477.0 486.5 9.5 1.25 1.25  
      521.0 532.0 11.0 2.11 2.11  
      558.0 567.0 9.0 4.18 4.18 Lower Pillow Flow
      614.0 623.0 9.0 1.18 1.18  
      680.0 691.0 11.0 0.95 0.95  
DG-10-990 17,740E   Abandoned at 279.0 m. No significant results.  
         
DG-10-990A 17,740E   Wedged from 186.0 to 279.0 m. Hole abandoned. Not sampled.  
         
DG-10-990B 17,740E   Wedged from 194.4 m.  
      282.0 291.0 9.0 1.11 1.11  
      309.0 316.0 7.0 1.13 1.13  
      322.0 334.0 12.0 1.65 1.65  
      361.0 377.0 16.0 1.06 1.06  
      539.0 549.0 10.0 0.98 0.98  
      562.0 583.0 21.0 2.14 2.14 Upper MF/Lower PF
      598.0 656.0 58.0 3.13 2.70 Lower Pillow Flow
      Inc. 604.5 605.0 0.5 20.90 20.00  
      Inc. 628.0 628.5 0.5 35.20 20.00  
      Inc. 638.0 638.5 0.5 54.10 20.00  
      677.0 708.0 31.0 4.91 3.12 Lower PF/Lower MF
      Inc. 693.5 694.0 0.5 52.50 20.00  
      Inc. 706.0 707.0 1.0 53.00 20.00  
      Inc. 707.0 708.0 1.0 26.10 20.00  
DG-10-998 17,500E   148.0 155.0 7.0 1.11 1.11  
QK Zone     168.0 176.0 8.0 2.15 2.15  
      187.0 208.7 21.7 0.85 0.85  
      234.0 241.0 7.0 3.32 3.32  
      250.0 258.7 8.7 1.03 1.03  
      287.0 318.0 31.0 1.26 1.26 Upper MF/Upper PF
      327.0 340.0 13.0 2.52 1.56 Upper Massive Flow
      Inc. 332.5 333.0 0.5 44.95 20.00  
      355.0 363.0 8.0 0.93 0.93  
DG-10-1003 17,500E   14.8 22.0 7.2 1.20 1.20  
QK Zone     113.9 121.0 7.1 2.06 2.06  
      201.0 210.0 9.0 1.34 1.34  
      238.0 247.0 9.0 0.96 0.96  
      257.0 267.5 10.5 1.36 1.36  
      302.0 309.0 7.0 1.17 1.17  
      344.0 368.0 24.0 6.60 3.23 Upper MF/Upper PF
      Inc. 349.0 350.0 1.0 83.50 20.00  
      Inc. 350.0 351.0 1.0 35.90 20.00  
      Inc. 367.0 367.5 0.5 23.09 20.00  
      401.0 411.0 10.0 0.97 0.97  
      440.0 447.0 7.0 1.15 1.15  
      465.5 473.0 7.5 2.16 1.66  
      Inc. 466.0 466.5 0.5 27.51 20.00  
DG-10-1008 17,500E   No significant results.  
QK Zone                
DG-10-1009 17,500E   127.0 134.0 7.0 1.19 1.19  
QK Zone     156.0 163.0 7.0 1.02 1.02  
      237.0 245.0 8.0 7.28 4.04 Upper Massive Flow
      Inc. 241.0 242.0 1.0 45.90 20.00  
      266.0 273.0 7.0 3.41 2.76  
      Inc. 266.6 267.5 0.9 25.00 20.00  
      300.0 311.8 11.8 0.84 0.84  
      367.0 405.5 38.5 2.60 1.47 Upper Pillow Flow
      Inc. 402.4 402.9 0.5 96.74 20.00  
      Inc. 405.0 405.5 0.5 30.13 20.00  
      444.0 465.8 21.8 1.65 1.62 Upper MF/Lower PF
      Inc. 446.0 446.5 0.5 21.48 20.00  
      531.0 538.0 7.0 1.12 1.12  
DG-10-1010 17,460E   55.8 65.0 9.2 1.52 1.52  
QK Zone                
DG-10-1011 17,500E   245.5 257.0 11.5 2.77 2.39 Lower Massive Flow
QK Zone     Inc. 255.0 256.0 1.0 24.38 20.00  
      417.0 424.0 7.0 1.07 1.07  
      437.0 449.0 12.0 1.31 1.31  
      463.5 480.0 16.5 2.13 1.97 Contact MF/CMH
      Inc. 463.5 464.0 0.5 20.49 20.00  
      Inc. 468.2 468.7 0.5 24.82 20.00  
DG-10-1012 17,460E   146.5 155.0 8.5 1.19 1.19  
QK Zone                
DG-10-1013 17,460E   72.0 79.0 7.0 1.26 1.26  
QK Zone     447.0 456.0 9.0 4.11 3.52 Lower Massive Flow
      Inc. 453.5 454.0 0.5 30.69 20.00  
      476.0 487.0 11.0 3.84 3.13 Lower Massive Flow
      Inc. 483.0 484.0 1.0 27.73 20.00  
      497.0 515.1 18.1 1.16 1.16  
DG-10-1014 17,500E   141.0 148.0 7.0 1.40 1.40  
QK Zone     309.0 316.0 7.0 1.38 1.38  
      337.0 349.0 12.0 1.08 1.08  
      426.0 469.0 43.0 1.61 1.59 Upper MF/Upper PF
      Inc. 454.0 454.5 0.5 20.01 20.00  
      Inc. 461.8 462.3 0.5 21.53 20.00  
      483.5 496.0 12.5 0.78 0.78  
      508.0 522.0 14.0 2.84 2.83 Lower Pillow Flow
      Inc. 520.0 521.0 1.0 20.10 20.00  
      539.5 550.0 10.5 0.95 0.95  
      588.0 612.0 24.0 3.31 0.92 Lower Massive Flow
      Inc. 588.0 588.5 0.5 134.74 20.00  
DG-10-1015 17,500E   27.0 43.0 16.0 1.00 1.00  
QK Zone     58.0 65.0 7.0 1.77 1.77  
      148.0 157.0 9.0 0.79 0.79  
      167.0 177.0 10.0 1.70 1.70  
      209.0 228.0 19.0 1.94 1.94 Upper Massive Flow
      243.0 250.0 7.0 1.63 1.63  
      315.0 322.0 7.0 2.09 2.09  
      476.0 483.0 7.0 1.58 1.58  
DG-10-1016 17,460E   70.5 95.0 24.5 0.97 0.97  
QK Zone     125.2 143.6 18.4 0.70 0.70  
      161.0 169.0 8.0 0.88 0.88  
      187.0 194.0 7.0 1.42 1.42  
      204.0 211.4 7.4 1.10 1.10  
      402.0 409.0 7.0 2.09 1.54  
      Inc. 406.5 407.0 0.5 27.78 20.00  
      537.0 545.0 8.0 1.10 1.10  
      596.0 603.0 7.0 1.24 1.24  
      620.0 627.0 7.0 2.08 2.08  
DG-10-1016A
QK Zone
17,460E   Wedged from 279 m to 351 m as a result of mishandled core from DG-10-1016. Assays were assigned to DG-10-1016.  
DG-10-1017 17,500E   70.0 79.0 9.0 1.68 1.68  
QK Zone     95.0 110.0 15.0 3.97 3.22 Upper Pillow Flow
      Inc. 104.0 105.0 1.0 31.20 20.00  
      162.3 178.0 15.7 2.44 2.44 Upper Pillow Flow
      201.5 221.5 20.0 1.40 1.40 Upper Pillow Flow
      266.0 274.5 8.5 1.63 1.63  
      540.0 554.0 14.0 1.91 1.83 Lower Massive Flow
      Inc. 553.5 554.0 0.5 22.06 20.00  
      563.0 587.0 24.0 1.53 1.53 Lower Massive Flow
      Inc. 580.1 580.6 0.5 20.10 20.00  
DG-10-1018 17,500E   95.0 102.0 7.0 1.08 1.08  
QK Zone     149.0 156.0 7.0 1.53 1.53  
      210.5 218.0 7.5 5.01 2.90 North Pillow Flow
      Inc. 212.0 213.0 1.0 35.80 20.00  
      302.0 312.0 10.0 1.03 1.03  
      344.0 353.0 9.0 0.94 0.94  
      487.0 503.5 16.5 1.51 1.51  
      517.0 524.0 7.0 1.94 1.94  
      581.0 605.0 24.0 0.96 0.96  
      628.0 718.0 90.0 1.38 1.31 Lower Massive Flow
      Inc. 712.0 712.5 0.5 31.80 20.00  
      745.0 752.0 7.0 1.84 1.84  
DG-10-1019 17,460E   85.0 114.8 29.8 2.30 1.89 Lower Pillow Flow
QK Zone     Inc. 104.5 105.3 0.8 35.00 20.00  
      351.0 358.0 7.0 8.05 1.62 Lower Massive Flow
      Inc. 352.2 352.7 0.5 110.00 20.00  
DG-10-1020 17,500E   145.0 155.0 10.0 1.73 1.73  
QK Zone     173.5 181.0 7.5 1.66 1.66  
      214.0 238.0 24.0 0.71 0.71  
      249.4 259.0 9.6 1.97 1.97  
      316.0 334.0 18.0 1.82 1.82 Lower Pillow Flow
DG-10-1020A 17,500E   Wedged from 396.0 m to 594.0 m. No significant results. Hole abandoned.  
QK Zone                
DG-10-1020B 17,500E   Wedged from 585.0 to 756.0 m.  
QK Zone     611.0 618.0 7.0 4.39 3.19 Lower Massive Flow
      Inc. 613.0 614.0 1.0 28.40 20.00  
      654.2 661.6 7.4 1.13 1.13  
DG-10-1021 17,460E   430.9 453.0 22.1 6.63 1.34 Lower Massive Flow
QK Zone     Inc. 430.9 431.4 0.5 204.45 20.00  
      Inc. 449.5 450.0 0.5 69.13 20.00  
      465.2 472.7 7.5 3.29 3.29  
DG-10-1022 18,540E   18.0 37.4 19.4 1.68 1.10 Lower Pillow Flow
      Inc. 23.5 24.0 0.5 42.60 20.00  
      70.0 77.0 7.0 2.37 2.37  
      104.7 119.0 14.3 1.10 1.10  
      141.2 176.2 35.0 1.48 0.94 Lower Massive Flow
      Inc. 175.7 176.2 0.5 57.90 20.00  
      190.0 220.5 30.5 1.27 1.12 Lower MF/CMH
      Inc. 220.0 220.5 0.5 28.80 20.00  
DG-10-1023 17,460E   30.0 37.0 7.0 1.54 1.54  
QK Zone     64.0 75.0 11.0 2.89 2.89 Upper Pillow Flow
      155.2 163.0 7.8 1.34 1.34  
      172.0 181.6 9.6 1.89 1.89  
      227.0 238.0 11.0 1.22 1.22  
      295.0 302.0 7.0 1.13 1.13  
      515.1 526.5 11.4 5.20 1.39 Lower Massive Flow
      Inc. 515.1 515.6 0.5 106.82 20.00  
      546.7 554.6 7.9 1.22 1.22  
DG-10-1024 17,460E   101.0 122.5 21.5 0.92 0.92  
QK Zone     131.0 165.0 34.0 1.19 1.19 Upper Pillow Flow
      197.0 247.0 50.0 0.95 0.95 Upper Pillow Flow
      276.0 283.0 7.0 4.17 3.09 Upper Massive Flow
      Inc. 280.0 281.0 1.0 27.50 20.00  
      318.0 332.0 14.0 2.07 1.55 Lower Pillow Flow
      Inc. 329.5 330.0 0.5 34.40 20.00  
      462.0 469.0 7.0 1.77 1.52  
      Inc. 467.5 468.0 0.5 23.60 20.00  
      492.0 499.0 7.0 3.53 2.27  
      Inc. 495.5 496.0 0.5 37.60 20.00  
      674.0 691.0 17.0 4.38 2.71 Lower Massive Flow
      Inc. 687.5 688.0 0.5 76.70 20.00  
      708.7 717.0 8.3 3.42 3.42 CMH
DG-10-1025 17,460E   Abandoned at 40.0 m. No significant results.  
QK Zone                
DG-10-1025A 17,460E   54.0 61.0 7.0 1.08 1.08  
QK Zone     233.5 241.0 7.5 1.57 1.57  
      250.0 269.0 19.0 1.36 1.36 Upper Pillow Flow
      288.2 309.0 20.8 1.31 1.28 Upper Pillow Flow
      Inc. 297.5 298.0 0.5 21.20 20.00  
      332.0 347.4 15.4 0.88 0.88  
      354.3 377.0 22.7 9.07 3.58 Upper Pillow Flow
      Inc. 354.3 355.0 0.7 101.00 20.00  
      Inc. 360.0 361.0 1.0 85.20 20.00  
      Inc. 363.0 363.5 0.5 25.60 20.00  
      436.0 452.0 16.0 0.91 0.91  
      686.0 694.0 8.0 3.11 2.63  
      Inc. 686.0 687.0 1.0 23.80 20.00  
      704.0 711.0 7.0 1.00 1.00  
DG-10-1026 17,460E   187.4 198.0 10.6 0.98 0.98  
QK Zone     211.0 225.6 14.6 1.52 1.52  
      278.0 285.2 7.2 1.07 1.07  
      307.0 323.0 16.0 2.50 2.25 Upper Pillow Flow
      Inc. 319.0 320.0 1.0 24.00 20.00  
      354.7 366.0 11.3 3.34 2.29 Upper Massive Flow
      Inc. 355.4 355.9 0.5 43.70 20.00  
      384.0 401.6 17.6 1.50 1.50 Lower MF/Lower PF
      422.0 432.0 10.0 0.94 0.94  
      586.0 593.1 7.1 1.94 1.94  
      648.0 656.0 8.0 3.30 1.45 Lower Massive Flow
      Inc. 648.0 648.5 0.5 49.61 20.00  
      732.0 739.0 7.0 1.49 1.49  
      752.0 769.0 17.0 1.47 1.47  
DG-10-1027 17,460E   64.0 76.5 12.5 1.86 1.54  
QK Zone     Inc. 71.0 71.5 0.5 28.00 20.00  
      151.6 163.0 11.4 0.76 0.76  
      178.0 214.0 36.0 1.09 1.09 Upper Pillow Flow
      225.0 233.0 8.0 1.02 1.02  
      254.0 262.0 8.0 2.64 2.64  
      285.5 295.0 9.5 1.48 1.48  
      315.0 330.0 15.0 1.76 1.61 Upper Massive Flow
      Inc. 316.8 317.3 0.5 24.60 20.00  
      347.9 366.0 18.1 2.65 1.78 Lower MF/Lower PF
      Inc. 362.0 362.5 0.5 51.30 20.00  
      510.0 517.0 7.0 1.22 1.22  
      588.0 595.0 7.0 2.38 1.56  
      Inc. 593.5 594.0 0.5 31.41 20.00  
      731.0 738.6 7.6 2.86 2.01  
      Inc. 732.1 732.6 0.5 32.90 20.00  
DG-10-1028 17,460E   131.0 141.0 10.0 5.33 2.60 North Pillow Flow
QK Zone     Inc. 131.0 132.0 1.0 47.30 20.00  
      348.0 355.0 7.0 3.86 3.86 Upper Massive Flow
      501.8 514.0 12.2 2.17 1.37 Upper Massive Flow
      Inc. 513.5 514.0 0.5 39.62 20.00  
      543.0 550.0 7.0 3.08 2.26  
      Inc. 543.0 543.5 0.5 31.45 20.00  
      588.0 613.0 25.0 1.09 1.09 Upper MF/Lower PF
      635.0 647.0 12.0 1.48 1.48  
      656.0 677.0 21.0 2.04 1.89 Lower Pillow Flow
      Inc. 658.0 659.0 1.0 21.10 20.00  
      Inc. 675.0 675.5 0.5 24.20 20.00  
DG-10-1029 17,460E   Abandoned at 15.0 m in overburden. Not sampled.  
QK Zone        
DG-10-1029A 17,460E   Abandoned at 339.0.  
QK Zone     80.0 93.0 13.0 1.06 1.06  
      240.0 264.8 24.8 2.06 1.79 Upper Pillow Flow
      Inc. 243.0 244.0 1.0 26.70 20.00  
      331.0 338.0 7.0 5.95 2.24 Upper Pillow Flow
      Inc. 332.0 332.5 0.5 71.88 20.00  
DG-10-1029B 17,460E   Wedged from 198.0 to 738.0 m.  
QK Zone     308.0 315.0 7.0 1.01 1.01  
      391.0 398.0 7.0 2.18 2.18  
      416.0 432.0 16.0 1.57 1.57 Upper Pillow Flow
      460.0 469.0 9.0 1.56 1.56  
      477.0 501.0 24.0 0.90 0.90  
      512.0 519.5 7.5 0.97 0.97  
      534.5 542.0 7.5 9.05 1.61 Lower Massive Flow
      Inc. 535.2 535.7 0.5 131.55 20.00  
      557.4 565.0 7.6 1.56 1.43  
      Inc. 557.4 557.9 0.5 22.01 20.00  
Note: All values above 20 g/t in the composite are reported in the table. True width is estimated to be 65 to 75% of the drilled length.

For more information, please contact

Detour Gold Corporation
Gerald Panneton
President and CEO
(416) 304.0800
or
Detour Gold Corporation
Laurie Gaborit
Director Investor Relations
(416) 304.0581
or
Detour Gold Corporation
Royal Bank Plaza, South Tower
200 Bay Street, Suite 2200
Toronto, Ontario M5J 2J1
www.detourgold.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Detour Gold Corporation

EN DÉVELOPPEMENT
CODE : DGC.TO
ISIN : CA2506691088
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Detour Gold est une société d’exploration minière d'or basée au Canada.

Son principal projet en développement est DETOUR LAKE (SUNDAY LAKE) au Canada et son principal projet en exploration est BLOCK A au Canada.

Detour Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 4,0 milliards CA$ (3,0 milliards US$, 2,7 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 23 novembre 2018 à 10,00 CA$, et son plus haut niveau récent le 03 février 2020 à 23,10 CA$.

Detour Gold possède 174 600 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Detour Gold Corporation
14/12/2018Detour Gold interim CEO, chairman lose out to Paulson nomine...
04/12/2018ISS backs Detour Gold board proposals in Paulson proxy fight
19/07/2018Paulson & Co to ask Detour Gold for special meeting for boar...
Financements de Detour Gold Corporation
30/05/2012Initiates Consent Solicitation With Respect to 5.50% Senior ...
07/02/2012Closes Caterpillar Financing
13/12/2011Announces Flow-Through Financing
Nominations de Detour Gold Corporation
09/05/2016Detour Gold Announces Meeting Results and New Board Member
18/02/2014Detour Gold Announces Appointment of CEO and CFO
13/03/2008Appoints Michael Kenyon to its Board
Rapports Financiers de Detour Gold Corporation
02/11/2016Detour Gold Reports Third Quarter 2016 Results
28/07/2016Detour Gold Reports Second Quarter 2016 Results
29/06/2016Detour Gold Provides Notice of Second Quarter 2016 Results
27/04/2016Detour Gold Reports First Quarter 2016 Results
27/04/2016Detour Gold Re-purchases $75 million of Convertible Notes
06/04/2016Detour Gold Provides Notice of First Quarter 2016 Results an...
10/03/2016Detour Gold Reports Fourth Quarter and Full-Year 2015 Result...
28/10/2015Detour Gold Reports Third Quarter 2015 Results
29/07/2015Detour Gold Reports Solid Second Quarter 2015 Results
20/04/2015Detour Gold Provides Notice of First Quarter 2015 Results an...
21/01/2014Detour Gold Reports Fourth Quarter 2013 Operating Results
08/11/2013Detour Gold Reports Third Quarter Financial Results
09/05/2013Detour Gold to File Financial Results for the First Quarter ...
Projets de Detour Gold Corporation
28/07/2016(Detour Lake (sunday Lake))Detour Gold Reports Positive Drilling Results from Lower Det...
21/04/2016(Detour Lake (sunday Lake))Detour Gold Provides Update on the Investigation of Employee...
04/02/2014Detour Gold Updates Life of Mine Plan for Detour Lake
03/02/2014Detour Gold to Announce Updated Life of Mine Plan for the De...
27/01/2014Detour Gold Provides 2014 Guidance and Secures Long-Term Pow...
02/01/2014Detour Gold Resumes Milling Operations at the Detour Lake Mi...
23/12/2013Detour Gold Reports an Unplanned Mill Shutdown Due to Pre-Le...
14/08/2013Achieves Commercial Production at Detour Lake
19/02/2013Detour Gold Pours First Gold Bars at Detour Lake Mine
12/02/2013commences winter work program at Conquest's (TSXV : CQR) Sun...
11/02/2013Detour Gold Announces Start of Production at Detour Lake
09/11/2012Detour Gold Starts Mill Commissioning and Reaches 95% Constr...
24/10/2011Detour Gold's Transmission Line for Detour Lake Mine Connect...
15/03/2011(Detour Lake (sunday Lake))Reports Final Drill Results From Its 2010 Drilling Program a...
07/03/2011(Detour Lake (sunday Lake)) Detour Gold commences drilling program at Conquest's Sunday...
16/02/2011(Block A)Not in Position to Comment on NI 43-101 Technical Report Fil...
03/02/2011(Detour Lake (sunday Lake))Announces US$105 Million Financing for Mining Fleet
31/01/2011(Detour Lake (sunday Lake))Updates Reserves to 14.9 Million Ounces at Detour Lake
12/11/2008(Detour Lake (sunday Lake))PDX RESOURCES ADVISED BY DETOUR GOLD OF ADDITIONAL DRILL RES...
12/03/2008(Detour Lake (sunday Lake))Reports More Results from 2007 Phase II Drilling at its Deto...
16/01/2008(Detour Lake (sunday Lake))Reports First Results of 2007 Phase II Drilling at its Deto...
11/01/2008Starts 2008 Drilling Program and Announces the Lead Manager ...
Communiqués de Presse de Detour Gold Corporation
28/07/2016Coverage Initiated on Gold Stocks FrancoNevada, New Gold, De...
06/06/2016Detour Gold Provides Operational Update for Detour Lake Mine...
06/04/2016Detour Gold Provides Notice of First Quarter 2016 Results an...
25/01/2016Detour Gold Provides New Life of Mine Plan for Detour Lake
14/01/2016Detour Gold Delivers on 2015 Guidance; Electricity Contract ...
17/12/2015Detour Gold Reports Drilling Results from Lower Detour
29/10/2015Edited Transcript of DGC.TO earnings conference call or pres...
07/10/20152 Metals Stocks BMO Analysts Are Downgrading
21/09/2015Detour Gold Poured its One Millionth Ounce of Gold at Detour...
02/09/2015Ministry of Labour and Ontario Provincial Police Investigate...
31/07/2015Edited Transcript of DGC.TO earnings conference call or pres...
15/07/2015Detour Gold Provides Notice of Second Quarter 2015 Results
10/07/2015S&P Dow Jones Indices Announces Quarterly Review of S&P/TSX ...
20/04/2015Detour Gold Provides Notice of First Quarter 2015 Results an...
09/03/2015Detour Gold Reports Fourth Quarter and Full-Year 2014 Result...
06/03/2015Detour Gold Reports Fourth Quarter and Full-Year 2014 Result...
24/02/2015Detour Gold Completes C$162 Million Bought Deal Offering
10/02/2015Completes C$162 Million Bought Deal Offering
22/01/2015PRESS DIGEST- Canada- Jan 22
15/01/2015Detour Gold Reports Fourth Quarter and Full Year 2014 Operat...
14/01/2015Detour Gold to Announce Fourth Quarter and Full Year 2014 Op...
13/01/2015Detour Gold to Announce Fourth Quarter and Full Year 2014 Op...
07/10/2014Detour Gold Provides Notice of Third Quarter 2014 Results an...
29/07/2014Detour Gold Reports Second Quarter 2014 Results
15/07/2014Detour Gold Provides Notice of Release of Second Quarter 201...
11/07/2014Morganti Legal, P.C. Announces a Shareholder Lawsuit Against...
02/06/2014Detour Gold Reports High Grade Gold Intersections in the Low...
25/11/2013Detour Gold Announces Management Changes
29/10/2013Provides Notice of Release of Third Quarter 2013 Financial R...
09/10/2013Detour Gold Reports Third Quarter Production Results
23/09/2013webcast presentation today
09/09/2013Detour Gold Reports Drill Results on Detour Lake Property 17...
09/07/2013Detour Gold Reports Second Quarter Production Results
11/06/2013Completes C$176 Million Bought Deal Offering
10/05/2013Detour Gold Announces Results from Annual and Special Meetin...
02/05/20132013 Annual and Special Meeting Invite
09/04/2013Detour Gold Reports First Quarter Production Results
19/03/2013Detour Gold Announces Annual and Special Meeting, Record Dat...
12/03/2013Detour Gold Closes $135 Million Senior Secured Credit Facili...
24/01/2013webcast presentation tomorrow
10/01/2013Announces Partial Exercise of Over-Allotment Option
11/12/2012Completes C$106 Million Bought Deal Offering
18/10/2012Detour Gold Files Technical Report on Updated Mine Productio...
04/09/2012Detour Gold Announces Updated Open Pit Mine Production Plan ...
30/08/2012to Announce Updated Mine Production Plan for the Detour Lake...
23/07/2012Announces Connection of the 230 kV Transmission Line and 75%...
16/07/2012Successfully Completes Consent Solicitation
24/04/2012Reaches 60% Construction Completion at Detour Lake
20/03/2012Reports Final Drill Results from Its 2011 Drilling Program a...
02/03/2012Join the Detour Gold Team! A Dynamic Career Awaits!
14/02/2012Completes C$277 Million Bought Deal Financing
17/01/2012Starts 2012 Drilling Program on Detour Lake Property
10/01/2012Reports Additional Drill Results from Its 2011 Drilling Prog...
01/12/2011Completes Acquisition of Trade Winds
26/09/2011to Consolidate Detour Lake Camp With Acquisition of Trade Wi...
16/08/2011Obtains US$40 Million Financing for Mining Fleet
04/08/2011Completes C$428 Million Bought Deal Financing
12/07/2011Holds Ground Breaking Ceremony for its New Regional Office i...
22/06/2011on Detour Lake Project Construction and Increased Exploratio...
03/05/2011Closes US$105 Million Financing for Mining Fleet
20/04/2011Reports First Drill Results from Its 2011 Drilling Program a...
25/01/2011and Moose Cree First Nation Execute and Sign Agreement for t...
06/05/2008Reports Wide Gold Intersections from the Calcite Zone of it...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (DGC.TO)
23,10-2.53%
TORONTO
CA$ 23,10
03/02 16:15 -0,600
-2,53%
Cours préc. Ouverture
23,70 23,58
Bas haut
22,72 23,72
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  23,10 -%
Volume var. 1 mois
5 219 412 -%
24hGold TrendPower© : -33
Produit
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2020-6,74%26,1422,64
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,28 US$+2,17%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,82 CA$-1,43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$-2,11%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,02 US$+1,15%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :