Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

First Nickel Inc.

Publié le 14 mai 2008

Reports Financial and Operating Results for the Three Month Period Ended March 31, 2008

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cobalt | Copper | Dollar | Nickel |
======================================================================
Re: News Release - Tuesday, May 13, 2008
First Nickel Reports Financial and Operating Results for the
Three Month Period Ended March 31, 2008
======================================================================

News Release No. 2008-09

Toronto, Ontario - May 13, 2008 - First Nickel Inc. ("First Nickel" or
the "Company") (TSX: "FNI") announces that it has filed with the
Canadian securities regulatory authorities its unaudited financial
statements, and management's discussion and analysis for the three
month period ended March 31, 2008.

Complete results will also be available on SEDAR and on the Company's
website at www.firstnickel.com. All dollar amounts are expressed in
Canadian currency unless otherwise stated.

Summary

.. First quarter net loss of $1.4 million ($0.01 per share) compared to
net earnings of $0.5 million in the first quarter of 2007. The first
quarter 2008 loss reflects weak 2007 fourth quarter production.

.. Production during the first quarter of 2008 increased to 930,854
pounds of payable nickel, an increase of 33% over the 699,622 pounds
produced in the first quarter of 2007. Production of payable copper in
the first quarter of 2008 was 611,537 pounds, an increase of 41% over
the 433,409 pounds of payable copper produced in first quarter of 2007.

.. Mine operating cost per tonne of ore for the first quarter of 2008
declined by $116 per tonne, or 33%, to $238 per tonne from the
equivalent period in 2007.

.. 6,075 metres of drilling were completed on the historic Lockerby
Main Zone, where the target is contact and shallow footwall
mineralization, approximately 1,300 metres above current mining levels.

.. 2,869 metres of drilling was completed on the West Graham Property
on the Conwest Deposit, the up-dip equivalent of the Lockerby East
Zone. The property is under option from Landore Resources Ltd. A
deposit amenable to bulk mining is the target.

Production at Lockerby Mine was brought back in line with planned
rates, with first quarter production aligned with forecasts.

Continued strong metal prices helped to limit the loss for the quarter
that, in accordance with the Company's revenue recognition policy was
based on revenue from the reduced production in the fourth quarter of
2007.

Under an ore sale agreement with Xstrata, production from the Lockerby
Mine is shipped to Xstrata's Strathcona Mill (the "Mill") for
processing. Revenue is recognized when the metal content of the ore
sold to the Mill, and the pricing of the metals contained therein are
determined, and title transferred. For nickel, the most significant
component of the revenue, the final settlement is determined three
months following the month of mine production.

The Company remains in a strong financial position with working capital
of $18,536,072 at March 31, 2008 after investments of $5,164,465 in
development, exploration and mine equipment acquisitions in the
quarter. The Company is debt free.

Financial Results

The following table presents a summary of the results of operations for
the three month periods ended March 31, 2008 and 2007:

March 31,
2008 2007
----------------------------------------------------------------------
----------------------------------------------------------------------
---------(Unaudited)----------

Sales Revenue $ 9,962,797 $ 10,459,410
-----------------------------
-----------------------------

Operating costs excluding
amortization 10,422,444 7,787,022
Amortization of mining properties
and equipment 907,452 589,000
Accretion of asset retirement
obligations 47,000 45,000
-----------------------------
-----------------------------
11,376,896 8,421,022
-----------------------------
-----------------------------

Operating profit (loss) (1,414,099) 2,038,388
-----------------------------
-----------------------------

General and administration 576,482 527,488
Stock-based compensation 199,774 14,479
Depreciation and amortization 6,051 7,485
Debenture interest and accretion -- 755,788
Other interest 106,928 125,141
Interest and other income (273,108) (128,764)
-----------------------------
-----------------------------
616,127 1,301,617
-----------------------------
-----------------------------

Earnings (loss) before taxes (2,030,226) 736,771

Provision for (recovery of)
income and mining taxes (606,109) 206,502
-----------------------------
-----------------------------

Net earnings (loss) for the period $ (1,424,117) $ 530,269
-----------------------------
-----------------------------

Net earnings (loss) per share
- basic and diluted $ (0.01) $ 0.01
-----------------------------
-----------------------------

Weighted average number of
common shares outstanding 140,308,515 97,953,799

For the three month period ended March 31, 2008, the Company recorded a
net loss of $1,424,117, or $0.01 per share, compared to net earnings of
$530,269, or $0.01 per share, recorded for the three month period ended
March 31, 2007.

Significant differences between the two periods include:

.. A decrease in revenues of $496,613 (5%) in 2008 compared to 2007.
An increase of $1,078,759 (86%) in the copper, cobalt and other metal
revenues (resulting from overall higher sales volume and price) was
offset by a decrease of $1,575,372 in the nickel revenues. Although
the pounds of nickel sold during the quarter was 149,285 (32%) higher
in 2008 versus 2007, a drop in the average realized nickel price of
$4.43 (27%) from $16.67 to $12.24 more than offset the higher volume.
Also contributing to the decrease in revenues is the substantial
increase in the value of the Canadian dollar relative to the U.S.
dollar. During the first quarter of 2007 the U.S. dollar averaged
about $1.17 compared to an average of $1.00 in the first quarter of
2008. This works out to approximately $1.5 million difference in
revenues.

The following table sets out selected sales information for the periods
indicated:

---------------------------------------------------------------------
Q1 2008 Q1 2007 Change
---------------------------------------------------------------------
Sales by Payable Metal
---------------------------------------------------------------------
Nickel -- pounds 620,944 471,659 149,285
---------------------------------------------------------------------
Copper -- pounds 480,639 299,761 180,878
---------------------------------------------------------------------
Cobalt -- pounds 12,571 7,837 4,734
---------------------------------------------------------------------
Ave. price received -- US$/lb
---------------------------------------------------------------------
Nickel $12.24 $16.67 $(4.43)
---------------------------------------------------------------------
Copper $3.07 $2.70 $0.37
---------------------------------------------------------------------
Cobalt $45.90 $25.77 $20.13
---------------------------------------------------------------------
Ave. Exch. Rate Realized
---------------------------------------------------------------------
US $ 1 equals Canadian $ $1.0031 $1.1704 $(0.1673)
---------------------------------------------------------------------

.. An increase in mine operating costs, including treatment and
refining charges, of 34% in 2008 compared to 2007. Higher tonnes
treated (84%), and an overall increase in manpower of 20% at the
Lockerby Mine, mostly accounted for the increase in operating costs,
however the greater physical quantities allowed for lower unit costs.
A nickel bonus of $945,000 is included in the first quarter 2007
operating costs, whereas in 2008 there was no nickel bonus as the
operations generated a loss. The bonus is defined in the Company's
collective agreements and is tied to the price of nickel.

.. An increase of $48,994 (9%) in general and administrative expenses
in 2008. The increase is mostly attributable to an increase in
salaries, director's fees and tax consulting, offset by a recovery of
capital tax.

.. An increase in stock-based compensation costs in 2008 of $185,295
reflects the fair value of options granted in prior periods, which have
vested in this period, to directors, employees and consultants. The
Company uses the Black-Scholes pricing model in the valuations of the
options.

.. A reduction of $755,788 in debenture interest and accretion. The
$14,500,000 debentures were fully repaid on June 1, 2007.

.. A decrease of $18,213 in other interest. Other interest is mostly
comprised of interest paid on advances received from Xstrata on the ore
delivered to their facilities.

.. Interest and other income is mostly made up of interest earned on
cash balances, and on short term deposits. The higher interest income
in 2008, compared to 2007, results from the Company having
substantially higher cash balances in 2008 to invest.

Lockerby Mine Operations

During the first quarter of 2008, 39,686 tonnes of ore were delivered
to the Xstrata treatment facilities, an increase of 18,122 tonnes, or
84%, over the 21,564 tonnes of ore delivered in the first quarter of
2007. The payable metal content in the ore is estimated to be
approximately 930,854 pounds of nickel (an increase of 33% over 2007)
and 611,537 pounds of copper (an increase of 41% over 2007).

Selected operating statistics for the first quarter of 2008 compared to
the first quarter of 2007 are as follows:

--------------------------------------------------------------------
Item 1st Q 2008 1st Q 2007
--------------------------------------------------------------------
Ore Delivered to Mill (tonnes) 39,686 21,564
--------------------------------------------------------------------
Nickel Mill Head Grade (%) 1.43 1.90
--------------------------------------------------------------------
Copper Mill Head Grade (%) 0.82 1.06
--------------------------------------------------------------------
Payable Nickel (pounds) 930,854 699,622
--------------------------------------------------------------------
Payable Copper (pounds) 611,537 433,409
--------------------------------------------------------------------
Payable Cobalt (pounds) 17,018 11,821
--------------------------------------------------------------------
Mine operating cost per tonne $238 $354
--------------------------------------------------------------------
Cash cost per pound of nickel (i) $10.23 $10.42
--------------------------------------------------------------------
(i) Cash cost per pound of nickel is a non GAAP measure and is net
of other metal credits, and does not include amortization of mining
properties and equipment, but does include the nickel bonus defined
in the Company's collective agreements which is tied to the
price of nickel.

Following completion of repairs to the crusher in late December 2007,
production including ore grades returned to planned levels going into
2008.

The majority of the ore was generated from stopes on 64 Level in the
Depth Zone and to a minor extent from development and stopes in the
East Zone. At the end of the quarter some ore was being sourced from
initial development on 65-3 Level.

Although ore grades were lower than anticipated, the amount of material
handled was an all time high for a quarter, with both waste and ore at
new levels. Development advance rates improved against the previous
quarter, and equipment availabilities and utilization levels reflected
positive changes to maintenance planning.

Premiere Ridge

Discussions continued with Xstrata Nickel on an off-take agreement.

Exploration Activity

Exploration efforts were focused on the Lockerby Mine and West Graham
properties in the first quarter of 2008. A total of 2 underground
drills and one surface drill were utilized during this time period.

Exploration activities including drilling highlights are summarized as
follows:

.. 6,075 metres of drilling were completed on the Lockerby Main Zone,
which occurs about 1,300 metres closer to surface than where current
mining is taking place. Highlights include:
o FNI1704: 17.50 metres grading 1.36% Ni and 0.84% Cu
o FNI1714: 12.35 metres grading 1.90% Ni and 0.93% Cu
o FNI1715: 3.25 metres grading 2.17% Ni and 0.58% Cu
o FNI1734: 7.00 metres grading 1.48% Ni and 1.63% Cu

.. 2,869 metres of drilling were completed on the West Graham Property
which hosts the Conwest Deposit, the up dip continuation of Lockerby
East mineralization. The target is a deposit with potential for bulk
mining
o FNI2045: 70.20 metres grading 0.59% Ni and 0.44% Cu, including
10.50 metres grading 1.14% Ni and 0.60% Cu
o FNI2050: 86.70 metres grading 0.55% Ni and 0.43% Cu, including
12.70 metres grading 1.15% Ni and 0.71% Cu

.. 1,506 metres of drilling were completed on the Lockerby East Zone
o Assays pending

.. 1,758 line kilometres of airborne Mag and EM completed over the
Raglan Hills project area

.. 6,130 line kilometres of airborne Mag and EM completed over the
Belmont project area

Outlook

For the full year, the company expects:

.. To produce between 3.8 and 4.4 million pounds of payable nickel, and

.. To produce between 2.3 and 2.7 million pounds of payable copper.

First Nickel has budgeted $17 million for development and capital
improvements at the Lockerby Mine and expects to spend approximately $7
million on exploration the majority of which will be spent on targets
around the existing Lockerby Mine infrastructure, Lockerby East and
footwall areas. Funding for these expenditures will come from existing
cash balances and cash flow generated from the Lockerby operations.

First Nickel is completing a new life of mine study using the new
Lockerby resource estimate announced in January (see January 16, 2008
press release). The study includes engineering and economic comparisons
of development options and mine design. FNI anticipates that
infrastructure improvements, based on the new resource model, will
yield increased output, better productivity, reduced costs and will
substantially extend the mine life. Results of this study should be
available early in the third quarter.

Qualified Person

The foregoing scientific and technical information has been prepared or
reviewed by Paul C. Davis, P.Geo., Vice-President Exploration of the
Company. Mr. Davis is a "qualified person" within the meaning of
National Instrument 43-101.

The Company follows rigorous quality control practices and procedures
in full compliance of NI 43-101, and these are described on the
Company's website and in all technical press releases.

Non-GAAP Performance Measures

This press release contains non-GAAP measures like operating cost per
tonne of ore, net cash cost per pound of nickel, etc. Please see the
Company's MD&A on SEDAR for discussion on non-GAAP performance
measures.

First Nickel is a Canadian mining and exploration Company. Its current
activities are primarily focused on the Sudbury Basin in northern
Ontario, the location of the company's producing property (the Lockerby
Mine) and four of its exploration properties. First Nickel also has
two exploration properties in the Timmins region of northern Ontario.
First Nickel's shares are traded on the TSX under the symbol FNI.

This news release contains forward-looking statements, which are
subject to certain risks, uncertainties and assumptions, including the
cash flows, metal prices, decrease costs, increase output, expected
production, and expected exploration expenditures. A number of factors
could cause actual results to differ materially from the results
discussed in such statements, and there is no assurance that actual
results will be consistent with them. Such factors include fluctuating
metal prices, 2008 production forecast, lower unit costs and other
factors described in the Company's most recent Annual Information Form
under the heading "Risk Factors" which has been filed electronically by
means of the System for Electronic Document Analysis and Retrieval
("SEDAR") located at www.sedar.com. Such forward-looking statements
are made as at the date of this news release, and the company assumes
no obligation to update or revise them, either publicly or otherwise,
to reflect new events, information or circumstances, except as may be
required under applicable securities law.

For further information contact:

William Anderson, President & CEO
First Nickel Inc.
Telephone: (416) 362-7050
Fax: (416) 362-9050
Email: wanderson@firstnickel.com

Or:

Forbes West, Investor Relations Advisor
416-203-2200 / 1-888-655-5532 / forbes@sherbournegroup.ca

View News Release in PDF Format:
http://www.firstnickel.com/i/pdf/2008-05-13_NR.pdf
46 KB in size, approx. 10 seconds to download at 56.6Kbps

======================================================================
Copyright (c) 2008 FIRST NICKEL INC. (FNI) All rights reserved. For
more information visit our website at http://www.firstnickel.com/ or
send mailto:info@firstnickel.com
======================================================================
.

First Nickel Inc.

EN DÉVELOPPEMENT
CODE : FNI.TO
ISIN : CA33582W1068
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

First Nickel est une société d’exploration minière de nickel basée au Canada.

First Nickel est en développement de projets de nickel, d'argent, de cobalt, de cuivre, d'or, de palladium et de platine au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en développement sont LOCKERBY MINE et PREMIERE RIDGE au Canada et ses principaux projets en exploration sont RAGLAN HILLS, LANDORE/ WEST GRAHAM, MORGAN-LUMSDEN, BELMONT PROJECT, WEST GRAHAM, FOY MOUTH, KAMISKOTIA et DUNDONALD au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de First Nickel Inc.
12/03/2015Completes Debt Refinancing
11/03/2015FNI Announces Approval by Shareholders of Debt Refinancing a...
08/04/2013Completes Refinancing
12/09/2011Hires New President & CEO and Announces $500,000 Private Pla...
02/03/2011Secures Commitments for C$30 Million Senior Secured Project ...
Nominations de First Nickel Inc.
03/10/2013Names Alfred Colas as Chief Financial Officer
04/02/2013Announces Changes to the Board of Directors With the Appoint...
03/07/2012Appoints David Comba as New Chairman
29/04/2008Gerry Bilodeau Appointed as Vice President Operations
Rapports Financiers de First Nickel Inc.
26/03/2015Reports Financial and Operating Results for the Year Ended D...
12/08/2013Reports Three and Six Months Financial and Operating Results...
15/05/2013Reports First Quarter 2013 Financial and Operating Results
13/11/2012Reports Third Quarter 2012 Financial and Operating Results
14/08/2012Reports Second Quarter 2012 Financial and Operating Results
16/05/2012Reports First Quarter 2012 Financial and Operating Results
11/08/2011Reports Financial and Operating Results for the Period Ended...
30/05/2011Reports Financial and Operating Results for the Period Ended...
30/03/2011Reports Financial and Operating Results for the Year Ended D...
11/11/2008Reports Financial And Operating Results For The Three And Ni...
14/05/2008Reports Financial and Operating Results for the Three Month ...
27/03/2008 Reports Financial And Operating Results For The Year Ended ...
14/11/2007 Reports Third Quarter 2007 Results
Projets de First Nickel Inc.
06/05/2014First Nickel says two workers dead at Sudbury mine
03/01/2013Reports Lockerby 2012 Nickel Production is Expected to Be Ap...
03/08/2012(Lockerby Mine)Files Optimized Lockerby Mine Plan with SEDAR
18/06/2012(Lockerby Mine)Optimizes Lockerby Mine Plan, Resulting in an $87 Million NP...
07/11/2008(West Graham)Provides an Exploration Update on Lockerby and West Graham P...
03/07/2008(Lockerby Mine)Announces the Results of the NI 43-101 Reserve Estimate and ...
30/06/2008(Premiere Ridge)Announcement Re Premiere Ridge
25/03/2008(West Graham) Intersects 86.70 Metres of 0.55% Ni and 0.43% Cu on West Gr...
16/01/2008(Lockerby Mine) Reports 289% Increase in Indicated Resources at the Lockerb...
11/12/2007(Raglan Hills)Sign Joint Venture on Raglan Hills Project
01/11/2007(Lockerby Mine)Nickel Production Increasing Additional Promising Lockerby D...
23/07/2007(Lockerby Mine)Intersects 53.30 Metres of 1.82% Ni and 1.39% Cu at Lockerby...
Communiqués de Presse de First Nickel Inc.
27/08/2015TSX Delisting Review - First Nickel Inc. (Symbol: FNI)
20/08/2015First Nickel Announces Appointment of Receiver
20/08/2015TSX Delisting Review - First Nickel Inc. (Symbol: FNI)
20/08/2015First Nickel Announces Application for Appointment of Receiv...
20/08/2015IIROC Trading Halt - FNI
20/08/2015First Nickel Reports Financial and Operating Results for the...
14/08/2015First Nickel Reports Financial and Operating Results for the...
04/08/2015First Nickel Reports Incident at Lockerby Mine
03/08/2015First Nickel Reports Incident at Lockerby Mine
20/07/2015First Nickel Announces Change to Board of Directors
17/07/2015First Nickel Announces Change to Board of Directors
22/06/2015Results of the FNI Annual General Meeting of Shareholders
26/03/2015FNI Reports Financial and Operating Results for the Year End...
26/03/2015First Nickel Reports Financial and Operating Results for the...
12/03/2015FNI Completes Debt Refinancing
11/03/2015FNI Announces Approval by Shareholders of Debt Refinancing a...
02/03/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
02/03/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
09/02/2015IIROC Trade Resumption - FNI
09/02/2015First Nickel Announces Debt Refinancing
09/02/2015IIROC Trading Halt - FNI
27/01/2015First Nickel Provides Preliminary 2014 Production Results an...
12/01/2015First Nickel Restructures the Lockerby Mine, Reducing Costs ...
12/01/2015First Nickel Restructures the Lockerby Mine, Reducing Costs ...
11/11/2014FNI Reports FInancial and Operating Results for the Three an...
10/11/2014First Nickel Reports Financial and Operating Results for the...
11/08/2014First Nickel Reports Financial and Operating Results for the...
11/06/2014Results of the FNI Annual General Meeting of Shareholders
12/05/2014First Nickel Reports Financial and Operating Results for the...
08/05/2014First Nickel Reports the Lockerby Mine Will Resume Operation...
06/05/2014First Nickel Provides Update on Lockerby Accident
06/05/2014First Nickel Reports Two Fatalities at the Lockerby Mine
06/05/2014IIROC Trade Resumption - FNI
06/05/2014First Nickel Reports Incident at the Lockerby Mine
06/05/2014IIROC Trading Halt - FNI
21/03/2014FNI Reports Financial and Operating Results for the Year End...
21/03/2014First Nickel Reports Financial and Operating Results for the...
19/03/2014FNI Positioned to Benefit from Higher Nickel Prices
27/09/2013FNI Amends Lockerby Ore Processing Agreement
10/07/2013Reports 4 Year Contract Ratified with Mine Mill 598/CAW
12/06/2013Results of the FNI Annual General Meeting of Shareholders
18/04/2013(Lockerby Mine)FNI Achieves Full Production at Lockerby Mine
01/04/2013Announces Restructuring of Indebtedness
16/01/2013FNI Arranges US$5.0 Million Loan Facility
19/10/2012Reports Lockerby Nickel Production at 80% of Full Production...
24/04/2012Provides Comment on Ministry of Labour Order
23/03/2012Announces Increase to 2012 Exploration Program
25/01/2012Announces Continued Progress at Lockerby in Q4-2011 and Prov...
14/12/2011Announces Organizational Changes
05/12/2011Hires New Head of Corporate Development
20/07/2011Completes $5 Million Private Placement
05/07/2011Enters Into C$30 Million Project Loan Facility
18/05/2011Announces $2 Million Flow-Through Private Placement
25/04/2011Provides Update on Lockerby Restart
06/05/2008Establishes Shareholder Rights Plan
30/04/2008Market Update Announcement
12/02/2008Provides 2008 Guidance
06/09/20072007 Update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FNI.TO)
0,005+0.00%
TORONTO
CA$ 0,005
25/09 15:47 -
0%
Cours préc. Ouverture
0,005 0,005
Bas haut
0,005 0,005
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,005 -50,00%
Volume var. 1 mois
90 000 -50,00%
24hGold TrendPower© : -2
Produit
Développe Cobalt - Copper - Gold - Nickel - Palladium - Platinum - Silver
Recherche Cobalt - Copper - Gold - Lead - Nickel - Platinum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 04/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,24%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :