Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Le budget doit être équilibré. Le Trésor doit être plein. La dette doit être réduite. Et l'arrogance de élus doit être controllée.
Ciceron  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1386,20-1,40
Silver 22,36-0,14
Platinum 1447,50-10,00
Palladium 724,00-11,00
MARCHES MONDIAUX
DOWJONES 1530312
NASDAQ 34590
NIKKEI 14612128
ASX 4964-77
CAC 40 3957-10
DAX 8305-47
HUI 255-3
XAU 97-3
MONNAIES (€)
AUS $ 1,3402
CAN $ 1,3332
US $ 1,2932
GBP (£) 0,8551
Sw Fr 1,2432
YEN 130,7700
RATIOS & INDEXES
Gold / Silver61,99
Gold / Oil14,77
Dowjones / Gold11,04
MATIERES PREMIERES
Copper 3,29-0,01
WTI Oil 93,87-0,38
Nat. Gas 4,22-0,04
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
Dans la même rubrique 
Mercator Minerals Reports First Quarter 2012 Production Results
Published : April 10, 2012

Mill Throughput Averaged a Record 48,666 Tons Per Day

( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 10, 2012) - Mercator Minerals Ltd. (News - Market indicators) ("Mercator" or the "Company") is pleased to announce the production results for the three months ended March 31, 2012 from its wholly-owned Mineral Park Mine in Arizona. Production for the quarter totalled 20.1 million pounds of copper equivalent*, which consisted of 9.9 million pounds of copper in concentrates and cathode copper, 2.3 million pounds of molybdenum and 211,431 ounces of silver.

First Quarter 2012 Operating Details

Production(1) Q1 2012
  Copper in concentrate (lbs) 9,003,518
  Cathode Copper (lbs) 865,680
  Total Copper (lbs) 9,869,197
  Molybdenum in concentrate (lbs) 2,267,621
  Silver (oz) 211,431
Mine  
  Total tons mined 7,670,509
  Ore tons mined 4,219,888
  Leach tons mined 817,416
  Low grade tons mined 683,286
  Waste tons mined 1,949,919
Mill  
  Tons processed 4,428,622
  Tons processed per day 48,666
  Copper grade (%) 0.14
  Molybdenum grade (%) 0.036
  Silver grade (oz/t) 0.14
Recoveries  
  Copper (%) 72.6
  Molybdenum (%) 70.9
  Silver (%) 33.3
Concentrates(1)  
  Copper concentrates (dry ton) 25,295
  Copper (%) 17.8
  Silver (oz/t) 8.36
  Molybdenum concentrates (dry lbs) 4,671,071
  Molybdenum (%) 48.5
 
(1) Adjustments based on final settlements will be made in future periods.

* All references to copper equivalent production is calculated using a molybdenum/copper ratio of 4.53, based on the Company's estimated 2012 metals prices.

As previously disclosed, the Company encountered harder ore in certain sections of the Turquoise pit during the fourth quarter 2011 at the Mineral Park Mine which impacted throughput rates. During the first quarter of 2012, the Company initiated a successful program to optimize the operating parameters in the SAG mills resulting in the processing of a blend of harder ore from the Turquoise pit through the mill. Through the period January 1 to February 15, 2012, average daily throughput at the Mineral Park Mine was just over 44,700 ton per day (tpd). Subsequent to implementing the changes, from February 16 to March 31, the daily throughput improved to an average of 52,650 tpd, thus improving the average daily throughput for the first quarter 2012 to a record average daily throughput of 48,666 tpd.

Recoveries in the first quarter 2012 were 72.6% and 70.9%, respectively for copper and molybdenum. Ore blending requirements necessitated mining from stockpiled ore material that had higher than normal oxide levels. This resulted in lower recoveries, however, the sulfide mill recoveries were 82.5% for copper and 74.7% for molybdenum for the first quarter of 2012. Mining of the stockpiled ore material has since been completed.

"Despite the harder ore impacting the mine's throughput rates," commented Bruce McLeod, President & CEO, "we are very pleased with the mine's operations for the quarter. We have turned the corner on the hard ore issue and are now operating at rates better than expected, which will allow us to meet our 2012 guidance."

Quality Assurance/Quality Control

Gary Simmerman, BSc Mining Eng, FAusIMM, Mercator's VP Mineral Park, a Qualified Person as defined by National Instrument 43-101, supervised the preparation of and verified the Mineral Park technical information contained in this release.

About Mercator Minerals Ltd.

Mercator Minerals Ltd., a TSX listed Canadian mining company with the potential to have one of the fastest growing base metal profiles in its peer group, is a copper, molybdenum and silver producer with a diversified portfolio of high quality assets in the USA and Mexico. Mercator provides investors exposure to current copper, molybdenum and silver production from the large tonnage long life Mineral Park Mine in Arizona, as well as mid-term exposure to potential copper production from its El Pilar deposit in the State of Sonora in northern Mexico and longer term exposure of molybdenum and copper through the potential development of the El Creston deposit also in the State of Sonora in northern Mexico.  

On Behalf of the Board of Directors

MERCATOR MINERALS LTD.

D. Bruce McLeod, P.Eng, President and CEO

National Instrument 43-101 Compliance

Unless otherwise indicated, Mercator has prepared the technical information in this news release ("Technical Information") based on information contained in the technical reports, news releases, material change reports and quarterly and annual consolidated financial statements and management discussion and analysis (collectively the "Disclosure Documents") available under Mercator Minerals Ltd.'s company profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by or under the supervision of a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administration ("NI 43-101"). Readers are encouraged to review the full text of the Disclosure Documents which qualifies the Technical Information. Readers are advised that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The Technical Information contained in this news release has been prepared under the supervision of, and its disclosure has been reviewed by, Gary Simmerman, BSC, Mining Eng., FAusIMM, Mercator's Vice President, Mineral Park, who is a Qualified Person as defined under NI 43-101.

Forward-Looking Information

This press release contains certain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements", are not historical facts, are made as of the date of this press release and include without limitation, statements regarding discussions of future plans, projections, objectives, estimates and forecasts and statements as to management's expectations with respect to, among other things, the size and quality of the Company's mineral reserves and mineral resources, potential mineralization, and possible extensions of zones. In addition, estimates of mineral reserves and mineral resources may constitute forward looking statements to the extent they involve estimates of the mineralization that will be encountered if a property is developed. These forward-looking statements involve numerous risks and uncertainties and actual results may vary. Important factors that may cause actual results to vary include without limitation, certain transactions, certain approvals, changes in commodity and power prices, changes in interest and currency exchange rates, risks inherent in exploration results, timing and success, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications, cost escalation, unavailability of materials, equipment and third-party contractors, delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, the assumptions that: (1) market fundamentals will result in sustained copper and molybdenum demand and prices; (2) the current copper leach operations at Mineral Park remain viable, operationally and economically; (3) the milling operations at Mineral Park will continue to be viable, operationally and economically, (4) the financing, construction and operation of the El Pilar Project will proceed as expected; and (5) any additional financing needed will be available on reasonable terms.

The Company's ability to progress the El Pilar and El Creston projects towards a construction decision and eventually into production is dependent on the Company's ability to arrange for sufficient funds to cover the capital and start up related costs. There can be no assurance that the Company will be successful in arranging such funding. Statements concerning mineral reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that may be encountered during current or future operations. The words "expect", "anticipate", "estimate", "may", "will", "should", "intend", "believe", "target", "budget", "plan", "projection" and similar expressions are intended to identify forward-looking statements. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. The risks and assumptions are described in more detail in the Company's Annual Information Form, audited financial statements and MD&A for the year ended December 31, 2011 on the SEDAR website at www.sedar.com. The Company does not assume the obligation to revise or update these forward-looking statements after the date of this news release or to revise them to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.



Mercator Minerals Ltd.
Bruce McLeod
President & CEO
778.330.1290
bmcleod@mercatorminerals.com
or
Mercator Minerals Ltd.
David Jan
Head of Investor Relations & Communications
778.330.1295
djan@mercatorminerals.com
www.mercatorminerals.com
Tweet

Mercator Minerals Ltd

PRODUCTEUR
CODE : ML.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Mercator Minerals Ltd
14/05/2013Mercator ekes out slim profit in Q1
27/09/2011Mercator tackles debt financing following El Pilar feasibili...
07/07/2011Mercator Mineral Park mine production well exceeds 2Q11 guid...
07/07/2011Mercator Q2 production increases; forecasts growth
16/03/2010Mercator Announces Heads Of Agreement For Sale Of...
Rapports annuels de Mercator Minerals Ltd
2011 Annual Report
Financements de Mercator Minerals Ltd
23/10/2012Amends Mineral Park Credit Facility and Closes Bought Deal E...
01/10/2012Announces Mineral Park Credit Facility Restructuring with C$...
Nominations de Mercator Minerals Ltd
05/04/2012Announces the Appointment of Daniel Tellechea to the Board o...
17/01/2011Mercator Minerals Appoints New Chief Financial Officer
11/04/2007Reports Construction Update and Appointment of VP Engineeri...
Rapports Financiers de Mercator Minerals Ltd
10/05/2013Reports First Quarter 2013 Results
20/03/2013Reports Fourth Quarter and Year End 2012 Results
25/02/2013to Hold Fourth Quarter 2012 Financial Results Conference Cal...
15/11/2012Reports Third Quarter 2012 Results
16/08/2012Reports Second Quarter 2012 Results
23/07/2012to Hold Second Quarter 2012 Financial Results Conference Cal...
11/05/2012Reports First Quarter 2012 Results
03/05/2012to Hold First Quarter 2012 Financial Results Conference Call...
02/04/2012Reports Fourth Quarter and Year End 2011 Results
11/08/2011Q2 2011 Financial Results Conference Call/Webcast on August ...
03/04/20112010 Financial Statements and Report
29/11/2010AMENDED THIRD QUARTER FINANCIAL RESULTS
15/11/2010Mercator Reports Profitable Third Quarter and October Produc...
27/10/2010(Mineral Park Mine)Rougher Expansion Update and Third Quarter Operating Result...
17/05/2010Reports First Quarter Results and Provides Operations Update
17/08/2009Second Quarter Results and Provides Operations Update
08/07/2009(Mineral Park Mine)Second Quarter Operating Results from the Mineral Park Mine
15/05/2009Reports First Quarter Results and Provides Operations Update
01/04/2009Financial Results for the Year ended December 31, 2008
14/11/2008Mercator Reports Third Quarter Results
15/08/2008Reports Second Quarter Results
04/10/2007Records record Third Quarter Copper Production
15/08/2007Reports Record Second Quarter Results
17/07/2007Reports Record Copper Production for the Second Quarter
14/05/2007Mercator Minerals Ltd. (the "Company") - First Quarter Finan...
14/05/2007Reports Record First Quarter Cash Flow
Projets de Mercator Minerals Ltd
04/04/2011(Mineral Park Mine)td. (the "Company") - News Release
08/03/2011(Mineral Park Mine)2011 Production Guidance
05/01/2011(Mineral Park Mine)PARK MINE SETS MOLYBDENUM PRODUCTION RECORD
09/02/2010(Mineral Park Mine)Starts commissioning of phase 1,5 at Mineral Park
04/01/2010(Bluebird)Meekatharra project could be back in production soon
09/04/2009(Mineral Park Mine)First Silver Shipment and Production Update
09/03/2009(Mineral Park Mine)Ships First Molybdenum Concentrates From The Mineral Park Mi...
05/01/2009(Mineral Park Mine) Ships First Copper Concentrates at Its Mineral Park Mine
02/12/2008(Mineral Park Mine)Commences Producing Copper-Moly Concentrates at Its Mineral ...
05/11/2008(Mineral Park Mine)Commences Crushing Ore at the Mineral Park Mill
21/10/2008(Mineral Park Mine)Commissioning of the Mineral Park Mill
12/08/2008(Mineral Park Mine)Mineral Park Construction Update
Communiqués de Presse de Mercator Minerals Ltd
20/02/2013to Present at Upcoming Investor Conferences
20/12/2012Secures Debt Facility to Replace El Pilar Pre-Construction C...
19/10/2012Files Updated El Pilar Feasibility Study Technical Report
09/07/2012Reports Second Quarter 2012 Production Results
10/04/2012Reports First Quarter 2012 Production Results
05/12/2011Closes $20 Million Financing
04/10/2011Reports 2011 Third Quarter Production Results
06/07/2011Reports 2011 Second Quarter Production Results: Production o...
14/03/2011Announces Inclusion in S&P/TSX Composite Index
09/02/2011Mercator Board Approves Shareholder Rights Plan
17/05/2010March 31, 2010 Interim Quarterly Report
11/05/2010Reports Improving Recoveries and Costs at Mineral Park
26/04/2010Closes Previously Announced US$130 million of Senior Secured...
31/03/2010Secures Commitments For US$130 million of Senior Secured Cre...
26/01/2010Provides update on El Pilar Copper Project
02/10/2009Friendly business combination
15/08/2009Interim Financial Statements and MD&A
13/07/2009Obtains Consent of Noteholders for Early Repayment
15/05/2009Interim Financial Statements and MD&A
01/04/2009Audited Financial Statements and MD&A
15/11/2008 Interim Financial Statements and MD&A
13/06/2008Closes US$42 million Silver Sale Transaction with Silver Whe...
27/05/2008approve Silver Sale Transaction with Silver Wheaton
15/05/2008Interim Financial Statements and MD&A
01/04/2008Results for the Year ended December 31, 2007
01/04/2008Audited Financial Statements and MD&A
17/03/2008Announces US$42 million Silver Sale Transaction with Silver ...
09/01/2008Allows Offer for Tyler Resources to Expire
18/12/2007EXTENDS OFFER TO ALLOW TIME FOR TYLER SHAREHOLDERS TO TENDER
27/11/2007Responds to Tyler Circular
13/11/2007Files normal bid for Tyler resources
06/11/2007Corporate and construction updates
22/10/2007 ANNOUNCES INTENTION TO OFFER TO ACQUIRE TYLER RESOURCES
11/09/2007Signs Framework Agreement for Moly Concentrate Sales
18/06/2007Provides Construction Update
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ML.TO)Other OTC (MLKKF.PK)
0,220+0.00%0,220-4.35%
TORONTO
CA$ 0,220
24/05 15:59 -
0%
Cours préc. Ouverture
0,220 0,220
Bas haut
0,220 0,230
Année b/h Var. YTD
0,220 -  0,630 -59,26%
52 sem. b/h var. 52 sem.
0,220 -  0,700 -66,15%
Volume var. 1 mois
345 749 -26,67%
24hGold TrendPower© : -44
Produit Silver
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-60,71%
2012-63,16%2,000,41
2011-59,57%4,901,19
201062,77%3,801,27
2009696,55%3,180,34
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois