Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Rubicon Resources Limited

Publié le 25 juin 2013

Reports Positive Results for New Preliminary Economic Assessment and a 111% In

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report |
Marketwired
 
 
Rubicon Minerals Corporation
TSX: RMX
NYSE MKT: RBY
Other Recent News | Printer Friendly Version

June 25, 2013
Rubicon Reports Positive Results for New Preliminary Economic Assessment and a 111% Increase in Indicated Mineral Resources
TORONTO, ONTARIO--(Marketwired - June 25, 2013) - Rubicon Minerals Corporation (TSX:RMX)(NYSE MKT:RBY) ("Rubicon" or the "Company") is pleased to announce positive results and highlights from a new preliminary economic assessment ("New PEA")(1) and updated mineral resource estimate completed by SRK Consulting (Canada) Inc. ("SRK") for the F2 Gold System, which comprises part of the Company's flagship Phoenix Gold Project, located in Red Lake, Ontario. A technical report documenting the New PEA will be filed on SEDAR within 45 days in accordance with the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

Readers are cautioned that the New PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the inferred resources will be converted to the measured and indicated categories, that the indicated resources will be converted to the proven and probable mineral reserve categories and there is no certainty that the New PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability; the estimate of mineral resources in the New PEA and updated mineral resource statement may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

All financial figures are in Canadian dollars unless otherwise specified

New PEA Highlights:

--  On a go-forward basis, the Phoenix Gold Project base case demonstrates
    an after-tax internal rate of return(2) ("IRR") of 27.0% and a 5%
    discounted after-tax net present value(2) ("NPV") of $531.0 million; on
    a pre-tax basis, IRR and NPV are 28.7% and $650.0 million, respectively;
--  Total life of potential mine ("LOM") projected gold production of 2.19
    million ounces, an 18.0% increase over the previous conceptual
    production plan(3); 
--  Average annual projected gold production of 165,300 ounces, expected to
    peak at 242,000 ounces in year 2022; 
--  The primary projected mining method(3) is intended to be longhole
    stoping ("longhole"); 90% of the LOM production is planned to come from
    longhole stopes and 10% from cut-and-fill mining; 
--  Average grade of mill feed is 8.1 grams of gold per tonne ("g/t Au") at
    a cut-off grade of 5.0 g/t Au; external dilution of 15% was applied to
    the conceptual mine plan, plus internal dilution of 26%; 
--  Average LOM cash operating cost is $629 per recovered ounce or $151 per
    tonne; including a 1.5% royalty(4) the average LOM total cash operating
    cost is $651 per recovered ounce of gold or $156 per tonne; 
--  Average LOM all-in sustaining cash costs(5) are $845 per ounce or $203
    per tonne; 
--  Average annual post-tax cash flow from operations is $69.0 million; 
--  On a go-forward basis, pre-production capital expenditure is $224.0
    million (including a 20% contingency)(6); and 
--  Average daily LOM throughput is approximately 1,900 tonnes per day
    ("tpd").
 
Readers are cautioned that the projected mining method, potential production profile and plan and mine plan referred to in the New PEA and this release are conceptual in nature and additional technical studies will need to be completed in order to fully assess their viability. There is no certainty that a potential mine will be realized or that a production decision will be made. A mine production decision that is made without a feasibility study carries additional potential risks which include, but are not limited to, the inclusion of inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mine design and mining schedules, metallurgical flow sheets and process plant designs may require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production.

Updated Mineral Resource Estimate Highlights:

--  Increased indicated mineral resources by 111% to 1.129 million ounces of
    gold in 4.12 million tonnes grading 8.52 g/t Au using a 4.0 g/t Au cut-
    off grade; 
--  Block model demonstrates substantial continuity of mineralization and an
    average horizontal thickness of 7.8 metres ("m") (based on 4.0 g/t Au
    cut-off estimated using tonne weighted average thickness per level); 
--  Reported inferred mineral resources(1) of 2.219 million ounces of gold
    on 7.45 million tonnes grading 9.26 g/t Au using a 4.0 g/t Au cut-off
    grade; and 
--  Updated mineral resource estimate includes approximately 116,000 m of
    additional drilling (90% infill) since the 2011 mineral resource
    estimate.
 
The Company believes the new methods considered in the New PEA will potentially improve the efficiency and productivity of the Phoenix Gold Project. The implementation of the new methods will, however, increase the capital cost of developing the Project. When current working capital of $118 million is taken into account, there is a shortfall in required project capital of approximately $106 million. Rubicon is currently in negotiations with third parties in an attempt to secure non-equity funding of the shortfall. To assist in the evaluation of funding alternatives, the Company has entered into financial advisory agreements with two investment banking firms.

The New PEA summary is contained in Table 1 below(7).

Table 1: New PEA Summary

                                                              New PEA (2013)
Projected Production profile(3)                                             
  LOM from production start (years)                                       13
  LOM projected gold production (Moz)                                   2.19
  LOM average annual gold production (oz)                            165,300
                                                                            
  Total projected mineralized material mined (tonnes)              9,131,926
  LOM average throughput (tpd)                                         1,900
  Peak average throughput (tpd)                                        2,250
                                                                            
  Average diluted grade to the mill (g/t Au)                            8.06
  Recovery (%)                                                          92.5
                                                                            
Capital Costs (millions)                                                    
  Total pre-production capital expenditure (includes 20%                    
   contingency)(8), on a go-forward basis                             $224.0
  Pre-production capital expenditure spent, August 2011 to-                 
   date                                                               $117.8
  Total pre-production capital expenditure from August 2011           $341.8
  Total sustaining capital expenditure                                $425.7
                                                                            
Operating Costs                                                             
  Cash operating costs (per tonne)                                      $151
  Cash operating costs (per recovered oz)                               $629
  Royalty (per recovered oz, assuming US$1,385/oz gold                      
   price)                                                                $22
  Total cash cost (per recovered oz)                        $651 (or US$620)
                                                                            
  LOM sustaining capital (per recovered oz)                 $194 (or US$185)
  All-in sustaining cash cost(9) (per recovered oz)         $845 (or US$805)
                                                                            
(8)  The Company's present working capital is $118.0 million                
(9)  All-in sustaining cash costs include operating costs, royalties, and   
     sustaining capital and do not include pre-production capital           
     expenditures, any allocation of estimated corporate overhead costs or  
     exploration costs                                                      
                                                                            
                                                                            
                                                                            
                                                              New PEA (2013)
Economic Analysis (on a go-forward basis)(1,2,3)                            
  Base case gold price assumption(10) (per oz)                      US$1,385
  $CDN/$USD exchange rate assumption(3)                                 1.05
                                                                            
  Pre-tax IRR (%)                                                      28.7%
  Pre-tax NPV @ 5% discount rate (millions)                           $650.0
  After-tax IRR (%)                                                    27.0%
  After-tax NPV @ 5% discount rate (millions)                         $531.0
                                                                            
  Payback period (years, at production start)                            3.7
                                                                            
(10) 30-day trailing spot gold price as of June 14, 2013. Source: London PM
      Fix                                                                   
                                                                            
                                                                            
----------------------------------------------------------------------------
(1)   The New PEA is preliminary in nature and includes inferred mineral    
      resources that are considered too speculative geologically to have the
      economic considerations applied to them that would enable them to be  
      categorized as mineral reserves. There is no certainty that the       
      inferred resources will be converted to the measured and indicated    
      categories, that the indicated resources will be converted to the     
      proven and probable mineral reserve categories and there is no        
      certainty that the New PEA will be realized. Mineral resources that   
      are not mineral reserves do not have demonstrated economic viability; 
      the estimate of mineral resources in the New PEA and updated mineral  
      resource statement may be materially affected by environmental,       
      permitting, legal, title, taxation, socio-political, marketing, or    
      other relevant issues                                                 
(2)   Based on a 30-day trailing spot gold price assumption of US$1,385 per 
      ounce and a $CDN/$USD consensus exchange rate of 1.05:1.00 (Source:   
      Bloomberg $CDN/$US FX Forecast 2013 through 2017, as of June 18, 2013)
(3)   The projected mining method, potential production profile and plan and
      mine plan are conceptual in nature and additional technical studies   
      will need to be completed in order to fully assess their viability.   
      There is no certainty that a potential mine will be realized or that a
      production decision will be made. A mine production decision that is  
      made without a feasibility study carries additional potential risks   
      which include, but are not limited to, the inclusion of inferred      
      mineral resources that are considered too speculative geologically to 
      have the economic considerations applied to them that would enable    
      them to be categorized as mineral reserves. Mine design and mining    
      schedules, metallurgical flow sheets and process plant designs may    
      require additional detailed work and economic analysis and internal   
      studies to ensure satisfactory operational conditions and decisions   
      regarding future targeted production                                  
(4)   Assumes Rubicon exercises its right to purchase a 0.5% from the 2.0%  
      NSR that Franco-Nevada Corporation currently owns on the Phoenix Gold 
      Project water claims for US$675,000                                   
(5)   All-in sustaining cash costs include operating costs, royalties, and  
      sustaining capital and do not include any pre-production capital      
      expenditures, allocation of estimated corporate overhead costs or     
      exploration costs                                                     
(6)   The Company presently has working capital totalling $118.0 million    
(7)   This news release should be read in conjunction with the tables and   
      figures included in the body and presented at the end of the release. 
      All references to the Company's original Preliminary Economic         
      Assessment and 2011 mineral resource estimates are reported in the    
      Company's Preliminary Economic Assessment ("2011 PEA") prepared by AMC
      Mining Consultants (Canada) Ltd. with metallurgical and processing    
      contributions from Soutex Inc., with an effective date of August 8,   
      2011, available on SEDAR (http://www.sedar.com/) and EDGAR            
      (www.sec.gov/edgar.shtml). The Company plans to file a NI 43-101      
      Technical Report for both the New PEA and updated mineral resource    
      estimate within 45 days from today. This report will replace the 2011 
      PEA and previous mineral resource estimate                            
(8)   The Company's present working capital is $118.0 million               
(9)   All-in sustaining cash costs include operating costs, royalties, and  
      sustaining capital and do not include pre-production capital          
      expenditures, any allocation of estimated corporate overhead costs or 
      exploration costs
 
"My primary objective when I took the leadership role at Rubicon was, and remains, building our flagship Phoenix Gold Project to be the best that it can be," said Michael A. Lalonde, Rubicon's President and Chief Executive Officer. "We are very pleased with the results of the updated mineral resource and the New PEA, which demonstrates that the Project has the ability to generate strong cash flow. The updated mineral resource estimate exhibits significant improvement in continuity and greater horizontal thickness over the previous mineral resource estimate, making it easier to plan and schedule future potential mining. We improved the confidence of the block model and increased the indicated mineral resources by 111% through our successful infill drilling program.

While the New PEA continues to demonstrate positive projected economics for the Phoenix Gold Project, potentially generating an after-tax IRR and NPV of 27% and $531 million, respectively, we believe that the New PEA and the updated mineral resource estimate are conservative and provide room for further optimization.

An estimated inherent internal dilution of 26% was included within the stope design envelopes used to develop the conceptual mine design. An additional 15% external dilution was applied to the conceptual mining model, compared to 18% in the 2011 PEA, to best ensure that the estimated grades are achievable once we commence potential production. We chose to take a cautious approach and set targets that we can confidently achieve. The development of the Phoenix Gold Project continues to progress well and we remain on schedule for projected gold production in the second half of 2014."

Mineral Resources for the Phoenix Gold Project

The 2013 Mineral Resource Statement for the Phoenix Gold Project is presented in Table 2 below. Please refer to Figure 1 at the end of this news release for a visual diagram of the Phoenix Gold Project domains.

Table 2: Mineral Resource Statement(1,2,3,11,12) Phoenix Gold Project, Ontario, SRK Consulting (Canada) Inc., June 24, 2013

--------------------------------------------------------------------------
--------------------------------------------------------------------------
                                        Quantity     Grade  Contained Gold
Domain        Resource Category(11)      (000't)  (g/t Au)        (000'oz)
                                                                          
Main(13)      Measured                         -         -               -
                                                                          
              Indicated                    4,120      8.52           1,129
              Measured + Indicated         4,120      8.52           1,129
              Inferred(1,3)                6,027      9.49           1,839
--------------------------------------------------------------------------
HW            Measured                         -         -               -
                                                                          
              Indicated                        -         -               -
              Measured + Indicated             -         -               -
              Inferred(1,3)                  151      5.21              25
--------------------------------------------------------------------------
External      Measured                         -         -               -
                                                                          
              Indicated                        -         -               -
              Measured + Indicated             -         -               -
              Inferred(1,3)                1,274      8.66             355
--------------------------------------------------------------------------
Combined      Measured                         -         -               -
                                                                          
              Indicated                    4,120      8.52           1,129
              Measured + Indicated         4,120      8.52           1,129
              Inferred(1,3)                7,452      9.26           2,219
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Source: SRK                                                                 
(11)  CIM definitions were used for measured mineral resources, indicated   
      mineral resources and inferred mineral resources                      
(12)  All figures have been rounded to reflect the relative accuracy of the 
      estimates. Reported at a cut-off grade of 4.0 g/t Au assuming an      
      underground extraction scenario, a gold price of US$1,500 per ounce,  
      and metallurgical recovery of 92.5%                                   
(13)  The Main domain includes the Main 45 domain
 
The Company's indicated mineral resource, at a 4.0 g/t Au cut-off grade, increased 111% to 1.129 million ounces of gold with 4.12 million tonnes grading 8.52 g/t Au, as compared to 0.54 million ounces of gold with 1.43 million tonnes grading 11.63 g/t Au reported at a 4.0 g/t Au cut-off grade as indicated material from the 2011 mineral resource model. The increase was due to the successful conversion of inferred mineral resources to the indicated category as a result of the completion of an additional 116,000 m of diamond drilling (approximately 90% infill) in 309 drill holes since the previous mineral resource. A 4.0 g/t Au cut-off grade was applied to the updated mineral resource estimate based on improved economics associated with increased continuity and horizontal thicknesses (averaging 7.8 m) of mineralized zones. The decrease in the indicated mineral resource grade compared to the previous estimate is due to the methodology and resource parameters applied to the mineral resource estimate.

The successful conversion of inferred resources to the indicated resource category resulted in the reduction of inferred mineral resources from 2.52 million ounces to 2.22 million ounces (at a 4.0 g/t Au cut-off grade). The reduction of inferred mineral resources was offset by a greater gain in the indicated mineral resource. The average grade and tonnage of the updated inferred mineral resources are 9.26 g/t Au and 7.45 million tonnes, respectively, compared to 13.83 g/t Au and 5.67 million tonnes in the 2011 PEA, using a 4.0 g/t Au cut-off grade.

Please refer to Tables 3 and 4 below for a comparison of the 2011 and 2013 classified quantity and grade estimates using 4.0 g/t Au and 5.0 g/t Au cut-off grades, respectively.

Readers are cautioned that the New PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the inferred resources will be converted to the measured and indicated categories, that the indicated resources will be converted to the proven and probable mineral reserve categories and there is no certainty that the New PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability; the estimate of mineral resources in the New PEA and updated mineral resource statement may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

Table 3: Comparison between 2011 and 2013 Quantities and Grades Reported at 4.0 g/t

----------------------------------------------------------------------------
                         Quantity            Grade            Contained     
Classification(11)       (000't)            (g/t Au)        Gold (000'oz)   
                   ---------------------------------------------------------
                     2011  2013 Change  2011  2013 Change  2011  2013 Change
----------------------------------------------------------------------------
Indicated           1,430 4,120   188% 11.63  8.52   -27%   535 1,129   111%
Inferred(1,2,3)     5,674 7,452    31% 13.83  9.26   -33% 2,523 2,219   -12%
----------------------------------------------------------------------------
Source: SRK
 
Table 4: Comparison between 2011 and 2013 Quantities and Grades Reported at 5.0 g/t

----------------------------------------------------------------------------
                         Quantity            Grade            Contained     
Classification(11)       (000't)            (g/t Au)        Gold (000'oz)   
                   ---------------------------------------------------------
                     2011  2013 Change  2011  2013 Change  2011  2013 Change
----------------------------------------------------------------------------
Indicated           1,028 3,116   203%  14.5  9.82   -32%   477   984   106%
Inferred(1,2,3)     4,230 5,604    32%    17 10.84   -36% 2,317 1,954   -16%
----------------------------------------------------------------------------
Source: SRK
 
The mineral resource estimate was prepared based on a total of 355,611 m of diamond drilling in 820 drill holes carried out between February 2008 and October 2012. The mineral resource estimate is defined over a strike length of approximately 1,200 m and depths of 1,500 m and remains open along strike and at depth. A summary of the 2013 Global Quantities and Grade Estimates at Various Cut-off Grades is presented in Table 5 below:

Table 5: The 2013 Global Quantities and Grade Estimates at Various Cut-off Grades(14,15,16,17)

            ----------------------------------------------------------------
            ----------------------------------------------------------------
                Indicated Classification      Inferred Classification(1,3)  
----------------------------------------------------------------------------
------------                                                                
Cut-off                            Contained                       Contained
Grade           Tonnes     Grade   Ounces Au    Tonnes     Grade   Ounces Au
(g/t Au)        (000s)  (g/t Au)       (000)    (000s)  (g/t Au)       (000)
----------------------------------------------------------------------------
7.0              1,959     12.16         766     3,962     12.90       1,643
----------------------------------------------------------------------------
6.0              2,425     11.06         862     4,617     11.99       1,780
----------------------------------------------------------------------------
5.0              3,116      9.82         984     5,604     10.84       1,954
----------------------------------------------------------------------------
4.0              4,120      8.52       1,129     7,452      9.26       2,219
----------------------------------------------------------------------------
3.0              5,396      7.33       1,272    11,119      7.34       2,623
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Source: SRK                                                                 
(14) CIM definitions were used for indicated mineral resources and inferred
      mineral resources                                                     
(15)  Mineral resources that are not mineral reserves do not have           
      demonstrated economic viability. All figures have been rounded to     
      reflect the relative accuracy of the estimates. Reported at cut-off   
      grade sensitivities ranging from 3.0 g/t Au to 7.0 g/t Au assuming an 
      underground extraction scenario, a gold price of US$1,500 per ounce,  
      and metallurgical recovery of 92.5%                                   
(16)  Capping values of 200 g/t Au, 150g/t Au, and 30 g/t Au were applied to
      the composites from the Main and 45 Trend, HW, and External domains,  
      respectively                                                          
(17)  Using drilling results to October 31, 2012
 
The mineral resource block model demonstrates improved continuity at the 4.0 g/t Au cut-off grade. The estimated average horizontal thickness of the gold mineralization is approximately 7.8 m (based on 4.0 g/t Au cut-off estimated using tonne weighted average thickness per level). Ordinary kriging was used as the calculation methodology, compared to the inverse distance cubed methodology used for the previous mineral resource estimate. Block model parameters applied to the current mineral resource statement are listed in Tables 6, 7, 8, and 9 at the end of this release.

Capping values of 200 g/t Au, 150 g/t Au and 30 g/t Au were applied to the composites from the Main and 45 Trend, HW, and External wireframes, respectively, representing a lower capping grade compared to the previous mineral resource estimate of 270 g/t Au.

During 2011, Rubicon collected two approximately 1,000-tonne gold mineralized bulk samples from underground stoping on the 305-metre level (please refer to the Rubicon June 29, 2011 news release for more details). The bulk samples were coarse crushed and a 10 tonne sub-sample split from each. The 10 tonne sub-samples were further crushed to approximately minus 1/2 inch and shipped to G&T Metallurgical Services ("G&T") in Kamloops, BC for metallurgical test work. G&T reported the average gold contents of the head samples collected from the two bulk samples to be 7.6 and 8.6 g/t Au, respectively. SRK has estimated the grades for the areas where the bulk sample was taken for comparative purposes, by reporting block model grades within wireframes representing the two bulk samples. Although the bulk samples are limited in size they represent the best reconciliation against the resource estimate currently available. The reconciled grade of the bulk sample is notably higher than the estimated resource grade for this area. Once development resumes within the F2 zone, there will be an opportunity to take additional bulk samples to assist with grade reconciliation against the resource model. See Table 10 below for more details.

Table 10 - Comparison of Bulk Sample results (Average Head Grade Samples Reported by G&T) Versus the Bulk Sample Area Estimated by SRK 2013 (Mineral Resource Model)

----------------------------------------------------------------------------
                                        Volume   Tonnage               Grade
Bulk Sample     Source        Domain    (m(3))       (t)   Density  (g/t Au)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
A               SRK             Main       189       560      2.96     17.91
                                                                            
                            45 Trend       462     1,327      2.87      0.76
                            External         7        20      2.87      0.02
                          --------------------------------------------------
                          --------------------------------------------------
                               Total       658     1,906      2.90      5.79
                G&T                                  976                7.60
----------------------------------------------------------------------------
----------------------------------------------------------------------------
B               SRK             Main       540     1,574      2.91      3.47
                                                                            
                            45 Trend         -         -         -         -
                            External        71       203      2.87      0.02
                          --------------------------------------------------
                          --------------------------------------------------
                               Total       611     1,777      2.91      3.08
                G&T                                1,107                8.60
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Combined        SRK             Main       729     2,134      2.93      7.26
A and B                                                                     
                                                                            
                            45 Trend       462     1,327      2.87      0.76
                            External        78       223      2.87      0.02
                          --------------------------------------------------
                          --------------------------------------------------
                               Total     1,269     3,683      2.90      4.48
                G&T                                2,083                8.13
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Source: SRK
 
Conceptual Mining Model(1,2,3) for the New PEA (diluted)

The conceptual mining model uses a design cut-off grade of 5.0 g/t Au and will potentially extract 78% (by ounces) of the mineral resources reported in Table 2. The stope outlines (greater than 5.0 g/t Au) include inherent internal dilution of approximately 26% derived from areas contained within the block models. An average external dilution of 15% grading 0.68 g/t Au was applied with higher than typical external dilution grade resulting from the disseminated nature of the gold mineralization. The resulting tonnes delivered to the mill, after application of dilution and appropriate conceptual mining losses, are 9.13 million grading at 8.1 g/t Au for a total of 2.37 million ounces (an increase in total ounces of 18% compared to the 2011 PEA).

Conceptual Mining(1,2,3)

The New PEA considers the development of the F2 Gold System as a potential underground mine using methods that are significantly different to those modeled in the 2011 PEA. The new primary planned method is longhole stoping utilizing paste backfill. It is intended that the longhole method will comprise 90% of the total mining with 10% cut-and-fill. Approximately 76% of the longhole tonnage will come from stope widths greater than 5 m (56% of LOM tonnage). Please see Figure 2 at the end of this release for a cross section of the conceptual mine plan. Please see Figure 3 at the end of this release for the potential production and cash flow schedule.

Readers are cautioned that the mining model, projected mining method, potential production profile and plan and mine plan referred to in the New PEA and this release are conceptual in nature and additional technical studies will need to be completed in order to fully assess their viability. There is no certainty that a potential mine will be realized or that a production decision will be made. A mine production decision that is made without a feasibility study carries additional potential risks which include, but are not limited to, the inclusion of inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mine design and mining schedules, metallurgical flow sheets and process plant designs may require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production.

Development and Infrastructure

The main underground levels are planned to be spaced nominally 60 m apart with sublevel spacings between 15 m and 30 m depending on width of target gold mineralization and access method selected. The main levels are planned to be connected by a series of ramps for the efficient movement of equipment, material, and personnel between levels. Material is planned to be transferred between levels by gravity through internal ore passes to the 610-metre level, where rail units are planned to haul this material to an ore pass dump. From here, the material is planned to be crushed and conveyed to the loading pocket at the 680-metre elevation. The crushed material will then be hoisted to surface via 10-tonne skip for processing at the mill.

The current shaft will be deepened to the 710-metre level. The shaft will later be extended from the 710-metre level to the 1,400-metre elevation (shaft bottom) utilizing a concrete circular configuration which is designed to best address a wide range of ground conditions. The 1285-metre level will be the main haulageway for material mined below the 610-metre level. Hoisting will be via 16-tonne skips from a loading pocket on the 1360-metre level. There is no planned interruption to mining activities in the upper levels. The second phase of sinking is planned to be separated from the rest of the mine by installing a substantial concrete bulkhead between operating shaft and the shaft extension.

Additional delineation drilling is planned to provide further definition required for detailed stope planning. As well, an exploration platform is planned for the 610-metre level allowing for deep expansion drilling.

Throughput

The LOM average throughput rate is estimated to be 1,900 tpd, with a peak throughput rate of 2,250 tpd. The mineralized material is planned to be crushed underground by a jaw crusher. Hoisting capacity is 3,000 tonnes from the upper pocket, based on 12-hours of hoisting per day, and 3,000 tonnes from the lower pocket, based on 10-hours of hoisting per day. A ball mill and pebble mill will be added to the current SAG mill and ball mill configuration to achieve higher throughput rates. The current mill building has enough capacity to add the extra ball mill and pebble mill.

Equipment

A mix of battery-operated, electric, and diesel powered 3.5 cubic yard scoops and trucks are planned to be utilized to provide a cleaner work environment for personnel.

Metallurgy and Processing

Soutex Inc. had confirmed that processing of the material will be a combination of gravity separation followed by a conventional carbon-in-leach ("CIL") process. Total gold recovery is estimated at 92.5%. 50.0% of the gold will be recovered through gravity separation.

Capital Cost Summary

The capital cost estimates, on a go-forward basis, for the Phoenix Gold Project are summarized in Table 11 below.

Table 11: Capital Cost Summary

----------------------------------------------------------------------------
                                                                   $millions
Pre-production capital                                                      
  Mill                                                                 $94.5
  Surface infrastructure                                               $42.7
  Underground development                                              $42.7
  Shaft, underground infrastructure, and mobile equipment              $15.7
  Other development (pre-production stope development)                 $27.7
  Royalty purchase of 0.5% NSR(4)                                       $0.7
----------------------------------------------------------------------------
Total pre-production capital, on a go-forward                               
 basis(including 20% contingency)(8)                                  $224.0
                                                                            
  Sustaining capital                                                  $425.7
                                                                            
Total project capital                                                 $649.7
                                                                            
----------------------------------------------------------------------------
 
Operating Cost Summary

The cash operating cost for the project is $629 per recovered ounce of gold or $151 per tonne of mineralized material. Total cash cost is $651 per ounce of recovered gold, including a 1.5% royalty and assuming a US$1,385/oz gold price and 1.05 exchange rate. If sustaining capital of $194 per recovered ounce is added to the total cash cost, the resulting all-in sustaining cost is $845 per recovered ounce (US$805/oz). See Table 12 below for more details.

Table 12: Operating Cost Summary

----------------------------------------------------------------------------
                                                       Per ounce   Per tonne
Cash operating cost components                                              
  In stope mining cost                                      $113         $27
  Underground utilities                                      $52         $13
  Underground services                                       $24          $6
  Material handling                                          $37          $9
  Surface, general and administrative                       $128         $30
  Processing                                                 $84         $20
  Lateral operating development                              $76         $18
  Vertical operating development                              $7          $2
  Pre-production lateral development                         $85         $20
  Pre-production vertical development                        $23          $6
----------------------------------------------------------------------------
Total cash operating cost before royalties                  $629        $151
  Royalty (1.5%)                                             $22          $5
----------------------------------------------------------------------------
Total cash costs                                            $651        $156
  Sustaining capital cost                                   $194         $47
----------------------------------------------------------------------------
All-in sustaining cash cost(9)                              $845        $203
                                                     (or US$805)            
----------------------------------------------------------------------------
 
Royalties and Taxes

The Phoenix Gold Project mineral claims that comprise the F2 Gold System are subject to a 2.0% royalty payable to Franco-Nevada Corporation. The Company has the option to purchase a 0.5% royalty for US$675,000, which the Company intends to purchase and is factored into the New PEA.

The Company estimates that it will have approximately $355 million of tax deductible pools, tax losses and tax credits available for deduction at the potential commencement of commercial production. Application of these pools and deductions is estimated to result in the payment of no income taxes in the first eight years of production and no Ontario Mineral Tax in the first seven years of production. Any Ontario Alternate Minimum Tax charged is expected to be recovered in ensuing years and is not expected to have a material effect on the economic model.

Economic Analysis and Sensitivities

The economic analysis of the New PEA assumed a base case 30-day average of the London PM fix spot gold price of US$1,385 per ounce (as of June 14, 2013) and a discount rate of 5%. Cost escalation was not used in the financial model. Under these parameters, on an after-tax basis, the base case go-forward NPV and IRR calculated on a mid-year cash flow basis for the project are $531.0 million and 27.0%, respectively. See sensitivities in Tables 13, 14, and 15 below for more details. Readers should note that mineral resources that are not mineral reserves do not have demonstrated economic viability.

Table 13: After-Tax NPV(2) ($millions) Sensitivity, go-forward basis

----------------------------------------------------------------------------
Discount Rate                             Gold Price Assumption             
                            ------------------------------------------------
                                                US$1,385/oz                 
                                 US$1,100/oz     (base case)     US$1,700/oz
----------------------------------------------------------------------------
3.0%                                  $275.3          $655.1        $1,061.3
----------------------------------------------------------------------------
5.0%                                  $193.8          $531.0          $888.2
----------------------------------------------------------------------------
7.0%                                  $128.4          $429.6          $745.9
----------------------------------------------------------------------------
 
Table 14: After-Tax IRR(2) (%) Sensitivity, go-forward basis

----------------------------------------------------------------------------
                            Gold Price Assumption                           
----------------------------------------------------------------------------
                                   US$1,385/oz                              
US$1,100/oz                        (base case)                   US$1,700/oz
----------------------------------------------------------------------------
12.8%                                    27.0%                         42.0%
----------------------------------------------------------------------------
 
Table 15: After-Tax NPV(2) ($millions) and IRR (%) on Grade Sensitivity, go-forward basis

                ------------------------------------------------------------
                          Average Diluted Grade to the Mill +/- 10%         
                ------------------------------------------------------------
                                              8.1 g/t Au                    
                          7.3 g/t Au         (base case)          8.9 g/t Au
----------------------------------------------------------------------------
NPV                           $371.5              $531.0              $689.5
(5% discount                                                                
 rate)                                                                      
----------------------------------------------------------------------------
IRR                            20.3%               27.2%               33.7%
----------------------------------------------------------------------------
 
Opportunities in the New PEA and Mineral Resource Estimate

The Company has identified several opportunities in the New PEA and updated mineral resource estimate to improve upon the economics of the project.

The Rubicon exploration team and SRK have invested a considerable amount of effort into improving the geological model and the boundaries for the mineralized zones that form the basis of the updated mineral resource estimate. The Company has identified numerous areas adjacent to the reported mineral resource blocks where, although drill holes are present with elevated gold grades, drill hole density is insufficient to satisfy the mineral resource criteria as applied by SRK. The Company believes these areas represent opportunities to expand the current mineral resource.

The deposit is also open on strike and at depth. Additional exploration could potentially add more ounces to the financial model, which would improve the project economics. Improved economics may support a new high capacity circular concrete shaft capable of reaching greater depths than contemplated in the New PEA.

The economic model is very sensitive to grade. A small increase in grade would be very significant (as Table 15 shows, a 10% increase in grade leads to a 29.8% increase in after-tax NPV in the base case). The Company regards the criteria applied by SRK to the mineral resource model as conservative given that the initial bulk samples returned grades higher than those reported by SRK in the current block model (please see Table 10 in this release). Accordingly, the Company believes there are further potential upside opportunities with respect to grade.

The Alimak horizontal breasting, longhole stoping method should be investigated for possible reduction in operating costs. This method has the potential to reduce or eliminate a portion of the operating sublevel development and, as result, increase projected productivity by improving stope cycle time.

Tailings Management Facility ("TMF")

The TMF incorporates engineered features to manage the chemical and physical stability of the deposited tailings in accordance with current best-in-class practices. Approximately 50% of the tailings will be converted to paste fill and deposited underground to minimize the amount of tailings that will be deposited on surface and also to provide a suitable backfill for the underground mine. The remaining tailings will be thickened prior to deposition in the TMF. The TMF can accommodate the tailings generated by the proposed mine plan in the New PEA, with engineering studies planned to gather empirical data and evaluate further expansion.

Closure and Rehabilitation Costs

Rehabilitation measures have been designed using a precautionary approach to ensure the long-term physical and chemical stability of the site in accordance with Ontario's Mining Act and the associated Aboriginal consultation process. The rehabilitation measures are intended to return the site to a productive land use that will not require long-term care and maintenance. The rehabilitation cost is estimated to be equivalent to the salvage value of material site assets at closure.

Permitting and Consultation

The Company has been granted the material permits required for an average production rate of 1,250 tpd and is evaluating the permit amendments required for the increased projected production rate. The increased production rate contemplated in the New PEA will not increase the surface area of the site, simplifying the permit amendments and associated consultation process.

The Company is continuing consultations with First Nations and the Metis Nation of Ontario and local municipalities.

Recommendation from SRK and Continuing Studies

SRK has determined that the results of the New PEA support the continued development of the Phoenix Gold Project and work related to further technical studies. No production decision has been made at this time. Such a decision, if reached, will require such additional technical studies and ongoing evaluation by Rubicon of the construction and development of the Phoenix Gold Project and would not be based solely on the New PEA(1).

Project Development Update and Timeline

Shaft sinking continues on the Phoenix Gold Project, with the current shaft depth at 670 m below surface. Key project milestones include:

SAG and ball mill delivery - Q3-2013

Shaft loading pocket at 680-metre elevation - Q3-2013

Mill commissioning and projected gold production(1) - H2-2014

Conference Call Details

The Company's senior management team will host a conference call today, Tuesday, June 25, 2013 at 8:30 am ET to discuss the New PEA and updated mineral resource.

Participants in Canada and the United States may join the conference call by dialing toll free 1 (800) 319-4610 or +1 (604) 638-5340 for calls outside Canada and the United States or via webcast on the Company's website at www.rubiconminerals.com.

A recorded playback of the conference call can be accessed after the event by dialing 1 (800) 319-6413 or +1 (604) 638-9010 for calls outside Canada and the United States. The pass code for the conference call playback is 7856#. The archived audio webcast will also be available on the Company's website at www.rubiconminerals.com.

About Rubicon Minerals Corporation

Rubicon Minerals Corporation is an advanced stage gold development company, focused on responsible and environmentally sustainable development of its Phoenix Gold Project in Red Lake, Ontario towards projected gold production in 2014. Rubicon's flagship Phoenix Gold Project is fully permitted for initial production at 1,250 tpd. In addition, Rubicon controls over 100 square miles of prime exploration ground in the prolific Red Lake gold district which hosts Goldcorp's high-grade, world class Red Lake Mine. Rubicon's shares are listed on the NYSE.MKT (RBY) and the TSX (RMX) Exchanges. Rubicon's shares are included in the S&P/TSX Composite Index.

RUBICON MINERALS CORPORATION

Mike Lalonde, President and Chief Executive Officer

Mineral Resources

Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The quantity and grade of reported inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category. The mineral resources in this press release were reported using CIM Standards.

Qualified Persons

Phoenix Gold Project exploration drill programs and all related drill data forming the basis of the resource update were supervised and verified by Terry Bursey, B.Sc., P.Geo., Regional Exploration Manager for Rubicon, through 2011 and by Matthew Wunder B.Sc., P.Geo., and Vice President Exploration for Rubicon, from January 2012 to present. Both are Qualified Persons under the definition of NI 43-101. Drill core assays were conducted on sawn NQ-sized half core sections. The saw blade is routinely cleaned between samples when visible gold is noted during logging and sampling of the drill core. All assays were conducted by SGS Minerals Services using standard fire assay procedures with a gravimetric finish. Standards, blanks and check assays were included at regular intervals in each sample batch. Check assays on 5% of samples are carried out at a third party independent laboratory. Gold standards were prepared by CDN Resource Laboratories Ltd. Daniel Labine, P.Eng., Vice President Operations for Rubicon, is the Qualified Person, under the definition of NI 43-101, responsible for the Phoenix Gold Project construction and development.

The content of this news release, other than that pertaining to metallurgy and processing, has been read and approved by SRK staff including Mr. Sebastien Bernier, P.Geo, Principal Consultant Resource Geology, Mr. Glen Cole, P.Geo., Principal Consultant (Resource Geology), Mr. Dan Hewitt, P. Eng., Principal Consultant (Mining), Mr. Stephen Taylor P. Eng, Principal Consultant (Mining) and Mr. Gary Poxleitner P. Eng, Principal Consultant (Mining), all independent Qualified Persons as defined by NI 43-101. Exploration drill programs and all related drill data forming the basis of the inferred and indicated resource estimate described in this release were supervised and verified by Terry Bursey, P.Geo., Regional Exploration Manager for Rubicon, through 2011 and Matthew Wunder B.Sc., P.Geo., and Vice President Exploration for Rubicon, from January 2012 to present. The New PEA has been prepared by SRK Consulting with metallurgical and processing contributions from Soutex Inc. Individual contributing authors are Mr. Sebastien Bernier, Mr. Glen Cole, Mr. Stephen Taylor, and Mr. Dan Hewitt of SRK Consulting and Mr. S. Caron, ing. of Soutex Inc. All are independent Qualified Persons as defined by NI 43-101.

Forward-Looking Statements

This news release contains statements that constitute "forward-looking statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934 and "forward looking information" within the meaning of applicable Canadian provincial securities legislation (collectively, "forward-looking statements"). Forward-looking statements often, but not always, are identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect", "targeting", "look forward" and "intend" and statements that an event or result "may", "will", "would", "should", "could", or "might" occur or be achieved and other similar expressions.

Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management's best judgment based on facts and assumptions that management considers reasonable. The material assumptions upon which such forward-looking statements are based include, among others: that the demand for gold and base metal deposits will develop as anticipated; that the price of gold will remain at levels that will render the Phoenix Gold Project economic; that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, disturbances by Aboriginal communities, interruption in transportation or utilities, or adverse weather conditions; that Rubicon will meet its estimated timeline for the development of the Phoenix Gold Project; that Rubicon will continue to have the ability to attract and retain skilled staff; that the mineral resource estimate as disclosed in the New PEA will be realized; that Rubicon will be able to obtain additional financing for its development, construction and other needs; and that there are no material unanticipated variations in the cost of energy or supplies, or in the pre-production capital and operating cost estimate as disclosed in the New PEA. Rubicon makes no representation that reasonable business people in possession of the same information would reach the same conclusions.

Capital expenditures and time required to develop new mines are considerable and changes in cost or construction schedules can significantly increase both the time and capital required to build and complete a development project. Additional capital costs may have to be incurred in respect of the Phoenix Gold Project.

The New PEA is preliminary in nature as it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the New PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The quantity and grade of reported inferred resources referred to in the New PEA are uncertain in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource category.

Forward-looking statements in this news release include, but are not limited to statements regarding estimates of mineral resources, estimates of gold grades and ounces, estimates of costs, estimates of mine development and production, estimates of economic potential and returns, the potential result of current negotiations of different funding alternatives, and the projected gold production in 2014. The Company believes that the new methods being considered in the New PEA and optimization studies will potentially improve the efficiency and productivity of the Phoenix Gold Project. However, the implementation of the new methods will increase the capital cost of developing the Phoenix Gold Project. Management is in negotiations regarding various funding alternatives and plans to continue evaluating such alternatives, to address the increase in the capital cost of the Phoenix Gold Project.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: future prices of gold and other metals; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; actual results of reclamation activities; conclusions of future economic evaluations and studies; changes in new mineral resource models and revised geological interpretations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays and other risks related to joint venture operations; timing and receipt of regulatory approvals of operations; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the availability of financing for proposed transactions and programs on reasonable terms; the ability of third-party service providers to deliver services on reasonable terms and in a timely manner; and delays in the completion of development or construction activities due to poor ground conditions or other factors. Other factors that could cause the actual results to differ include market prices, results of exploration, availability of capital and financing on acceptable terms, inability to obtain required regulatory approvals, unanticipated difficulties or costs in any rehabilitation which may be necessary, market conditions and general business, economic, competitive, political and social conditions.

Forward-looking statements contained herein are made as of the date of this news release and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

It is important to note that the information provided in the New PEA and in the summary of the New PEA contained in this news release is preliminary in nature. There is no certainty that a potential mine will be realized or that a production decision will be made. A mine production decision that is made without a feasibility study carries additional potential risks which include, but are not limited to, the inclusion of inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mine design and mining schedules, metallurgical flow sheets and process plant designs may require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production.

Cautionary Note to U.S. Readers Regarding Estimates of Indicated and Inferred Resources

This news release uses the terms "indicated mineral resources" and "inferred resources". The Company advises U.S. investors that while these terms are recognized and required by Canadian securities administrators, they are not recognized by the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred" or "indicated mineral resource" will ever be upgraded to a higher category.

Under Canadian rules, estimates of "inferred mineral resources" may not form the basis of feasibility studies, pre-feasibility studies or other economic studies, except in prescribed cases, such as in a preliminary economic assessment under certain circumstances. The SEC normally only permits issuers to report mineralization that does not constitute "reserves" as in-place tonnage and grade without reference to unit measures. Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of an indicated or inferred resource exists or is economically or legally mineable. Information concerning descriptions of mineralization and resources contained herein may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

Figure 1: Vertical Section Looking Northwest Showing the Gold Mineralization Domains of the Phoenix Project

To view Figure 1, click on the following link: http://media3.marketwire.com/docs/r624a.pdf

Figure 2: Cross Section of the Conceptual Mine Plan, Phoenix Gold Project

To view Figure 2, click on the following link: http://media3.marketwire.com/docs/r624b.pdf

Figure 3: Projected Production Schedule and Cash Flow Model

To view Figure 3, click on the following link: http://media3.marketwire.com/docs/r624c.pdf

Table 6: Phoenix Project Block Models Specification

----------------------------------------------------------------------------
                        Block                     Number  Rotation  Rotation
Domain      Axis      Size (m)       Origin(1)  of Cells    Angles      Axis
                --------------------                                        
                    Parent  Sub cell                                        
----------------------------------------------------------------------------
               X       5.0    0.1250     9,000       460       165         3
----------------------------------------------------------------------------
Main           Y      10.0    0.2500    50,700       250        65         1
----------------------------------------------------------------------------
               Z       2.5    0.0625     5,100       500        95         2
----------------------------------------------------------------------------
               X      10.0    0.2500    10,000       196       210         3
----------------------------------------------------------------------------
45 Trend       Y       5.0    0.1250    49,800       132       165         1
----------------------------------------------------------------------------
               Z       2.5    0.1250     5,400       280        90         2
----------------------------------------------------------------------------
               X      20.0    0.5000     9,984        92       260         3
----------------------------------------------------------------------------
HW             Y      10.0    0.2500    48,698        37       -60         1
----------------------------------------------------------------------------
               Z      20.0    0.5000     4,872        39         0         -
----------------------------------------------------------------------------
               X      10.0    1.0000     8,905       286       165         3
----------------------------------------------------------------------------
External       Y      20.0    1.0000    51,361       151        65         1
----------------------------------------------------------------------------
               Z       5.0    1.0000     5,075       336        95         2
----------------------------------------------------------------------------
Source: SRK                                                                 
(1)   Expressed as mine grid coordinates converted from the local UTM grid  
      (Nad83 datum)
 
Table 7: Gold Variogram Parameters for the Phoenix Gold Project

----------------------------------------------------------------------------
Domain   Structure Contribution Model R1x  R1y  R1z     Angle(1)        Axis
                                     ---------------------------------------
                                      (m)  (m)  (m)    1   2   3   1   2   3
----------------------------------------------------------------------------
         C0        0.10        Nugget   -    -    -  165  65  95   3   1   2
Main     C1        0.60           Exp  15   25   15  165  65  95   3   1   2
         C2        0.30           Sph 200  600  150  165  65  95   3   1   2
----------------------------------------------------------------------------
         C0        0.10        Nugget   -    -    -  210  75  90   3   1   2
45 Trend C1        0.55           Exp  75   10   80  210  75  90   3   1   2
         C2        0.35           Sph  80  150   85  210  75  90   3   1   2
----------------------------------------------------------------------------
         C0        0.10        Nugget   -    -    -  260  30   0   3   1   2
HW       C1        0.70           Exp  35   10   35  260  30   0   3   1   2
         C2        0.20           Sph 150  120   60  260  30   0   3   1   2
----------------------------------------------------------------------------
         C0        0.10        Nugget   -    -    -  165  65  95   3   1   2
External C1        0.60           Exp  15   25   15  165  65  95   3   1   2
         C2        0.30           Sph 200  600  150  165  65  95   3   1   2
----------------------------------------------------------------------------
Source: SRK                                                                 
(1)   The rotation angles are shown in CAE Studio 3 convention
 
Table 8: Summary of Gold Estimation Search Parameters for the Main, 45 Trend, and HW Domains

----------------------------------------------------------------------------
Parameter                       1st Pass          2nd Pass          3rd Pass
Element estimated                     Au                Au                Au
Interpolation method    Ordinary kriging  Ordinary kriging  Ordinary kriging
Search range X             80% Var range     90% Var range     90% Var range
Search range Y             80% Var range     90% Var range     90% Var range
Search range Z             80% Var range     90% Var range     90% Var range
Minimum number of                                                           
 composites                            8                 8                 6
Maximum number of                                                           
 composites                           16                24                24
Octant search                        Yes               Yes                No
Minimum number of                                                           
 octant                                3                 3                 -
Minimum number of                                                           
 composites per octant                 3                 3                 -
Maximum number of                                                           
 composites per octant                12                12                 -
Maximum number of                                                           
 composites per                                                             
 borehole                              5                 5                 5
----------------------------------------------------------------------------
Source: SRK
 
Table 9: Summary of Estimation Search Parameters for Gold in the External Domain

----------------------------------------------------------------------------
Parameter                                                           1st Pass
Element estimated                                                         Au
Interpolation method                                        Ordinary kriging
Search range X                                                          95 m
Search range Y                                                         290 m
Search range Z                                                          75 m
Minimum number of composites                                               6
Maximum number of composites                                              24
Octant search                                                             No
Minimum number of octant                                                   -
Minimum number of composites per octant                                    -
Maximum number of composites per octant                                    -
Maximum number of composites per borehole                                  5
----------------------------------------------------------------------------
Source: SRK
 
The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release

CONTACT INFORMATION:
Rubicon Minerals Corporation
Allan Candelario
Director of Investor Relations
+1 (416) 766-2804
ir@rubiconminerals.com
www.rubiconminerals.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Rubicon Resources Limited

CODE : RBR.AX
ISIN : AU000000RBR9
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Rubicon Res. est une société d’exploration minière d'or et de cuivre basée en Australie.

Rubicon Res. détient divers projets d'exploration en Australie.

Son principal projet en exploration est YINDARLGOODA en Australie.

Rubicon Res. est cotée en Australie. Sa capitalisation boursière aujourd'hui est 889 820 AU$ (571 386 US$, 536 760 €).

La valeur de son action a atteint son plus haut niveau récent le 28 octobre 2010 à 0,06 AU$, et son plus bas niveau récent le 19 avril 2024 à 0,00 AU$.

Rubicon Res. possède 444 910 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Rubicon Resources Limited
25/06/2013Reports Positive Results for New Preliminary Economic Assess...
Communiqués de Presse de Rubicon Resources Limited
27/01/2016Australia assists African skills development
22/12/2015PacMoz Secures Labour Broking Licence
17/12/2015Initial Director's Interest Notice
16/09/2015Change of Director's Interest Notice
16/09/2015Revised Securities Trading Policy
08/09/2015Rights Issue Shortfall
08/09/2015Placement of Rights Issue Shortfall
31/07/201501 07 2015 - RBR New Client - Triton Minerals Ltd
22/07/2015TESTING
10/07/2015Appendix 3B
01/07/201501 07 2015 - Rubicon Resources Ltd Engaged to Assist Develop...
01/07/2015New Client - Triton Minerals Limited
19/06/2015Update on PacMoz, Rubicon's Mozambican Subsidiary
16/06/2015Board/Management Changes
17/04/2015RBR Investor Presentation
26/03/2015Completion of PacMoz Acquisition
23/03/2015ASX approval fof Waiver
23/03/2015Response to ASX Appendix 5B Query
23/03/2015S708 Cleansing Statement
10/12/2014Update of PacMoz transaction
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (RBR.AX)
0,002+0.00%
AUSTRALIA
AU$ 0,002
19/04 11:00 -
0%
Cours préc. Ouverture
0,002 0,002
Bas haut
0,002 0,002
Année b/h Var. YTD
- -  0,002 -
52 sem. b/h var. 52 sem.
- -  0,003 -33,33%
Volume var. 1 mois
0 -
24hGold TrendPower© : -27
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-33,33%
20230,00%0,000,00
2022-40,00%0,010,00
2021-37,50%0,020,00
2020-38,46%0,020,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,08 US$+1,92%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$+4,20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,20 CA$-3,70%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-2,15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,53 US$+0,76%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :