Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
IMX Reports Initial Drilling Results from Ntaka Hill
Published : September 12, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Mozambique | Nickel | Precious Metals |

PERTH, AUSTRALIA--(Marketwired - Sept. 12, 2013) -

HIGHLIGHTS

  • Drilling at the northern end of the Ntaka Hill intrusive recommenced in May 2013

  • Targeted proposed near surface mineralization extensions in the vicinity of G and J Zones

  • Significant low grade disseminated mineralization intersected in the majority of the holes

  • Best results included from hole NAD13-357:

    • 0.25 metres from 46.75m @ 2.00% nickel

    • 0.35 metres from 49.3m @ 2.39% nickel

IMX Resources Limited (TSX:IXR)(TSX:IXR.WT)(News - Market indicators) ('IMX' or the 'Company') is pleased to report the first round of assay results from its 2013 drilling program at the Ntaka Hill Nickel Sulphide Project (the 'Ntaka Hill Project') in south eastern Tanzania.

The holes drilled in May and June 2013 were targeted on testing the extent of proposed extensions to the mineralisation to the north, south and west of the strongly mineralised G and J Zones at the north-east extremity of the Ntaka Hill intrusion. All holes were targeted based on coincident soil anomalism, down hole electromagnetic ('DHEM') targets and high gravity measurements.

Managing Director Neil Meadows commented, "The intent of the initial phase of our drilling campaign for 2013 was to test the northern extent of the Ntaka Hill intrusion. The results suggest that we have now defined the northern extent of the higher grade mineralisation. Drill results from NAD13-353 in particular are encouraging as they indicate the potential to link G and J Zones. However, given the overall quality of the mineralisation intercepted in the initial drilling program, the decision has been made to focus the next phase of our drilling campaign at Ntaka Hill to the south, where we have previously achieved the most encouraging results in and around Sleeping Giant. There may be more mineralisation along the northern extent of the Ntaka Hill intrusion, but if so it is likely to be much deeper than we have drilled to date."

Figure 1 outlines the drill hole collar positioning with respect to G and J Zones, while Figure 2 outlines the location of G and J Zones with respect to Ntaka Hill as a whole.

To view 'Figure 1: Initial Drill Hole Collar Locations (2013)', please visit the following link: http://media3.marketwire.com/docs/imxr0912a.pdf

To view 'Figure 2: Ntaka Hill General View (2013)', please visit the following link: http://media3.marketwire.com/docs/imxr0912b.pdf

Nickel and copper mineralisation was found in all except two of the holes drilled at these locations as detailed in Appendix 1, with a summary of the significant intersections being:

  • Hole NAD13-351: 4 metres from 88m @ 0.53% nickel and 0.19% copper

  • Hole NAD13-352: 10.2 metres from 167m @ 0.48% nickel and 0.15% copper

  • Hole NAD13-353: 1.2 metres from 153m @ 1.12% nickel

  • Hole NAD13-354: 21.4 metres from 139m @ 0.40% nickel including 0.6 metres @ 1.47% nickel and 0.11% copper

  • Hole NAD13-357: 0.25 metres from 46.75m @ 2.00% nickel, 0.12% copper and 0.35 metres from 49.3m @ 2.39% nickel and 0.46% copper

  • Hole NAD13-360: 16 metres from 54m @ 0.29% nickel and 0.08% copper

  • Hole NAD13-362: 1 metre from 243m @ 0.83% nickel and 0.25% copper

  • Hole NAD13-364: 10 metres from 55m @ 0.37% nickel and 0.09% copper

Drilling has extended our knowledge of the high-grade mineralisation to the south of J Zone, and our belief is that this high-grade mineralisation may extend further at depths beyond current drilling. Disseminated mineralisation remains open to the south and north of G and J Zones.

NAD13-353 has provided encouraging results with shallow mineralisation being discovered in the area between the two known deposits (G and J Zones) offering potential for these two zones to be joined together by infill drilling. This is supported by results from 2012 which returned high-grade mineralisation between G and J Zones. Further drilling will however be required to definitively establish this.

Targeting in the north has been complicated due to the presence of large amounts of graphite which provides false targets in DHEM measurements and surface induced polarisation techniques. Drilling in the north will be reconsidered later in the season as this location is better suited for the wet season between December and April.

Drilling is currently focusing on the south of the Ntaka intrusion as this offers the opportunity to significantly increase resources in the immediate future. Results from the work completed to date in that area will be available for release in the coming weeks.

NEIL MEADOWS, Managing Director

Appendix 1: Summary of Assay Results

G Zone and J Zone, Nachingwea Project, Tanzania

Drill hole
(NAD13-)
Location
East / North
UTM:WGS84
Az / Dip Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
% Ni % Cu Zone / Prospect
351 451248 / 8884183 -75 / 91.4 200.4 75.0 85.15 5.15 0.32 0.11 G Zone
        88.0 92.0 4.0 0.53 0.19 G Zone
        134.0 140.0 6.0 0.21 0.07 G Zone
        88.0 90.0 1.0 0.68 0.25 G Zone
        147.0 148.0 1.0 0.31 0.09 G Zone
        154.0 155.9 1.9 0.36 0.11 G Zone
352 451049 / 8884700 -60 / 90 248.3 37.0 44.0 7.0 0.32 0.08 G Zone
        59.0 60.0 1.0 0.39 0.11 G Zone
        67.0 69.0 2.0 0.50 0.11 G Zone
        169.6 171.0 1.4 0.89 0.34 G Zone
        117.4 118.25 0.85 0.32 0.06 G Zone
        167.0 177.2 10.2 0.43 0.15 G Zone
353 451298 / 8884650 -60 / 90 202.6 29.0 32.0 3.0 0.43 0.11 J Zone
        34.0 41.0 7.0 0.38 0.11 J Zone
        43.4 48.0 4.6 0.56 0.18 J Zone
        50.0 51.35 1.35 0.58 0.15 J Zone
        52.0 54.0 2.0 0.53 0.13 J Zone
        55.0 55.7 0.7 0.66 0.29 J Zone
        77.4 78.0 0.6 0.72 0.24 J Zone
        153.0 154.2 1.2 1.12 N/A J Zone
        147.0 165.0 18.0 0.37 0.11 J Zone
354 451137 / 8884346 -70 / 98.6 448.7 17.5 18.5 1.0 0.51 0.12 G Zone
        23.5 25.0 1.5 0.38 0.07 G Zone
        35.0 36.0 1.0 0.30 0.09 G Zone
        41.0 75.5 34.5 0.24 0.06 G Zone
      Incl. 51.3 52.1 0.8 0.64 0.13 G Zone

Appendix 1: Summary of Assay Results

G Zone and J Zone, Nachingwea Project, Tanzania (cont.)

Drill hole
(NAD13-)
Location
East / North
UTM:WGS84
Az / Dip Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
% Ni % Cu Zone / Prospect
354 451137 / 8884346 -70 / 98.6 448.7 60.0 66.0 6.0 0.35 0.09 G Zone
        139.0 160.4 21.4 0.40 0.11 G Zone
      Incl. 144.8 145.4 0.6 1.47 0.26 G Zone
        241.0 242.0 1.0 0.31 0.06 G Zone
355 451422 / 8884713 -65 / 90 188.1 50.0 51.0 1.0 0.53 0.27 J Zone
        57.1 60.7 3.6 0.33 0.11 J Zone
356 450894 / 8884692 -60 / 90 245.5 222.0 226.45 4.45 0.45 0.13 G Zone
      Incl. 222.0 223.0 1.0 0.65 0.15 G Zone
357 451456 / 8884249 -60 / 90 169.0 5.2 6.3 1.1 0.48 0.08 J Zone
        7.25 8.5 1.25 0.64 0.04 J Zone
        10.0 15.0 5.0 0.46 0.09 J Zone
        20.15 26.5 6.35 0.44 0.06 J Zone
        46.75 47.0 0.25 2.0 0.12 J Zone
        49.3 49.65 0.35 2.39 0.46 J Zone
359 451022 / 8884207 -60 / 90 298.7 147.0 148.0 1.0 0.52 0.22 G Zone
        158.0 159.0 1.0 0.40 0.16 G Zone
        165.0 165.5 0.5 0.64 0.35 G Zone
        171.0 173.1 2.1 0.41 0.15 G Zone
        178.3 179.0 0.7 0.36 0.09 G Zone
        195.65 197.0 1.35 0.53 0.09 G Zone
        216.4 217.4 1.0 0.51 0.10 G Zone
360 451048 / 8884652 -60 / 90 258.1 54.0 70.0 16.0 0.29 0.08 G Zone
        80.0 83.0 3.0 0.39 0.09 G Zone
361 451405 / 8884911 -60 / 90 171.8 52.0 52.4 0.4 0.52 0.28 J Zone
362 451286 / 8884999 -60 / 90 281.2 68.0 69.15 1.15 0.35 0.17 Thunderbolt
        73.6 74.0 0.4 0.55 0.22 Thunderbolt
        96.0 97.0 1.0 0.32 0.07 Thunderbolt

Appendix 1: Summary of Assay Results

G Zone and J Zone, Nachingwea Project, Tanzania (cont.)

Drill hole
(NAD13-)
Location
East / North
UTM:WGS84
Az / Dip Hole Depth
(m)
From
(m)
To
(m)
Interval
(m)
% Ni % Cu Zone / Prospect
362 451286 / 8884999 -60 / 90 281.2 243.0 244.0 1.0 0.83 0.25 Thunderbolt
363 451274 / 8884918 -65 / 90 221.8 29.0 35.0 6.0 0.27 0.06 J Zone
        57.0 59.0 2.0 0.38 0.11 J Zone
        105.0 109.0 4.0 0.32 0.09 J Zone
364 451144 / 8884748 -60 / 90 289.5 42.0 43.0 1.0 0.72 0.27 G Zone
        55.0 65.0 10.0 0.37 0.09 G Zone
365 451151 / 8884233 -70 / 90 410.8 92.9 94.0 1.1 0.55 0.17 G Zone
      Incl. 92.9 93.3 0.4 0.96 0.24 G Zone
        101.0 102.0 1.0 0.32 0.1 G Zone
        123.0 125.0 2.0 0.31 0.05 G Zone
        151.5 155.0 3.5 0.26 0.09 G Zone
        167.0 179.0 12.0 0.26 0.08 G Zone
        200.0 207.1 7.1 0.27 0.08 G Zone
        241.1 244.0 2.9 0.27 0.09 G Zone

Competent Persons / Qualified Person / NI 43-101 Statement

Information in this announcement relating to quality control and technical information on exploration results has been prepared under the supervision of Mr Mathew Perrot in his capacity as Senior Exploration Geologist for IMX. Mr Perrot is a registered member of the Australian Institute of Geoscientists and has sufficient relevant experience to qualify as a Competent Person under the 2012 Edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves ('JORC 2012') and as a qualified person under Canadian National Instrument 43-101 ('NI 43-101'). Mr Perrot has verified the data underlying the information contained in this announcement and approves and consents to the inclusion of the data in the form and context in which it appears.

Quality Control

Drill core samples (NQ) are cut in half by a diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 metre intervals or less, at the discretion of the site geologists. Sample preparation is completed at the on-site sample preparation laboratory under the supervision of ALS Chemex South Africa ('ALS'). Sample pulps were sent by courier to the ALS Chemex analytical laboratory in Johannesburg, South Africa. Blank samples and commercially prepared and certified Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples, or a minimum of one per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (Analytical Code ME-ICP61). Analyses for Pt, Pd, and Au are by fire assay with an ICP-AES finish (Analytical Code PGM-ICP23).

Refer to Sections 1 and 2 of Appendix 2 for further information.

About IMX Resources Limited

IMX Resources Limited is an Australian based mining and base and precious metals exploration company, listed on the Australian Securities Exchange and Toronto Stock Exchange ('TSX'), with projects located in Australia, Africa and North America.

In Africa, IMX owns and operates the highly prospective Nachingwea Exploration Project in south-eastern Tanzania, which includes the potentially word-class Ntaka Hill Nickel Sulphide project, located approximately 250km west of the port town of Mtwara. Nachingwea is highly prospective for nickel and copper sulphide, gold and graphite mineralisation. The Ntaka Hill Nickel Sulphide Project is one of the world's best undeveloped nickel sulphide projects and has the potential to produce a very clean, high quality premium nickel concentrate.

In Australia, IMX operates and owns 51% of the Cairn Hill Mining Operation, located 55 kilometres south-east of Coober Pedy in South Australia, where it produces a premium coarse-grained magnetite-copper-gold DSO product at a rate of 1.8Mtpa.

IMX is actively developing the Mt Woods Magnetite Project on the highly prospective Mt Woods Inlier in South Australia. IMX currently has a JORC Inferred Mineral Resource of 569Mt @ 27% Fe at the Snaefell Magnetite Deposit and a Global Exploration Target of between 900Mt-1,200Mt @ 20-32% Fe elsewhere in the project. Studies indicate that coarse grained concentrates that could be produced at Snaefell, have the potential to attract a significant price premium. The Global Exploration Target tonnage quantity and grades estimates are conceptual in nature only. These figures are not a Mineral Resource estimate as defined by the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves or NI 43-101, as insufficient exploration has been conducted to define a Mineral Resource and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource.

IMX has a joint venture with OZ Minerals Limited ('OZ Minerals'), the Mt Woods Copper-Gold Joint Venture Project, to explore the Mt Woods tenements for copper and gold. OZ Minerals is spending a minimum of AUD 20 million for a 51% interest in the non-iron rights, with IMX retaining a 49% interest in the non-iron rights and 100% of the iron ore rights.

Cautionary Statement: The TSX does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Forward-looking Statements: This News Release includes certain "forward‐looking statements". Forward-looking statements and forward-looking information are frequently characterised by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may", "will" or "could" occur. All statements other than statements of historical fact included in this release are forward‐looking statements or constitute forward-looking information. There can be no assurance that such information of statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such information. Important factors could cause actual results to differ materially from IMX's expectations.

These forward-looking statements are based on certain assumptions, the opinions and estimates of management and qualified persons at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements or information. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted), uncertainties relating to the availability and costs of financing needed in the future and other factors. Exploration Target tonnage quantity and grades estimates are conceptual in nature only. These figures are not Mineral Resource estimates as defined by JORC 2012 or NI 43-101, as insufficient exploration has been conducted to define a Mineral Resource and it is uncertain if further exploration will result in the target being delineated as a Mineral Resource. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

IMX undertakes no obligation to update forward-looking statements or information if circumstances should change. The reader is cautioned not to place undue reliance on forward-looking statements or information. Readers are also cautioned to review the risk factors identified by IMX in its regulatory filings made from time to time with the ASX, TSX and applicable Canadian securities regulators.

Appendix 2: JORC 2012 Table 1 Reporting

Section 1 Sampling Techniques and Data

Criteria     Explanation
Sampling techniques
 
  HQ/NQ Diamond core is geologically logged and sampled to geological contacts with nominal samples lengths between 0.25 and 1.5 metres. Core selected for assay is half cored by diamond blade rock saw, numbered and bagged before dispatch to the laboratory for analysis.
  Core is routinely photographed.
Drilling techniques   Diamond drilling (HQ/NQ) with standard inner tubes. HQ diameter (63.5mm) typically to competent rock depth and NQ diameter (47.6mm) to target depth.
Drill sample recovery
 
  Diamond core recoveries in fresh rock are measured in the core trays and recorded as RQD metres and RQD% recovery as part of the geological logging process.
  99% of unweathered core sample intervals in fresh rock measured had core recoveries of 50% or better, 95% of unweathered core sample intervals measured in fresh rock had core recoveries of 80% or better, and 91% of unweathered core sample intervals measured in fresh rock had core recoveries of 90% or better.
Logging
 
  All diamond core has been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation.
  Total length of logged data is 53,795 metre of a total 54,754 metre drilled. Please recheck these values.
Sub-sampling techniques and sample preparation   Core is cut with a diamond saw into half core. Generally, one of each of the 2 control samples (blank or standard) is inserted into the sample stream every twentieth sample.
Quality of assay data and laboratory tests
 
 
  Ni, Cu & Co assays are determined by peroxide fusion preparation and ICP-AES finish (ME-ICP61). Laboratory and assay procedures are appropriate for Mineral Resource estimation.
  Laboratory QAQC consisted of standards, blanks and laboratory duplicates (both coarse and pulp) used at a ratio of 1 in 20. The QAQC sample results showed acceptable levels of accuracy and precision.
  The Ntaka Hill assay data is considered suitable for Mineral Resource estimation.
Verification of sampling and assaying   Independent verification has not been undertaken on these results, independent review will take place during resource modelling.
Verification of sampling and assaying (cont.)   Below detection limit values (negatives) have been replaced by background values for each element.
Location of data points
 
 
  Drill holes have been surveyed utilising a Trimble R7 DGPS unit.
  Down-hole surveys were undertaken using a Reflex EZTRAK, a magnetic based multi shot survey instrument with a reading taken approximately every 30 metres down the hole.
  Grid system is UTM WGS84 Zone 37 South datum and projection.
Data spacing and distribution   Data spacing is variable being in the range of 100m x 100m to 50m x 50m.
Orientation of data in relation to geological structure
 
  Drill hole sections are orientated east-west orthogonal to the interpreted strike of the deposit.
  The dip orientation of the drill holes are moderate to steep ranging from -60 to -70 (Angled holes have been orientated in both directions east & west). The mineralisation being targeted is flat lying to steeply dipping west. The drilling orientation is adequate for a non-biased assessment of the deposit with respect to interpreted structures and interpreted controls on mineralisation.
Sample security   Labelling and submission of samples complies with industry standard.
Audits or reviews   No Audits have been conducted on this data.

Section 2 Reporting of Exploration Results

Criteria     Explanation
Mineral tenement and land tenure status   The exploration results reported in this announcement are from work carried out on granted prospecting licence number PL4422/2007, owned 100% by IMX.
    The prospecting licence number PL4422/2007 is in good standing.
Exploration done by other parties   Exploration has been performed by an incorporated subsidiary company Ngwena Limited.
Geology   The nickel/copper mineralisation at Ntaka Hill occurs entirely within the Ntaka ultramafic intrusion which cross-cuts the late Proterozoic Mozambique mobile belt (MB) lithologies consisting of mafic to felsic granulites, gneisses and migmatites interlayered with amphibolites and metasedimentary rocks. The Ntaka ultramafic package is interpreted to be a Proterozoic MgO-rich intrusion formed at a continental margin. Structure appears to be the predominant overall control on mineralisation. The mineralisation identified to date occurs in disseminated and massive nickel sulphide forms.
Drill hole Information   Easting, northing and RL of the drill hole collars are in UTM WGS84 Zone 37 South datum and projection.
    Dip is the inclination of the hole from the horizontal. For example a vertically down drilled hole from the surface is -90°. Azimuth is reported in degrees as the grid direction toward which the hole is drilled.
    Down-hole length of the hole is the distance from the surface to the end of the hole, as measured along the drill trace. Intersection depth is the distance down the hole as measured along the drill trace. Intersection width is the down-hole distance of an intersection as measured along the drill trace.
    Drill hole length is the distance from the surface to the end of the hole, as measured along the drill trace.
Data aggregation methods   No high grade cuts have been applied to assay results. Drill core intersection results are distance weighted to their matching assay results using the down-hole width of the relevant assay interval.
    The assay intervals are reported as down-hole length as the true width variable is not known.
    Intersections are reported above 0.2% and 0.3% Ni grade as highlighted in the tables and can contain up to 2m of low grade or barren material.
    Assays are rounded to 2 decimal places.
    No metal equivalent reporting is used or applied.
Relationship between mineralisation widths and intercept lengths   The intersection width is measured down the hole trace and may not be the true width.
    All drill results are down-hole intervals only due to the variable orientation of the mineralisation.
Diagrams   Diagrams of drill hole collar locations and the location of G and J Zones are included in this announcement.
Balanced reporting   Assay results are presented in Appendix 1.
Other substantive exploration data   No other exploration data is considered meaningful and material to this announcement.
Further work   Future exploration may involve the drilling of more drill holes, both diamond core and reverse circulation, to further extend the mineralised zones and to collect additional detailed data on known mineralized zones.

ABN 67 009 129 560



IMX Resources Limited
Neil Meadows
Managing Director
+61 8 9388 7877
nmeadows@imxres.com.au
www.imxresources.com.au
or
Professional Public Relations
Tony Dawe
Investor Relations
+61 8 9388 0944
tony.dawe@ppr.com.au
Données et statistiques pour les pays mentionnés : Mozambique | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Mozambique | Tous

IMX Resources NL

EN DÉVELOPPEMENT
CODE : IXR.AX
ISIN : AU000000IXR2
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

IMX Resources NL est une société développant des projet miniers de nickel et de cuivre basée en Australie.

IMX Resources NL est en développement de projets de nickel, de cuivre et de fer en Australie, et détient divers projets d'exploration en Australie et en Tanzanie.

Son principal projet en développement est CAIRN HILL en Australie et ses principaux projets en exploration sont KANGAROO au Canada, LUWUMBU, NTAKA, MIBANGO et NYATI en Tanzanie et MUSGRAVE, BLACK HILL, MT WOODS et MT PAISLEY en Australie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de IMX Resources NL
15/08/2016$0.94 million Placement and SPP to follow
Nominations de IMX Resources NL
16/10/2013: Resignation of Managing Director
26/08/2013: Resignation of Non-Executive Director
Projets de IMX Resources NL
17/12/2015Update on gold exploration at Nachingwea
24/09/2015Exceptional results from infill drilling at Chilalo
03/09/2015Update on Ntaka Hill joint venture
29/06/2015IMX receives US$1.7 million under Ntaka Hill joint venture
23/04/2015FCC approves Ntaka Hill joint venture with Fig Tree
07/04/2015Maiden graphite mineral resource
24/03/2015IMX agrees revised terms for Ntaka Hill joint venture
10/10/2013(Mt Woods)OZ Minerals to Withdraw from Mt Woods Copper-Gold JV
21/05/2013(Mt Woods): Mt Woods Exploration Work Plan Agreed
17/02/2013(Mt Woods)Mt Woods Copper-Gold JV With OZ Minerals to Remain in Place
26/09/2012(Ntaka)Reports Positive Flotation Results for Disseminated Nickel S...
23/07/2009(Mt Woods)Drilling Commences at Mt Woods
16/07/2009(Ntaka)Maiden Resource at Nachingwea
19/09/2008Additional High Grade Nickel, Copper and Cobalt Intersection...
05/06/2008(Cairn Hill)Trial Mining Commences at Cairn Hill
23/01/2008 NACHINGWEA NICKEL JV IN TANZANIA INTERSECTS 21 METRES OF NI...
09/01/2008(Cairn Hill) COMMITS TO CAIRN HILL DEVELOPMENT and Continental Nickel Co...
Communiqués de Presse de IMX Resources NL
30/08/2016Change of Director’s Interest Notice
02/08/2016Appendix 3B
28/07/2016Becoming a substantial holder
28/07/2016Assay results increase size of Naujombo gold anomaly
08/07/2016Corporate presentation July 2016
21/06/2016IMX completes share consolidation and name change
16/06/2016Expiry of Options and Share Appreciation Rights
31/05/2016Completion of Chilalo sale clears way for Graphex listing
27/05/2016Change of Auditor
10/05/2016Replacement Prospectus approved, Graphex IPO to proceed
09/05/2016Update to record date for in-specie distribution
27/04/2016Update on Graphex prospectus
21/04/2016Graphex IPO – reminder of closing date for IMX shareholders
20/04/2016Chairman’s address and EGM presentation
15/04/2016Update on Termite Resources
04/04/2016Graphex Mining Limited Prospectus now available
22/03/2016Presentation to Perth Graphite Conference
22/03/2016Further testwork confirms high quality of Chilalo graphite
01/02/2016IMX places shortfall from entitlement offer
01/02/2016IMX agrees MOU for development of Chilalo Project
29/01/2016Trading Halt
27/01/2016Change of Director’s Interest Notice
27/01/2016World class expandable graphite results for IMX
21/01/2016Closing of Non-Renounceable Entitlement Offer
18/01/2016Update on Termite Resources – Liquidator agrees Standstill
29/12/2015Non renounceable 1 for 3 entitlement offer
21/12/2015Proposed Demerger of Chilalo Graphite Asset
17/12/2015Chairman’s Address and AGM Presentation
30/10/2015September 2015 Quarterly Report and Appendix 5B
20/10/2015Appointment of Managing Director
19/10/2015Notice of General Meeting/Proxy Form
15/10/2015Appendix 3B
13/10/2015Indicated Resource grading 11.9% Total Graphitic Carbon
13/10/2015Becoming a substantial holder
02/10/2015Update on Termite Resources
01/10/2015Annual Report to shareholders
01/10/2015Appendix 4G
21/09/2015Appendix 3B
21/09/2015Update on liquidation of Termite Resources NL
21/09/2015Trading Halt
15/09/2015Expiry of listed options
15/09/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
11/09/2015Change of Director's Interest Notice
11/09/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
08/09/2015Testwork delivers 67.6% large and jumbo flake graphite
07/09/2015Appendix 3B and Section 708A(5)(e) Cleansing Statement
02/09/2015Potential for significant resource growth at Chilalo
25/08/2015Results of Meeting
25/08/2015Shortfall from Share Purchase Plan to be underwritten
14/08/2015Consistent coarse flake graphite at Chilalo
10/08/2015Confirmation of delisting from TSX
10/08/2015Details of Company Address
29/07/2015Security Purchase Plan
28/07/2015Potential for high grade extensions to Shimba resource
24/07/2015Application to delist from Toronto Stock Exchange
20/07/2015IMX secures cornerstone investor as part of $3M placement
16/07/2015Trading Halt
13/07/2015Fig Tree review highlights Ntaka Hill potential
27/06/2015GMP Securities issues research report
27/06/2015Expiry of unlisted options
27/06/2015Chilalo marketing and offtake update
27/06/2015IMX to receive US$1.7 million
20/04/2015First stage of Chilalo Project permitting process completed
17/04/2015Appendix 3B
16/04/2015IMX receives prepayment from Fig Tree
15/04/2015Appendix 3B
15/04/2015Allotment of shares
15/04/2015Section 708A Notice
15/04/2015IMX signs MOU for sale of 25,000 TPA of Chilalo graphite
14/04/2015Grant of Retention Licence over Ntaka Hill tenement
07/04/2015Completion of $1.57 million capital raising
02/04/2015Trading Halt
02/04/2015Final Director's Interest Notice
30/03/2015Appendix 3X
30/03/2015Appointment of non-executive director
30/03/2015Initial metallurgical testwork results from Chilalo
24/03/2015Reinstatement to Official Quotation
23/03/2015Suspension from Official Quotation
20/03/2015Trading Halt
16/03/2015Appendix 3B
13/03/2015Extension of due diligence period to 20 March 2015
11/03/2015Appointment of Chief Executive Officer (contract terms)
19/06/2014(Cairn Hill)Cairn Hill operating entity appoints Administrator
20/09/2013Agrees to US$60 Million JV with MMG at Nachingwea in an Acce...
12/09/2013(Ntaka)Reports Initial Drilling Results from Ntaka Hill
15/08/2013(Ntaka)s Sleeping Giant Resource at its Ntaka Hill Nickel Sulphide ...
22/07/2013(Mt Woods)Reports Favourable Metallurgical Test Results from Mt Woods ...
06/05/2013Reports Inferred Mineral Resource at Zeppelin Deposit of 31,...
24/04/2013: Report for the Quarter Ended 31 March 2013
24/04/2013: Report for the Quarter Ended 31 March 2013
17/04/2013Acquires 50% Interest in the St. Stephen Project
18/03/2013(Mt Woods)Announces Significant Improvement in Mt Woods Magnetite Meta...
11/03/2013Terminates Revolving Line of Credit
11/03/2013Terminates Revolving Line of Credit
01/02/2013: Report for the Quarter Ended 31 December 2012
09/12/2012Repays Revolving Line of Credit in Full
22/10/2012(Cairn Hill)Reduces Debt and Operating Costs at Cairn Hill
09/10/2012(Ntaka)Sleeping Giant Infill Drilling Continues to Intersect High G...
01/10/2012(Ntaka)Reports Results of Updated Preliminary Economic Assessment (...
19/09/2012Successfully Completes CNI Transaction
04/01/2010Signs $47 million funding agreement for Cairn Hill developme...
19/01/2010Media Release: OZ Minerals to Exercise Anti-Dilution Rights ...
11/08/2008 Sales offtake Contract and Processing Plant First Right of ...
16/05/2008(ASX : IXR) Nachingwea Nickel JV to Undertake Expanded 2008 ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (IXR.AX)
0,014-6.67%
AUSTRALIA
AU$ 0,014
29/04 15:15 -
-6,67%
Cours préc. Ouverture
0,015 0,015
Bas haut
0,014 0,015
Année b/h Var. YTD
0,014 -  0,030 -53,33%
52 sem. b/h var. 52 sem.
0,014 -  0,031 -48,15%
Volume var. 1 mois
3 247 922 -26,32%
Produit
Développe Copper - Iron
Recherche Cobalt - Copper - Gold - Iron - Nickel - Palladium - Platinum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-50,00%
2023-15,15%0,040,02
2022-28,26%0,100,03
2021170,59%0,070,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,51 GBX-2,47%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,70 CA$+2,27%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :