Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Treasury Metals Reports More Results from Developing Goliath Gold Project
Published : July 20, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

TORONTO, ONTARIO--(Marketwire - July 20, 2011) - Treasury Metals Inc. ("Treasury Metals" or the "Company") (News - Market indicators) is pleased to announce additional drill results from the Goliath Gold Project.

Treasury Metals is currently drilling two targets of the Main Zone located one kilometre along strike from each other. The eastern high-grade zone remains the Company's main focus and recently commenced diamond drilling continues to define the developing Western target where anomalous gold mineralization has been intersected and the extent of gold mineralization has yet to be defined.

Results are reported in the table below from both targets. The Company is pleased to report positive intersections with the best result from the Eastern target being 4.1m @ 8.7 g/t in hole TL11-180, where visible gold was observed. TL11-180 is the deepest hole drilled in the Eastern target of the Main Zone in this current campaign and one of only a few deep holes ever drilled at the Goliath Gold Project. The latest results from the east are located near the eastern boundary of the resource. These drill holes coupled with the results from previously announced drilling are being used to define the extent of the high-grade gold zone at the Goliath Gold Project, which continues to be open at depth.

The best result from the Western target being 0.6m @ 18.5 g/t continues to define the extent of gold mineralization in that area. The initial holes in the Western target are less than 275 metres below surface (also see press release dated July 5, 2011).

Finally, the Company continues to explore for gold in the C Zone, which is parallel to the Main Zone, as part of its current exploration program.

Drill Hole From(m) To(m) *Interval(m) Au(g/t) Comments
TL11-175 437.0 440.6 3.6 1.3 C Zone
TL11-176 234.0 234.6 0.6 18.5 Main Zone-West
TL11-177 192.1 194.2 2.1 1.5 Main Zone
TL11-178 205.3 210.6 5.3 2.2 Main Zone-West
  218.8 221.3 2.5 3.2 C Zone – West
TL11-179 189.7 192.5 2.8 8.4 Main Zone
TL11-180** 588.9 593.0 4.1 8.7 Main Zone
TL11-182 261.8 264.8 3.0 1.6 Main Zone-West
TL11-183 372.8 375.8 3.0 2.7 Main Zone
TL11-184 136.4 140.0 3.6 3.0 Main Zone-West
TL11-185A 353.1 356.1 3.0 2.2 Main Zone
*Intervals do not necessarily indicate true widths. Holes drilled at approx. 320°Az and dip of -60°. All depths and assays rounded to one decimal place. No significant assays were reported from TL11-181.
**Cut value (using a top-cut of 50 g/t) TL11-180: 4.1 m @ 6.9 g/t.

The drill program at the Goliath Gold Project is on-going with two drilling rigs currently turning on-site. Given the encouraging results to date, Treasury Metals has expanded the current 30,000 metres drilling program to 40,000 metres. One drilling rig remains on the Eastern target, where Treasury Metals has been intersecting significant high grade results. The second drilling rig continues to test the Western target and other higher grade shoots where mineralization has been observed in historical drilling. This drilling rig will soon be moved to drill exploration targets one kilometre east and along strike from the mineral resource.

Technical information in this press release has been reviewed and approved by Andrew Cheatle, P.Geo., Vice President of Exploration at Treasury Metals, who is a qualified person under the definitions established by National Instrument 43-101.

The Company has implemented a quality assurance and quality control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the CIM Exploration Best Practices Guidelines. The drill core is sawn in half with one-half of the core samples shipped to Accurassay Laboratories in Thunder Bay, Ontario. The other half of the core is retained for future assay verification, and/or metallurgical testing. Other QA/QC procedures include the insertion of blind blanks and standards for every tenth sample in the sample stream. Selected quarter core duplicates were assayed for 5% of the samples. The laboratory re-assays 10% of all samples (pulps and rejects) and additional checks are routinely run on anomalous values including gravimetric analysis and pulp metallics. Gold analysis is conducted by lead collection, fire assay with atomic absorption and / or gravimetric finish on a 30 gram sample. Check assays by a secondary lab are completed as necessary.

To learn more about Treasury Metals and a complete map of drill holes, please visit the Company's website at www.treasurymetals.com.

Forward-looking Statements

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expect, are forward-looking statements. Actual results or developments may differ materially from those in forward-looking statements. Treasury Metals disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws.      



Treasury Metals Inc.
Greg Ferron
Vice President, Corporate Development
1.416.214.4654
greg@treasurymetals.com
or
Treasury Metals Inc.
Martin Walter
President and CEO
1.416.214.4654
martin@treasurymetals.com
www.treasurymetals.com

Treasury Metals Inc.

EXPLORATEUR
CODE : TML.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Treasury Metals est une société d’exploration minière de zinc et de plomb basée au Canada.

Ses principaux projets en exploration sont GOLIATH et LARA au Canada.

Treasury Metals est cotée au Canada. Sa capitalisation boursière aujourd'hui est 24,4 millions CA$ (17,8 millions US$, 16,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 20 février 2009 à 0,11 CA$, et son plus haut niveau récent le 14 août 2020 à 1,90 CA$.

Treasury Metals possède 103 970 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Treasury Metals Inc.
20/06/2016Closes US$4.4 Million Loan Transaction with Loinette Leasing...
18/05/2016Closing $4.0 Million Offering
05/05/2016Announces Exercise of Over-Allotment Option and Private Plac...
27/04/2016Announces Private Placement Financing
29/12/2015Completes Non-brokered Financing
30/09/2015Closes Final Tranche of Non-brokered Financing
24/09/2015Completes Non-brokered Financing
16/12/2014Closes Equity Financing
16/12/2014Closes Equity Financing
24/11/2014Closes RMB Resources' Second Tranche Financing
18/12/2013increases private placement financing
04/12/2013announces flow-through financing
01/05/2013Completes Final Tranche of Financing
26/04/2013Completes Non-brokered Financing
14/09/2012announces increase in previously announced financing to $5.0
06/12/2011Announces Closing of Private Placement
Rapports Financiers de Treasury Metals Inc.
24/06/2011Files Revised Unaudited Interim Financial Statements to Incl...
Projets de Treasury Metals Inc.
14/05/2013(Goliath)Provides Operational Update for its Goliath Gold Project
03/04/2013Reports Additional Near Surface Results - Includes 17 m @ 1....
18/03/2013Reports Additional Main and C Zone Results - Includes 13 met...
29/01/2013(Goliath)Drills 27 metres of 1.9 g/t Gold in Developing C Zone at Gol...
10/01/2013(Goliath)Recommences Drilling at Goliath Gold Project, Ontario
29/10/2012(Goliath)Commences Exploration Program at Goliath Gold Project
18/10/2012(Goliath)Completes Strategic Land Consolidation at Goliath Gold Depos...
15/10/2012Commences Drilling Program at Goldcliff Project, Ontario
17/09/2012(Goliath)Completes Advanced Staged Metallurgical Results - Goliath Go...
20/07/2012Receives Updated Preliminary Economic Assessment
25/01/2012(Goliath)Commences 2012 Exploration Program at Goliath Gold Project
18/01/2012Presents at Mineral Exploration Roundup
14/12/2011(Goliath)Announces New Management Positions to Further Advance Goliat...
20/07/2011(Goliath)Reports More Results from Developing Goliath Gold Project
07/06/2011(Goliath)Reports Exceptional 96% to 97% Gold Recoveries from Goliath ...
19/05/2011to Acquire Pico Machay Gold Project
27/04/2011(Goliath)Adds a Third Drilling Rig-Expands Program to 30,000 Metres a...
11/04/2011(Goliath)Continues to Consolidate Land Position at Goliath Gold Depos...
01/04/2011(Goliath)Defines High-Grade Gold Zone at Goliath-Intersects 23.22 g/t...
16/03/2011(Goliath)Intersects Additional High-Grade Gold Mineralization at the ...
23/02/2011(Goliath)Intersects High-Grade Gold Mineralization
31/01/2011(Goliath)Adds a Second Drill Rig to Its Goliath Gold Project
Communiqués de Presse de Treasury Metals Inc.
18/08/2016Treasury Metals Commences Drilling Campaign at Goliath Gold ...
11/07/2016Treasury Metals Provides Goliath Gold Project Update and Ann...
20/06/2016Treasury Metals Closes US$4.4 Million Loan Transaction with ...
08/06/2016Treasury Metals Announces Results of Annual Meeting of Share...
03/06/2016Treasury Metals Announces CEO Departure
18/05/2016Treasury Metals Closing $4.0 Million Offering
05/05/2016Treasury Metals Announces Exercise of Over-Allotment Option ...
27/04/2016Treasury Metals Announces Private Placement Financing
31/03/2016Treasury Metals Announces US$4.4 Million Loan Transaction wi...
23/01/2016Treasury Metals Files Supplement To Information Circular
29/12/2015Treasury Metals Completes Non-brokered Financing
13/10/2015Treasury Metals Announces Filing of NI 43-101 Resource Estim...
27/04/2015Treasury Metals Goliath Gold Project Moves to Public Comment...
15/04/2015Treasury Metals Intersects High Grade Gold and Silver Minera...
25/03/2015Treasury Metals Reports High-Grade Gold Results in New Zone ...
12/02/2015Treasury Metals Fast-Tracks Drilling with Additional Rig at ...
08/01/2015Treasury Metals Infill Drilling Program in Western Zone Conf...
16/12/2014Treasury Metals Closes Equity Financing
24/11/2014Treasury Metals Closes RMB Resources' Second Tranche Financi...
20/11/2014Treasury Metals Commences 2nd Phase of 2014 Drill Program
21/10/2014Treasury Metals Files Goliath Gold Project Environmental Imp...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Drilling Program Outlines Shallow High Grade Ounces Outside ...
05/08/2014Treasury Metals Drilling Program Outlines Shallow High Grade...
11/06/2014Treasury Metals Drilling Program Confirms New C Zone Continu...
22/05/2014Treasury Metals Announces Results of Voting at Annual Meetin...
05/05/2014Treasury Metals Delivers Solid Drill Results Across Goliath ...
08/04/2014(Goliath)Reports High-Grade Results on the Goliath Gold Project
08/04/2014Treasury Metals Reports High-Grade Results on the Goliath Go...
19/02/2014Closes RMB Resources $6 Million Financing
27/01/2014Engages Consultants to complete Environmental Impact Stateme...
20/12/2013Closes Equity Financing and Enters Into Facility Agreement W...
02/12/2013launches new website and corporate video
15/11/2013Announces Financing with RMB Resources Inc.
23/10/2013Provides Operational Update and Announces New Management Pos...
04/09/2013President and CEO interview - with download link
04/09/2013President and CEO interview
31/05/2013Announces Results of Voting At Annual Meeting of Shareholder...
28/05/2013Reminder–Treasury Metals–Annual Meeting of
22/05/2013Reports Near Surface Drilling Results
21/01/2013(Goliath)Receives Draft EIS For Goliath
11/12/2012(Goliath)Drills 5.2 Metres at 18.6 g/t Au at Goliath Gold Project
30/07/2012Recent Article in Northern Miner on Treasury Metals - Aquili...
21/03/2012Expands Development Team
06/02/2012to Host Investor Presentations in Europe
25/01/2012News Release
26/10/2011News Release
26/10/2011(Goliath)Reports Further High-Grade Gold Results on the Goliath Gold ...
26/09/2011News Release
26/09/2011-Pico Machay Gold Project Acquisition Update
31/08/2011News Release
30/08/2011News Release
26/08/2011News Release
26/08/2011Reports High-Grade Results at Depth in the Eastern Zone and ...
05/08/2011News Release
02/08/2011News Release
27/07/2011Completes Airborne Survey on Its Ontario Gold Properties
05/07/2011(Goliath)Reports High-Grade Results from Developing Western Target at...
07/06/2011Meeting Invitation
07/06/2011June 7
19/05/2011May 18
18/05/2011(Goliath)Reports High-Grade Results from Developing Gold Zone at the ...
11/05/2011May 11
11/04/2011April 11
20/03/2011March 16, 2011
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (TML.TO)
0,235+2.17%
TORONTO
CA$ 0,235
19/04 11:56 -
2,17%
Cours préc. Ouverture
0,230 0,230
Bas haut
0,230 0,240
Année b/h Var. YTD
0,120 -  0,245 38,24%
52 sem. b/h var. 52 sem.
0,120 -  0,320 -25,40%
Volume var. 1 mois
113 000 46,88%
24hGold TrendPower© : -12
Produit
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202417,50%
2023-37,50%0,390,20
2022-56,16%0,780,25
2021-45,93%1,460,65
2020357,63%1,900,15
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,27 US$+2,08%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+3,70%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,49 CA$-1,19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,89 CA$-1,00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,96 US$+1,02%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :