Reports Fourth Quarter and 2010 Financial Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Cameco Reports Fourth Quarter and 2010 Financial Results

-

ALL AMOUNTS ARE STATED IN CDN $ (UNLESS NOTED)

Cameco (News - Market indication) (NYSE:CCJ) today reported its consolidated financial and operating results for the fourth quarter ended December 31, 2010 and for the year.

"
Cameco had an excellent year in 2010," said CEO Jerry Grandey. "We increased production, lowered uranium unit costs, and substantially raised our dividend. We also achieved the best safety record in our history.

"The market ended the year very strongly, as China signed significant long-term uranium purchasing agreements and several countries indicated their intentions to build more nuclear reactors. Our company is well-positioned to prosper from the growing need for clean energy now and in the future. We remain committed to our strategy of doubling production to 40 million pounds by 2018."




----------------------------------------------------------------------------
                       Three months ended               Year ended
Highlights                    December 31              December 31
($ millions except per -----------------------------------------------------
 share amounts)              2010    2009   change    2010    2009  change
----------------------------------------------------------------------------
Revenue                       673     659        2%  2,124   2,315      (8%)
----------------------------------------------------------------------------
Gross profit                  245     206       19%    744     750      (1%)
----------------------------------------------------------------------------
Net earnings                  207     598      (65%)   515   1,099     (53%)
----------------------------------------------------------------------------
 $ per common share (basic)  0.52    1.52      (66%)  1.31    2.83     (54%)
 $ per common share
  (diluted)                  0.52    1.52      (66%)  1.30    2.82     (54%)
----------------------------------------------------------------------------
Adjusted net earnings
 (non-GAAP, see page 8)       191     170       12%    496     528      (6%)
----------------------------------------------------------------------------
$ per common share
 (adjusted and diluted)      0.48    0.43       12%   1.25    1.35      (7%)
----------------------------------------------------------------------------
Cash provided by operations    
(after working capital
 changes)                     120     188      (36%)   507     690     (27%)
----------------------------------------------------------------------------



Full year

Net earnings for the year were $515 million ($1.30 per share diluted) compared to $1,099 million ($2.82 per share diluted) in 2009. In addition to the items noted below, our net earnings were impacted by the one time gain on the sale of our interest in Centerra Gold Inc. (Centerra) at the end of 2009 and lower unrealized gains on financial instruments this year.

On an adjusted basis, our earnings for the year were $496 million ($1.25 per share adjusted and diluted) compared to $528 million ($1.35 per share adjusted and diluted) (non-GAAP, see page 8). The 6% decrease resulted from:

- lower profits in our electricity business relating to lower realized selling prices

- higher exploration expenses

- higher income taxes

- partially offset by improved profits from our uranium business relating to lower cost of sales

See 2010 financial results by segment for more detailed discussion.

Fourth quarter

Our net earnings this quarter were $207 million ($0.52 per share diluted), a decrease of $391 million compared to $598 million ($1.52 per share diluted) in 2009. We had a $374 million net gain in the fourth quarter of 2009 related to the sale of our interest in Centerra.

On an adjusted basis, our earnings this quarter were $191 million ($0.48 per share diluted) compared to $170 million ($0.43 per share diluted) (non-GAAP, see page 8) in the fourth quarter of 2009. The 12% increase in adjusted net earnings was from higher profits in our uranium segment relating to a higher average realized selling price and a lower unit cost of sales, partially offset by lower profits in the electricity business due to a lower realized price.

See 2010 financial results by segment for more detailed discussion.

The 2010 annual financial statements have been audited, however 2009 and 2010 fourth quarter financial information presented is unaudited. You can find a copy of our 2010 audited financial statements on our website at cameco.com. Our 2010 annual management's discussion and analysis will be posted on our website on Monday, February 14, 2011.

Outlook for 2011

Over the next several years, we expect to invest significantly in expanding production at existing mines and advancing projects as we pursue our growth strategy. The projects are at various stages of development, from exploration and evaluation to construction.

We expect our existing cash balances and operating cash flows will meet our anticipated capital requirements without the need for significant additional funding. Cash balances will decline gradually as we use the funds in our business and pursue our growth plans.

Our outlook for 2011 reflects the growth expenditures necessary to help us achieve our strategy. We do not provide an outlook for the items in the table that are marked with a dash.




2011 Financial outlook(1)


----------------------------------------------------------------------------
                    Consolidated        Uranium  Fuel services  Electricity
----------------------------------------------------------------------------
Production                     -           21.9       15 to 16            -
                                    million lbs    million kgU
----------------------------------------------------------------------------
Sales volume                   -       31 to 33       Increase            -
                                    million lbs     10% to 15%
----------------------------------------------------------------------------
Capacity factor                -              -              -           89%
----------------------------------------------------------------------------
Revenue compared        Increase       Increase       Increase     Decrease
 to 2010               10% to 15%   15% to 20%(2)     5% to 10%   10% to 15%
----------------------------------------------------------------------------
Unit cost of                         
 product sold                  -    Increase 0%       Increase     Increase
(including DDR)                         to 5%(3)      2% to 5%   10% to 15%
----------------------------------------------------------------------------
Direct administration
 costs compared to      Increase              -              -            -
 2010(4)              15% to 20%            
----------------------------------------------------------------------------
Exploration                           
 costs compared                -       Decrease              -            -
 to 2010                              5% to 10%
----------------------------------------------------------------------------
Tax rate             Recovery of              -              -            -
                        0% to 5%
----------------------------------------------------------------------------
Capital         
 expenditures     $575 million(5)             -              -  $80 million
----------------------------------------------------------------------------
(1) Commencing January 1, 2011, we will be reporting our financial results
    in accordance with International Financial Reporting Standards (IFRS).
    The information in our 2011 financial outlook has been prepared in
    accordance with IFRS and our policy choices thereunder to date. Further
    information on our transition to IFRS is contained in our 2010 annual
    management's discussion and analysis.
(2) Based on a uranium spot price of $73.00 (US) per pound (the Ux spot
    price as of February 7, 2011), a long-term price indicator of $73.00
    (US) per pound (the Ux long-term indicator on January 31, 2011) and an
    exchange rate of $1.00 (US) for $1.00 (Cdn).
(3) This increase is based on the unit cost of sale for produced material.
    If we decide to make discretionary purchases in 2011 then we expect the
    overall unit cost of product sold to increase further.
(4) Direct administration costs do not include stock-based compensation
    expenses. 
(5) Does not include our share of capital expenditures at Bruce Power
    Limited Partnership (BPLP).



Consolidated outlook

We expect consolidated revenue to be 10% to 15% higher in 2011 due to:

- higher sales volumes in the uranium and fuel services businesses

- increases in realized prices in the uranium and fuel services businesses

- partially offset by lower realized prices for electricity

We expect administration costs (not including stock-based compensation) to be about 15% to 20% higher than they were in 2010 due to planned higher spending in support of our growth strategy.

We expect exploration expenses to be about 5% to 10% lower than they were in 2010 due to a reduction in evaluation activities at the Kintyre project as we near the completion of the pre-feasibility stage.

Uranium outlook

We expect to produce 21.9 million pounds of U3O8 in 2011.

Based on the contracts we have in place, we expect to sell between 31 million and 33 million pounds of U3O8 in 2011. We expect the unit cost of sales to be 0% to 5% higher than in 2010. This increase is based on the unit cost of sale for produced material. If we decide to make discretionary purchases in 2011 then we expect the overall unit cost of product sold to increase further.

Based on current spot prices, revenue should be about 15% to 20% higher than it was in 2010 as a result of increases in expected realized prices and sales volumes in 2011.

Our customers choose when in the year to receive deliveries of uranium and fuel services products, so our quarterly delivery patterns, and therefore our sales volumes and revenue, can vary significantly. We expect the trend in delivery patterns in 2011 to be somewhat different than in 2010, with deliveries heavily weighted to the second half of the year. We expect the fourth quarter to account for about one third of our 2011 sales volumes.

Price sensitivity analysis: uranium

The table below is not a forecast of prices we expect to receive. The prices we actually realize will be different from the prices shown in the table.

It is designed to indicate how the portfolio of long-term contracts we had in place on December 31, 2010 would respond to different spot prices. In other words, we would realize these prices only if the contract portfolio remained the same as it was on December 31, 2010, and none of the assumptions we list below change.




Expected realized uranium price sensitivity under various spot price
assumptions


(rounded to the nearest $1.00)


----------------------------------------------------------------------------
($US/lb U3O8)
----------------------------------------------------------------------------
Spot prices           $  20   $  40   $  60   $  80   $ 100   $ 120   $ 140
----------------------------------------------------------------------------
2011                     38      41      47      52      57      63      68
----------------------------------------------------------------------------
2012                     36      40      50      58      68      77      86
----------------------------------------------------------------------------
2013                     43      45      54      63      73      82      90
----------------------------------------------------------------------------
2014                     44      47      55      64      74      83      91
----------------------------------------------------------------------------
2015                     40      45      55      65      75      85      94
----------------------------------------------------------------------------



The table illustrates the mix of long-term contracts in our December 31, 2010 portfolio, and is consistent with our contracting strategy. It has been updated to reflect deliveries made and contracts entered into up to December 31, 2010.

Our portfolio includes a mix of fixed-price and market-price contracts, which we target at a 40:60 ratio. We signed many of our current contracts in 2003 to 2005, when market prices were low ($11 to $31 (US)). Those that are fixed at lower prices or have low ceiling prices will yield prices that are lower than current market prices. These older contracts are beginning to expire, and we are starting to deliver into more favourably priced contracts.

Our portfolio is affected by more than just the spot price. We made the following assumptions (which are not forecasts) to create the table:

Sales

- sales volume on average of 32 million pounds per year

Deliveries

- customers take the maximum quantity allowed under each contract (unless they have already provided a delivery notice indicating they will take less)

- we defer a portion of deliveries under existing contracts for 2011 and 2012

Prices

- the average long-term price indicator is the same as the average spot price for the entire year (a simplified approach for this purpose only). Since 1996, the long-term price indicator has averaged 13% higher than the spot price. This differential has varied significantly. Assuming the long-term price is at a premium to spot, the prices in the table will be higher.

- we deliver all volumes that we don't have contracts for at the spot price for each scenario

Inflation

- is 2.0% per year

Cameco's share of production - annual forecast to 2015

We have geographically diversified sources of production. We expect to produce about 125 million pounds of U3O8 over the next five years from the properties listed below. Our strategy is to double our annual production to 40 million pounds by 2018, which we expect will come from our operating properties, development projects and projects under evaluation.




----------------------------------------------------------------------------
Current forecast
(million lbs U3O8)             2011      2012      2013      2014      2015
----------------------------------------------------------------------------
McArthur River/Key Lake        13.1      13.1      13.1      13.1      13.1
----------------------------------------------------------------------------
Rabbit Lake                     3.6       3.6       3.6       3.6       3.6
----------------------------------------------------------------------------
US ISR                          2.5       3.1       3.1       3.7       3.8
----------------------------------------------------------------------------
Inkai                           2.7       3.1       3.1       3.1       3.1
----------------------------------------------------------------------------
Cigar Lake                        -         -       1.0       2.0       5.6
----------------------------------------------------------------------------
Total                          21.9      22.9      23.9      25.5      29.2
----------------------------------------------------------------------------



In 2013, production at McArthur River may be lower as we transition to mining upper zone 4.

In 2010, Inkai received approval in principle to produce 3.9 million pounds per year (100% basis) and is seeking final approval with an amendment to the resource use contract.

Our 2011 and future annual production targets assume Inkai receives the government approvals and support of our partner, Kazatomprom. More specifically, it must:

- obtain final approval to produce at an annual rate of 3.9 million pounds (our share 2.3 million pounds)

- obtain the necessary permits and approvals to produce at an annual rate of 5.2 million pounds (our share 3.1 million pounds)

- ramp up production to an annual rate of 5.2 million pounds this year

We expect Inkai to receive all of the necessary permits and approvals to meet its 2011 and future annual production targets and we anticipate it will be able to ramp up production this year as noted above.

There is no certainty, however, that Inkai will receive these permits or approvals or that it will be able to ramp up production this year. If Inkai does not, or if the permits and approvals are delayed, Inkai may be unable to achieve its 2011 and future annual production targets.

This forecast is forward-looking information. It is based on the assumptions and subject to the material risks discussed on page 15, and specifically on the assumptions and risks listed here. Actual production may be significantly different from this forecast.

Assumptions

- we achieve our forecast production for each operation, which requires, among other things, that our mining plans succeed, processing plants are available and function as designed, we have sufficient tailings capacity and our mineral reserve estimates are accurate

- we obtain or maintain the necessary permits and approvals from government authorities

- our production is not disrupted or reduced as a result of natural phenomena, labour disputes, political risks, blockades or other acts of social activism, shortage or lack of supplies critical to production, equipment failures or other development and operation risks

Material risks that could cause actual results to differ materially

- we do not achieve forecast production levels for each operation because of a change in our mining plans, processing plants are not available or do not function as designed, lack of tailings capacity or for other reasons

- we cannot obtain or maintain necessary permits or government approvals

- natural phenomena, labour disputes, political risks, shortage or lack of supplies critical to production, blockages or other acts of social activism, equipment failures or other development and operation risks disrupt or reduce our production

Fuel services outlook

We expect total production to be between 15 million and 16 million kgU in 2011.

We expect the average realized price for our fuel services products to decline by 2% to 5%, sales volumes to increase by 10% to 15% and revenue to be 5% to 10% higher.

Electricity outlook

We expect the average capacity factor for the four Bruce B reactors to be 89% in 2011, and actual output to be about 2% lower than it was in 2010. The 2011 realized price for electricity is projected to be about 5% to 10% lower than 2010 as BPLP has fewer financial contracts in place for 2011. At December 31, 2010, BPLP had about 7.5 TWh under financial contracts, which is equivalent to about 30% of Bruce B generation at its planned capacity factor. We expect that revenue will decline by 10% to 15% as a result.

We expect the average unit cost (net of cost recoveries) to be 10% to 15% higher in 2011, and total operating costs to rise by about 5% to 10%, mainly due to higher costs for planned outages and maintaining the workforce.




Capital spending
----------------------------------------------------------------------------
(
Cameco's share in $ millions)                     2010      2010      2011
                                                   plan    actual      plan
----------------------------------------------------------------------------
Growth capital
----------------------------------------------------------------------------
 Cigar Lake                                         111        90       176
----------------------------------------------------------------------------
 Inkai                                                4         5         9
----------------------------------------------------------------------------
 McArthur River                                       -         -        14
----------------------------------------------------------------------------
 Millennium                                           -         -         6
----------------------------------------------------------------------------
 US ISR                                               -         -        13
----------------------------------------------------------------------------
Total growth capital                                115        95       218
----------------------------------------------------------------------------
Sustaining capital
----------------------------------------------------------------------------
 McArthur River/Key Lake                            220       165       169
----------------------------------------------------------------------------
 US ISR                                              53        45        38
----------------------------------------------------------------------------
 Rabbit Lake                                         56        49        85
----------------------------------------------------------------------------
 Inkai                                               18         5        19
----------------------------------------------------------------------------
 Fuel services                                       29        20        32
----------------------------------------------------------------------------
 Other                                                9         8        14
----------------------------------------------------------------------------
Total sustaining capital                            385       292       357
----------------------------------------------------------------------------
Capitalized interest                                 52        48         -
----------------------------------------------------------------------------
Total uranium & fuel services                    552(1)       435       575
----------------------------------------------------------------------------
Electricity (our 31.6% share of BPLP)                41        35        80
----------------------------------------------------------------------------
(1) We updated our 2010 capital cost estimate in the Q2 MD&A to $510
    million and in the Q3 MD&A to $475 million.



Capital expenditures were 21% below our 2010 plan mainly as a result of reduced activity at our Saskatchewan uranium operations. We do not expect this reduction in capital expenditures in 2010 will impact our plans to double annual uranium production by 2018. The variance at Cigar Lake was due mainly to the clean-up and remediation of the underground workings taking longer than originally expected and the revision to project schedules as a result of the decision to proceed with surface freezing. The variance at McArthur River was due mainly to a change in the mine development plans and postponement of some capital projects that were not critical to production. The variance at Key Lake was mainly a result of delays in the construction of the acid and oxygen plants and deferring some of the other Key Lake revitalization projects.

We expect total capital expenditures for uranium and fuel services to be 32% higher in 2011, as a result of higher spending for:

- growth capital at Cigar Lake

- sustaining capital at Rabbit Lake

For the next several years, we expect our capital expenditures will be similar to 2011.

Sensitivity analysis

At December 31, 2010, every one-cent change in the value of the Canadian dollar versus the US dollar would change our 2010 net earnings by about $9 million (Cdn). This sensitivity is based on an exchange rate of $1.00 (US) for $0.99 (Cdn).

For 2011:

- a change of $5 (US) per pound in each of the Ux spot price ($73.00 (US) per pound on February 7, 2011) and the Ux long-term price indicator ($73.00 (US) per pound on January 31, 2011) would change revenue by $34 million and net earnings by $26 million.

- a change of $5 in the electricity spot price would change our 2011 net earnings by $2 million, based on the assumption that the spot price will remain below the floor price provided for under BPLP's agreement with the Ontario Power Authority (OPA).

Non-GAAP measures

We use adjusted net earnings, a non-GAAP measure, as a more meaningful way to compare our financial performance from period to period. Adjusted net earnings is our GAAP-based net earnings, adjusted for earnings from discontinued operations and unrealized mark-to-market gains and losses on our financial instruments, which we believe do not reflect underlying performance.

Adjusted net earnings is non-standard supplemental information, and not a substitute for financial information prepared according to GAAP. Other companies may calculate this measure differently. The table below reconciles adjusted net earnings with our net earnings.




----------------------------------------------------------------------------
                                  Three months ended             Year ended
                                         December 31            December 31
                                 -------------------------------------------
($ millions)                       2010         2009      2010         2009
----------------------------------------------------------------------------
Net earnings (GAAP measure)         207          598       515        1,099
----------------------------------------------------------------------------
Adjustments (after tax)
----------------------------------------------------------------------------
 Earnings from discontinued
  operations                          -      (424)(1)        -      (382)(1)
----------------------------------------------------------------------------
 Unrealized gains on financial
  instruments                       (16)          (4)      (19)        (189)
----------------------------------------------------------------------------
Adjusted net earnings (non-GAAP
 measure)                           191          170       496          528
----------------------------------------------------------------------------
(1) We have changed our method for determining adjusted earnings to exclude
    all amounts related to our investment in Centerra. Previously, we had
    included our share of operating income from Centerra in our adjusted
    earnings measure.



2010 financial results by segment


Uranium
----------------------------------------------------------------------------
                       Three months ended               Year ended
                              December 31              December 31
                       -----------------------------------------------------
Highlights                  2010     2009  change     2010    2009  change
----------------------------------------------------------------------------
Production volume
 (million lbs)               6.4      6.7      (4)%   22.8    20.8      10%
----------------------------------------------------------------------------
Sales volume (million
 lbs)                        9.1     10.0      (9)%   29.6    33.9     (13)%
----------------------------------------------------------------------------
Average spot price
 ($US/lb)                  58.29    45.96      27%   46.83   46.06       2%
----------------------------------------------------------------------------
Average realized price
($US/lb)                   48.50    40.64      19%   43.63   38.25      14%
($Cdn/lb)                  50.10    43.51      15%   45.81   45.12       2%
----------------------------------------------------------------------------
Average unit cost of
 sales ($Cdn/lb U3O8)
 (including DDR)           29.89    30.29      (1)%  28.40   30.59      (7)%
----------------------------------------------------------------------------
Revenue ($ millions)         461      443       4%   1,374   1,551     (11)%
----------------------------------------------------------------------------
Gross profit ($
 millions)                   181      132      37%     503     488       3%
----------------------------------------------------------------------------
Gross profit (%)              39       30      30%      37      31      19%
----------------------------------------------------------------------------



Fourth quarter

Production volumes this quarter were 4% lower than in the fourth quarter of 2009 due to lower output at Rabbit Lake.

Uranium revenues were up 4% due to a 15% increase in the realized selling price, partially offset by a 9% decline in sales volumes.

Realized prices were higher due to higher prices under market-related and fixed-price sales contracts.

Total cash cost of sales (excluding DDR) decreased by 12% to $233 million ($25.30 per pound U3O8). This was mainly the result of the following:

- the 9% decline in sales volume

- average unit costs for produced uranium were 26% higher

- average unit costs for purchased uranium were 14% lower due to fewer purchases at spot prices

The net effect was a $49 million increase in gross profit for the quarter.

Full year

Production volumes in 2010 were 10% higher than in 2009 due to higher production at McArthur River/Key Lake and the continued rampup of production at Inkai.

Uranium revenues this year were down 11% compared to 2009, due to a 13% decline in sales volumes.

Sales volumes in 2010 were 13% lower than 2009 due to some customers deferring deliveries under contracts until 2011. In addition, given the discretionary nature of spot market demand and the low level of spot market prices during the first three quarters of 2010, we intentionally reduced our spot market sales for the year.

Our realized prices this year in US dollars were 14% higher than 2009 mainly due to higher prices under fixed-price sales contracts. Our Canadian dollar selling price, however, was only slightly higher than 2009 as it was impacted by a less favourable exchange rate. Our exchange rate averaged $1.05 compared to $1.18 in 2009.

Total cash cost of sales (excluding DDR) decreased by 23% this year, to $699 million ($23.32 per pound U3O8). This was mainly the result of the following:

- the 13% decline in sales volume

- average unit costs for produced uranium were 6% lower

- average unit costs for purchased uranium were 17% lower due to fewer purchases at spot prices

- a lower proportion of sales of purchased uranium, which carries a higher cash cost

The net effect was a $15 million increase in gross profit for the year.

The following table shows our cash cost of sales per unit (excluding DDR) for produced and purchased material, including royalty charges on produced material, and the quantity of produced and purchased uranium sold.




----------------------------------------------------------------------------
                   Unit cash cost of sale           Quantity sold
                            ($Cdn/lb U3O8)           (million lbs)
Three months ended ---------------------------------------------------------
December 31                 2010     2009  change    2010    2009   change
----------------------------------------------------------------------------
Produced                   22.30    17.73    4.57     5.5     5.1      0.4
----------------------------------------------------------------------------
Purchased                  29.93    34.72   (4.79)    3.6     4.9     (1.3)
----------------------------------------------------------------------------
Total                      25.30    26.19   (0.89)    9.1    10.0     (0.9)
----------------------------------------------------------------------------


Full year ended
December 31                 2010     2009  change    2010    2009   change
----------------------------------------------------------------------------
Produced                   22.45    23.86   (1.41)   20.0    20.9     (0.9)
----------------------------------------------------------------------------
Purchased                  25.11    30.22   (5.11)    9.6    13.0     (3.4)
----------------------------------------------------------------------------
Total                      23.32    26.33   (3.01)   29.6    33.9     (4.3)
----------------------------------------------------------------------------



Fuel services results
(includes results for
 UF6, UO2 and fuel
 fabrication)
----------------------------------------------------------------------------
                       Three months ended              Year ended
                              December 31             December 31
Highlights                  2010     2009  change    2010    2009   change
----------------------------------------------------------------------------
Production volume
 (million lbs)               3.9      3.9       -    15.4    12.3       25%
----------------------------------------------------------------------------
Sales volume (million lbs)   6.3      6.0       5%   17.0    14.9       14%
----------------------------------------------------------------------------
Realized price
 ($Cdn/kgU)                14.59    14.89      (2)% 16.86   17.84       (5)%
----------------------------------------------------------------------------
Average unit cost of
 sales ($Cdn/lb U3O8)
 (including DDR)           12.87    12.43       4%  13.39   14.47       (7)%
----------------------------------------------------------------------------
Revenue ($ millions)          93       91       2%    301     276        9%
----------------------------------------------------------------------------
Gross profit ($ millions)     11       13     (15)%    60      50       20%
----------------------------------------------------------------------------
Gross profit (%)              12       14     (14)%    20      18       11%
----------------------------------------------------------------------------



Fourth quarter

Total revenue increased by 2% due to a 5% increase in sales volumes.

Our Canadian dollar realized price for UF6 was similar to the prior year but was affected by a less favourable exchange rate. Our exchange rate averaged $1.03 in the fourth quarter compared to $1.06 in 2009.

The total cost of products and services sold (including DDR) increased by 5% ($82 million compared to $78 million in the fourth quarter of 2009) due to the increase in sales volume. The average unit cost of sales was 4% higher due to increased sales of fuel fabrication, which carries a higher unit cost than other fuel services products.

The net effect was a $2 million decrease in gross profit.

Full year

The Port Hope UF6 conversion plant operated for a full year in 2010, increasing production volumes by 25% over 2009. In 2009, the facility was shutdown for the first five months of the year.

Total revenue increased by 9% due to a 14% increase in sales volumes.

Our Canadian dollar realized price for UF6 was affected by a less favourable exchange rate. Our exchange rate averaged $1.05 in 2010 compared to $1.18 in 2009.

The total cost of products and services sold (including DDR) increased by 6% ($241 million compared to $226 million in 2009) due to the increase in sales volume. The average unit cost of sales was 7% lower due to lower costs for purchased material and the return to operational status of the UF6 facility.

The net effect was a $10 million increase in gross profit.

Electricity results

Fourth quarter

Total electricity revenue decreased 7% as higher actual output was offset by a lower realized price. Realized prices reflect spot sales, revenue recognized under BPLP's agreement with the OPA, and financial contract revenue. BPLP recognized revenue of $114 million this quarter under its agreement with the OPA, compared to $137 million in the fourth quarter of 2009. The equivalent of about 45% of BPLP's output was sold under financial contracts this quarter, compared to 54% in the fourth quarter of 2009.

The capacity factor was 91% this quarter, up from 89% in the fourth quarter of 2009. Operating costs were $221 million compared to $218 million in 2009.

The result was an 18% decrease in our share of earnings before taxes.

BPLP distributed $120 million to the partners in the fourth quarter. Our share was $38 million. The partners have agreed that BPLP will distribute excess cash monthly, and will make separate cash calls for major capital projects.

Full year

BPLP's results in 2010 are largely the result of lower revenues, which were 8% lower than 2009 due to a 9% decrease in realized electricity prices. BPLP recognized revenue of $339 million under the agreement with the OPA during the year, compared to $514 million in 2009. The equivalent of about 42% of BPLP's output was sold under financial contracts in 2010, compared to 57% in 2009.

The capacity factor was 91% in 2010. Operating costs were $930 million this year compared to $905 million in 2009.

The net effect was a decrease in our share of earnings before taxes of 26%.

BPLP distributed $525 million to the partners in 2010. Our share was $166 million.




Operations and development project updates


Uranium - production overview
----------------------------------------------------------------------------
                            Three months ended      Year ended
                                   December 31     December 31
                         ---------------------------------------------------
Cameco's share
(million lbs U3O8)                2010    2009    2010    2009    2010 plan
----------------------------------------------------------------------------
McArthur River/Key Lake            4.0     4.0    13.9    13.3         13.1
----------------------------------------------------------------------------
Rabbit Lake                        1.3     1.4     3.8     3.8          3.6
----------------------------------------------------------------------------
Smith Ranch-Highland               0.4     0.5     1.8     1.8          1.8
----------------------------------------------------------------------------
Crow Butte                         0.2     0.2     0.7     0.8          0.7
----------------------------------------------------------------------------
Inkai                              0.5     0.6     2.6     1.1          2.3
----------------------------------------------------------------------------
Total                              6.4     6.7    22.8    20.8       21.5(1)
----------------------------------------------------------------------------
(1) We updated our 2010 plan in our Q3 MD&A to 22 million pounds.



McArthur River/Key Lake

Our share of production for the year was 6% higher than our target of 13.1 million pounds U3O8, and a 5% increase over 2009. In 2009, we also exceeded our production target.

Our strong performance at both McArthur River and Key Lake allowed us to realize benefits under the production flexibility amendments to the McArthur River and Key Lake operating licences.

We developed a second raisebore chamber in zone 2, panel 5. This is expected to improve production efficiency in the future.

In lower zone 4, we completed the transition to this zone and began production during the fourth quarter.

Rabbit Lake

Production this year was the same as in 2009.

We added mineral reserves, extending the estimated mine life by two years to 2017. We have completed surface exploration drilling near the mine and have found new mineralization. In 2012, we are planning to start an underground drilling program to further evaluate this mineralization.

Inkai

Our share of production this year was significantly higher due to successful wellfield performance and the processing of uranium in inventory at the end of 2009. Production was 13% higher than our plan at the beginning of the year due to the completion of the processing facilities and a stable acid supply.

Inkai received state commissioning approval for the main processing plant, allowing full processing of uranium concentrate on site. The plant operated at production rates very close to design capacity for several months due to strong wellfield performance.

Inkai received approval in principle to:

- increase annual production from blocks 1 and 2 to 3.9 million pounds of U3O8 (100% basis)

- amend the block 3 licence to provide for a five-year appraisal period to carry out delineation drilling, construction and operation of a test leach facility, and to complete a feasibility study

Inkai is in the process of finalizing the approval process with an amendment to its resource use contract.

Inkai continued delineation drilling throughout the year on block 3 and began planning for engineering and construction of a test plant facility.

Cigar Lake

During 2010, we:

- completed dewatering the underground development

- substantially completed clean up, inspection, assessment and securing of the underground development areas

- we prepared the ground around shaft 2 for freezing in preparation to resume shaft sinking

- began implementing a surface freeze strategy we expect will shorten the rampup period for the project by bringing forward uranium production into the early years and improve mining costs and project economics

- increased installed pumping capacity to design standards

- completed backfilling of the 420 and 465 metre levels

- resumed underground development in the south end of the mine

- completed the 2010 surface drilling program

In 2011, we expect to:

- finish restoring all remaining underground mine systems, infrastructure and underground development areas

- complete the work to secure the mine

- resume underground construction

- complete the sinking of shaft 2

- complete the surface ore loadout facilities

- procure additional equipment for the jet boring system

- work to obtain regulatory approval of the environmental assessment that will allow the release of treated water directly to Seru Bay of Waterbury Lake

- work to obtain regulatory approval for the Cigar Lake mine plan

Later in 2011, we plan to issue a new technical report for Cigar Lake to reflect developments during 2010, including our decision to proceed with the surface freeze strategy. In the report, we will update our estimates including our capital cost estimate and production rampup schedule.

We continue to target initial production to begin in mid-2013.

Fuel services

Fuel services production totalled 15.4 million kgU in 2010, in line with our target of 15 million to 16 million kgU. Production was 25% higher than in 2009 due to the routine operation of the Port Hope UF6 plant, which did not operate for most of the first half of 2009.

Qualified persons

The technical and scientific information discussed in this document for our material properties (McArthur River/Key Lake, Inkai and Cigar Lake) was prepared under the supervision of the following individuals who are qualified persons for the purposes of NI 43-101:

McArthur River/Key Lake

- Alain G. Mainville, director, mineral resources management,
Cameco

- David Bronkhorst, vice-president, Saskatchewan mining south,
Cameco

- Greg Murdock, technical superintendent, McArthur River,
Cameco

- Lorne D. Schwartz, chief metallurgist, major projects - technical services,
Cameco

- Les Yesnik, general manager, Key Lake,
Cameco

Cigar Lake

- Alain G. Mainville, director, mineral resources management,
Cameco

- C. Scott Bishop, principal mine engineer, major projects - technical services,
Cameco

- Grant J.H. Goddard, vice-president, Saskatchewan mining north,
Cameco

- Lorne D. Schwartz, chief metallurgist, major projects - technical services,
Cameco

Inkai

- Alain G. Mainville, director, mineral resources management,
Cameco

About forward-looking information

This document includes statements and information about our expectations for the future.

When we discuss our strategy, plans and future financial and operating performance, or other things that have not yet taken place, we are making statements considered to be forward-looking information or forward-looking statements under Canadian and United States securities laws. We refer to them in this document as forward-looking information.

Key things to understand about the forward-looking information in this document:

- It typically includes words and phrases about the future, such as: anticipate, expect, plan, intend, predict, goal, target, project, potential, strategy and outlook (see examples below).

- It represents our current views, and can change significantly.

- It is based on a number of material assumptions, including those we've listed below, which may prove to be incorrect.

- Actual results and events may be significantly different from what we currently expect due to the risks associated with our business. We list a number of these material risks below. We recommend you also review our current annual information form and annual MD&A, which include a discussion of other material risks that could cause actual results to differ significantly from our current expectations.

Forward-looking information is designed to help you understand management's current views of our near and longer term prospects, and it may not be appropriate for other purposes. We will not necessarily update this information unless we are required to by securities laws.

Examples of forward-looking information in this document

- outlook for each of our operating segments for 2011 and our consolidated outlook for the year

- our expectation that existing cash balances and operating cash flows will meet our anticipated capital requirements without the need for significant additional funding

- our uranium price sensitivity analysis

- production at our uranium operations from 2011 to 2015 and our target of doubling annual production to 40 million pounds by 2018

- our 2011 capital spending plan and our expectation that for the next several years capital expenditures will be similar to 2011

- our expectation that our reduction in capital expenditures in 2010 will not impact our plans to double annual uranium production by 2018

- our mid-2013 target for initial production from Cigar Lake, the expected benefits of our surface freeze strategy and our 2011 Cigar Lake plans

- Material risks

- actual sales volumes or market prices for any of our products or services are lower than we expect for any reason, including changes in market prices or loss of market share to a competitor

- we are adversely affected by changes in foreign currency exchange rates, interest rates or tax rates

- production costs are higher than planned, or necessary supplies are not available, or not available on commercially reasonable terms

- our estimates of production, purchases, costs, decommissioning or reclamation expenses, or our tax expense estimates, prove to be inaccurate

- we are unable to enforce our legal rights under our existing agreements, permits or licences, or are subject to litigation or arbitration that has an adverse outcome

- there are defects in, or challenges to, title to our properties

- our mineral reserve and resource estimates are inaccurate, or we face unexpected or challenging geological, hydrological or mining conditions

- we are affected by environmental, safety and regulatory risks, including increased regulatory burdens or delays

- we cannot obtain or maintain necessary permits or approvals from government authorities

- we are affected by political risks in a developing country where we operate

- we are affected by terrorism, sabotage, blockades, accident or a deterioration in political support for, or demand for, nuclear energy

- there are changes to government regulations or policies, including tax and trade laws and policies

- our uranium and conversion suppliers fail to fulfil delivery commitments

- delay or lack of success in remediating and developing Cigar Lake

- we are affected by natural phenomena, including inclement weather, fire, flood and earthquakes

- our operations are disrupted due to problems with our own or our customers' facilities, the unavailability of reagents, equipment, operating parts and supplies critical to production, lack of tailings capacity, labour shortages, labour relations issues, strikes or lockouts, underground floods, cave-ins, tailings dam failures, and other developments and operating risks

Material assumptions

- sales and purchase volumes and prices for uranium, fuel services and electricity

- expected production costs

- expected spot prices and realized prices for uranium, and other factors discussed on page 4, Price sensitivity analysis: uranium

- tax rates, foreign currency exchange rates and interest rates

- decommissioning and reclamation expenses

- mineral reserve and resource estimates

- the geological, hydrological and other conditions at our mines

- our Cigar Lake remediation and development plans succeed

- our ability to continue to supply our products and services in the expected quantities and at the expected times

- our ability to comply with current and future environmental, safety and other regulatory requirements, and to obtain and maintain required regulatory approvals

- our operations are not significantly disrupted as a result of political instability, nationalization, terrorism, sabotage, blockades, breakdown, natural disasters, governmental or political actions, litigation or arbitration proceedings, the unavailability of reagents, equipment, operating parts and supplies critical to production, labour shortages, labour relations issues, strikes or lockouts, underground floods, cave in, tailings dam failure, lack of tailings capacity, or other development or operating risks

Quarterly dividend notice

We announced today that our board of directors approved a quarterly dividend of $0.10 per share on the outstanding common shares of the corporation that is payable on April 15, 2011, to shareholders of record at the close of business on March 31, 2011.

Conference call

We invite you to join our fourth quarter conference call on Monday, February 14, 2011 at 11:00 a.m. Eastern.

The call will be open to all investors and the media. To join the call, please dial (800) 769-8320 or (416) 695-6616 (Canada and US). An operator will put your call through. A live audio feed of the conference call will be available from a link at cameco.com. See the link on our home page on the day of the call.

A recorded version of the proceedings will be available:

- on our website, cameco.com, shortly after the call

- on post view until midnight, Eastern, Monday, March 14, 2011 by calling (800) 408-3053 or (905) 694-9451 (Passcode 4257148 #)

Additional information

Our 2010 annual management's discussion and analysis, annual audited financial statements, reconciliation to United States GAAP and annual information form will be available shortly on SEDAR at sedar.com, on EDGAR at sec.gov/edgar.shtml and on our website at cameco.com.

Profile

We are one of the world's largest uranium producers, a significant supplier of conversion services and one of two Candu fuel manufacturers in Canada. Our competitive position is based on our controlling ownership of the world's largest high-grade reserves and low-cost operations. Our uranium products are used to generate clean electricity in nuclear power plants around the world, including Ontario where we are a limited partner in North America's largest nuclear electricity generating facility. We also explore for uranium in the Americas, Australia and Asia. Our shares trade on the Toronto and New York stock exchanges. Our head office is in Saskatoon, Saskatchewan.

As used in this news release, the terms we, us, our and
Cameco mean Cameco Corporation and its subsidiaries and affiliates unless stated otherwise.

For more information, please contact

Cameco
Investor inquiries
Bob Lillie
(306) 956-6639

or

Media inquiries
Lyle Krahn
(306) 956-6316

 

Cameco Corporation

PRODUCTEUR
CODE : CCO.TO
ISIN : CA13321L1085
CUSIP : 13321L108
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Cameco est une société de production minière d'uranium basée au Canada.

Cameco est productrice d'uranium, de cobalt, de cuivre, de nickel et de zinc au Canada, au Kazakhstan et en Finlande, en développement de projets d'uranium au Canada et en Australie, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont RABBIT LAKE, KEY LAKE, SMITH RANCH, CROW BUTTE, MCARTHUR RIVER (SASKATCHEWAN), MC ARTHUR RIVER et MCARTHUR RIVER MINE au Canada, INKAI et HIGHLAND au Kazakhstan et TALVIVAARA en Finlande, ses principaux projets en développement sont CIGAR LAKE et MILLENNIUM au Canada et KINTYRE en Australie et ses principaux projets en exploration sont EAGLE POINT, DAWN LAKE, SMART LAKE, BOOMERANG et DAWSON au Canada.

Cameco est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 26,2 milliards CA$ (19,1 milliards US$, 17,9 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 26 décembre 2003 à 10,02 CA$, et son plus haut niveau récent le 19 avril 2024 à 66,18 CA$.

Cameco possède 395 792 522 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Cameco Corporation
26/04/2019Australia approves Cameco's controversial uranium mine
27/07/2018Cameco lays off 700 staff
27/04/2018World's top uranium miner Cameco back in the black
12/02/2018Cameco handed court victory over WA uranium prospect
09/02/2018Cameco's profit beat estimates on improved uranium prices, c...
09/01/2018Cameco's tractor-trailer with uranium concentrate involved i...
27/10/2017Cameco posts unexpected third-quarter loss, trims production...
28/07/2017Cameco misses with -11 cents a share adjusted loss in Q2
07/03/2017Cameco mulling sale of U.S. assets
10/02/2017Canada's Cameco posts $62 million loss hurt by sinking urani...
02/02/2017Cameco to lose $1.3bn as Japan's TEPCO cancels uranium contr...
Rapports annuels de Cameco Corporation
Cameco's 2012 online annual report is now available
Cameco Corporation AR Cameco's 2012 online annual report is ...
2009 Annual Report
Financements de Cameco Corporation
28/11/2011To Allow Offer For Hathor Exploration To Lapse
02/09/2009Completes Bought Deal Offering of 5.67% Senior Unsecured Deb...
Attributions d'options de Cameco Corporation
09/02/2012Approves Dividend
Nominations de Cameco Corporation
05/12/2013New Member Appointed to Cameco=E2??s Board of Directors
15/05/2013Cameco News Release - Cameco Board of Directors Re-Elected
15/05/2013Board of Directors Re-Elected
18/05/2011Elects Two New Board Members
22/02/2011annonce la nomination de son prochain PDG
Rapports Financiers de Cameco Corporation
08/02/2014Cameco reports fourth quarter and 2013 financial results
08/02/2014Cameco reports fourth quarter and 2013 financial results
30/10/2013Cameco reports third quarter financial results
30/10/2013Cameco reports third quarter financial results
30/10/2013reports third quarter financial results
01/08/2013Cameco Quarterly Cameco News Release - Cameco Reports Second...
01/08/2013Cameco News Release - Cameco Reports Second Quarter Financia...
01/05/2013Cameco Quarterly Cameco Reports First Quarter Financial Resu...
01/05/2013Cameco Reports First Quarter Financial Results
09/02/2013Cameco Reports Fourth Quarter and 2012 Financial Results
09/02/2013Cameco Quarterly Cameco Reports Fourth Quarter and 2012 Fina...
09/02/2013reports fourth quarter and 2012 financial results
01/11/2012Cameco Reports Third Quarter Financial Results
01/11/2012Cameco Quarterly Cameco Reports Third Quarter Financial Resu...
01/11/2012Reports Third Quarter Financial Results
27/07/2012Cameco News Release - Cameco Reports Second Quarter Financia...
01/05/2012Cameco Quarterly Cameco reports first quarter financial resu...
01/05/2012Cameco reports first quarter financial results
01/05/2012Reports First Quarter Financial Results
10/02/2012Cameco News Release - Cameco Reports Fourth Quarter and 2011...
04/08/2011Cameco News Release - Cameco Reports Second Quarter Earnings
06/05/2011Cameco News Release - Cameco reports first quarter financial...
06/05/2011Reports First Quarter Financial Results
17/02/2011(Inkai)2010 Management discussion and analysis
13/02/2011annonce ses résultats financiers du quatrième trimestre et d...
12/02/2011Cameco News Release - Cameco Reports Fourth Quarter and 2010...
12/02/2011Cameco Corporation Quarterly - Cameco Reports Fourth Quarter...
11/02/2011Reports Fourth Quarter and 2010 Financial Results
12/08/2009Second Quarter Earnings
Projets de Cameco Corporation
06/01/2016Cameco aims for bigger uranium output from new mine
02/03/2015Low-cost U.S. uranium miners await price signal to boost out...
31/01/2014Cameco announces agreement to sell its interest in Bruce Pow...
09/09/2013Cameco News Release - Cameco Provides Update on the Cigar La...
09/09/2013(Cigar Lake)Provides Update on the Cigar Lake Project
09/01/2013Cameco News Release - Cameco Completes NUKEM Acquisition
27/08/2012Cameco News Release - Cameco Acquires Yeelirrie Uranium Proj...
02/03/2012Cameco News Release - Cameco Announces Agreement to Acquire ...
07/10/2011Cameco News Release - Cameco Receives Competition Bureau Cle...
08/02/2011(Talvivaara)se dote d'un nouvel approvisionnement d'uranium en Finlande
07/02/2011(Talvivaara)Adds New Uranium Supply from Finland
31/12/1997(Kintyre)1997 Technical report
Communiqués de Presse de Cameco Corporation
29/07/2016Coverage Initiated on Industrial Metals and Minerals Stocks ...
28/07/2016Cameco reports 2Q loss
28/07/2016Cameco Reports Second Quarter Financial Results
22/07/2016Skechers Tops Friday’s 52-Week Low Club
14/07/2016Cameco Provides Date for Q2 Conference Call
08/07/2016Cameco Port Hope Conversion Facility Workers Accept New Coll...
21/06/2016Athabasca Basin Communities Renew Partnership with the Urani...
31/05/2016Cameco Updates Production Outlook for Cigar Lake
31/05/2016Cameco Touchdown for Dreams Program Names First Dream Recipi...
27/05/2016Cameco and Kazatomprom Sign Agreement to Restructure JV Inka...
11/05/2016Cameco Reports First Quarter Financial Results
25/01/2016Cameco Provides Date for Q4 Conference Call
21/01/2016Cameco Named on Top 100 List for most Sustainable Corporatio...
16/01/2016Company seeks to expand uranium mining in western Nebraska
07/01/2016Cameco Investor Webcast Advisory
06/01/2016Cameco Sets Production Outlook for Cigar Lake Operation
28/12/2015Uranium prices set to march higher as climate deal boosts nu...
17/12/2015New Director Appointed to Cameco’s Board
17/12/2015New Director Appointed to Cameco's Board
17/12/2015Cameco Restricts Underground Mining Activities at the Rabbit...
17/12/2015Cameco restricts underground mining at Rabbit Lake after roc...
03/12/2015Cameco Approves Dividend
02/12/2015Is ISIS Pharmaceuticals, Inc. (SIS) Going to Burn These Hedg...
02/12/2015Do Hedge Funds Love StanCorp Financial Group, Inc. (SFG)?
30/11/2015Do Hedge Funds Love Cameco Corporation (USA) (CCJ)?
24/11/2015Here is What Hedge Funds Think About Seattle Genetics, Inc. ...
07/11/2015This Hedge Fund is Betting Big on Mining Stocks and Here Are...
05/11/2015Cameco Investor Webcast Advisory
05/11/2015Pacific trade pact to ease foreign takeover scrutiny in Cana...
03/11/2015Edited Transcript of CCO.TO earnings conference call or pres...
31/10/2015Cameco Q3 adjusted profit falls amid oversupply
30/10/2015Cameco Reports Third Quarter Financial Results
30/10/2015Cameco Q3 adjusted profit falls
30/10/2015Cameco reports 3Q loss
16/10/2015How bulls are playing Cameco
13/10/2015Cameco Investor Webcast Advisory
09/10/2015S&P Dow Jones Indices Announces Quarterly Review of S&P/TSX ...
02/10/2015Cameco Provides Dates for Q3 Results and Conference Call
01/10/2015Cameco Provides Dates for Q3 Results and Conference Call
23/09/2015Cameco and AREVA Celebrate Start of Production at Cigar Lake
10/09/2015Canada's uranium a 'strategic asset' and NDP won't reverse P...
03/09/2015Cameco Recognized for Outstanding Web Development
27/08/2015Billionaire Lei Zhang’s Favorite North American Companies
13/08/2015Kopernik Global Investors Is Betting Big On Its Top Mining P...
07/08/2015Cameco Updates Sustainable Development Report
04/08/2015Canpotex taps Cameco's Seitz as next CEO
03/08/2015Edited Transcript of CCO.TO earnings conference call or pres...
30/07/2015Cameco misses 2Q profit forecasts
30/07/2015Uranium producer Cameco sees 5-10 pct rise in 2015 revenue
30/07/2015Cameco reports second quarter financial results
30/07/2015Canadian uranium producer Cameco's profit falls 31 pct
09/07/2015Cameco Provides an Update on Saskatchewan Forest Fire Situat...
02/07/2015Cameco Provides Date for Q2 Results and Conference Call
22/06/2015Can Kopernik Global Investors’ Top Energy Stock Picks Help I...
26/05/2015Hedge Funds Pulling Back From The Mining Industry ~ See Thei...
23/04/2015Cameco Corporation (CCJ) in Focus: Stock Adds 6% in Session ...
22/04/2015NYSE stocks posting largest percentage increases
16/04/2015PRESS DIGEST- Canada- April 16
15/04/2015annonce la signature avec l'Inde d'un contrat d'approvisionn...
15/04/2015Cameco Announces Contract With India To Provide Uranium For ...
15/04/2015Cameco signs C$350 mln deal to supply uranium to India react...
15/04/2015India, Canada expected to announce uranium supply deal
15/04/2015PRESS DIGEST- Canada - April 15
10/04/2015PRESS DIGEST- Canada-April 10
26/03/2015Cameco Provides Date for Q1 Results and Conference Call
26/03/2015Provides Date for Q1 Results and Conference Call
13/03/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
06/03/2015Cameco Reports Document Filings
13/02/2015présente ses résultats financiers pour le quatrième trimestr...
09/02/2015Canada Stocks to Watch: Tahoe, Rio Alto, Enbridge, Danier Le...
14/01/2015(Cigar Lake)diffuse une mise à jour concernant la production de la mine ...
13/01/2015(Cigar Lake)Provides Production Update for the Cigar Lake Mine
19/02/2014Cameco Investor Webcast Advisory
10/02/2014Cameco Again Recognized as a Top Diversity Employer
07/02/2014Cameco Announces Senior Management Changes
18/12/2013Cameco Investor Webcast Advisory
05/12/2013Cameco Approves Dividend
02/12/2013Season's Greetings from Cameco Corporation
06/11/2013Cameco Investor Webcast Advisory
21/10/2013Cameco News =2D Cameco Celebrates Five Years as Top Employer
01/10/2013Provides Date for Q3 Results and Conference Call
26/09/2013Cameco Update =2D Cameco Investor Webcast Advisory
26/09/2013Cameco Update =2D Cameco Investor Webcast Advisory
25/09/2013Investor Webcast Advisory
12/09/2013Cameco Email Alert System Upgrade
15/08/2013Cameco News Release - Cameco Update - Cameco Investor Webcas...
05/07/2013Cameco News Release - Cameco Port Hope Conversion Facility W...
02/07/2013Cameco News Release - Cameco Provides Date for Q2 Results an...
02/07/2013Provides Date for Q2 Results and Conference Call
03/06/2013Cameco Web Release - Cameco Updates Sustainable Development ...
31/05/2013Cameco Web Release - Collaboration Agreement builds on relat...
13/05/2013Cameco Web Release - Cameco Starts Production from North But...
09/05/2013Cameco launches new Uranium 101 website
01/04/2013Cameco Advisory - Cameco Provides Date for Q1 Results and Co...
01/04/2013Provides Date for Q1 Results and Conference Call
22/02/2013Cameco Update - Cameco Reports Document Filings
19/02/2013Cameco Update - Cameco Investor Webcast Advisory
19/02/2013Investor Webcast Advisory
19/02/2013Cameco Update - Cameco Recognized for Valuing Diversity in t...
06/02/2013Cameco Update - Cameco Remains a Top 10 Employer in Canada
16/01/2013Cameco Update - Cameco Investor Webcast Advisory
16/01/2013Investor Webcast Advisory
08/01/2013Cameco News Release - Cameco Provides Dates for Q4 Results a...
08/01/2013Provides Dates for Q4 Results and Conference Call
07/11/2012Announces $500 Million Debenture Offering
03/11/2012Cameco Announces Filing of a Technical Report for the McArth...
19/10/2012Cameco News Release - Cameco Touchdown for Dreams program an...
12/10/2012Cameco Update - Cameco Signs Milestone Agreement With Martu
10/10/2012Cameco Update - Cameco Continues to be a Top Employer
01/10/2012Cameco Update - Cameco Provides Date for Q3 Results and Conf...
01/10/2012Cameco News Release - Cameco Clarifies Comments Made During ...
01/10/2012Clarifies Comments Made During Investor Tour
19/09/2012Cameco Update - Cameco Investor Webcast Advisory
19/09/2012Investor Webcast Advisory
07/07/2012Cameco News Release - Workers at Cameco's Fuel Manufacturing...
27/06/2012Cameco News Release - Cameco Provides Date for Q2 Results an...
27/06/2012Provides Date for Q2 Results and Conference Call
18/06/2012Cameco Update - Cameco Releases 2012 Sustainable Development...
11/06/2012Cameco News Release - Cameco Acquires Majority Ownership of ...
11/06/2012(Millennium)Acquires Majority Ownership of the Millennium Project
29/05/2012Cameco Update - Cameco Investor Webcast Advisory
29/05/2012Investor Webcast Advisory
22/05/2012Cameco News Release - Cameco Announces Filing of Preliminary...
22/05/2012Announces Filing of Preliminary Base Shelf Prospectus
15/05/2012Cameco News Release - Cameco Elects New Board Member
14/05/2012Cameco News Release - Cameco Announces Agreement to Acquire ...
10/05/2012Cameco Update - Cameco Investor Webcast Advisory
10/05/2012Investor Webcast Advisory
06/04/2012Cameco Update - Cameco Provides Date for Q1 Results and Conf...
05/04/2012Provides Date for Q1 Results and Conference Call
02/03/2012Cameco News Release - Finland Grants Licence for Uranium Ext...
02/03/2012(Millennium)Announces Agreement to Acquire Majority Ownership of the Mil...
25/02/2012Cameco News Release - Cameco Reports Document Filings
25/02/2012Reports Document Filings
21/02/2012Cameco Update - Cameco Investor Webcast Advisory
21/02/2012Investor Webcast Advisory
21/02/2012Cameco News Release - Cameco Named A Top Diversity Employer ...
08/02/2012Cameco News Release - Cameco Approves Dividend
01/02/2012Cameco Update - Cameco Named Top 10 Employer For Third Conse...
11/01/2012Cameco News Release - Cameco Investor Webcast Advisory
10/01/2012Cameco News Release - Cameco Provides Date for Q4 Results an...
10/01/2012Provides Date for Q4 Results and Conference Call
03/01/2012Cameco News Release - Cameco Announces Breakthrough of Secon...
03/01/2012(Cigar Lake)Announces Breakthrough of Second Shaft at Cigar Lake
19/12/2011Cameco News Release - Cameco Signs Agreements to Improve Cig...
19/12/2011(Cigar Lake)Signs Agreements to Improve Cigar Lake Economics
02/12/2011Cameco News Release - Cameco Approves Dividend
28/11/2011Cameco News Release - Cameco To Allow Offer For Hathor Explo...
19/10/2011Responds to Hathor Announcement
07/10/2011Cameco Update - Cameco Named A Top 100 Employer For Third Co...
06/10/2011Receives Competition Bureau Clearance for Hathor Acquisition
06/10/2011Cameco News Release - Cameco Signs MOU to Improve Cigar Lake...
14/09/2011Cameco News Release - Cameco Provides Further Comment on Hat...
13/09/2011Cameco News Release - Cameco comments on Hathor News Release
13/09/2011Provides Initial Comment on Hathor's News Release Summarizin...
01/09/2011Cameco News Release - Cameco Announces Agreement to Increase...
31/08/2011(Inkai)Announces Agreement to Increase Inkai Production
30/08/2011Cameco News Release - Cameco Commences Offer to Acquire Hath...
29/08/2011Cameco Update - Cameco Investor Webcast Advisory
26/08/2011Cameco News Release - Cameco Announces Intention to Acquire ...
04/08/2011Cameco Corporation Quarterly - Cameco Reports Second Quarter...
15/07/2011Cameco News Release - Cameco Announces Senior Management Cha...
04/07/2011Cameco News Release - Cameco Provides Date for Q2 Results an...
04/07/2011Provides Date for Q2 Results and Conference Call
17/05/2011Cameco News Release - Cameco Elects Two New Board Members
06/05/2011Cameco Corporation Quarterly - Cameco reports first quarter ...
04/04/2011Cameco News Release - Cameco Provides Date for Q1 Results an...
24/02/2011Cameco Update - Cameco Investor Webcast Advisory
22/02/2011Cameco News Release - Cameco Announces Next CEO
21/02/2011Cameco Update - Cameco Again Recognized As Top Diversity Emp...
21/02/2011Again Recognized As Top Diversity Employer
17/02/2011Cameco News Release - Cameco Reports Additional Document Fil...
10/08/2009Reports No Material Change in Centerra Gold Divestiture
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CCO.TO)NYSE (CCJ)
66,18-0.24%48,10-0.15%
TORONTO
CA$ 66,18
19/04 17:00 -0,160
-0,24%
Cours préc. Ouverture
66,34 65,91
Bas haut
65,66 67,19
Année b/h Var. YTD
53,31 -  69,03 18,09%
52 sem. b/h var. 52 sem.
34,53 -  69,03 92,05%
Volume var. 1 mois
694 908 16,91%
24hGold TrendPower© : 24
Produit Cobalt - Copper - Nickel - Uranium - Zinc
Développe Uranium
Recherche Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 06/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202421,34%
202377,71%56,3630,02
20227,05%41,0523,03
202168,15%35,4715,84
202047,62%9,7410,28
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :