Publié le 12 février 2008

Reports Fourth Quarter Results for 2007

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cadmium | Calcium | Canada | Copper | Dollar | Panama | Swaps | Zinc |

Marketwire

 
 
Teck Cominco Limited
TSX:TCK.A
TSX:TCK.B
NYSE:TCK
Other Recent News

February 11, 2008
Teck Cominco Reports Fourth Quarter Results for 2007
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 11, 2008) -

All dollar amounts expressed in this news release are in Canadian dollars unless otherwise noted.

Earnings were $280 million or $0.64 per share in the fourth quarter. Don Lindsay, President and CEO said, "Our earnings were affected by significantly lower prices for zinc (-38%) and coal (-26%), the stronger Canadian dollar and its effect on our cost base, lower zinc sales volumes from the Red Dog mine versus last year and reduced sales from Highland Valley due to the mine life extension program. The reduced revenues were partially offset by higher lead prices and revenue increases from the new copper mines acquired from Aur. In addition, we recorded after-tax write-downs totalling $51 million related to our investment in Tahera Diamonds and our Lennard Shelf and Pend Oreille zinc mines and a $50 million pre-tax ($33 million after-tax) equity loss related to our investment in Galore Creek."

"While we faced a number of challenges in 2007, it was still a year with several solid accomplishments for the company. We delivered the second highest earnings in our history at $1.6 billion and returned just over $1 billion to our shareholders through dividends and our share buy-back program, amongst the very highest returns in Canadian business." said Mr. Lindsay. "Our acquisition of Aur Resources is performing significantly above expectations and, combined with our investment to extend the mine life of Highland Valley, has substantially increased both our production and reserves in copper. We also increased our effective interest in Elk Valley Coal to 52%. In our energy division, we increased our interest in the Fort Hills oil sands project from 15% to 20% and together with our partner, UTS, we have jointly acquired very prospective oil sands leases on approximately 285,000 acres of land in the Athabasca region of northern Alberta. Our balance sheet remains very strong as evidenced by a debt rating upgrade to the highest level in our history."

Financial Highlights and Significant Items

- Prices for zinc, copper and coal in the fourth quarter were 46%, 13% and 26% lower respectively in Canadian dollar terms than a year ago. The zinc price averaged C$1.17 per pound compared to C$2.18 per pound a year ago, copper was C$3.19 versus C$3.66 per pound last year and coal was C$91 per tonne compared to C$123 per tonne a year ago.

- Net earnings were $280 million or $0.64 per share in the fourth quarter compared with $866 million or $2.01 per share in the fourth quarter of 2006. Adjusted net earnings were $380 million, compared with adjusted earnings of $793 million in 2006. Net earnings for 2007 were $1.6 billion, compared with $2.4 billion in 2006.

- Fourth quarter cash flow from operations was $560 million compared with $1.2 billion in 2006 and our cash balance was $1.4 billion at the end of the year.

- Earnings before interest taxes depreciation and amortization ("EBITDA") were $422 million in the fourth quarter, compared with $1.3 billion a year ago. For the full year EBITDA was $2.6 billion compared with $3.8 billion in 2006.

- The three mines acquired from Aur Resources all performed well in the quarter, setting production records and recording operating profits of $105 million in the quarter before negative pricing adjustments of $27 million and $62 million reduction due to one time fair value adjustments made to inventories at the time of our acquisition of Aur.

- On February 8, 2008, we and our partners, Inmet Mining Corporation and Petaquilla Copper Ltd. announced the results of an interim report on the Front End Engineering and Design ("FEED") study being conducted by Petaquilla copper project in Panama. The interim report estimates that the capital cost required to develop the Petaquilla project is expected to be US$3.5 billion (including a contingency of $515 million but not including working capital and escalation). At this time, there can be no assurance that we will participate in the development of this project.

- Results from our Trail metal operations were affected by the shutdown of the lead smelter and refinery facilities in October/November to conduct planned maintenance originally scheduled for 2008 on the KIVCET furnace, boiler and related equipment. Both the lead smelter and lead refinery resumed full operation in November. The shutdown increased unit costs and reduced profitability.

- Our Antamina copper-zinc mine in Peru has been experiencing problems with the stationary part of the drive system for its main grinding mill, which resulted in 14 days of downtime in the fourth quarter and a further 11 days in 2008 to date. We are currently assessing the nature of the problems to determine the appropriate actions required to fix the electrical motor. Although the mill is currently operating near full capacity, there is significant potential for further production interruptions during 2008 while a long term solution is being implemented.

- In November construction activities were suspended on the Galore Creek copper project due to escalating cost estimates and reduced expected operating margins as a result of the stronger Canadian dollar. We continue to view the property as a substantial resource and have commenced a comprehensive review to evaluate alternative development strategies. The $33 million after-tax ($50 million pre-tax) equity loss related to our investment in Galore Creek is our 50% after-tax share of the estimated $100 million of demobilization costs related to the decision to suspend construction of the project. Galore Creek has measured and indicated resources containing approximately 8.9 billion pounds of copper and 7 million ounces of gold and an inferred resource containing approximately 2.9 billion pounds of copper and 2 million ounces of gold. In 2008 our efforts at the site will be focused on the demobilization of equipment and the placing of the project onto a care and maintenance basis that will enable us to restart it at a later date. Given the information we have at this time and before we have completed our comprehensive review, no provision has been made against the carrying value of our investment in Galore Creek as we believe the project retains value in excess of our carrying value of $214 million, which is after our $50 million equity loss related to our share of the estimated demobilization costs. However, there can be no assurances that our review will result in a commercially viable project or that a future write-down will not be required.

- Asset impairment charges totalling $51 million after-tax were taken against our investment in Tahera Diamond Corporation which sought protection from their creditors on January 16 due to operating and financial difficulties, and against our Lennard Shelf and Pend Oreille zinc mines, which are operating with lower than expected ore grades and higher unit operating costs.

This news release is dated as at February 11, 2008 should be read in conjunction with the unaudited consolidated financial statements of Teck Cominco Limited and the notes thereto for the three months and year ended December 31, 2007 and with the audited consolidated financial statements of Teck Cominco Limited and the notes thereto for the year ended December 31, 2006. In this news release, unless the context otherwise dictates, a reference to the company or us, we or our refers to Teck Cominco Limited and its subsidiaries including Teck Cominco Metals Ltd. and its subsidiaries. Additional information relating to the company, including the company's annual information form, is available on SEDAR at www.sedar.com.

This news release contains forward-looking statements. Please refer to the cautionary language after our outstanding share data information.

Earnings

Net earnings were $280 million or $0.64 per share in the fourth quarter, down significantly from $866 million or $2.01 per share in the fourth quarter of 2006. In 2006 one time items included a $115 million after-tax gain on the disposition of a strategic investment.

Our fourth quarter results were affected by a $33 million ($50 million pre-tax) equity loss related to our investment in the Galore Creek project where mine construction was suspended due to escalating capital costs and a number of asset write-downs totalling $51 million after taxes. The equity loss represents our after-tax share of the Galore Creek partnership's estimated demobilization costs. The asset write-downs relate to our investment in Tahera Diamond Corporation, which was written down due to the severe financial difficulties facing the company. Due to difficult mining conditions and low ore grades that impact their ongoing profitability, we also wrote down the property, plant and equipment at our Pend Oreille and Lennard Shelf zinc mines.

In addition, we recorded after-tax negative settlement adjustments of $94 million as base metal prices fell substantially in the quarter. This amount is comprised of $37 million of settlement adjustments on sales from the previous quarter and $57 million on sales that were initially recorded at the average price for the month of sale and subsequently revalued to the quarter end forward curve prices. A $69 million gain on the reduction of future tax liabilities due to the reduction in Federal income tax rates in Canada, and after-tax gains of $25 million on asset sales partially offset these effects.

The table below shows the impact of these items on our earnings.


                                     Three months ended         Year ended
                                            December 31        December 31
                                     ------------------     --------------

(in millions of dollars)                2007       2006     2007      2006

Net earnings as reported               $ 280      $ 866  $ 1,615   $ 2,431

Add (deduct) the after-tax effect of:
 Loss (earnings) from discontinued
  operations                              16        (14)      46       (36)
 Negative (positive) pricing adjustments
  On prior period sales                   37         (4)      56       (42)
  On current period sales                 57         41       10       (71)
 Realization of cumulative translation
  adjustment loss                          -          -       59         -
 Asset write downs and equity loss        84          -       84         -
 Tax rate adjustment                     (69)         -      (80)      (26)
 Gain on disposition of our investment
  in Inco                                  -       (115)       -      (103)
 Asset sales and other                   (25)        19      (36)      (23)
                                         100        (73)     139      (301)
 Adjusted net earnings (1)             $ 380      $ 793  $ 1,754   $ 2,130

(1) This news release refers to adjusted net earnings, which is not a
    measure recognized under generally accepted accounting principles
    (GAAP) in Canada or the United States, and does not have a standardized
    meaning prescribed by GAAP. We adjust net earnings as reported to
    remove the effect of unusual and/or non-recurring transactions in
    disclosing adjusted earnings. This measure may differ from those used
    by, and may not be comparable to such measures as reported by other
    issuers. We disclose this measure, which has been derived from our
    financial statements and applied on a consistent basis, because we
    believe it is of assistance in understanding the results of our
    operations and financial position and is meant to provide further
    information about our financial results to shareholders.
 
Adjusted Net Earnings

Adjusted net earnings of $380 million ($0.86 per share) in the fourth quarter were significantly lower than the $793 million ($1.84 per share) earned in the fourth quarter of 2006. The primary reasons for the decline in earnings were lower zinc prices and sales volumes, lower coal prices and the stronger Canadian dollar. Zinc prices averaged US$1.19 per pound in the quarter compared to US$1.91 per pound in 2006, and the lower price accounted for approximately $160 million of the decline in earnings. The US dollar averaged C$0.98 in the quarter compared with C$1.14 a year ago. The stronger Canadian dollar reduced the profit margin for our Canadian operations, particularly Highland Valley Copper and Elk Valley Coal, and the value of the profits we earn in US dollar economies from operations such as Red Dog, Antamina and Quebrada Blanca. This reduced net earnings by approximately $125 million. Higher lead prices partially offset these reductions while average copper prices were relatively unchanged in US dollars but were 13% lower in Canadian dollar terms.

Our earnings from coal operations are particularly sensitive to fluctuations in the Canadian/US dollar exchange rate. Although costs remained relatively constant compared with last year, the coal price averaged US$93 per tonne compared with US$106 per tonne in the previous year. Combined with the effect on operating margins from the stronger Canadian dollar, our 40% direct share of quarterly operating profits from the Elk Valley Coal Partnership declined from $100 million in 2006 to $30 million in 2007.

Other significant factors affecting earnings in the quarter included the effects of the month long maintenance shutdown of the KIVCET lead smelter at our Trail operations, lower sales at Red Dog, production disruptions at Antamina and lower production and sales at Highland Valley Copper.

In the fourth quarter of 2006, earnings included unusually large zinc sales volumes from Red Dog when shipping delays in the third quarter of 2006 shifted sales and the related profits into the fourth quarter. In 2007, sales volumes were reflective of the normal seasonal sales pattern and represented 33% of annual zinc sales compared with 46% in 2006.

We moved a 32-day maintenance shutdown of the KIVCET lead furnace, boiler and related equipment at Trail from 2008 forward into the last quarter of 2007. This resulted in a reduction of lead production and sales in the quarter by approximately 25%. We incurred additional maintenance costs of $20 million during the shutdown.

Copper production at Highland Valley Copper was down by approximately 25% in the quarter compared to 2006. This decline was primarily a result of lower grades in the areas mined in the current phase of the mine plan. Copper recoveries were lower as a result of higher clay content in the mined ore. The mining of the areas with higher clay content will continue into 2008 and 2009. These activities facilitate the previously announced expansion pre-stripping, which will extend the mine life until 2019.

The three mines acquired from Aur contributed operating profits of $105 million in the quarter before $27 million of negative final pricing adjustments and $62 million of one time mark-to-market adjustments made to inventories at the time of acquisition. Work-in-process inventories on hand at the acquisition date were assigned fair values based on their copper content less costs to complete and a small margin. As the acquired operations complete the processing and sale of these inventories, the cost of goods sold will reflect the higher assigned values resulting in reduced profits.

Cash Flow from Operations

Cash flow from operations was $560 million in the fourth quarter compared with $1.2 billion in the fourth quarter of 2006. The reduction is primarily the result of lower profits and a smaller reduction in Red Dog's inventory for the quarter than last year. Acquisition adjustments of $62 million to work-in-process inventories acquired in the acquisition of Aur Resources affect operating profits, but not cash flows. During the third and fourth quarters of each year, cash flow from operations is positively affected by the seasonal decline of Red Dog concentrate inventories. This decline was not as substantial as in 2006 when third quarter sales were pushed into the fourth quarter due to the late start to the shipping season that year.

Cash flow from operations was $1.7 billion for the year ended December 31, 2007 compared to $2.9 billion in 2006. In addition to lower profits in 2007, there was a build-up of working capital of $282 million in 2007 compared with a $299 million draw down in 2006. This occurred because an unusually large portion of taxes and royalties on 2006 earnings were paid in early 2007.

Revenues

Revenues are affected by sales volumes, commodity prices and currency exchange rates. Comparative data for production, sales and revenues are presented in the tables below. Average commodity prices and the Canadian/U.S. dollar exchange rate are presented in the table below.


Average Metal Prices and Exchange Rate

                                                                 Year ended
                                     Fourth Quarter             December 31
                              ---------------------   ---------------------
                              2007   2006  % Change   2007   2006  % Change

Zinc (LME Cash - US$/pound)   1.19   1.91      -38%   1.47  1.49        -1%
Lead (LME Cash - US$/pound)   1.46   0.74      +97%   1.17  0.59       +98%
Copper (LME Cash - US$/pound) 3.26   3.21       +2%   3.23  3.05        +6%
Molybdenum (published
 price(i) - US$/pound)          32     25      +28%     30    25       +20%
Gold (LME PM fix - US$/ounce)  789    614      +29%    697   604       +15%
Coal
 (US$/tonne)                    93    106      -12%     98   113       -13%
 (C$ equivalent/tonne)          91    123      -26%    105   131       -20%
Cdn/US exchange rate
 (Bank of Canada)             0.98   1.14      -14%   1.07  1.13        -5%

(i) Published major supplier selling price in Platts Metals Week.
 
Revenues from operations were lower by $550 million in the fourth quarter of 2007, compared with the same period last year. The decline was the result of three primary factors, lower zinc sales volumes from the Red Dog mine, the stronger Canadian dollar and lower prices for zinc and coal. These effects were partially off-set by higher lead prices. The effect of revenue increases from the new copper mines acquired from Aur was partially offset by reduced sales from Highland Valley.

Sales of metals in concentrate are recognized in revenue on a provisional pricing basis when title transfers and the rights and obligations of ownership pass to the customer, which usually occurs upon shipment. However, final pricing is typically not determined until a subsequent date, often in the following quarter. Accordingly, revenue in a quarter is based on current prices for sales occurring in the quarter and ongoing pricing adjustments from sales that are still subject to final pricing. These pricing adjustments result in additional revenues in a rising price environment and reductions to revenue in a declining price environment. The extent of the final pricing adjustments also takes into account the actual price participation terms as provided in the concentrate sales agreements. In the fourth quarter of 2007, we had negative after-tax pricing adjustments of $94 million compared with $37 million in 2006. The 2007 amount is comprised of $37 million of settlement adjustments on sales from the previous quarter, and $57 million on sales that were initially recorded at the average price for the month of shipment and subsequently revalued to quarter end forward curve prices.

At September 30, 2007, outstanding receivables included 141 million pounds of copper provisionally valued at US$3.66 per pound, 256 million pounds of zinc provisionally valued at US$1.38 per pound and 153 million pounds of lead provisionally valued at US$1.54 per pound. During the fourth quarter of 2007, 128 million pounds of copper included in the September 30, 2007 receivables were settled at an average final price of US$3.23 per pound, 193 million pounds of zinc were settled at an average final price of US$1.24 per pound and 114 million pounds of lead were settled at an average final price of US$1.56 per pound resulting in negative after-tax final pricing adjustments of C$37 million in the quarter. At December 31, 2007, outstanding receivables included 180 million pounds of copper provisionally valued at an average of US$3.04 per pound, 296 million pounds of zinc valued at an average of US$1.05 per pound and 74 million pounds of lead provisionally valued at an average of US$1.15 per pound.


PRODUCTION AND SALES (Note 1)
                              Production                    Sales
                      -------------------------   -------------------------
                            Fourth        Year-         Fourth        Year-
                           Quarter      to-date        Quarter      to-Date
                      2007    2006   2007  2006   2007    2006   2007  2006

TRAIL

Refined Zinc
 (thousand tonnes)      72     77     292   296     78      71    292   290

Refined Lead
 (thousand tonnes)      16     22      76    90     16      22     76    88

Surplus Power (GW.h)     -      -       -     -    208     106  1,130   891

BASE METALS (Note 2)

Zinc (thousand tonnes)
 Red Dog               134    134     575   558    192     246    576   536
 Antamina               10      9      66    35     10      11     66    36
 Pend Oreille            9      5      29    34      9       6     29    35
 Lennard Shelf
  (Note 3)               6      -      21     -      7       -     18     -
 Duck Pond (Note 4)      6      -       8     -      7       -      7     -
---------------------------------------------------------------------------
                       165    148     699   627    225     263    696   607
Lead (thousand tonnes)
 Red Dog                36     33     136   124     46      57    144   115
 Pend Oreille            1      1       4     5      1       1      4     5
 Lennard Shelf (Note 3)  2      -       6     -      4       -      6     -
---------------------------------------------------------------------------
                        39     34     146   129     51      58    154   120
Copper (thousand tonnes)
 Highland Valley Copper 34     46     136   167     32      47    137   180
 Antamina               20     24      74    87     24      26     74    87
 Quebrada Blanca
  (Note 4)              21      -      30     -     22       -     32     -
 Andacollo (Note 4)      5      -       7     -      5       -      7     -
 Duck Pond (Note 4)      4      -       5     -      2       -      5     -
---------------------------------------------------------------------------
                        84     70     252   254     85      73    255   267
Molybdenum (thousand
 pounds)
 Highland Valley
  Copper             1,207    847   3,968 4,023  1,174     846  3,913 3,954
 Antamina              997  1,129   3,165 3,906    889   1,188  3,436 3,948
---------------------------------------------------------------------------
                     2,204  1,976   7,133 7,929  2,063   2,034  7,349 7,902
GOLD
 Gold (thousand ounces)
  Hemlo                 50     51     169   205     48      50    165   207
  Pogo (Note 3)         32      5     104    45     30       4     93    39
  Other                  3      4      12    13      3       3     13    11
---------------------------------------------------------------------------
                        85     60     285   263     81      57    271   257
COAL
 Coal (thousand tonnes)
  Elk Valley Coal
   (Note 5)          2,214  2,167   9,024 8,657  2,396   2,311  9,071 8,994

Notes:
(1) The table presents our share of production and sales volumes.
(2) Production and sales volumes of base metal mines refer to metals
    contained in concentrate with the exception of Quebrada Blanca and
    Andacollo mines, which produce copper cathode.
(3) Lennard Shelf and Pogo operations began commercial production on April
    1, 2007, and results from operations are included in earnings from that
    date.
(4) Quebrada Blanca, Andacollo and Duck Pond results are effective from
    August 22, 2007.
(5) Results of the Elk Valley Coal Partnership represent our 40% direct
    interest in the Partnership from April 1, 2006 and 39% from January 1,
    2006 to March 31, 2006.


REVENUES, DEPRECIATION AND OPERATING PROFIT

QUARTER ENDED DECEMBER 31

                                               Depreciation
                                                   and         Operating
                                  Revenues     Amortization   Profit (Loss)
($ in millions)                 2007    2006   2007    2006   2007    2006
                                ------------   ------------   ------------

Smelting and Refining
 Trail (including power
  sales)                       $ 382   $ 545   $ 16    $ 12   $ 24    $111

Zinc
 Red Dog                         358     850     20      25    174     623
 Pend Oreille                     13      19      6       3     (6)      7
 Lennard Shelf (Note 1)           20       -      2       -     (7)      -
--------------------------------------------------------------------------
                                 391     869     28      28    161     630
Copper
 Highland Valley Copper          212     302     10      12    114     201
 Antamina                        155     206      7      10    105     142
 Quebrada Blanca (Note 2)        133       -     12       -     26       -
 Andacollo (Note 2)               29       -      6       -     (4)      -
 Duck Pond (Note 2)               15       -      7       -     (6)      -
--------------------------------------------------------------------------
                                 544     508     42      22    235     343
Coal
 Elk Valley Coal (Note 3)        218     284     11      12     30     100

Gold
 Hemlo                            37      32      4       6      6      (3)
 Pogo (Note 1)                    23       -      6       -      2       -
--------------------------------------------------------------------------
                                  60      32     10       6      8      (3)

Inter-segment sales and other    (57)   (150)     1       1      2     (14)
--------------------------------------------------------------------------

TOTAL                         $1,538   2,088   $108    $ 81   $460  $1,167
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Notes:
(1) Lennard Shelf and Pogo operations began commercial production starting
    April 1, 2007 and results from operations are included in earnings from
    that date.
(2) Results from Quebrada Blanca, Andacollo and Duck Pond are effective
    from August 22, 2007.
(3) Results of the Elk Valley Coal Partnership represent our 40% direct
    interest in the Partnership from April 1, 2006 and 39% from January 1,
    2006 to March 31, 2006.


REVENUES, DEPRECIATION AND OPERATING PROFIT

YEAR ENDED DECEMBER 31

                                               Depreciation
                                                        and      Operating
                                  Revenues     Amortization   Profit (Loss)
($ in millions)                 2007    2006   2007    2006   2007    2006
                                ------------   ------------   ------------

Smelting and Refining
 Trail (including power
  sales)                      $1,839  $1,802   $ 51    $ 47 $  345  $  395

Zinc
 Red Dog                       1,434   1,539     66      59    819   1,079
 Pend Oreille                     70      88     23      14     (6)     38
 Lennard Shelf (Note 1)           47       -      7       -     (4)      -
--------------------------------------------------------------------------
                               1,551   1,627     96      73    809   1,117
Copper
 Highland Valley Copper        1,115   1,413     39      46    737   1,019
 Antamina                        775     807     32      34    565     598
 Quebrada Blanca (Note 2)        215       -     16       -     55       -
 Andacollo (Note 2)               46       -      8       -      1       -
 Duck Pond (Note 2)               35       -     10       -     (4)      -
--------------------------------------------------------------------------
                               2,186   2,220    105      80  1,354   1,617
Coal
 Elk Valley Coal (Note 3)        951   1,177     40      39    209     444
--------------------------------------------------------------------------
Gold
 Hemlo                           123     143     23      24     (4)      7
 Pogo (Note 1)                    59       -     17       -     (1)      -
--------------------------------------------------------------------------
                                 182     143     40      24     (5)      7

Inter-segment sales and
 other                          (338)   (430)     1       1     26     (19)
--------------------------------------------------------------------------

TOTAL                         $6,371  $6,539   $333    $264 $2,738  $3,561
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Notes:
(1) Lennard Shelf and Pogo operations began commercial production starting
    April 1, 2007 and results from operations are included in earnings from
    that date.
(2) Results from Quebrada Blanca, Andacollo and Duck Pond are effective
    from August 22, 2007.
(3) Results of the Elk Valley Coal Partnership represent our 40% direct
    interest in the Partnership from April 1, 2006 and 39% from January 1,
    2006 to March 31, 2006.


OPERATIONS

Trail Metallurgical Operations (100%)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Zinc production (000's tonnes)     72.2       77.1        291.9      296.1
Lead production (000's tonnes)     16.9       22.5         76.4       90.3
Zinc sales (000's tonnes)          78.5       70.7        292.1      290.3
Lead sales (000's tonnes)          16.0       21.9         76.3       88.1
Surplus power sold (GW.h)           208        106        1,130        891
Power price (US$/megawatt hr)        64         59           51         44
Cost of sales ($ millions)
 Concentrates                       229        306        1,010        959
 Operating costs                     94         97          348        324
 Distribution costs                  19         19           85         77
Operating profit ($ millions)
 Metal operations                    15        109          297        370
 Power sales                          9          2           48         25
 
Operating profit from Trail metal operations decreased to $15 million in the fourth quarter compared with $109 million in the same period last year. The decline in operating profit was primarily due to significantly lower zinc prices combined with the strengthening Canadian dollar.

Metal prices and exchange rates were the most significant reasons for the decline in Trail's operating profits. The smelter participates in zinc prices through price escalators and payable metal percentages in concentrate purchase agreements. The decline in zinc prices from a year earlier resulted in a reduction in operating profits of $60 million. Refined lead production of 16,900 tonnes was below 2006 output due to the shutdown of the lead smelter and refinery facilities in October/November to conduct planned maintenance originally scheduled for 2008 on the KIVCET furnace, boiler and related equipment. Both the lead smelter and lead refinery resumed full operation in November. The shutdown reduced the production and sale of lead and certain by-products, increased unit costs and reduced profitability.

Operating profit from surplus power sales in the fourth quarter increased to $9 million compared with $2 million a year ago. The increase in operating profit was due to lower operating costs and the doubling of sales volumes in the quarter as a result of additional generating capacity from the completion of a turbine upgrade project and lower metallurgical load requirements during the KIVCET shutdown.


Zinc Mines

Red Dog (100%)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Tonnes milled (000's)               810        808        3,381      3,238
Zinc grade (%)                     20.1       19.9         20.2       20.6
Lead grade (%)                      6.6        5.7          6.1        6.1
Zinc recovery (%)                  82.0       82.8         84.2       83.5
Lead recovery (%)                  60.9       65.6         65.9       62.8
Zinc production (000's tonnes)    134.3      133.6        575.4      557.5
Zinc sales (000's tonnes)         191.9      245.6        575.7      536.0
Lead production (000's tonnes)     36.1       33.0        136.2      123.5
Lead sales (000's tonnes)          46.3       57.3        144.3      114.8
Cost of sales (US$ millions)
Operating costs                      57         75          193        155
Distribution costs                   37         43          104         90
Royalties (NANA and state)           75         62          230        112
Operating profit ($ millions)       174        623          819      1,079
 
Red Dog's operating profit in the fourth quarter decreased to $174 million from $623 million in the same period last year. This was the result of lower sales volumes due to the timing of shipments in 2006, lower zinc prices and negative pricing adjustments. During the quarter negative settlements totalled $49 million, of which $10 million were price adjustments relating to sales from the prior quarter and $39 million related to revaluation of current quarter sales that had not been final priced at the end of the period. This compares with $18 million of positive settlements in the fourth quarter of 2006. Sales volumes in the fourth quarter of 2006 were unusually high due to the delay in the start of the 2006 shipping season, which shifted some sales from the third quarter into the fourth quarter.

Zinc sales volumes were 191,900 tonnes in the fourth quarter, or 33% of total annual sales volumes, which represents typical sales volumes for the quarter. This compares with sales volumes of 245,600 tonnes in the fourth quarter of 2006, or 46% of total annual sales volumes, when sales volumes had been deferred from the third quarter due to a delay in the start of the 2006 shipping season. On a year-to-date basis, zinc sales volumes were 575,700 tonnes in 2007, or 7% higher than 2006 due to higher production and the timing of shipments. Lead sales were 46,300 tonnes in the fourth quarter compared with 57,300 tonnes in the same period last year. On a year-to-date basis, lead sales volumes were 144,300 tonnes in 2007 compared with 114,800 tonnes in 2006 due to higher production and strong smelter demand.

Zinc production in the fourth quarter was similar to a year ago at 134,300 tonnes, while lead production increased by 9% to 36,100 tonnes compared with last year due mainly to higher grades.

In the third quarter of 2006, in accordance with the operating agreement governing the Red Dog mine, the royalty to NANA increased to 25% of net proceeds of production. Previously, we paid an advance royalty of 4.5% of net smelter returns. The increase in royalty rate is partially offset by a decline in the base on which royalties are calculated as operating, distribution, selling and management fees, an allowance for future reclamation and closure costs, capital costs and deemed interest are deductible in the calculation of the royalty. The new 25% royalty became payable in the third quarter of 2007 after we had recovered the cumulative advance royalties previously paid to NANA. The NANA royalty charge in the fourth quarter of 2007 was US$68 million, compared with US$32 million expensed under the previous advance royalty regime in 2006. The net proceeds of production royalty rate will increase by 5% every fifth year to a maximum of 50%. The increase in to 30% of net proceeds of production will occur in 2012. NANA ultimately shares approximately 62% of the royalty with other Alaskan native corporations.

At December 31, 2007, we had 240,000 tonnes of zinc in concentrate and 3,000 tonnes of lead in concentrate available for sale, excluding production inventory at the site.

In the fourth quarter, the US Environmental Protection Agency (EPA) withdrew, for procedural reasons, a recently issued renewal of the Red Dog mine's water discharge permit, in the face of an appeal of the permit by a local community group and several environmental organizations. As a result, the permit renewal is expected to form part of the review and approval of a Supplemental Environmental Impact Statement (SEIS) of the Aqqaluk deposit. The Aqqaluk deposit is the next ore body scheduled to be developed by Red Dog and permitting must be in place prior to 2010 to ensure continuous operation of the mine at current production levels.

Pending approval of the Aqqaluk SEIS and the issuance of the renewal permit, Red Dog will continue to operate under its existing water discharge permit. The mine's discharges are in compliance with the criteria established under the withdrawn water discharge permit, which the EPA determined to be fully protective of the environment. However, the previous permit which was issued in 1998 and is now back in effect, contains limitations on total dissolved solids ("TDS") that the mine cannot meet on a sustained basis. TDS are non-toxic salts created as a result of the water treatment process to eliminate metals from the mine's discharge water. The largest constituent of this TDS is gypsum.

In addition to treating mill effluent and run-off from areas disturbed by mining, Red Dog collects and treats all areas where naturally occurring acidic drainage has traditionally impacted water quality. As a result, water quality has improved and fish now spawn in areas where pre-mining conditions caused fish mortality.

We are working with NANA and the EPA to ensure that the mine can discharge sufficient water to maintain a reasonable water balance in the tailings impoundment and that the permitting of Aqqaluk is not delayed. A group of technical experts are reviewing the entire water treatment and discharge system with the objective of addressing the TDS issue and the concerns of the appellants. However, there can be no assurance that past and ongoing violations of the existing permit will not result in other civil claims or appeals that could delay the permitting of Aqqaluk beyond 2010.

Other Zinc Mines

Our Pend Oreille mine recorded a $6 million operating loss in the fourth quarter compared with an operating profit of $7 million last year due mainly to higher operating costs, a lower zinc price and $2 million of negative price adjustments. Zinc production in the quarter increased to 8,400 tonnes compared with 5,500 tonnes last year. Ore grades improved in the fourth quarter and are forecast to improve further in 2008. Although the mine continues to contribute positive cash flow and is an important supplier of concentrate to our Trail operations, it is not expected to generate profits after depreciation and amortization charges during the remainder of its life at current zinc prices. Accordingly, we wrote down the mine's assets by $31 million in the fourth quarter to $41 million.

The Lennard Shelf mine, in which we hold a 50% joint venture interest, produced 11,800 tonnes of zinc and 3,600 tonnes of lead concentrate during the fourth quarter. The mine recorded an operating loss of $7 million in the fourth quarter as a result of lower than expected production levels and higher unit operating costs. Mill throughput and recoveries were very close to plan in 2007, but zinc production was well below plan due to lower ore grades. Access to the main mining area in Pillara South was delayed due to a water bearing structure that was encountered during development. As a result, underground production was supplemented with lower grade material in the remnant areas. The lower zinc price and negative settlement adjustments of $4 million in the quarter also negatively impacted operating results.
As a result of lower production levels and higher than expected unit operating costs, we are reviewing alternatives for the mine, including various cost reduction initiatives and a shortening of its life. This review is expected to be complete in the first quarter. However, we do not expect to recover the carrying values of the mine assets and as a result, we wrote down the mine's assets by $12 million in the quarter.


Copper Mines

Highland Valley Copper (97%)


                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Tonnes milled (000's)            11,798     11,395       42,593     45,356
Copper grade (%)                   0.36       0.45         0.37       0.41
Copper recovery (%)                82.0       92.3         87.9       91.5
Copper production (000's tonnes)   34.6       46.8        139.5      171.3
Copper sales (000's tonnes)        32.9       48.4        140.2      186.0
Molybdenum production
 (000's pounds)                   1,237        868        4,069      4,126
Molybdenum sales (000's pounds)   1,203        896        4,013      4,056
Cost of sales ($ millions)
 Operating costs                     81         78          308        307
 Distribution costs                   7         11           31         41
Operating profit ($ millions)       114        201          737      1,019
 
Highland Valley's operating profit in the fourth quarter declined to $114 million compared with $201 million in the fourth quarter of 2006 due to lower copper production during the current push-back phase in the Valley pit.

During the quarter, negative settlements totalled $26 million of which $25 million were price adjustments relating to sales from the prior quarter and $1 million related to the revaluation of current quarter sales. This compares with total negative settlement adjustments of $51 million in the fourth quarter of 2006.

Although mill throughput in the fourth quarter increased 4% from the same period a year ago, a greater proportion of ore was mined from the lower grade Lornex and Highmont pits compared with 2006 resulting in a reduction of overall average ore grades to 0.36% compared with 0.45% last year. The proportions of these various ores also negatively impacted mill recoveries in the quarter compared with the same period last year.

Copper sales volumes were 32% lower than last year as a result of the reduced production levels. Molybdenum sales volumes were 34% higher than last year due to higher production levels in the quarter as a result of higher molybdenum content in the ore processed. After refining charges and settlement adjustments, the mine realized a molybdenum price of US$30 per pound compared with US$24 per pound a year ago.

As part of its mine life extension project, Highland Valley will continue to draw a large proportion of ore from the Lornex pit, which will adversely affect both grades and recoveries. A higher proportion of Lornex ore in mill feed, approximately 50% in 2008 and 30% in 2009, will decrease copper recovery. In general, the softer Lornex ore produces a coarser grind and lower liberation of copper minerals and in turn lower recovery of the coarser fraction. In addition, ore from near the Lornex fault has a high clay content, which can significantly lower copper recovery. Over the previous 5 to 7 years, mill feed averaged 23% Lornex ore (ranging from 10% to 35%) and copper recovery averaged about 89%.

Under the current mine plan, grades and recoveries are expected to increase in 2010 and stripping ratios are expected to significantly decline beginning in 2011. Highland Valley copper production in 2008 is now estimated at 113,000 tonnes, down from our prior production guidance of 122,000 tonnes, with most of the reduction expected in the first half of the year.


Antamina (22.5%)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Tonnes milled (000's)
Copper-only ore                   5,757      6,209       20,326     22,875
Copper-zinc ore                   1,199      1,721       10,848      7,381
--------------------------------------------------------------------------
                                  6,956      7,930       31,174     30,256

Copper grade (1)(%)                1.47       1.41         1.21       1.38
Zinc grade(1) (%)                  3.52       2.45         3.03       2.53
Copper recovery(1) (%)             94.1       92.9         89.1       91.0
Zinc recovery (1)(%)               88.4       88.0         87.3       86.5
Copper production (000's tonnes)   90.0      104.7        329.9      384.2
Copper sales (000's tonnes)       100.1      108.7        326.9      385.5
Zinc production (000's tonnes)     43.0       38.3        291.7      156.1
Zinc sales (000's tonnes)          43.4       48.4        292.5      158.3
Molybdenum production (000's
 pounds)                          4,435      5,019       14,069     17,360
Molybdenum sales (000's pounds)   3,951      5,278       15,270     17,545
Cost of sales (US$ millions - 22.5%)
Operating costs                      25         26           90         80
Distribution cost                     5          4           22         15
Royalties and other(2)               12         18           53         59
Company's share of operating
 profit ($ millions)                105        142          565        598

Note:
(1) Copper ore grades and recoveries apply to all of the processed ores.
    Zinc ore grades and recoveries apply to copper-zinc ores only.
(2) Includes royalties, worker participation and voluntary social
    contribution.
 
Due to the relative strength of copper and molybdenum prices compared to zinc prices towards the end of 2007, the mine focused on copper-only ores during the fourth quarter to maximize revenue. Copper only ores are softer and have higher throughput rates through the mill. During the quarter, copper-only ores accounted for 83% of the mill throughput compared with 78% in the same period last year. Antamina's mill throughput in the fourth quarter was 12% lower than the same period last year due to electrical motor problems in the main grinding mill during November and December. As a result, copper production declined by 14% to 90,000 tonnes compared with 104,700 tonnes during the same period in 2006. Zinc production was 12% higher than the same period last year due mainly to higher zinc ore grades. Molybdenum production was 12% lower at 4.4 million pounds due to lower molybdenum grade ore processed in the quarter.

The main grinding mill ("SAG mill") failed on two separate occasions in the fourth quarter causing 14 days of lost production. Problems with the SAG mill motor have continued into 2008 with 11 days of downtime in January. Investigation of these failures is ongoing, but the root cause involves general deterioration of the insulation material on the windings and movement of the core laminations in the stator, which is the stationary part of the drive system. Various alternatives to permanently fix the problem are being evaluated, including a refurbishment program and/or the possibility of replacing the stator in early 2009. The SAG mill is currently operating at reduced speed and voltage to lessen the potential for further failures. Production of both copper-only and copper-zinc ores is currently very close to normal operating conditions despite the slower speed, however, there exists a significant potential for similar stoppages during the year. Various alternatives to bypass the SAG mill and still produce at lower throughput rates during SAG mill failures or planned repairs are also being evaluated.

Despite the SAG mill failures, mill throughput in 2007 was 3% higher than in 2006 due to various process improvement projects completed during the year. The new pebble crushing circuit, which will further improve throughput and recovery, in on track for completion in the first quarter of 2008.

Our share of operating profit in the fourth quarter declined to $105 million from $142 million in the same period last year due mainly to lower sales volumes and the effect of the strengthening Canadian dollar. During the quarter negative settlements totalled $37 million of which $15 million were price adjustments relating to sales from the prior quarter and $22 million related to revaluation of current quarter sales, which are recorded at the average price for the month of sale and subsequently revalued to quarter end prices. Negative price adjustments of $34 million were recorded in the fourth quarter of 2006.

Aur Resources Inc.

On August 22, 2007, as part of the purchase of Aur, we acquired interests in the Quebrada Blanca (76.5%) and Carmen de Andacollo (90%) ("Andacollo") copper mines in Chile and the Duck Pond (100%) copper-zinc mine. These mines add 115,000 tonnes of annual copper production and 30,000 tonnes of annual zinc production of to our production profile.

The Quebrada Blanca and Andacollo mines are open pit mining operations that produce cathode copper using heap and dump leaching together with solvent-extraction electro-winning ("SX-EW") refining. The Quebrada Blanca mine is located 117 kilometres southeast of the port city of Iquique in northern Chile. The Andacollo mine is located near the town of Andacollo in central Chile, approximately 55 kilometres southeast of the city of La Serena.

The Andacollo mine has a hypogene deposit underneath the supergene deposit that is currently being mined. The hypogene deposit is being developed with production start-up scheduled for late 2009, allowing for an expected additional 21 year mine life. The current capital cost estimate for the project is approximately US$380 million using an exchange rate of US$1 = 535 Chilean pesos. The development is expected to produce 81,000 tonnes (178 million pounds) of copper and 66,000 ounces of gold in copper concentrates annually over the first 10 years of production. Production from the Andacollo supergene deposit is scheduled to cease in 2010, but studies are underway to extend heap and dump leach production for a further two years to 2012.

A definition drill program is currently underway at Quebrada Blanca to improve geological interpretation and to further assess the potential for a large hypogene resource underlying the existing supergene reserve at the mine, which is expected to support continued production until at least 2016.

The Duck Pond copper-zinc mine is located in central Newfoundland. Duck Pond achieved commercial production in April, 2007. The mine is an underground operation with the ore being processed using conventional flotation processes to produce copper and zinc concentrates. The mine has an expected remaining life of about six years, which may be extended a further two years if 1.1 million tonnes of inferred resources can be upgraded to reserves.

We have allocated the acquisition cost of Aur to the net assets acquired based on preliminary fair value estimates only. This is a complex accounting exercise that requires a detailed analysis and valuation of all of the assets acquired and liabilities assumed that is not expected to be completed until later in 2008. Accordingly, values allocated to net assets at December 31, 2007 may be revised and the revisions could be material. The results of the final allocation, when complete, may significantly affect depreciation and amortization charges in future periods.

On a preliminary basis, we revalued the finished goods and work in process inventories on hand at August 22, 2007 at these operations to estimated fair values based on their copper and zinc content less costs to complete and a small margin. This adjustment totalled $162 million. As these operations complete the processing and sale of these inventories, the cost of goods sold will reflect the higher assigned inventory values resulting in reduced profits. In the period from the date of acquisition to the end of the fourth quarter, profits were reduced in this manner by $104 million. The balance will reduce future profits as the inventories that existed on the acquisition date are processed and sold. It does not impact cash flows derived from these operations.

Based on the normal flow of production through the mining and processing operations, we expect that approximately $30 million of the remaining inventory adjustments will be charged to earnings in the first quarter of 2008, $15 million in the second quarter of 2008 with decreasing charges continuing until December 2008. These preliminary estimates are subject to revision as we complete our detailed allocation of the purchase price. As new ore is mined and processed, the cost of goods sold in future periods will also be affected by increased depreciation and amortization charges arising out of the final allocation of the acquisition price of Aur to the operating assets.

The three mines acquired all performed well in the quarter. Their contribution to our quarterly operating profit before pricing adjustments and the effects of one time fair value adjustments made to inventories at the time of our acquisition of Aur is summarized in the following table.


                                 Quebrada                 Duck
                                   Blanca   Andacollo     Pond     Total
Operating profit before the
 undernoted items                    $ 89        $ 15      $ 1      $105
Effect of inventory adjustment
 on acquisition                       (43)        (17)      (2)      (62)
Negative pricing adjustments          (20)         (2)      (5)      (27)
------------------------------------------------------------------------
Operating profit (loss)
 as reported                         $ 26        $ (4)     $(6)     $ 16
------------------------------------------------------------------------
------------------------------------------------------------------------
 
The results of operations acquired as part of the acquisition of Aur are as follows for the period from August 22, 2007, the date of acquisition, to December 31, 2007 follow.


Quebrada Blanca (76.5%)

                              Three months ended     Period from August 22
100%                                 December 31            to December 31
                              ------------------     ---------------------
                                            2007                      2007
Tonnes Placed (000's)
 Heap leach ore                            1,778                     2,608
 Dump leach ore                            3,138                     3,769
                                           4,916                     6,377

Heap leach grade (TCu%)(2)                  1.14                      1.23
Dump leach grade (TCu%)(2)                  0.52                      0.53

Copper production (000's tonnes)
 Heap leach                                 15.9                      22.9
 Dump leach                                  5.4                       7.5
                                          ------                    ------
                                            21.3                      30.4

Copper sales (000's tonnes)                 22.4                      32.1
Operating profit ($ millions) (1)             26                        55

Note (1) Results do not include a provision for the minority interests'
         23.5% share of Quebrada Blanca.
     (2) TCu% is the percent assayed total copper grade.
 
Quebrada Blanca's operating profit was $26 million in the fourth quarter after deducting $43 million in respect of inventory revaluations to fair value on acquisition. This revaluation established a higher value for copper inventories based on market prices at the date of acquisition. During the quarter negative settlements totalled $20 million, of which $6 million were price adjustments relating to sales from the prior quarter and $14 million on sales that were originally recorded at the average price for the quarter and subsequently revalued to quarter end prices.

Copper cathode production was 21,300 tonnes while sales volumes were 22,400 tonnes in the fourth quarter and were similar to plan levels. Cathode production in 2007 totalled 83,000 tonnes, a new record for the mine. Early negotiations with the staff union resulted in a new four-year collective agreement that was ratified in the fourth quarter. The agreement with the worker's union expires in June 2008.

The diamond drilling program on Quebrada Blanca's hypogene deposit progressed well during the quarter, with approximately 4,700 metres drilled, bringing the total to 9,700 metres for the year.


Carmen de Andacollo (90%)

                              Three months ended     Period from August 22
100%                                 December 31            to December 31
                              ------------------     ---------------------
                                            2007                      2007
Tonnes Placed (000's)
 Heap leach ore                              869                     1,289
 Dump leach ore                              173                       344
                                           -----                     -----
                                           1,042                     1,633

Heap leach grade (TCu%)(2)                  0.55                      0.54
Dump leach grade (TCu%)(2)                  0.23                      0.23

Copper production (000's tonnes)
 Heap leach                                  4.0                       5.5
 Dump leach                                  0.6                       0.9
                                           -----                     -----
                                             4.6                       6.4

Copper sales (000's tonnes)                  4.6                       6.6
Operating profit (loss) ($ millions) (1)      (4)                        1

Note (1) Results do not include a provision for the minority interests' 10%
         share of Andacollo.
     (2) TCu% is the percent assayed total copper grade.
 
The Andacollo mine incurred an operating loss of $4 million in the fourth quarter due to the revaluation of copper inventory to fair value on acquisition and the negative pricing adjustments. This revaluation established a higher value for copper inventories, based on market prices at the date of acquisition. This increased our cost of sales by $17 million in the quarter and the subsequent decline in metal prices resulted in a loss on the sale of these inventories. In addition, the mine recorded negative pricing adjustments of $2 million in the quarter.

Copper cathode production and sales volumes were 4,600 tonnes in the fourth quarter and were similar to plan levels. Cathode production for all of 2007 totalled 18,600 tonnes. Early negotiations with both the staff and worker unions were successful with both agreements being ratified in the fourth quarter. Both agreements are for a four-year term starting in January 2008.

Work to develop Andacollo's hypogene deposit is progressing with detailed engineering approximately 90% complete.


Duck Pond (100%)

                              Three months ended     Period from August 22
100%                                 December 31            to December 31
                              ------------------     ---------------------
                                            2007                      2007

Tonnes milled (000's)                        148                       205
Copper grade (%)                             2.7                       2.6
Copper recovery (%)                         86.2                      86.0
Copper production (000's tonnes)             3.5                       4.5
Copper sales (000's tonnes)                  2.6                       5.3
Zinc production (000's tonnes)               6.9                       8.4
Zinc sales (000's tonnes)                    6.8                       6.8
Operating loss ($ millions)                   (6)                       (4)
 
The Duck Pond copper-zinc mine incurred an operating loss of $6 million in the fourth quarter due mainly to low sales volumes in the quarter due to timing, negative price adjustments of $5 million and the revaluation of concentrate inventory to fair value at the time of acquisition, which results in lower margins when sold.

Copper production was 3,500 tonnes and zinc production was 6,900 tonnes. Copper sales were 2,600 tonnes and zinc sales were 6,800 tonnes.


Metallurgical Coal

Elk Valley Coal Partnership (40% direct; 52% direct and indirect)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Coal production (000's tonnes)    5,535      5,418       22,561     21,790
Coal sales (000's tonnes)         5,990      5,776       22,677     22,614
Average sale price (US$/tonne)       93        106           98        113
Average sale price (Cdn$/tonne)      91        123          105        131
Cost of product sold (Cdn$/tonne)    41         38           42         40
Transportation (Cdn$/tonne)          33         37           35         37
Company's share of operating profit
 ($ millions)(1)                     30        100          209        444

Note (1) Results of the Elk Valley Coal Partnership represent the company's
         40% direct interest in the Partnership commencing April 1, 2006
         and 39% from April 1, 2005 to March 31, 2006.
 
Our 40% share of Elk Valley's Coal operating profit in the fourth quarter declined significantly to $30 million compared with $100 million in 2006 due mainly to a lower realized US dollar coal price combined with the effect of the strengthening Canadian dollar.

Coal sales volumes in the fourth quarter were slightly higher than a year ago at 6.0 million tonnes. The average US dollar coal prices in the quarter decreased 12% to US$93 per tonne as a result of lower prices for the 2007 coal year, which commenced April 1, 2007. With the stronger Canadian dollar, our average realized Canadian dollar coal prices decreased 26% to $91 per tonne.

Unit cost of product sold increased by 8% to $41 per tonne in the fourth quarter compared with the same period last year, primarily due to significantly higher fuel costs and higher costs for tires and other consumables. By the end of 2007, Elk Valley Coal had generally recovered from the unusually high unit costs experienced in the first quarter of 2007 as a result of rail transportation problems, which caused unplanned shutdowns and production interruptions in the first quarter.

Combined rail and port transportation costs in the fourth quarter were $33 per tonne compared with $37 per tonne in the same period in 2006. Lower rail and port costs, which are variable in part with lower average selling prices, contributed to lower unit transportation costs for the quarter and the year.

The significant strengthening of the Canadian dollar that occurred in the third and fourth quarters of 2007 highlights the sensitivity of Elk Valley's results to fluctuations in the US/Canadian dollar exchange rate. If the Canadian dollar remains at current levels, a substantial increase in the 2008 US dollar coal price or a decrease in our operating costs will be required to avoid significant reductions in our margins.

Contract negotiations for the 2008 coal year are currently taking place. Current market sentiment indicates that US dollar coal prices may increase from 2007 coal year prices. While early indications regarding the US dollar prices for the 2008 coal year are strong, the effect of the stronger Canadian dollar may eliminate some or all of the benefit of higher US dollar based coal prices.


Gold Mines

Hemlo Mines (50%)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
100%                               2007       2006         2007       2006

Tonnes milled (000's)               812        882        3,036      3,355
Grade (g/tonne)                     4.0        3.8          3.7        4.0
Mill recovery (%)                  94.5       94.0         94.1       94.2
Production (000's ounces)          99.8      101.3        337.3      409.7
Sales (000's ounces)               96.5      100.0        330.1      413.0
Cash operating cost per
 ounce (US$)                        541        495          568        465
Company's share of operating
 profit (loss) ($ millions)           6         (3)          (4)         7
 
Our share of Hemlo's operating profit was $6 million in the fourth quarter compared with an operating loss of $3 million in 2006, due mainly to higher gold prices and cost reductions implemented in the third quarter of this year.

During the fourth quarter the mine implemented cost cutting measures that included a work force reduction of 150 positions, including contractors. An expected reduction in operating costs of $60 - $70 million per annum starting in early 2008 will help to prevent cash costs from rising as the gold production profile drops going forward.

Gold production of 99,800 ounces was similar to last year, while cash operating costs decreased to C$531 (US$541) per ounce compared with C$564 (US$495) per ounce in the fourth quarter of 2006, mainly due to the effect of the cost reduction program that was implemented. The increase in the US dollar unit operating costs was due to the effect of a weaker US dollar. The average realized gold price in the fourth quarter was US$789 per ounce compared with US$614 per ounce in 2006, although the effect of the stronger Canadian dollar partly offset the higher US dollar gold price.

The labour agreement at Hemlo's David Bell mine, which expired at the end of October, was ratified in early December. The new agreement has a three-year term.


Pogo (40%)

                              Three months ended     Period from August 22
100%                                 December 31            to December 31
                              ------------------     ---------------------
                                            2007                      2007

Tonnes milled (000's)                        182                       649
Grade (g/tonne)                             15.7                      14.7
Mill recovery (%)                           87.6                      84.4
Production (000's ounces)                   80.9                     259.8
Sales (000's ounces)                        74.4                     232.8
Cash operating cost per ounce (US$)          514                     n/a(1)
Company's share of operating profit
 (loss) ($ millions)                           2                        (1)

(1) Operating results prior to April 1st, the date the operation achieved
    commercial production were capitalized as start-up costs.
 
Pogo's gold production of 80,900 ounces represented a 40% improvement over the third quarter, but remains below full capacity due to poor equipment availability which impacted online time and throughput rate. The ore at Pogo is extremely abrasive and continuous improvement projects are improving equipment reliability. Mill recoveries are improving and we are working on various improvement projects, including automation of the flotation circuit that are expected to be completed in the first half of 2008. The mine made good progress on reducing dilution by using smaller equipment in the narrow ore headings during the second half of the year. Operating costs are expected to improve slightly in 2008, but will remain high over the next two years due to the large number of optimization projects and the need to develop additional areas underground to sustain planned production levels.

Gold sales in the fourth quarter of 74,400 ounces were lower than production due to the timing of shipments, and the average realized gold price was US$796 per ounce in the quarter. Efforts to reduce in-process gold inventory are ongoing with gold sales expected to exceed production in the first quarter. Gold production is expected to be between 340,000 and 360,000 ounces in 2008. Our share of Pogo's operating profit was $2 million in the quarter.

COSTS AND EXPENSES

Administration expense was $20 million in the fourth quarter compared with $33 million in 2006. The decline was primarily due to a recovery of stock based compensation expense as our share price, to which the compensation is linked, declined in the fourth quarter of 2007. The prior year had seen a significant increase in our share price and the related compensation expense.

Interest expense of $21 million in the quarter was down slightly from $22 million a year earlier. The effects of a weaker US dollar were offset by additional debt assumed in the acquisition of Aur Resources as our Canadian dollar debt levels remained relatively constant.

Other income and expense was $82 million in the quarter compared with $142 million last year. Interest income declined from $65 million to $19 million as a result of the deployment of our cash balances in the acquisition of Aur Resources and our increased investment in Fording. A gain was recorded as the decline in zinc prices in the quarter reduced our derivative liability on the Duck Pond zinc hedges by $46 million and we had gains of $42 million on the sale of investments. Offsetting these gains were additional charges of $16 million for reclamation and remediation work at our closed operations. In the fourth quarter of 2006, other income included a $138 million gain on the sale of our position in Inco and $65 million in interest income.

Asset impairment charges totalling $69 million were taken against (i) our investment in Tahera Diamond Corporation, which sought protection from their creditors in January 2008 due to operating and financial difficulties, (ii) our Lennard Shelf zinc mine and (iii) our Pend Oreille zinc mine. Both zinc mines are operating with lower than expected ore grades and higher unit operating costs. Operating cost increases and potentially shortened mine lives underlay the write-downs.

Income and resource taxes for the quarter were $61 million, or 15% of pre-tax earnings, which is substantially lower than the Canadian statutory tax rate of 34%. The primary reason for the difference was the enactment of reductions in Canadian statutory rates for future years that resulted in a $69 million decrease in our future tax liability. Before the effect of these reductions, our tax expense was $130 million, or 33% of pre-tax earnings. The lower rate was due to lower effective tax rates in foreign jurisdictions where a substantial portion of our income is earned, partially offset by the effect of mining taxes in Canada.

Minority Interest expense was $19 million in the fourth quarter compared with $5 million last year. The increase was the result of the minority interests at two of the mines acquired in the Aur transaction.

Equity earnings

We recorded equity earnings on our investment in the Fording Canadian Coal Trust of $14 million, up from the $7 million recorded last year. We increased our investment in the Trust from 8.75% to 19.95% at the end of the third quarter and the higher earnings are reflective of our increased interest. However, more than offsetting the higher earnings from Fording was our share of losses from the Galore Creek Partnership.

Mine construction was suspended at our Galore Creek project in the fourth quarter due to escalating cost estimates. An agreement was reached between the partners as to financial responsibilities and commitments while the project is under review. The partners have estimated demobilization costs to be $100 million and we have accrued our commitment and recorded an equity loss of $33 million ($50 million pre-tax) in respect of our share of these costs on an after-tax basis.

Discontinued operations

Our earnings from discontinued operations relate to a price participation provision in the agreement to sell the Cajamarquilla zinc refinery in 2004. We are entitled to additional consideration of US$365,000 for each US$0.01 by which the average annual price of zinc exceeds US$0.454 per pound. This zinc price participation expires at the end of 2009. In 2005 and 2006, we accrued the additional consideration based on the average annual zinc price for the year. Effective January 1, 2007, upon adoption of a new accounting standard for financial instruments, we recorded an asset of $139 million by increasing our retained earnings in respect of the contingent receivable, which was valued based on the zinc forward curve at December 31, 2006. The new standard for financial instruments requires us to mark this receivable to market at the end of each quarter. With the decline in the zinc price that occurred during the fourth quarter, the mark-to-market adjustment resulted in a $19 million ($16 million after-tax) reduction in the receivable. In January 2008, we received approximately US$38 million for the 2007 price participation payment.

FINANCIAL POSITION AND LIQUIDITY

Cash flow from operations was $560 million in the fourth quarter, down substantially from the previous year, primarily as a result of lower earnings. In addition, higher sales volumes from Red Dog in the fourth quarter of 2006 resulted in a larger inventory drawdown in that period. Income items not affecting cash flow in 2007 included demobilization costs related to Galore Creek, the write-down of our investment in Tahera Diamond Corporation and the impairment charges at Pend Oreille and Lennard Shelf. In 2006, pre-tax gains on the sale of our investment in Inco totalled $138 million and are not included in cash flow from operations.

In early October we paid $599 million for the previously announced acquisition of an additional 11.25% interest in the Fording Canadian Coal Trust. We now own 19.95% of Fording's outstanding units.

Expenditures on property, plant and equipment were $163 million in the fourth quarter and include $112 million on sustaining capital and $51 million on development projects. Major components of these expenditures included upgrading equipment at our newly acquired Chilean copper mines and expansion capital, including preparatory stripping at Highland Valley Copper.

Investments in the fourth quarter totalled $355 million and included $153 million of funding to the Galore Creek Partnership and $36 million to the Fort Hills Energy Limited Partnership. We also realized $168 million on the sale of certain mineral properties and investments in marketable securities.

In October, we filed a shelf prospectus to enable us to issue debt securities of up to US$2.5 billion in the United States.

A dividend of $0.50 per share was declared with a record date of December 19, 2007. The dividend payment was made in January 2008 and totalled $221 million.

Our cash position declined in the quarter from $1.8 billion to $1.4 billion. Long term debt remained at approximately $1.5 billion in the quarter as there were no significant financings or repayments in the period and US dollar exchange rates at December 31, 2007 were similar to September 30, 2007 rates, despite significant intra-period fluctuations. At the end of the year, we had bank credit facilities aggregating $1.1 billion, 82% of which matures in 2012 and beyond. Our unused credit lines under these facilities after draw downs and letters of credit amounted to $809 million. Our senior unsecured debt is rated Baa1 by Moody's Investor Services, BBB by Standard and Poor's and BBB (high) by Dominion Bond Rating Service.

COMPREHENSIVE INCOME

We now report comprehensive income having adopted the new accounting standards for financial instruments which became effective on January 1, 2007. The most significant components of other comprehensive income are the unrealized mark-to-market gains on our portfolio of marketable securities and currency translation adjustments on self-sustaining foreign subsidiaries. Our marketable securities consist primarily of investments in publicly traded companies with whom we partner in exploration or development projects. These gains are held in Accumulated Other Comprehensive Income, net of taxes until they are realized, at which time they are included in regular earnings.

CORPORATE DEVELOPMENT

Galore Creek

In August 2007, we formed a 50/50 partnership with NovaGold Resources Inc. to develop the Galore Creek copper-gold deposit in northwest British Columbia. Pursuant to the terms of the partnership agreement, we were required to fund the next C$528 million in development costs. Thereafter, each partner was responsible for funding its pro rata share of development costs. Under the original agreement, NovaGold was entitled to receive up to US$50 million of preferential distributions if revenues in the first year of commercial production exceed specific established targets.

Construction activities at the project were suspended in the fourth quarter of 2007 as a result of our review of the first season of construction and a more extensive detailed engineering study that anticipated substantially higher capital costs and a longer construction schedule for the project. Based on a higher capital cost estimate and reduced expected operating margins as a result of the stronger Canadian dollar, the project as originally conceived and permitted would be uneconomic at the then consensus long-term metal prices.

Although there were changes in scope from the original feasibility study, the largest portion of the capital cost increase is related to the complex sequencing of activities necessary to build the tailings dam and water management structures and the resulting extension of the construction schedule by 18 to 24 months.

Due to its remote location, there is considerably more civil work required for Galore Creek than most other mining projects. Estimating the civil work is a particularly difficult aspect of project design and engineering. We now believe that the construction of the 130 kilometre access road and tunnel into the Galore Creek valley and the large water diversion structures and the tailings dam require much more labour to complete than either the feasibility study or our due diligence, including a third party review, anticipated. As a result, we decided to halt development work until all aspects of project design and engineering can be thoroughly reviewed and we are more confident of the overall project cost estimates.

By agreement with NovaGold at the time of the suspension, our funding obligations in connection with the project were amended. Our obligation to fund project costs incurred after August 1, 2007 was reduced from the original $528 million to $403 million. Of this total, $264 million was spent by us as of the suspension date. Of the next $100 million of project costs (other than project study costs described below), we will fund two-thirds and NovaGold will fund one-third. Thereafter, each partner will fund its pro rata share of partnership costs. In addition, we agreed to invest an additional $72 million in the partnership over the next five years to be used principally to reassess the project and evaluate alternative development strategies. Under the terms of the revised agreement, NovaGold is entitled to receive up to US$25 million of preferential distributions if revenues in the first year of commercial production exceed specific established targets.

Our future obligations with respect to the project are to fund studies to review and optimize the project with the objective of identifying an alternative development strategy, and to complete construction demobilization and put the site on care and maintenance in the interim. The estimated demobilization costs, which are intended to put the site in a condition that will enable us to restart the project at a later date, are estimated to be approximately $100 million and have been accrued and expensed in the period. We have recorded our after-tax share of these expenses as an equity loss of $33 million ($50 million pre-tax) in the period. These cost estimates are based on preliminary plans that could change as more information becomes available. In addition, the project is subject to severe weather conditions that can affect the nature, extent and timing of work. Accordingly, our actual demobilization costs could vary by a material amount from our estimates. On-going care and maintenance costs estimated at between $10 to $20 million annually, which will be expensed as incurred, will be required to monitor the site and infrastructure until a decision is made whether or not to proceed with the project. If the project does not proceed, the Galore Creek partnership may have to reclaim and restore any disturbed land and these costs could be material.

We continue to view the property as a substantial resource. This view is reflected in our commitment to undertake a comprehensive review to evaluate alternative development strategies. Accordingly, no provision has been made against the carrying value of our investment in Galore. In 2008 we will redeploy the efforts of the construction team to demobilizing the project and preparing it for care and maintenance, and will initiate studies aimed at re-evaluating and optimizing the project to determine whether Galore Creek, which has measured and indicated resources containing approximately 8.9 billion pounds of copper and 7 million ounces of gold and an inferred resource containing approximately 2.9 billion pounds of copper and 2 million ounces of gold, can become a viable, operating mine with a long, profitable life. Possible alternative design concepts include:

- reducing in-valley activities by minimizing the amount of waste rock and potential acid generating rock by conducting more drilling to better categorize the material or increase the proportion of economic ore in the original design; alternative mining and ore hauling methods to reduce waste generated, including steeper mine slopes, conveyer haulage, and glory hole systems for lower extremities of the ore zones and reviewing alternative ways to store tailings by lowering their water content,

- mining and grinding ore in the valley and piping the ground ore to a more optimum location, and

- considering alternative tailings storage locations that may allow for a significant reduction in the size and cost of water diversion and dam facilities.

We expect that this work could take several years to complete and may result in the project having to be re-permitted. However, there can be no assurances that this work will result in a commercially viable project, or a future write-down will not be required.

Petaquilla

Along with our partners, Inmet and Petaquilla Copper, we previously announced the results of an interim report on the FEED Study being conducted by AMEC Americas Limited on the Petaquilla copper project in Panama.

The interim report estimates that the capital cost required to develop the Petaquilla project would be US$3.5 billion (including a contingency of $515 million but not including working capital and escalation). The capital cost estimate includes approximately $500 million for the construction of an oil-fired power plant and approximately $280 million for port facilities. Cash costs, including operating and realization costs and net of by-product credits, in years 1 to 10 of the project are estimated to average US $0.85 per pound of copper produced. The study is based on the mine plan developed in 1998, which contemplates a 23-year mine life. The project includes a concentrator capable of processing 120,000 tonnes per day of ore. Construction is expected to take approximately 44 months from issuance of construction permits. Permitting would follow the submission of a social and environmental impact assessment, expected to be completed in the fourth quarter of 2008.

Capital costs for the project have increased substantially over previously published estimates both as a result of scope changes, including enhancements in erosion control, water management and other environmental protection measures, as well as increases in equipment and construction costs that have been affecting projects worldwide.

Work is continuing on the FEED Study. A project review team is currently studying opportunities to reduce the capital costs from the Interim FEED study estimate. Several possible opportunities have already been identified in the area of the grinding circuit, power supply and port infrastructure. The project review team will evaluate these opportunities over the next six weeks and, where appropriate, incorporate these changes into the capital cost estimate.

Inmet holds a 48% equity interest in Minera Petaquilla, S.A., the Panamanian company that holds the Petaquilla concession, while Petaquilla Copper currently holds a 52 percent equity interest. We have the right to acquire a 26% equity interest in Minera Petaquilla by committing, prior to March 31, 2008, to participate in work plans and budgets leading to commercial production, and by committing to fund 52% of development costs for the project. If Teck Cominco funds those development costs, it will recoup 26% of the development costs, plus interest at US prime plus two percent per annum, prior to any distributions to Petaquilla Copper. In lieu of receiving funding from us, Petaquilla Copper may elect, within 30 days of our production commitment, to finance all or part of the development costs for its 26% equity interest in the project. We are the operator of the project.

There can be no assurances that we will exercise our right to acquire a 26% equity interest in Petaquilla Copper on or before March 31, 2008.

Nautilus Minerals

In December, 2007, we exercised three million share purchase warrants for total consideration of US$15 million that increased our shareholding in Nautilus Minerals to approximately 7.2%. The six-month early exercise of these warrants was part of an agreement with Nautilus in which we are now entitled to conduct our own ship-based exploration program during 2008 in one or more designated areas in Papua New Guinea, Tonga and New Zealand. The agreement further specifies that the funding for this program will be the US$12 million we had originally agreed upon in December 2006 to contribute to Nautilus directed exploration activities. Consequently, we will establish our own exploration team to develop and execute this exploration program.

OUTLOOK

The information below is in addition to the disclosure concerning specific operations included above in the Operations and Corporate Development sections of this Management's Discussion and Analysis.

Commodity prices are a key driver of our earnings and current prices are well above historic averages. On the supply side, the depleting nature of ore reserves, difficulties in finding new ore bodies, progressing through the permitting process, finding skilled resources to develop projects, infrastructure constraints and significant cost inflation may continue to have a moderating impact on the growth in future production. Although we are concerned about current global economic conditions, particularly in the United States, we believe that as China and India continue to industrialize, those two economies will continue to be major positive factors in the future demand for commodities. We believe that the long-term price environment for the products that we produce and sell remains favourable.

Based on our expected 2008 production and prices prevailing at December 31, the sensitivity of our annual earnings to a 1% change in the US dollar exchange rate and commodity prices before pricing adjustments is as follows:


                                             Impact of a 1%
                                 2008      change on Annual
                      Production Plan    After-Tax Earnings            EPS
--------------------------------------------------------------------------

US$1  equals  C$                                $26 million      5.9(cents)
Copper (tonnes)               300,000           $11 million      2.5(cents)
Zinc (tonnes)               1,000,000            $7 million      1.6(cents)
Coal (tonnes                9,600,000            $6 million      1.4(cents)
Lead (tonnes)                 220,000            $2 million      0.5(cents)
Gold (ounces)                 275,000            $1 million      0.2(cents)
Molybdenum (pounds)         7,000,000            $1 million      0.2(cents)
Notes:
(1) The effect on our earnings of commodity price and exchange rate
    movements will vary from quarter to quarter depending on sales volumes.
 
At December 31, 2007, outstanding receivables included 180 million pounds of copper provisionally valued at an average of US$3.04 per pound, 296 million pounds of zinc valued at an average of US$1.05 per pound and 74 million pounds of lead provisionally valued at an average of US$1.15 per pound. Final price adjustments on these outstanding receivables will increase or decrease our revenue in 2008 depending on metal prices at the time of settlement

At the current time, copper and lead prices are slightly higher than 2007 average prices. The zinc price is approximately 28% lower, and gold is approximately 30% higher than the 2007 average prices respectively. As previously mentioned, market sentiment indicates that coal prices may increase, but if they do, the impact will not start until the second quarter of 2008. In addition, the Canadian dollar is currently near par against the US dollar compared with US$1 averaging C$1.07 in 2007.

Our copper production for 2008 is expected to be about 48,000 tonnes higher than production in 2007, due mainly to the addition of the three mines acquired in August 2007 from Aur. Highland Valley's copper production is expected to decrease by approximately 20% from 2007 as we mine lower grade ore as part of the mine life extension program. Our share of copper production at Antamina in 2008 is expected to be about the same as 2007, while our share of zinc production is expected to decrease by 6,000 tonnes due to the changes in ore mix and ore grades. However, Antamina has recently been experiencing problems with its main grinding mill. If these problems persist, they could impact Antamina's production and financial results in 2008. Repairs may necessitate an extended shut down of the mill later this year or in early 2009, which could have a material impact on production. The insurers are in the process of evaluating the losses to date, however, it is the company's view that the property and business interruption losses associated with the outages are insured.

Our zinc production in 2008 is expected to be about 10,000 tonnes higher than in 2007, with the increase due mainly to the additional zinc production from the Duck Pond mine acquired from Aur in August 2007.

Due to sea ice conditions, Red Dog has a shipping window that normally starts in early July and ends in late October. If ice or other weather conditions are such that the shipping season is delayed, our quarterly sales patterns can vary substantially. Sales and profits of the Red Dog mine follow a seasonal pattern, with higher sales volumes of zinc and most of the lead sales occurring in the last five months of the year following the commencement of the shipping season in July.

Elk Valley's 2008 sales volumes are estimated at 23 to 25 million tonnes, of which our share is 40%. Negotiations are under way for coal prices and volumes for the coal year commencing April 1, 2008 and prices and volumes have not yet been finalized, although current market sentiment indicates that US dollar coal year prices may increase significantly for the 2008 coal year over the 2007 prices. Coal prices in the first quarter of 2008 are expected to be similar to the fourth quarter average price of US$93 per tonne. Elk Valley will not see the full benefit of higher 2008 coal year prices until possibly the third quarter of calendar 2008. It is expected that a substantial portion of Elk Valley's sales in the second quarter of 2008 will be at 2007 pricing due to the carryover of tonnes from the 2007 coal year. Further, the winter months typically present challenging shipping conditions for Elk Valley Coal that could potentially impact first quarter results and further increase the amount of carryover.

Our share of gold production is expected to decrease by approximately 10,000 ounces in 2008 compared with 2007 due to a 44,000 ounce reduction at Hemlo partially offset by higher planned production from the Pogo mine. Our share of gold production from Pogo is expected to be 135,000 to 145,000 ounces, while our share of production from the Hemlo joint venture is expected to be 26% lower than 2007 at approximately 125,000 ounces.

Based on the information above, and depending on commodity prices and the US/Canadian dollar exchange rate, we expect that our earnings will be stronger in the second half of the year than the first half of the year. This is due mainly to Red Dog's sales volumes generally being higher in the latter half of the year due to the short shipping window and metallurgical coal prices, which are expected to rise beginning in the second quarter of 2008.

Like many of our competitors, we are facing significant cost increases and longer construction schedules in bringing new projects into production. The current robust demand for commodities has resulted in significant inflation in the cost of labour, fuel, raw materials and other key inputs required by the mining industry. In addition, lead times required to source major capital equipment and the challenge of attracting and retaining skilled labour has made it difficult to bring major projects into production on time and on budget. These increases could adversely affect the viability of a project and consequently our asset values, costs, earnings and cash flows.

Our 2008 capital expenditures are planned at approximately $840 million, including $465 million of sustaining capital expenditures, $285 million on development projects and $90 million for our share of the various oil sands properties that we jointly own with UTS Energy Corporation. This estimate does not include any amounts for the development of the Petaquilla copper project in Panama should we decide in March 2008 to proceed with its development. In addition, we expect to spend approximately $750 million on our share of costs for the Fort Hills oil sands project and $20 million in engineering studies for the Galore Creek project. Although we believe our estimates to be reasonable at this time, we may not be able to complete all of our projects on time and our cost estimates could change by a significant amount due to the pressures described above. In addition, with the recent tightening in the financial markets that began in the summer of 2007 with concerns over asset-backed commercial paper, obtaining any financing for future development projects could be more difficult and expensive than in recent years.

CONTINGENCIES

Upper Columbia River Basin (Lake Roosevelt)

Prior to our acquisition in 2000 of a majority interest in Cominco Ltd. (now TCML), the Trail smelter discharged smelter slag into the Columbia River. These discharges commenced prior to TCML's acquisition of the Trail smelter in 1906 and continued until 1996. Slag was discharged pursuant to permits issued in British Columbia subsequent to the enactment of relevant environmental legislation in 1967. Slag and other non-slag materials released from the Trail smelter in British Columbia have traveled down river as have substances discharged from many other smelting and industrial facilities located along the length of the Upper Columbia River system in Canada and the United States.

Slag is a glass-like compound consisting primarily of silica, calcium and iron, which contains small amounts of base metals including zinc, lead, copper and cadmium. It is sufficiently inert that it is not characterized as a hazardous waste under applicable Canadian or US regulations and is sold to the cement industry. While slag has been deposited into the river, further study is required to assess what effect the presence of slag in the river has had and whether it poses an unacceptable risk to human health or the environment. A large number of studies regarding slag deposition and its effects have been conducted by various governmental agencies on both sides of the border. The historical studies of which we are aware have not identified unacceptable risks resulting from the presence of slag in the river.

In June 2006, TCML and its affiliate, Teck Cominco American Incorporated ("TCAI"), entered into a Settlement Agreement (the "Agreement") with the US Environmental Protection Agency ("EPA") and the United States under which TCAI is paying for and conducting a remedial investigation and feasibility study ("RI/FS") of contamination in the Upper Columbia River (the "Studies") under the oversight of the EPA. This multi-year study will use the latest science developed by the EPA and other researchers to determine the true risks in the reservoir system. The RI/FS is scheduled for completion in 2011 and is being prepared by independent consultants approved by the EPA and retained by TCAI. TCAI is paying the EPA's oversight costs and providing funding for the participation of other governmental parties, the State of Washington and two native tribes, the Confederated Tribes of the Colville Nation (the "Colville Tribe") and the Spokane Tribe. TCML has guaranteed TCAI's performance of the Agreement. TCAI has also placed US$20 million in escrow as financial assurance of its obligations under the Agreement and we have accrued our estimate of the costs of the Studies. Contemporaneously with the execution of the Agreement, the EPA withdrew a unilateral administrative order ("UAO") purporting to compel TCML to conduct the Studies.

The RI/FS process requires TCAI to submit a work plan for the assessment of site conditions to the EPA which, when approved, will lead to the development of a set of sampling and other plans and actual field work. TCAI submitted the first draft of the work plan in December 2006 and we expect the final version to be approved in the first quarter of 2008. Data from field work will be used to determine whether further studies are required. When sufficient data have been compiled to adequately assess risk, a baseline human health and environmental risk assessment ("RA") will be produced to identify risks, if any, that may exist to humans and to various environmental receptors. The RA will form the basis for the RI/FS. The remedial investigation will identify potential remedial options available to mitigate any unacceptable risks; the feasibility study will consider engineering, procedural and practical constraints to these remedial options. Based on the RI/FS, the EPA will determine whether and what remedial actions are appropriate in accordance with criteria that take into account, among other factors, technical feasibility, effectiveness, costs, effects on the environment resulting from the remediation action, and acceptability of the relevant remedial option to the community. Each work product and plan in this process is subject to EPA approval. Internal consultation processes of the EPA will include consultation with state and other federal agencies and the two Indian Tribes bordering the site.

While the UAO was outstanding, two citizens of Washington State and members of the Colville Tribe commenced an enforcement proceeding under Section 310(a)(i) of the Comprehensive Environmental Response, Compensation and Liability Act ("CERCLA") to enforce the UAO and to seek fines and penalties against TCML for non-compliance. TCML sought to have all claims dismissed on the basis that the court lacked jurisdiction because the CERCLA statute, in TCML's view was not intended to govern the discharges of a facility occurring entirely in Canada under Canadian federal and provincial permits. That case proceeded through US Federal District Court and the Federal Court of Appeals for the 9th Circuit. The 9th Circuit affirmed the District Court decision denying TCML's motion to dismiss the case on jurisdictional grounds and found that CERCLA could be applied to TCML's disposal practices in British Columbia because they may have had an effect in Washington State. The 9th Circuit issued a stay of its decision pending the resolution of a further appeal by TCML to the US Supreme Court. In February 2007, TCML filed a petition for review and reversal with the US Supreme Court. TCML's petition was supported by amicus briefs filed by Canada, the Province of British Columbia, the Mining Association of Canada, the US National Mining Association, the US Association of Manufacturers, the Canadian and US Chambers of Commerce and the Consumer Electronics Association. In January 2008, the US Supreme court denied TCML's petition for a review of the 9th Circuit decision. That denial of review is not a decision on the merits of TCML's defence, but rather reflects on the US Supreme Court's decision not to take up the case at this particular time. The case will now revert to the District Court of Eastern Washington for a hearing on the merits of the original and amended complaints. TCML will raise the defences set out in its petition to the Supreme Court and continue to vigorously defend against the claims. Should the District Court find that TCML is liable under the CERCLA statute, TCML will have the opportunity to appeal that decision to both the 9th Circuit and the US Supreme Court.

TCAI will continue to fulfill its obligations under the settlement agreement reached with the United States and the EPA in June 2006 and complete the RI/FS mentioned above. The settlement agreement is not affected by the litigation.

In July 2007, we received notification from the Colville Tribe that they have been appointed lead administrative trustee to the recently formed Upper Columbia/Lake Roosevelt Natural Resource Trustee Council comprised of the Colville Tribe, the Spokane Tribe, the State of Washington and the US Department of Interior. We were advised that the primary purpose of the council is the integration and coordination of the assessment of potential natural resource damages during the on-going RI/FS at the site. We believe and have so informed the council, that it is premature to conduct such studies until the RI/FS is further developed.

There can be no assurance that TCML will ultimately be successful in its defence of the litigation or that TCML or its affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the Agreement are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required, the cost of remediation may be material.

ADOPTION OF NEW ACCOUNTING STANDARDS

Effective January 1, 2007, we adopted the revised CICA Section 1506 "Accounting Changes", which requires that: (a) a voluntary change in accounting principles can be made if, and only if, the changes result in more reliable and relevant information, (b) changes in accounting policies are accompanied with disclosures of prior period amounts and justification for the change, and (c) for changes in estimates, the nature and amount of the change should be disclosed. The company has not made any voluntary change in accounting principles since the adoption of the revised standard.

Effective January 1, 2007, we adopted the following three new accounting standards and related amendments to other standards on financial instruments issued by the CICA. Prior periods have not been restated.

Comprehensive Income, Section 1530

This standard requires the presentation of a statement of comprehensive income and its components. Comprehensive income includes both net earnings and other comprehensive income. Other comprehensive income includes holding gains and losses on available-for-sale investments, gains and losses on certain derivative instruments and foreign currency gains and losses relating to self-sustaining foreign operations, all of which are not included in the calculation of net earnings until realized. This statement has been included in the consolidated financial statements starting this year.

Inventories, Section 3031

In June 2007, the Canadian Institute of Chartered Accountants issued section 3031 "Inventories" to replace existing section 3030. The new section, which is effective January 1, 2008, establishes standards for the measurement and disclosure of inventories. Management is in the process of assessing the impact of applying this section, but does not expect the application to have a significant impact on the company's financial statements.

Financial Instruments - Recognition and Measurement, Section 3855

This standard prescribes when a financial asset, financial liability, or non-financial derivative is to be recognized on the balance sheet and whether fair value or cost-based methods are used to measure the recorded amounts. It also specifies how financial instrument gains and losses are to be presented.

Effective January 1, 2007, our cash equivalents, temporary investments and investments in marketable securities have been classified as available-for-sale and are recorded at fair value on the balance sheet. Fair values are determined directly by reference to published price quotations in an active market. Changes in the fair value of these instruments are reflected in other comprehensive income and included in shareholders' equity on the balance sheet.

All derivatives are recorded on the balance sheet at fair value. Mark-to-market adjustments on these instruments are included in net income, unless the instruments are designated as part of a cash flow hedge relationship. In accordance with the standard's transitional provisions, we recognize as separate assets and liabilities only embedded derivatives acquired or substantively modified on or after January 1, 2003.

All other financial instruments will be recorded at cost or amortized cost, subject to impairment reviews. The criteria for assessing an other than temporary impairment remain unchanged. Transaction costs incurred to acquire financial instruments are included in the underlying balance. Regular-way purchases and sales of financial assets are accounted for on the trade date.

Hedges, Section 3865

This standard is applicable when a company chooses to designate a hedging relationship for accounting purposes. It builds on the previous AcG-13 "Hedging Relationships" and Section 1650 "Foreign Currency Translation", by specifying how hedge accounting is applied and what disclosures are necessary when it is applied. Upon adoption of this standard, we discontinued hedge accounting on all commodity derivative contracts and interest rate swaps. The company may enter into foreign exchange forward contracts in the future to hedge anticipated sales and may designate these contracts as cash flow hedges as they occur.

FINANCIAL INSTRUMENTS AND DERIVATIVES

We hold a number of financial instruments and derivatives, the most significant of which are marketable securities, fixed price forward metal sales contracts, settlements receivable and price participation payments on the sale of the Cajamarquilla zinc refinery. The Cajamarquilla price participation payments are economically similar to a fixed price forward purchase of zinc. The financial instruments and derivatives are all recorded at fair values on the company's balance sheet with gains and losses in each period included in other comprehensive income, net earnings from continuing operations and net earnings from discontinued operations as appropriate. Some of our gains and losses on metal related financial instruments are affected by smelter price participation and are taken into account in determining royalties and other expenses. All are subject to varying rates of taxation depending on their nature and jurisdiction.


QUARTERLY EARNINGS AND CASH FLOW

                                 2007                        2006
                    --------------------------- ---------------------------

                        Q4     Q3     Q2     Q1     Q4     Q3     Q2     Q1
Revenues             1,538  1,932  1,561  1,340  2,088  1,632  1,546  1,273

Operating profit       460    894    764    620  1,167    876    894    624

Net earnings           280    490    485    360    866    504    613    448

Earnings per share  $ 0.64 $ 1.15 $ 1.14 $ 0.83 $ 2.01 $ 1.17 $ 1.48 $ 1.09

Cash flow from
 continuing operations
 (before changes to
 working capital
 items)                309    672    579    441    829    647    669    461
 
OUTSTANDING SHARE DATA

As at February 8, 2008 there were 432,642,262 Class B subordinate voting shares and 9,353,470 Class A common shares outstanding. In addition, there were 3,789,741 director and employee stock options outstanding with exercise prices ranging between $3.20 and $43.74 per share. More information on these instruments and the terms of their conversion is set out in Note 17 of the company's 2006 year end financial statements.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

This news release contains certain forward-looking information. This forward-looking information, principally under the heading "Outlook", but also elsewhere in this news release, includes estimates, forecasts, and statements as to management's expectations with respect to, among other things, the size and quality of the company's mineral reserves and mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital and mine production costs, demand and market outlook for commodities, future commodity prices and treatment and refining charges, the outcome of legal proceedings involving the company, and the financial results of the company. This forward-looking information involves numerous assumptions, risks and uncertainties and actual results may vary materially.

Factors that may cause actual results to vary materially include, but are not limited to, changes in commodity and power prices, changes in interest and currency exchange rates, acts of foreign governments and the outcome of legal proceedings, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, adverse weather conditions and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets.

Statements concerning future production costs or volumes, and the sensitivity of the company's earnings to changes in commodity prices and exchange rates are based on numerous assumptions of management regarding operating matters, including that new collective bargaining agreements are entered into at certain operations without labour disruption, that demand for products develops as anticipated, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies.

WEBCAST

Teck Cominco will host an Investor Conference Call to discuss its Q4/2007 financial results on Tuesday, February 12, 2008 at 11 AM Eastern/8 AM Pacific time. A live audio webcast of the conference call, together with supporting presentation slides, will be available at the company's website at www.teckcominco.com. The webcast is also available at www.earnings.com. The webcast will be archived at www.teckcominco.com.


Teck Cominco Limited
Consolidated Statements of Earnings
(Unaudited)

--------------------------------------------------------------------------
                                Three months ended              Year ended
(in millions of dollars,               December 31             December 31
except per share data)             2007       2006         2007       2006
--------------------------------------------------------------------------

Revenues                        $ 1,538    $ 2,088      $ 6,371    $ 6,539

Operating expenses                 (970)      (840)      (3,300)    (2,714)

Depreciation and amortization      (108)       (81)        (333)      (264)
--------------------------------------------------------------------------

Operating profit                    460      1,167        2,738      3,561

Other expenses
 General and administration         (20)       (33)        (109)       (96)
 Interest on long-term debt         (21)       (22)         (85)       (97)
 Exploration                        (26)       (28)        (105)       (72)
 Research and development           (11)        (1)         (32)       (17)
 Asset impairment charges (Note 7)  (69)         -          (69)         -
 Other income (expense) (Note 9)     82        142          170        316
--------------------------------------------------------------------------

Earnings before the undernoted
 items                              395      1,225        2,508      3,595

Provision for income and
 resource taxes                     (61)      (375)        (795)    (1,213)

Minority interests                  (19)        (5)         (47)       (19)

Equity earnings (loss) (Note 10)    (19)         7           (5)        32
--------------------------------------------------------------------------

Net earnings from continuing
 operations                         296        852        1,661      2,395

Net earnings (loss) from
 Discontinued operations
 (Note 14(b))                       (16)        14         (46)         36
--------------------------------------------------------------------------

Net earnings                     $  280    $   866     $ 1,615     $ 2,431
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Earnings per share

 Basic                           $ 0.64   $   2.01     $  3.74     $  5.77

 Basic from continuing
  operations                     $ 0.67   $   1.98     $  3.85     $  5.68

 Diluted                         $ 0.63   $   1.99     $  3.72     $  5.60

 Diluted from continuing
  operations                     $ 0.67   $   1.96     $  3.83     $  5.52

Weighted average shares
 outstanding (millions)           441.8      431.2       431.5       421.2

Shares outstanding at end
 of period (millions)             441.9      431.6       441.9       431.6

The accompanying notes are an integral part of these financial statements.
See note 12(e) for additional information on share split.


Teck Cominco Limited
Consolidated Statements of Cash Flows
(Unaudited)

                                Three months ended              Year ended
                                       December 31             December 31
                                   ---------------         ---------------
(in millions of dollars)           2007       2006         2007       2006
--------------------------------------------------------------------------

Operating activities
 Net earnings from continuing
  operations                    $   296    $   852      $ 1,661    $ 2,395
 Items not affecting cash
  Depreciation and amortization     108         81          333        264
  Future income and resource taxes  (95)       (18)         (97)        59
  Equity (earnings) loss             31          2           30          5
  Minority interests                (23)         4            5         14
  Asset impairment charges           69          -           69          -
  Gain on sale of investments
   and assets                       (42)      (143)         (55)      (201)
  Other                             (35)        51           55         70
--------------------------------------------------------------------------
                                    309        829        2,001      2,606
 Net change in non-cash working
  capital items                     251        341         (282)       299
--------------------------------------------------------------------------
                                    560      1,170        1,719      2,905
--------------------------------------------------------------------------
Financing activities
 Issuance of long-term debt           3          -           14        123
 Repayment of long-term debt          -         (4)           -       (333)
 Issuance of Class B subordinate
  voting shares                       1          7           13         16
 Purchase and cancellation of
  Class B subordinate voting shares   -          -         (577)         -
 Dividends paid (Note 12(c))          -          -         (426)      (296)
 Redemption of exchangeable
  debentures                          -       (220)        (105)      (345)
--------------------------------------------------------------------------
                                      4       (217)      (1,081)      (835)
--------------------------------------------------------------------------
Investing activities
 Decrease (increase) in temporary
  investments                        33        (83)         194        759
 Cash held in trust                   -       (105)         105       (105)
 Property, plant and equipment     (163)      (146)        (571)      (391)
 Investments and other assets      (355)      (109)        (724)      (272)
 Fording Canadian Coal Trust
  Investment (Note 3(b))           (599)         -         (599)         -
 Acquisition of Aur Resources Inc.
  (Note 3(a))                         -          -       (2,588)         -
 Proceeds from sale of investments
  and assets                        168        777          194        885
 Additional proceeds from sale
  of discontinued operation           -          -           40          -
--------------------------------------------------------------------------
                                   (916)       334       (3,949)       876
--------------------------------------------------------------------------
Effect of exchange rate changes
 on cash and cash equivalents
 held in U.S. dollars                (8)        88         (335)        10
--------------------------------------------------------------------------
Increase (decrease) in cash and
 cash equivalents                  (360)     1,375       (3,646)     2,956
Cash and cash equivalents at
 Beginning of period              1,768      3,679        5,054      2,098
--------------------------------------------------------------------------
Cash and cash equivalents
 at end of period               $ 1,408    $ 5,054      $ 1,408    $ 5,054
--------------------------------------------------------------------------
--------------------------------------------------------------------------

The accompanying notes are an integral part of these financial statements.
See note 12(e) for additional information on share split.


Teck Cominco Limited
Consolidated Balance Sheets
(Unaudited)

--------------------------------------------------------------------------
                                     December 31,              December 31,
(in millions of dollars)                    2007                      2006
--------------------------------------------------------------------------

ASSETS

Current assets
 Cash and cash equivalents             $   1,408                  $  5,054
 Temporary investments                         -                       227
 Cash held in trust                            -                       105
 Accounts and settlements receivable         593                       723
 Inventories                               1,004                       786
--------------------------------------------------------------------------
                                           3,005                     6,895

Investments (Note 14(c))                   1,506                       365

Property, plant and equipment              7,807                     3,724

Other assets (Note 5)                        776                       463

Goodwill (Note 3(a))                         663                         -
--------------------------------------------------------------------------
                                        $ 13,757                  $ 11,447
--------------------------------------------------------------------------
--------------------------------------------------------------------------

LIABILITIES AND SHAREHOLDERS' EQUITY

Current liabilities
 Dividends payable                      $   221                   $    216
 Accounts payable and accrued
  liabilities                             1,017                        763
 Current portion of long-term debt
  (Note 14 (d))                              31                          -
 Current income and resource taxes payable    -                        443
 Current portion of future income and
  resource taxes                             81                        161
 Exchangeable debentures                      -                        105
--------------------------------------------------------------------------

                                          1,350                      1,688

Long-term debt (Note 14(d))               1,492                      1,509

Other liabilities (Note 6)                  994                        778

Future income and resource taxes          2,110                        880

Minority interests                           92                         43

Shareholders' equity (Note 12(a))         7,719                      6,549
--------------------------------------------------------------------------

                                                    $ 13,757     $ 11,447
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Contingencies (Note 15)

The accompanying notes are an integral part of these financial statements.
See note 12(e) for additional information on share split.


Teck Cominco Limited
Consolidated Statements of Retained Earnings
(Unaudited)


                                Three months ended              Year ended
                                       December 31             December 31
(in millions of dollars)           2007       2006         2007       2006
--------------------------------------------------------------------------

Retained earnings at beginning
 of period as previously
 reported                       $ 4,979    $ 3,575      $ 4,225    $ 2,228

Adoption of financial
 instrument standards
 (Note 2(b))                          -          -          112          -
--------------------------------------------------------------------------

As restated                       4,979      3,575        4,337      2,228

Net earnings                        280        866        1,615      2,431

Interest on exchangeable
 debentures, net of taxes             -          -            -         (3)

Dividends declared                 (221)      (216)        (431)      (431)

Share repurchase (Note 12(d))         -          -         (483)         -
--------------------------------------------------------------------------

Retained earnings at end of
 period                         $ 5,038    $ 4,225      $ 5,038    $ 4,225
--------------------------------------------------------------------------
--------------------------------------------------------------------------


Consolidated Statements of Comprehensive Income
(Unaudited)
--------------------------------------------------------------------------
                                Three months ended              Year ended
                                       December 31             December 31
(in millions of dollars)           2007       2006         2007       2006
--------------------------------------------------------------------------
Net earnings                      $ 280      $ 866      $ 1,615    $ 2,431
Other comprehensive income in
 the period
 Currency translation adjustment
  Unrealized gains (losses)        (244)        99         (609)        22
  Losses reclassified to net
   Income on realization              -                      59          -
                                   (244)        99         (550)        22
--------------------------------------------------------------------------

 Available-for-sale instruments
  Unrealized gains (losses)
   (net of taxes of $3 and $9)      (19)         -          (47)         -
  Losses reclassified to net
   income on realization (net of
   tax of $3 and $2)                 14          -           11          -
--------------------------------------------------------------------------
                                     (5)         -          (36)         -
 Derivatives designated as cash
  flow hedges
  Losses reclassified to net
   income on realization
   (net of tax of $2 and $7)         4           -           10          -
--------------------------------------------------------------------------
                                     4           -           10          -
--------------------------------------------------------------------------
Total other comprehensive
income (loss) (Note 13)           (245)         99         (576)        22
--------------------------------------------------------------------------

Comprehensive income             $  35       $ 965      $ 1,039    $ 2,453
--------------------------------------------------------------------------
--------------------------------------------------------------------------

The accompanying notes are an integral part of these financial statements.
See note 12(e) for additional information on share split.
 
1. BASIS OF PRESENTATION

(a) These interim consolidated financial statements have been prepared in accordance with Canadian GAAP using standards for interim financial statements and do not contain all of the information required for annual financial statements. These statements follow the same accounting policies and methods of application as the most recent annual financial statements, except as described in Note 2. Accordingly, they should be read in conjunction with our most recent annual financial statements. All dollar amounts are disclosed in Canadian currency unless otherwise noted.

(b) Certain comparative figures have been reclassified to conform to the presentation adopted for the current period.

2. ADOPTION OF NEW ACCOUNTING STANDARDS AND ACCOUNTING DEVELOPMENTS

(a) Accounting changes

Effective January 1, 2007, the company adopted the revised CICA Section 1506 "Accounting Changes", which now requires that: (a) a voluntary change in accounting principles can be made if, and only if, the changes result in more reliable and relevant information, (b) changes in accounting policies are accompanied with disclosures of prior period amounts and justification for the change, and (c) for changes in estimates, the nature and amount of the change should be disclosed. The company has not made any voluntary change in accounting principles since the adoption of the revised standard.

(b) Financial instruments

Effective January 1, 2007, we adopted the three new accounting standards and related amendments to other standards on financial instruments issued by the CICA. Prior periods have not been restated.

(i) Financial Instruments - Recognition and Measurement, Section 3855

This standard prescribes when a financial asset, financial liability, or non-financial derivative is to be recognized on the balance sheet and whether fair value or cost-based methods are used to measure the recorded amounts. It also specifies how financial instrument gains and losses are to be presented.

Effective January 1, 2007, our cash equivalents, temporary investments and investments in marketable securities have been classified as available-for-sale and are recorded at fair value on the balance sheet. Fair values are determined directly by reference to published price quotations in an active market. Changes in the fair value of these instruments are reflected in other comprehensive income and included in shareholders' equity on the balance sheet.

All derivatives are recorded on the balance sheet at fair value. Mark-to-market adjustments on these instruments are included in net income, unless the instruments are designated as part of a cash flow hedge relationship. In accordance with the standard's transitional provisions, we recognize as separate assets and liabilities only embedded derivatives acquired or substantively modified on or after January 1, 2003.

All other financial instruments will be recorded at cost or amortized cost, subject to impairment reviews. The criteria for assessing an other than temporary impairment remain unchanged. Transaction costs incurred to acquire financial instruments are included in the underlying balance. Regular-way purchases and sales of financial assets are accounted for on the trade date.

(ii) Hedges, Section 3865

This standard is applicable when a company chooses to designate a hedging relationship for accounting purposes. It builds on the previous AcG-13 "Hedging Relationships" and Section 1650 "Foreign Currency Translation", by specifying how hedge accounting is applied and what disclosures are necessary when it is applied.

Upon adoption of this standard, we discontinued hedge accounting on all commodity derivative contracts and interest rate swaps. We may enter into foreign exchange forward contracts in the future to hedge anticipated sales and may designate these contracts as cash flow hedges as they occur.

(iii) Comprehensive Income, Section 1530

This standard requires the presentation of a statement of comprehensive income and its components. Comprehensive income includes both net earnings and other comprehensive income. Other comprehensive income ("OCI") includes holding gains and losses on available for sale investments, gains and losses on certain derivative instruments and foreign currency gains and losses relating to self-sustaining foreign operations, all of which are not included in the calculation of net earnings until realized.

As at January 1, 2007 the effect on our balance sheet of adopting these standards is summarized below. As prescribed by these standards, prior periods have not been restated.


--------------------------------------------------------------------------
--------------------------------------------------------------------------
(in millions of dollars)                     January 1, 2007
--------------------------------------------------------------------------
                                               Adjusted on
                                               adoption of        Restated
                                                 Financial         opening
                                               Instruments        balances
                                As reported      standards         in 2007
--------------------------------------------------------------------------

ASSETS

Current assets                      $ 6,895        $     -         $ 6,895

Investments                             365       106(a)(b)            471

Property, plant and equipment         3,724                          3,724

Other assets                            463       128(b)(c)            591
--------------------------------------------------------------------------
                                    $11,447        $   234         $11,681
--------------------------------------------------------------------------
--------------------------------------------------------------------------

LIABILITIES AND SHAREHOLDERS' EQUITY

Current liabilities                   1,688           19(b)          1,707

Long-term debt                        1,509         (11)(c)          1,498

Other liabilities                       778           52(b)            830

Minority interests                       43              -              43

Future income and resource taxes        880           12(d)            892
--------------------------------------------------------------------------
                                      4,898             72           4,970

Shareholders' equity
 Share capital                        2,405              -           2,405
 Retained earnings                    4,225          112(b)          4,337
 Contributed surplus                     64              -              64
 Cumulative translation adjustment     (145)         145(e)              -
 Accumulated other comprehensive
  income                                  -        (145)(e)            (95)
                                                   50(a)(b)
--------------------------------------------------------------------------
                                      6,549            162           6,711
--------------------------------------------------------------------------
                                   $ 11,447        $   234        $ 11,681
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Notes:
(a) Marketable securities previously accounted for at cost are designated
    as available for sale and are measured at fair value.
(b) Derivative instruments previously accounted for at cost are held for
    trading and are measured at fair value.
(c) Debt financing costs previously deferred as other assets are
    reclassified to reduce long-term debt.
(d) The tax effect of the above adjustments is recorded to future income
    and resource taxes.
(e) The cumulative translation adjustment is reclassified to accumulated
    other comprehensive income.
 
(c) Canadian accounting pronouncements effective for 2008

Inventories

In June 2007, the Canadian Institute of Chartered Accountants issued section 3031 "Inventories" to replace existing section 3030. The new section, which is effective January 1, 2008, establishes standards for the measurement and disclosure of inventories. We do not expect the application to have a significant impact on the company's financial statements.

3. ACQUISITIONS AND DISPOSITIONS

(a) Aur Resources Inc.

In the third quarter of 2007, we acquired 100% of the outstanding common shares of Aur Resources Inc. (Aur). Aur owns interests in three operating mines, the Quebrada Blanca (76.5%), and Andacollo (90%) copper mines located in Chile and the Duck Pond (100%) copper-zinc mine located in Newfoundland, Canada.

The Aur acquisition has been accounted for using the purchase method, with Teck Cominco Limited as the acquirer. Aur's results of operations are included in these consolidated financial statements from August 22, 2007. The purchase cost of $4,054 million was funded with a combination of cash and Class B subordinate voting shares issued as follows:

--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                                   (in millions of dollars)
--------------------------------------------------------------------------
Cash                                                               $ 3,089
Issuance of 21,971,906 Class B subordinate voting shares               952
Transaction costs                                                       13
--------------------------------------------------------------------------
Total purchase price                                               $ 4,054
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
Each Class B subordinate voting share was valued at $43.33, being the average closing price on the Toronto Stock Exchange for two trading days before and one day after the announcement of our offer for Aur, less deemed issuance costs.

The allocation of the purchase cost to the assets acquired and liabilities assumed is based upon estimated fair values at the time of acquisition. We have started the process of internal estimates and independent appraisals of Aur's assets and liabilities; however, the process of determining fair values is complex and time consuming and as such current estimates are preliminary. As a result, the purchase price allocation is subject to change in 2008 as the valuation process is completed. Matters still under review are principally related to income and resource taxes and could affect values assigned to fixed assets, future tax liabilities and goodwill.

The preliminary allocation of the purchase price assigned to the assets and liabilities of Aur is based on preliminary estimates of fair value on the acquisition date as follows:


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                                   (in millions of dollars)
--------------------------------------------------------------------------
 Cash                                                              $   501
 Inventory                                                             267
 Property, plant and equipment                                       4,137
 Goodwill                                                              706
 Other                                                                 330
 Total assets acquired                                               5,941
--------------------------------------------------------------------------

 Current liabilities                                                  (197)
 Derivative instrument liability                                       (96)
 Long-term liabilities                                                (302)
 Future income tax liability                                        (1,263)
 Non-controlling interests                                             (29)
--------------------------------------------------------------------------
 Total liabilities assumed                                          (1,887)
--------------------------------------------------------------------------
 Net assets acquired                                               $ 4,054
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
The net cash cost of the acquisition was as follows:

--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                                   (in millions of dollars)
Cash paid to Aur shareholders                                      $ 3,089
Less Aur's cash balance on acquisition date                           (501)
--------------------------------------------------------------------------
                                                                   $ 2,588
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
(b) Fording Canadian Coal Trust

On September 28, 2007 we acquired 16.65 million units of the Fording Canadian Coal Trust (Fording) at a price of $599 million, which was paid in the fourth quarter. The acquisition of these units increases our interest in Fording from 8.7% to 19.95%. If prior to July 31, 2008, we make an offer or announce an intention to acquire more than 50% of the outstanding Fording units, and subsequently complete the transaction, or sell Fording units, at a price in excess of $36 per unit, we will pay the seller such excess for each of the 16.65 million units acquired. The investment in Fording is accounted for on an equity basis.

(c) Galore Creek Partnership

In August 2007, we formed a 50/50 partnership with NovaGold Resources Inc. ("NovaGold") to develop the Galore Creek copper-gold deposit in northwest British Columbia. Pursuant to the terms of the partnership agreement, we were required to fund the next C$528 million in development costs. Thereafter, each partner was to be responsible for funding it's pro rata share of development costs. NovaGold was also entitled to receive up to US$50 million of preferential distributions if revenues in the first year of commercial production were to exceed specific established targets.

As the Galore Creek Partnership ("Galore Creek") is a variable interest entity with NovaGold as the primary beneficiary, we account for our interest in the Galore Creek using the equity method. Future events, such as the on-going funding arrangements, may result in a change to the accounting for our investment in Galore Creek.

In November, construction activities at the project were suspended as a result of our review of the first season of construction and a more extensive engineering study that anticipated substantially higher capital costs and a longer construction schedule for the project. Based on a revised capital cost estimate and a reduction in expected operating margins as a result of the stronger Canadian dollar, the project as originally conceived and permitted would be uneconomic at expected long-term metal prices.

By agreement with NovaGold at the time of the suspension, our funding obligations in connection with the project were amended. Our funding obligation of project costs incurred after August 1, 2007 was reduced from the original $528 million to $403 million. Of this total, $264 million was spent by us as of the suspension date. In addition, of the next $100 million of project costs (other than project study costs described below), we will fund two-thirds and NovaGold will fund one-third. Thereafter, each partner will fund its pro rata share of partnership costs. In addition, we agreed to invest an additional $72 million in the partnership over the next five years to be used principally to reassess the project and evaluate alternative development strategies.

Our future obligations with respect to the project are to complete construction demobilization and put the site on care and maintenance that will enable us to restart the project at a later date. The estimated project demobilization costs of $100 million have been accrued and expensed by the partnership in the period. We have recorded our after-tax 50% share of these expenses as an equity loss of $33 million in the quarter. These cost estimates are based on preliminary plans that could change as more information becomes available. In addition, the project is subject to severe weather conditions that can affect the nature, extent and timing of work. Accordingly, our actual demobilization costs could vary by a material amount from our estimates. On-going care and maintenance costs, which will be expensed as incurred, will be required to monitor the site and infrastructure until a decision is made to proceed with or abandon the project. This decision may not occur for several years. If the project does not proceed, the Galore Creek partnership may have to reclaim and restore any disturbed land.

At December 31, 2007, our investment in Galore Creek was $214 million, which consists of our $264 million investment less our pre-tax equity loss of $50 million related to our share of the project demobilization costs.

(d) Fort Hills Energy Limited Partnership

In September 2007, we entered into an agreement to acquire an additional 5% interest in the Fort Hills Energy Limited Partnership, which is developing the Fort Hills oil sands project in Alberta, Canada. To earn the additional 5% interest we are required to contribute 27.5% of project expenditures after project spending reaches $2.5 billion and before project spending reaches $7.5 billion, after which our contribution reverts to our 20% share. The interest in Fort Hills will continue to be recorded as an investment using the equity method of accounting.

4. CHANGES IN ESTIMATES

(a) Mineral reserves

Estimates of proven and probable mineral reserves at each mineral property are updated annually at the end of each year. Following the update of these estimates on December 31, 2006, calculations of depreciation and amortization of property, plant and equipment were prospectively revised.

(b) Mine life extension at Highland Valley Copper

In February 2007, we announced the extension of mine life at Highland Valley Copper to 2019. As a result, the amounts of depreciation and amortization of property, plant and equipment, pension expense and amounts related to asset retirement obligations at Highland Valley are now based on the extended mine life.

5. OTHER ASSETS


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                           December 31,        December 31,
 (in millions of dollars)                         2007                2006
--------------------------------------------------------------------------
 Restricted cash pledged as security (a)         $ 151               $   -
 Pension assets                                    210                 194
 Future income and resource tax assets             254                 103
 Cajamarquilla contingent receivable, net of
  current portion of
   $37 million (Note 14(b))                         42                   -
 Long-term receivables and investments              51                 109
 Other                                              68                  57
--------------------------------------------------------------------------
                                                 $ 776               $ 463
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
(a) Upon acquisition of Aur, we assumed a revolving credit facility that permits borrowings of up to US$150 million (Note 0(d)). The terms of the facility requires us to provide cash collateral to the lender equal to any amount outstanding under the facility plus US$3 million.

6. OTHER LIABILITIES


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                           December 31,        December 31,
(in millions of dollars)                          2007                2006
--------------------------------------------------------------------------
 Asset retirement obligations                    $ 492               $ 427
 Other environmental and post-closure costs         88                  70
 Accrued pension and post-retirement benefits      244                 222
 Forward sales contracts, net of current
  portion of $37 million (Note 14(e))               78                   -
 Other                                              92                  59
--------------------------------------------------------------------------
                                                 $ 994               $ 778
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
7. ASSET IMPAIRMENT CHARGES

During the fourth quarter of 2007 we recorded an impairment charge of $26 million on our investment in Tahera Diamond Corporation ("Tahera"). Tahera announced the suspension of operations at their primary asset, the Jericho mine and subsequently filed for creditor protection indicating an other than temporary decline in market value.

We also recorded impairment charges of $12 million against our Lennard Shelf zinc mine and $31 million against our Pend Oreille zinc mine. The impairment changes were recorded due to operating losses, lower than planned production and increasing costs. As a result, we no longer expect to recover the full carrying value of the mines over their expected mine lives and we have written the carrying value of the mines down to their fair value based on internal estimates of discounted future cash flows.

8. SUPPLEMENTARY CASH FLOW INFORMATION


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                  Three months ended            Year ended
                                         December 31           December 31
(in millions of dollars)             2007       2006       2007       2006
--------------------------------------------------------------------------

Income and resource taxes paid   $    256   $    198   $  1,283   $    846

Interest paid                    $     30   $     38   $     90   $    111
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
9. OTHER INCOME (EXPENSE)


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                  Three months ended            Year ended
                                         December 31           December 31
(in millions of dollars)             2007       2006       2007       2006
--------------------------------------------------------------------------

Interest income                  $     19   $     65   $    177   $    186
Gain on sale of investments
 and assets                            42        143         55        201
Realization of cumulative
 translation losses                     -          -        (59)         -
Reclamation expense for closed
 properties                           (16)       (11)       (26)       (17)
Non-hedge zinc derivative gains        46          -         53          -
Other non-hedge derivative gains
 (losses)                              (9)         1        (31)         -
Other                                   -        (56)         1        (54)
--------------------------------------------------------------------------

                                 $     82   $    142   $    170   $    316
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
10. EQUITY EARNINGS (LOSS)


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                  Three months ended            Year ended
                                         December 31           December 31
(in millions of dollars)             2007       2006       2007       2006
--------------------------------------------------------------------------

Fording Canadian Coal Trust      $     14   $      7   $     28   $     32
Galore Creek Partnership              (33)         -        (33)         -
--------------------------------------------------------------------------

                                 $    (19)  $      7   $     (5)  $     32
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
11. EMPLOYEE FUTURE BENEFITS EXPENSE


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                  Three months ended            Year ended
                                         December 31           December 31
(in millions of dollars)             2007       2006       2007       2006
--------------------------------------------------------------------------

Pension plans                    $      6   $     13   $     31   $     40
Post-retirement benefit plans          12         11         34         27
--------------------------------------------------------------------------

                                 $     18   $     24   $     65   $     67
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
12. SHAREHOLDERS' EQUITY

(a) Components of shareholders' equity


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                                December 31,   December 31,
(in millions of dollars)                               2007           2006
--------------------------------------------------------------------------

Share capital (note 3(a))                       $     3,281    $     2,405
Contributed surplus                                      71             64

Accumulated comprehensive income
 Retained earnings                                    5,038          4,225
 Accumulated other comprehensive loss (Note 13)        (671)          (145)
--------------------------------------------------------------------------

                                                      4,367          4,080
--------------------------------------------------------------------------

                                                $     7,719    $     6,549
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
(b) Stock-based compensation

In February 2007, 839,400 share options were granted to employees. These options have an exercise price of $43.74, a term of eight years and vest in equal amounts over three years. The weighted average fair value of Class B subordinate voting share options issued was estimated at $16.00 per share option at the grant date using the Black-Scholes option-pricing model. The option valuation was based on an average expected option life of four years, a risk-free interest rate of 5.15%, a dividend yield of 0.95% and an expected volatility of 35%.

During the year, we issued 359,228 Deferred and Restricted Share Units to employees and directors. Deferred and Restricted Share Units issued vest immediately for directors and vest in three years for employees. The total number of deferred and restricted share units outstanding at December 31, 2007 was 1,044,198.

Stock-based compensation expense of $21 million was recorded for the year ended December 31, 2007 in respect of all outstanding options and share units.

(c) Dividends

Dividends of $0.50 per share paid in January and July 2007 are eligible dividends, entitling Canadian resident individuals to claim the enhanced dividend tax credit for income tax purposes. An eligible dividend of $0.50 per share was declared payable to shareholders of record on December 21, 2007 and paid on January 3, 2008.

(d) Share purchase program

In February, 2007, we received regulatory approval to purchase up to 40 million of our outstanding Class B subordinate voting shares by way of a normal course issuer bid. Purchases are made from time-to-time at the prevailing market price of the Class B subordinate voting shares as traded on the Toronto Stock Exchange and any shares purchased are cancelled.

During the fourth quarter, we did not purchase any additional Class B subordinate voting shares. The total amount of buybacks to December 31, 2007 was 13.1 million Class B subordinated voting shares at a cost of $577 million, or $44.02 per share. The number of Class B subordinate voting shares that may yet be purchased under the program was 26.9 million at December 31, 2007. The program expires on February 21, 2008.

(e) Share split

On April 25, 2007, shareholders approved a two-for-one share split for Class A common shares and Class B subordinate voting shares effective as of the close of business on May 7, 2007. All share and per share information included in the consolidated financial statements and accompanying notes has been adjusted to reflect this share split for all periods presented.

13. ACCUMULATED OTHER COMPREHENSIVE INCOME (LOSS)


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                               Three months
                                                      ended     Year ended
                                                December 31,   December 31,
(in millions of dollars)                               2007           2006
--------------------------------------------------------------------------

Opening balances at beginning of period         $      (426)   $      (145)
Adoption of new accounting standards                      -             50
--------------------------------------------------------------------------

                                                       (426)           (95)
Other comprehensive loss for the period                (245)          (576)
--------------------------------------------------------------------------

Accumulated other comprehensive loss at end
 of period                                      $      (671)   $      (671)
--------------------------------------------------------------------------
 
The components of accumulated other comprehensive income (loss) are:


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                 December 31,     On adoption  December 31,
(in millions of dollars)                2006  January 1, 2007         2007
--------------------------------------------------------------------------

Currency translation adjustment  $      (145)     $      (145) $      (695)
Unrealized losses on cash flow
 hedges
 (net of tax of $21 and $14)               -              (28)         (18)
Unrealized gains on investments
 (net of tax of $16 and $10)               -               78           42
--------------------------------------------------------------------------

                                 $      (145)     $       (95) $      (671)
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
14. ACCOUNTING FOR FINANCIAL INSTRUMENTS (Note 2(b))

(a) Sales and purchases contracts

The majority of our metal concentrates are sold under pricing arrangements where final prices are determined by quoted market prices in a period subsequent to the date of sale. In these circumstances, revenues are recorded at the time of sale based on forward prices for the expected date of the final settlement. Metal concentrates for smelting and refining operations are purchased under similar arrangements. As a result, the values of our concentrate receivables and payables change as the underlying market prices vary. This component of the contracts is an embedded derivative, which is recorded at fair value with changes in fair value recorded in revenue or operating costs as appropriate.

(b) Contingent receivable related to sale of discontinued operations

Pursuant to a price participation clause in the agreement for sale of the Cajamarquilla zinc refinery in 2004, we are entitled to additional consideration of US$365,000 for each US$0.01 by which the average annual price of zinc exceeds US$0.454 per pound. This zinc price participation expires in 2009.

Effective January 1, 2007, upon adoption of the new accounting standards for financial instruments, we recorded an asset of $139 million by increasing our retained earnings in respect of the fair market value of the price participation clause in the sale agreement. The new accounting standards for financial instruments require us to mark the price participation portion of the receivable to market at the end of each quarter based on the zinc forward price curve. The net after-tax loss in respect of price participation and other consideration was $16 million in the fourth quarter. We recorded an after-tax loss of $46 million in respect of these items for the year ended December 31, 2007.

(c) Investments


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                     December 31, 2007   December 31, 2006
                                    -----------------   ------------------
                                    Carrying      Fair  Carrying      Fair
(in millions of dollars)               Value     Value     Value     Value
--------------------------------------------------------------------------
Marketable securities (i)           $    308  $    308  $     91  $    186
Fording Canadian Coal Trust (ii)
 (Note 3(b))                             750     1,132       148       309
Warrants (iii)                             1         1  $     12        23
--------------------------------------------------------------------------
                                       1,059     1,441       251       518
Galore Creek Partnership (ii)
 (Note 3(c))                             214                   -
Fort Hills Energy Limited
 Partnership (ii) (Note 3(d))            233                 114
--------------------------------------------------------------------------
                                    $  1,506            $    365
--------------------------------------------------------------------------
--------------------------------------------------------------------------

(i) Marketable securities are designated as available-for-sale with
    changes in fair value included in Other Comprehensive Income ("OCI").

(ii) Our interests in Fording Canadian Coal Trust, Fort Hills Energy
     Limited Partnership and the Galore Creek Partnership are equity
     investments and changes in fair value are not included in earnings or
     OCI.

(iii) Warrants are held for trading and changes in fair value are included
      in earnings as other income.
 
(d) Long-term debt


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                                         December 31, 2007
(in millions of dollars)                       Carrying Value   Fair Value
--------------------------------------------------------------------------
Debt instruments
 6.125% debentures due October 2035                $      675   $      637
 5.375% debentures due October 2015                       293          287
 7.000% debentures due September 2012                     196          212
 Antamina senior revolving credit facility                 92           92
 Aur Resources Inc. revolving credit facility
  (note 5(a))                                             148          148
 6.750% Aur Resources senior notes                         94           96
 Other                                                     25           25
--------------------------------------------------------------------------
                                                        1,523        1,497
Less current portion                                      (31)         (31)
--------------------------------------------------------------------------
                                                   $    1,492   $    1,466
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
(e) Our derivative positions at December 31, 2007 are as follows:


--------------------------------------------------------------------------
--------------------------------------------------------------------------

                                 2008  2009  2010  2011 Total   Fair Value
--------------------------------------------------------------------------

Gold (thousands of ozs)
 Forward sale contracts            44    43     -     -    87
 Average price (US$/oz)           350   350     -     -   350   $      (42)

Zinc (millions of lbs)
 Fixed forward sale contracts (i)  57    57    57    57   228
 Average price (US$/lb)          0.78  0.72  0.67  0.63  0.70          (76)

Zinc (millions of lbs)
 Fixed forward purchase 
  contracts (ii)                    6     -     -     -     6
 Average price (US$/lb)          1.05     -     -     -  1.05            -

Lead (millions of lbs)
 Fixed forward purchase
  contracts (ii)                    1     -     -           1
 Average price (US$/lb)          0.76     -     -     -  0.76            -
                                                                ----------
                                                                $     (118)
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Interest Rate Swap

--------------------------------------------------------------------------
--------------------------------------------------------------------------
Principal          Rate                Rate          Maturity         Fair
Amount          Swapped            Obtained              Date        Value
--------------------------------------------------------------------------
US$100 million    7.00%    LIBOR plus 2.14%    September 2012   $3 million
--------------------------------------------------------------------------
--------------------------------------------------------------------------

Notes:
(i) As part of the Aur Resources acquisition, fixed forward sale
    commitments were acquired.
(ii) From time to time, certain customers purchase refined metal products
     at fixed forward prices from the company's smelter and refinery
     operations. The forward purchase commitments for these metal products
    are matched to these fixed price sales commitments to customers.
 
15. CONTINGENCIES

We consider provisions for all our outstanding and pending legal claims to be adequate. The final outcome with respect to actions outstanding or pending as at December 31, 2007, or with respect to future claims, cannot be predicted with certainty.

(a) Upper Columbia River Basin (Lake Roosevelt)

Prior to our acquisition in 2000 of a majority interest in Cominco Ltd. (now TCML), the Trail smelter discharged smelter slag into the Columbia River. These discharges commenced prior to TCML's acquisition of the Trail smelter in 1906 and continued until 1996. Slag was discharged pursuant to permits issued in British Columbia subsequent to the enactment of relevant environmental legislation in 1967.

Slag and other non-slag materials released from the Trail smelter in British Columbia have traveled down river as have substances discharged from many other smelting and industrial facilities located along the length of the Upper Columbia River system in Canada and the United States.

Slag is a glass-like compound consisting primarily of silica, calcium and iron, which contains small amounts of base metals including zinc, lead, copper and cadmium. It is sufficiently inert that it is not characterized as a hazardous waste under applicable Canadian or US regulations and is sold to the cement industry. While slag has been deposited into the river, further study is required to assess what effect the presence of slag in the river has had and whether it poses an unacceptable risk to human health or the environment. A large number of studies regarding slag deposition and its effects have been conducted by various governmental agencies on both sides of the border. The historical studies of which we are aware have not identified unacceptable risks resulting from the presence of slag in the river.

In June 2006, TCML and its affiliate, Teck Cominco American Incorporated ("TCAI"), entered into a Settlement Agreement (the "Agreement") with the US Environmental Protection Agency ("EPA") and the United States under which TCAI is paying for and conducting a remedial investigation and feasibility study ("RI/FS") of contamination in the Upper Columbia River (the "Studies") under the oversight of the EPA. This multi-year study will use the latest science developed by the EPA and other researchers to determine the true risks in the reservoir system. The RI/FS is scheduled for completion in 2011 and is being prepared by independent consultants approved by the EPA and retained by TCAI. TCAI is paying the EPA's oversight costs and providing funding for the participation of other governmental parties, the State of Washington and two native tribes, the Confederated Tribes of the Colville Nation (the "Colville Tribe") and the Spokane Tribe. TCML has guaranteed TCAI's performance of the Agreement. TCAI has also placed US$20 million in escrow as financial assurance of its obligations under the Agreement and we have accrued our estimate of the costs of the Studies. Contemporaneously with the execution of the Agreement, the EPA withdrew a unilateral administrative order ("UAO") purporting to compel TCML to conduct the Studies.

The RI/FS process requires TCAI to submit a work plan for the assessment of site conditions to the EPA which, when approved, will lead to the development of a set of sampling and other plans and actual field work. Data from field work will be used to determine whether further studies are required. When sufficient data have been compiled to adequately assess risk, a baseline human health and environmental risk assessment ("RA") will be produced to identify risks, if any, that may exist to humans and to various environmental receptors. The RA will form the basis for the RI/FS. The remedial investigation will identify potential remedial options available to mitigate any unacceptable risks; the feasibility study will consider engineering, procedural and practical constraints to these remedial options. Based on the RI/FS, the EPA will determine whether and what remedial actions are appropriate in accordance with criteria that take into account, among other factors, technical feasibility, effectiveness, costs, effects on the environment resulting from the remediation action, and acceptability of the relevant remedial option to the community. Each work product and plan in this process is subject to EPA approval. Internal consultation processes of the EPA will include consultation with state and other federal agencies and the two Indian Tribes bordering the site.

While the UAO was outstanding, two citizens of Washington State and members of the Colville Tribe commenced an enforcement proceeding under Section 310(a)(i) of the Comprehensive Environmental Response, Compensation and Liability Act ("CERCLA") to enforce the UAO and to seek fines and penalties against TCML for non-compliance. TCML sought to have all claims dismissed on the basis that the court lacked jurisdiction because the CERCLA statute, in TCML's view was not intended to govern the discharges of a facility occurring in another country. That case proceeded through US Federal District Court and the Federal Court of Appeals for the 9th Circuit. The 9th Circuit affirmed the District Court decision denying TCML's motion to dismiss the case on jurisdictional grounds and found that CERCLA could be applied to TCML's disposal practices in British Columbia because they may have had an effect in Washington State. The 9th Circuit issued a stay of its decision pending the resolution of a further appeal by TCML to the US Supreme Court. In February 2007, TCML filed a petition for review and reversal with the US Supreme Court. TCML's petition was supported by amicus briefs filed by Canada, the Province of British Columbia, the Mining Association of Canada, the US National Mining Association, the US Association of Manufacturers, the Canadian and US Chambers of Commerce and the Consumer Electronics Association. In January 2008, the US Supreme court denied TCML's petition for a review of the 9th Circuit decision. That denial of review is not a decision on the merits of TCML's defense, but rather reflects on the US Supreme Court's decision not to take up the case at this particular time. The case will now revert to the District Court of Eastern Washington for a hearing on the merits of the original and amended complaints. TCML will raise the defenses set out in its petition to the Supreme Court and continue to vigorously defend against the claims. Should the District Court find that TCML is liable under the CERCLA statute, TCML will have the opportunity to appeal that decision to both the 9th Circuit and the US Supreme Court.

TCAI will continue to fulfill its obligations under the settlement agreement reached with the United States and the EPA in June 2006 and complete the RI/FS mentioned above. The settlement agreement is not affected by the litigation.

In July 2007, we received notification from the Colville Tribe that they have been appointed lead administrative trustee to the recently formed Upper Columbia/Lake Roosevelt Natural Resource Trustee Council comprised of the Colville Tribe, the Spokane Tribe, the State of Washington and the US Department of Interior. We were advised that the primary purpose of the council is the integration and coordination of the assessment of potential natural resource damages during the on-going RI/FS at the site. We believe and have so informed the council, that it is premature to conduct such studies until the RI/FS is further developed.

There can be no assurance that TCML will ultimately be successful in its defense of the litigation or that TCML or its affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the Agreement are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required, the cost of remediation may be material.

16. SEGMENTED INFORMATION

We have five reportable segments: smelting and refining, base metals, gold, coal, and corporate and other. Revenue from refined zinc and lead, electrical power, fertilizers and specialty metals operations are included in smelting and refining revenue for segmented purposes. The corporate segment includes administrative, investment, exploration and business development activities. Concentrates sold from one segment to another are valued at market prices.


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                   Three months ended December 31, 2007
                                ------------------------------------------
                                                             Corpo-
                                Smelting                      rate
                                     and    Base               and
(in millions of dollars)        refining  metals  Gold  Coal other   Total
--------------------------------------------------------------------------

Segment revenues                 $   382 $   935 $  60 $ 218 $  13 $ 1,608
Less inter-segment revenues            -     (70)    -     -     -     (70)
--------------------------------------------------------------------------

Revenues                             382     865    60   218    13   1,538

Operating profit                      24     396     8    30     2     460
Interest expense                       -      (5)    -     -   (16)    (21)
Other corporate expenses               -       -   (13)    -   (31)    (44)
--------------------------------------------------------------------------

Earnings before taxes, minority
 interests, equity earnings and
 discontinued operations              24     391    (5)   30   (45)    395

Capital expenditures                  29     106     8    15     5     163


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                      Year ended December 31, 2007
                                ------------------------------------------
                                                             Corpo-
                                Smelting                      rate
                                     and    Base               and
(in millions of dollars)        refining  metals  Gold  Coal other   Total
--------------------------------------------------------------------------
Segment revenues                 $ 1,839 $ 3,737 $ 182 $ 951 $  49 $ 6,758
Less inter-segment revenues            -    (385)    -     -    (2)   (387)
--------------------------------------------------------------------------
Revenues                           1,839   3,352   182   951    47   6,371
Operating profit                     345   2,163    (5)  209    26   2,738
Interest expense                       -     (13)    -    (1)  (71)    (85)
Other corporate expenses               -       -   (28)    -  (117)   (145)
--------------------------------------------------------------------------
Earnings before taxes, minority
 interests, equity earnings and
 discontinued operations             345   2,150   (33)  208  (162)  2,508
Total assets                       1,612   8,223   337   609 2,976  13,757
Capital expenditures                  87     320    30    35    99     571


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                   Three months ended December 31, 2006
                                ------------------------------------------
                                                             Corpo-
                                Smelting                      rate
                                     and    Base               and
(in millions of dollars)        refining  metals  Gold  Coal other   Total
--------------------------------------------------------------------------
Segment revenues                 $   545 $ 1,377 $  32 $ 284 $  11 $ 2,249
Less inter-segment revenues            -    (161)    -     -     -    (161)
--------------------------------------------------------------------------
Revenues                             545   1,216    32   284    11   2,088
Operating profit                     111     973    (3)  100   (14)  1,167
Interest expense                       -      (3)    -    (1)  (18)    (22)
Other corporate expenses               -       -     -     -    80      80
--------------------------------------------------------------------------
Earnings before taxes, minority
 interests, equity earnings and
 discontinued operations             111     970    (3)   99    48   1,225
Capital expenditures                  39      60     8     5    34     146


--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                      Year ended December 31, 2006
                                ------------------------------------------
                                                             Corpo-
                              Smelting                        rate
                                   and    Base                 and
(in millions of dollars)      refining  metals  Gold    Coal other   Total
--------------------------------------------------------------------------
Segment revenues               $ 1,802 $ 3,847 $ 143 $ 1,177 $  38 $ 7,007
Less inter-segment revenues          -    (466)    -       -    (2)   (468)
--------------------------------------------------------------------------
Revenues                         1,802   3,381   143   1,177    36   6,539
Operating profit                   395   2,734     7     444   (19)  3,561
Interest expense                     -     (11)    -      (2)  (84)    (97)
Other corporate expenses             -     (10)    -       -   141     131
--------------------------------------------------------------------------
Earnings before taxes, minority
 interests, equity earnings and
 discontinued operations           395   2,713     7     442    38   3,595
Total assets                     1,627   4,015   402     631 4,772  11,447
Capital expenditures                76     159    44      18    94     391
 
17. SEASONALITY OF SALES

Due to ice conditions, the port serving our Red Dog mine is normally only able to ship concentrates from July to October each year. As a result, zinc and lead concentrate sales volumes are generally higher in the third and fourth quarter of each year than in the first and second quarter.

CONTACT INFORMATION:

Teck Cominco Limited
Greg Waller
Investor Relations
(604) 687-1117
Fax: (604) 687-6100
Website: www.teckcominco.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Données et statistiques pour les pays mentionnés : Canada | Panama | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Panama | Tous

Teck Resources Limited

PRODUCTEUR
CODE : TCK
ISIN : CA8787422044
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Teck est une société de production minière basée au Canada.

Teck est productrice d'argent, de charbon, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Chili, au Perou et au Salvador, en développement de projets d'argent, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Mexique, au Panama, en Australie et en Turquie, et détient divers projets d'exploration au Burkina Faso, au Canada, au Chili, au Honduras, au Mexique, au Perou, en Australie, en Argentine, en Chine, en Guyana et en Turquie.

Ses principaux projets en production sont HEMLO, RED DOG, DUCK POND, BOUNDARY - CARAMELIA, WILLIAMS, ELKVIEW COAL MINE (BALMER MINE), HIGHLAND VALLEY, WILLIAMS UNDERGROUND, DAVID BELL et WILLIAMS OPEN PIT au Canada, COLQUIJIRCA MINE, PEND OREILLE, ANTAMINA ZINC ORE et ANTAMINA au Perou, QUEBRADA BLANCA - HYPOGENE, HORN SILVER COMPLEX (SAN FRANCISCO), ANDACOLLO, QUEBRADA BLANCA MINE, CARMEN DE ANDACOLLO et ANDACOLLO HYPOGENE au Chili et SAN SEBASTIAN au Salvador, ses principaux projets en développement sont LENNARD SHELF et LENNARD SHELF en Australie, CERATTEPE en Turquie, EL LIMON et POGO au Mexique, GALORE CREEK au Canada et PETAQUILLA et PETAQUILLA COPPER au Panama et ses principaux projets en exploration sont PORACOTA, PICOTA et SILVER CLOUD au Perou, TAVSAN et ALTINTEPE en Turquie, AURBEL, BEACON NORTH, MAINSTREET, MERIDIAN, FUSE WEST, ADEL, MOUNT PLEASANT, PICKLE CROW, LOUVICOURT, HOMESTAKE RIDGE, GALORE CREEK - COPPER CANYON, KUDZ ZE KAYAH, FORDING RIVER, GREENHILLS, COAL MOUNTAIN, LINE CREEK, CARDINAL RIVER, SULLIVAN MINE, POLARIS MINE et AURBEL (DUMONT MINE) au Canada, LOS VERDES, MORELOS et LA VERDE PROJECT au Mexique, VREDELUS en Namibie, STONEPARK (LIMERICK) en Irlande, APOLLO HILL en Australie et TRUN en Bulgarie.

Teck est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,6 milliards US$ (17,2 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 26 juin 2020 à 10,00 US$, et son plus haut niveau récent le 14 janvier 2022 à 33,98 US$.

Teck possède 576 419 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Teck Resources Limited
05/07/2008Duluth Complex: A World-Class Value Play
31/01/2008 Comments on Red Dog and Highland Valley
Financements de Teck Resources Limited
15/07/2009Announces Closing of Private Placement
03/07/2009Announces C$1.74 Billion Private Placement
Attributions d'options de Teck Resources Limited
14/11/2012Announces 12.5% Dividend Increase
25/04/2012Announces Dividend
27/10/2011Announces 33% Dividend Increase
Nominations de Teck Resources Limited
26/07/2017Announces Appointment of Scott Maloney =?ISO-8859-1?Q?as=20V...
13/09/2013Announces Appointment of Andrew Golding =?ISO-8859-1?Q?=20as...
20/06/2013Announces Appointment of Dale Andres as =?ISO-8859-1?Q?=20Se...
20/06/2013Announces Appointment of Ian Kilgour as Executive Vice Presi...
03/04/2013Appoints New Vice President, Community and Government Relati...
09/10/2012Edward C. Dowling Appointed to Teck Board of Directors
01/06/2011Announces Retirement of General Manager, Trail Operations
01/06/2011New General Manager Appointed to Lead Teck's Trail Operation...
20/04/2011New Vice President Appointed to Lead Teck Asian Affairs
01/10/2008 Names Ray Reipas Vice President of Energy
29/06/2007Announces Appointment Of Tim Watson As Senior Vice President...
Rapports Financiers de Teck Resources Limited
27/07/2017(Port)Reports Unaudited Second Quarter Results for 2017
28/07/2016Reports Unaudited Second Quarter Results for 2016
29/06/2016Q2 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
27/04/2016Announces Dividend
26/04/2016(Port)Reports Unaudited First Quarter Results for 2016
01/04/2016Q1 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
11/02/2016(Port)Reports Unaudited Fourth Quarter Results for 2015
05/01/2016Q4 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
22/10/2015(Port)Reports Unaudited Third Quarter Results for 2015
28/09/2015Q3 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/07/2015(Port)Reports Unaudited Second Quarter Results for 2015
24/06/2015Q2 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
21/04/2015(Port)Reports Unaudited First Quarter Results for 2015
13/02/2014(Port)Reports Unaudited Fourth Quarter Results for 2013
20/01/2014Q4 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2013(Port)Reports Unaudited Third Quarter Results for 2013
30/09/2013Q3 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2013(Port)Reports Unaudited Second Quarter Results for 2013
27/06/2013Q2 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/04/2013(Port)Reports Unaudited First Quarter Results for 2013
03/04/2013Q1 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
07/02/2013(Port)Reports Unaudited Fourth Quarter Results for 2012
16/01/2013Q4 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2012(Port)Reports Unaudited Third Quarter Results for 2012
27/09/2012Q3 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2012(Port)Reports Unaudited Second Quarter Results for 2012
28/06/2012Q2 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/04/2012(Port)Reports Unaudited First Quarter Results for 2012
28/03/2012Q1 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
18/01/2012Q4 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
12/10/2011Q3 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
29/07/2011(Port)Reports Unaudited Second Quarter Results for 2011
08/02/2011Reports Unaudited Results for 2010
28/07/2010Reports Second Quarter Results for 2010
20/04/2010First Quarter Results for 2010
09/02/2010Fourth Quarter Results for 2009
13/01/2010Q4 2009 Financial Results February =?ISO-8859-1?Q?8,=202010=...
05/10/2009Q3 2009 Financial Results October 28
28/10/2009Reports Third Quarter Results for 2009
23/07/2009Reports Second Quarter Results for 2009
17/02/2009CORRECTION FROM SOURCE: Teck Reports Fourth Quarter Results ...
17/02/2009 Reports Fourth Quarter Results for 2008
23/01/2009Q4 2008 Financial Results February
24/07/2008Reports Second Quarter Results for 2008
05/07/2008Q2 2008 Financial Results July =?ISO-8859-1?Q?=2023,=202008=...
23/04/2008 Reports First Quarter Results for 2008
12/02/2008Reports Fourth Quarter Results for 2007
09/10/2007Q3 2007 Financial Results Octob =?ISO-8859-1?Q?er=2029,=2020...
31/07/2007 Reports Second Quarter Results for 2007
03/07/2007Q2 2007 Financial Results July =?ISO-8859-1?Q?=2030,=202007=...
Projets de Teck Resources Limited
19/10/2016to Acquire 100% of Teena/Reward Zinc Project
16/01/2016Alaska zinc mine sues municipality over new severance tax
07/10/20156:02 am Teck Resources enters long-term streaming agreement ...
27/08/2015Canada's Goldcorp, Teck team up to develop Chile mine projec...
22/06/2015Chile environmental regulator eyes sanctions for Teck copper...
27/04/20159:34 am Teck Resources announces acquisition of an additiona...
06/04/2015Teck Resources' Greenhills coal mine re-opens after fire
31/10/2013(Fort Hills)Announces Partners Proceeding with Fort Hills Oil Sands Proj...
09/06/2012(Port)Files Technical Report for Quebrada Blanca Phase 2 Project
07/06/2011(Carmen De Andacollo)Announces Temporary Production Interruption at Carmen de And...
15/04/2011(Carmen De Andacollo)Inaugurates New Concentrator at Carmen de Andacollo
08/04/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Operation Collective Agreement
03/04/2011(Elkview Coal Mine (balmer Mine))Announces Memorandum of Settlement Reached at its Elkview Op...
15/03/2011(Elkview Coal Mine (balmer Mine))Announces Tentative Collective Agreement at its Elkview Oper...
14/03/2011(Carrapateena)Announces Sale of Carrapateena Project
31/01/2011(Elkview Coal Mine (balmer Mine))Announces Labour Interruption at Its Elkview Operation
27/01/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Strike Notice
02/07/2010(Greenhills)Provides Update on Incident
29/06/2010(Greenhills)Reports Serious Incident
24/02/2010(Line Creek)Line Creek Collective Agreement
21/01/2010(Highland Valley)! 7 Cent Jr. Hits Visible Copper Over 160 Meters Near Teck's...
15/01/2010(Red Dog)Comments on Red Dog Permit Appeal
05/01/2010(Antamina)Expansion at Antamina Mine
24/09/2009(Agi Dagi - Deli Zone) Proposed Sale of Turkish Gold Projects
13/08/2009(Andacollo)Possible Andacollo Permitting Delay
06/08/2009(Morelos)Proposed Sale of Morelos Gold Project
08/07/2009(Pogo)Closing of Pogo Sale
20/02/2009(Williams)Announces Sale of Hemlo Mines
15/12/2008(Pend Oreille) Announces Temporary Shutdown of Pend Oreille Zinc Mine
17/11/2008(Fort Hills)Fort Hills Energy Limited Partnership Defers Mine Decision U...
17/09/2008(Fort Hills Oil Sands)Fort Hills Energy Limited Partnership Releases Updated Cost ...
15/07/2008(Lennard Shelf)Lennard Shelf Operation Ceases Production
27/03/2008(Petaquilla)and Inmet Mining Announce Arrangements for Proceeding With P...
03/03/2008(Quebrada Blanca Mine) Reports New Billion Tonne Copper Resource at Quebrada Blanc...
31/12/2007(Elkview Coal Mine (balmer Mine))2007 Technical report
Communiqués de Presse de Teck Resources Limited
27/07/2017Announces Dividend
31/08/2016Teck Resources acquires 11.6% stake in Jet Gold
19/08/2016Top Analyst Upgrades and Downgrades: AK Steel, Allergan, Arc...
28/07/2016Teck Reports Unaudited Second Quarter Results for 2016
28/07/2016Teck Resources beats 2Q profit forecasts
27/07/2016Teck Announces Retirement of Vice President, Investor Relati...
06/05/2016Donates to Canadian Red Cross Fort McMurray Wildfire Relief ...
29/04/2016Reports Voting Results From Annual General Meeting
01/02/2016Freeport-McMoRan Burned Cash in 4Q15: Will 2016 Be Better?
25/01/2016Technical Coverage of Industrial Metals & Minerals Stocks --...
21/01/2016Teck Named to the Global 100 Most Sustainable Corporations L...
15/01/2016Teck Resources sues Alaska borough over tax hike
15/01/2016Teck Alaska Files Legal Complaint Over Severe Tax Hike
14/01/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
05/01/2016Teck's Q4 2015 Financial Results and Investors' Conference C...
22/12/2015Teck Media and Investor Webcast Advisory - December 2, 2015
03/12/2015Teck Resources Geared Up to Face Bleak Coal Fundamentals
03/12/2015Could OPEC’s Meeting Negatively Impact Freeport-McMoRan?
02/12/2015Miner Teck says could monetize assets to raise cash if neede...
29/11/2015Teck Resources Ltd (USA) (TCK): Are Hedge Funds Right About ...
27/11/2015The 52-Week Low Club for Friday
26/11/2015Here is What Hedge Funds Think About Con-way Inc (CNW)
26/10/2015A Closer Look at Freeport-McMoRan’s 3Q15 Earnings
22/10/2015Teck Resources stock up as operating earnings outshine write...
22/10/2015Teck Resources reports 3Q loss
22/10/2015Teck Reports Unaudited Third Quarter Results for 2015
22/10/2015Teck Resources reports quarterly loss on C$2.2 bln charge
20/10/2015Teck Announces Appointment of Lawrence Watkins as Vice Presi...
12/10/2015Teck draws long-term upside play
08/10/2015After Freeport-McMoRan’s October Two-Month High, What Next?
07/10/2015Teck Announces Silver Streaming Agreement with Franco-Nevada
30/09/2015How is Rio Tinto Weathering the Copper and Coal Price Downtu...
28/09/2015Teck's Q3 2015 Financial Results and Investors' Conference C...
25/09/2015The 52-Week Low Club for Friday
20/09/2015Could Southern Copper Offer Stable Returns in Global Sell-Of...
14/09/2015Moody's cuts Teck Resources debt rating to junk
11/09/2015Capex Cut Could Help Improve Freeport-McMoRan’s Balance Shee...
10/09/2015Teck Named to Dow Jones Sustainability World Index
10/09/2015Anglo American seen likely to cut dividend as metal prices f...
01/09/2015Teck Media and Investor Webcast Advisory
28/08/2015Teck/Goldcorp to Merge Chilean Projects for Better Returns
27/08/2015Goldcorp Inc. (USA) (GG) And Teck Resources Ltd (USA) (TCK) ...
27/08/2015Goldcorp and Teck Combine El Morro and Relincho Projects in ...
19/08/2015How To Play Copper Long Term Amid A Low Prices Environment
18/08/2015The 'Elusive' Bottom Might Still Not Be In For Metals & Mini...
13/08/2015Freeport-McMoRan Continues to Trade Weakly: Investor Takeawa...
23/07/2015Miner Teck beats expectations, eyes further coal cutbacks
23/07/2015Teck Reports Unaudited Second Quarter Results for 2015
23/07/2015Teck Resources beats 2Q profit forecasts
14/07/2015Large trade bets on Teck rebound
09/07/2015Teck Announces Carmen de Andacollo Gold Stream
17/06/2015Copper Demand Takes a Hit as Car Sales Sputter in China
11/06/2015Dodge & Cox Buys 2 New Stocks
27/04/2015Chilean Refined Copper Production Falls to 2-Year Low
27/04/2015US Copper Demand Strong in Auto Sector, Appliances
27/04/2015Teck Announces Subscription to Erdene Placement
24/04/2015No Major Surprises in Freeport-McMoRan’s 1Q Earnings
24/04/2015Teck Reports Voting Results from Annual and Special Meeting
21/04/2015Teck Resources says China coal demand weakens; cuts dividend
21/04/2015CANADA STOCKS-TSX slides as resource shares drop, profit-tak...
21/04/20156:22 am Teck Resources misses by $0.06, misses on revs
21/04/2015Teck Announces Dividend
21/04/2015Teck Reports Unaudited First Quarter Results for 2015
21/04/2015Teck Resources cuts dividend by two-thirds on lower prices
17/04/2015What to Watch in the Week Ahead and on Monday, April 20
13/04/2015Gibson Energy to build 900,000 barrels of crude storage in A...
13/04/2015Teck Provides Update on Fort Hills Marketing and Logistics
05/04/2015Teck Reports Incident at Greenhills Operations
02/04/2015Why Freeport Investors Should Track China’s Automobile Indus...
02/04/2015Building Sales in China Fell Steeply in February 2015
01/04/2015Bull Market Excesses Hit the Chinese Copper Industry
01/04/2015Weakness Seen in Teck Resources (TCK): Stock Tumbles 10% - T...
01/04/2015CANADA STOCKS-TSX set to open higher
31/03/2015Movado and CBRE Group are big market movers
31/03/2015CANADA STOCKS-TSX steady as Teck decline offsets banks' rise
31/03/2015How China Became the Global Copper Giant
31/03/2015CANADA STOCKS-TSX set for lower open ahead of GDP data
31/03/2015PRESS DIGEST- Canada - March 31
25/03/2015Teck's Q1 2015 Financial Results and Investors' Conference C...
25/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
24/03/2015Ill Wind Blowing On Copper, Aluminum Producers
17/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
17/03/2015How is Freeport reacting to lower energy prices?
17/03/2015Lower energy prices a negative for Freeport-McMoRan
17/03/2015How lower copper prices impact Freeport-McMoRan
11/03/2015What part of Freeport’s financials should investors track?
10/03/2015How’s Freeport doing with its energy assets?
10/03/2015Why Freeport’s North American operations are so important
09/03/2015Freeport-McMoRan’s global mining portfolio
06/03/2015How Freeport is responding to regulatory changes in Indonesi...
06/03/2015Why asset sales won’t be easy for Freeport-McMoRan
06/03/2015An investor’s guide to Freeport-McMoRan
22/01/2014Named to the Global 100 Most Sustainable Corporations List
16/01/2014Media and Investor Audiocast Advisory
20/11/2013Announces Dividend
17/11/2013Uranium | Silver Market Review | Teck
13/11/2013Media and Investor Webcast Advisory
17/10/2013Acquires East Kootenay Lands
13/09/2013Named to Dow Jones Sustainability World Index
05/09/2013Announces Exercise of Strait Minerals Warrants
16/07/2013Copper Fox Metals and Teck Resources form Schaft Creek Joint...
26/06/2013Receives Regulatory Approval for Renewal of Share Buy-Back P...
11/06/2013Announces Subscription to Horizonte Minerals Share Placement
07/06/2013Announces Asset Exchange Agreement
07/06/2013Recognized for Corporate Citizenship and Social Responsibili...
09/05/2013Announces Subscription to True Gold Mining Share Placement
07/05/2013Media and Investor Webcast Advisory
27/04/2013(Port)Reports Voting Results from Annual General Meeting
24/04/2013Announces Dividend
16/04/2013Receives B=2EC=2E Ministry of Environment Area Based Managem...
03/04/2013UNICEF Canada and Teck Launch Partnership to =?ISO-8859-1?Q?...
20/02/2013Media and Investor Webcast Advisory
19/02/2013The Micronutrient Initiative, Government of Canada and Teck ...
23/01/2013Named to Global 100 Most Sustainable Corporations List
14/01/2013Media and Investor Webcast Advisory
09/11/2012Announces New Vice President Appointments
19/10/2012Announces Redemption of Notes
15/09/2012Named to Dow Jones Sustainability World Index
14/09/2012Announces Vice President Appointments
10/09/2012Announces Agreement as to Certain Facts in Upper Columbia Ri...
05/09/2012Media and Investor Webcast Advisory
16/08/2012Announces Subscription to Strait Minerals Share Placement
31/07/2012Announces Pricing of US$1.75 Billion Notes Offering
09/07/2012Announces Temporary Withdrawal of Quebrada Blanca Phase 2 SE...
06/07/2012(Cardinal River)Announces New Collective Agreement at Cardinal River Operati...
28/06/2012Marks Canada Day with Trans Canada Trail Investment
26/06/2012Receives Regulatory Approval for Renewal of Share Buy-Back P...
19/06/2012Announces Subscription to Horizonte Minerals Share Placement
09/06/2012Announces New Collective Agreement at Trail Operations and R...
01/06/2012Announces Tentative Collective Agreement at Trail Operations
15/05/2012=?ISO-8859-1?Q?The=20Micronutrient=20Initiative,=20Governmen...
10/05/2012Media and Investor Webcast Advisory
04/04/2012Announces Closing of SilverBirch Transaction
19/03/2012and China's Ministry of Agriculture Sign Agreement to Promot...
14/03/2012Media and Investor Advisory
23/02/2012Media and Investor Webcast Advisory
17/02/2012Announces Redemption of US$1.051 Billion Principal Amount of...
17/02/2012Announces Pricing of US$1.00 Billion Notes Offering
16/02/2012Announces Notes Offering
09/02/2012(Port)Reports Unaudited Results for 2011
08/02/2012Announces New Collective Agreement at its Quebrada Blanca Op...
27/01/2012and BASF Announce Partnership to Reduce Zinc Deficiency Thro...
18/01/2012Media and Investor Webcast Advisory
07/01/2012(Carmen De Andacollo)Announces New Collective Agreement at Carmen de Andacollo
20/12/2011Closes Strait Gold Placement
28/11/2011Media and Investor Webcast Advisory
22/09/2011(Highland Valley)Announces Major Upgrades at Trail and Highland Valley Operat...
06/09/2011Media and Investor Webcast Advisory
02/09/2011and Ridley Terminals Announce Coal Shipment Agreement
30/06/2011Announces Pricing of US$2.0 Billion Notes Offering
29/06/2011Announces Notes Offering
23/06/2011Receives Regulatory Approval for Share Buy-Back Program
20/06/2011s Coal Guidance
12/05/2011Reaches Agreement at Community Justice Forum
06/04/2011Announces Extension of its Odd Lot Selling Program
14/03/2011Announces Coal Production Guidance
04/03/2011Announces Coal Shipment Agreement with Westshore
24/02/2011Announces Odd Lot Selling Program
17/08/2010Notes Offering Closes
09/08/2010Increases Its Previously Announced Cash Tender Offer
04/08/2010Announces Pricing of US$750 Million of 7 and 30 Year Notes
16/07/2010Provides Additional Update on Greenhills Incident
21/06/2010Media & Investor Webcast Advisory
26/05/2010To Renew Debt Shelf Prospectus
20/05/2010Aqqaluk to Proceed
07/05/2010Media and Investor Webcast Advisory
22/04/2010Dividend
23/03/2010Annual Disclosure Documents
05/03/2010Waneta Dam Sale Closing
01/03/2010Confirms No Damage to Chilean Mines
17/02/2010Comments on Additional Permit Appeal at Red Dog
12/02/2010Agreement with Westshore on Coal Shipments
04/02/2010BCUC Approval of Waneta Dam Transaction
25/01/2010Closing of Andacollo Gold Royalty Transaction
08/12/2009Coal Production Guidance
23/09/2009Recognized for Outstanding Achievement in Mine Reclamation
31/07/2009Full Production at Trail and Update on Coal Sales
06/07/2009Secures Reduction in Rail Costs
25/06/2009Reports on Geotechnical Issues Identified at Highland Valley
23/06/2009Recognized for Excellence in Mine Safety and Mine Rescue & F...
22/06/2009Provides Coal Update
20/02/2009Sale of El Brocal
08/01/2009Announces Global Workforce Reduction of 13% and 2009 Coal Pr...
01/10/2008 Announces the Creation of Five Strategic Business Units and...
30/09/2008 Enters Into Definitive Credit Agreements
01/10/2008Announce Receipt of Final Order and Satisfaction of Closing ...
29/09/2008Provides Update on Financing for Fording Transaction
11/09/2008Named to Dow Jones Sustainability Index
02/08/2008Global Copper Corp=2E and Teck Cominco Limited Announce Clos...
29/07/2008Acquire Fording Canadian Coal Trust Assets
28/07/2008Global Copper Shareholders Approve Teck Cominco Transaction
11/06/2008Metals Ltd=2E and United Steelworkers Reach Contract Agreeme...
31/05/2008on Trail Incident From Teck Cominco Metals Limited
30/05/2008Statement From Teck Cominco Metals Limited
23/04/2008Announces Dividend
14/04/2008Acquire Global Copper Corp.
07/03/2008Receives Regulatory Approval For Share Buy-Back Program
08/01/2008U.S. Supreme Court Denies Teck Cominco's Petition for Review...
26/11/2007UPDATES PROGRESS AT THE ROCMEC 1 GOLD PROPERTY
21/11/2007Announces Dividend
31/10/2007 Files Shelf Prospectus
28/09/2007Completes Acquisition of Aur Resources
24/09/2007Increases Holding in Fording Canadian Coal Trust to 19.95%
20/09/2007Announces Acquisition of Additional 5% Interest in Fort Hill...
30/08/2007Commences Compulsory Acquisition of Remaining Aur Shares
22/08/2007Acquires Approximately 93% of Aur Resources Common Shares
13/08/2007European Commission Approval for Aur Resources Transaction
03/08/2007Announces Canadian Competition Approval for Aur Resources Tr...
14/07/2007Review Coroner's Inquest Jury Recommendations
03/07/2007CORRECTION FROM SOURCE: Teck Cominco Makes Friendly C$41 Per...
28/06/2007Announces Fort Hills Design Basis Approval
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
NYSE (TCK)TORONTO (TCK-B.TO)
33,98+1.01%33,57+1.60%
NYSE
US$ 33,98
14/01 16:10 0,340
1,01%
Cours préc. Ouverture
33,64 33,24
Bas haut
32,82 34,34
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  33,98 -%
Volume var. 1 mois
4 241 389 -%
24hGold TrendPower© : 22
Produit Coal - Copper - Gold - Lead - Molybdenum - Silver - Zinc
Développe Copper - Gold - Lead - Molybdenum - Silver - Zinc
Recherche Coal - Copper - Gold - Lead - Molybdenum - Silver - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,69 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,42%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,51 CA$+6,36%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,92 CA$+2,94%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :