Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Batero Gold Corp

Publié le 22 mars 2012

Reports Preliminary Oxide Resource Potential and Metallurgical Test Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report |
.
 
 
Batero Gold Reports Preliminary Oxide Resource Potential and Metallurgical Test Results

Vancouver, British Columbia� March 22,2012- Batero Gold Corp. (�the Company�) (TSX-V: BAT) announced on February 27th 2012 its National Instrument 43-101 mineral resource estimate  ( "Technical Report ") for the Batero-Quinchia project  ( the �Project�) and on March 14th 2012 the Company filed the Technical Report on SEDAR. The Technical Report by Roscoe Postle Associates Inc. (�RPA�) contains detailed commentary on the oxide resource potential and metallurgical test work results and the Company is pleased to announce particulars of the oxide resource potential and the metallurgical test work results from the Technical Report.
 
As part of Batero�s planned 2012 work program to evaluate the potential of a high grade development option at the La Cumbre porphyry deposit in the southern area of the mineral resources, the Company will evaluate the opportunity to improve project economics through low cost heap leach mineral processing and will advance metallurgical test work and deposit modeling to increase oxide resources, gold grade and recovery.
 
Oxide Mineral Resources and Initial Metallurgy Highlights:
  • Zones of higher grade oxide resources, grading over 1 g/t gold near surface at La Cumbre and grading 11.42 g/t gold over 5.8 metres adjacent to the deposit, remain open to delineate
  • Initial metallurgical test work on oxide gold mineralization returned up to 94% recovery; 
  • Oxide gold resources (at a 0.16 g/t gold cut off):
  •        313,000 ounce indicated resource in 18 M tonnes averaging 0.54 g/t gold 
  •        275,000 ounce inferred resources in 24 M tonnes averaging 0.36 g/t gold
  • Oxide mineral resources amenable to low cost heap leach processing represent approximately 10% of the current indicated and inferred resources at the Project at this preliminary stage
  • Areas of oxide mineralization adjacent to La Cumbre still need to be modelled into the oxide portion of the oxide resource estimate potential
  • Mineralization in the oxide horizon and the thicker, underlying transition horizon at La Cumbre will be further evaluated to increase the potential leachable gold resource
 
View Figure 1 � Gold Grades Section 5300, Figure 2 - Gold Grades - within Gold Envelope and 0.16 cut-off Gold Whittle Pit Shell � 1525 m Bench, Figure 3 � Sulphur Grades Section 5300,  Table 1:  Summary Cyanide Leach Test Results and Table 2:  Preliminary Oxide and Sulphide Resource Potential
 
�We are pleased that 10% of our initial mineral resources are classified as oxide mineralization that may be amenable to low cost heap leaching.  Preliminary metallurgical testing also shows high recoveries of up to 94% in the oxide material,� stated Brandon Rook, President and CEO of the Company.  �An objective of our 2012 work program will be growth of the oxide opportunity at La Cumbre to contribute positively to the PEA.  Further modeling and metallurgical test work will be completed in 2012 to determine if there is a variation in gold recoveries between the oxide and the transition zones or if these two zones can be treated together.  Also, furtherdrill testing of the oxide zone has the potential to increase the volume of the oxide resources through new discoveries and better definition.�
 
Potentially Significant Volume of Oxidized Mineralization may be Amenable to Low Cost Heap Leaching
The presence and thickness of the oxide mineralization and underlying transition mineralization at La Cumbre are such that an initial heap leach extraction scenario might be a viable option.  At surface to a preliminary depth of 70 metres at the La Cumbre deposit is a higher grade gold-bearing �oxide mineral zone�.  Below the oxide zone is a thicker �transition mineral zone�, over a vertical distance of 150 metres to 200 metres, which overlies the primary �sulphide mineral zone�.
 
The thick transition zone, with low sulphur content, requires additional metallurgical test work to be included in, and therefore increase, the oxide mineral resources of the Project (Figure 3).  Test work will also determine the gold and silver recovery for oxide and transition mineralization.  The histograms in Figure 3 show the sulphur grades and the variation within the oxide, transition and sulphide zones at La Cumbre.  In general, the lowest sulphur grade produces the highest gold recovery.
 
Significant Zones of Higher Grade Oxide Mineralization
At La Cumbre, higher grade gold mineralization, averaging over 1 g/t gold, is situated near surface and adjacent to the deposit, and has the potential to improve the economics in the early stages of the Project (Figure 1 and Figure 2).  Additionally, high grade epithermal gold mineralization, in oxide and capped at 3 g/t gold in the resource estimate, has been intersected near surface and adjacent to La Cumbre.  Drill hole LC003 intersected 43.40 g/t gold over 2 metres at 28 metres down hole.  Drill hole QAP034, located northeast of La Cumbre, grades 11.42 g/t gold over 5.80 metres from 9.7 metres down hole.  Further delineation is required to determine the extent of this oxide mineralization.
 
Pockets of higher grade gold mineralization are situated throughout the mineral resources at La Cumbre (Figure 1).  The contours in Figure 1 show the gold grade contours as modeled in Leapfrog 3D software and their variation within the oxide, transition and sulphide zones at La Cumbre.  In general, the highest gold grades produce the highest recovery. 
 
Superior Recovery with Cyanidation
Preliminary metallurgical testing undertaken by G&T Metallurgical Services (�G&T�) on behalf of the Company was completed on six drill core composite samples to determine their response to gravity concentration, flotation and cyanidation.  The response to cyanidation via bottle roll tests was clearly superior and yielded gold recoveries ranging from 66% to 94% as determined by G&T. Test work on oxide mineralization returned up to 94% recovery.
 
Preliminary metallurgical tests indicate a relationship between gold and sulphur grades, and the gold recovery (Table 1).   Cyanidation extraction (after 48 hours) averaged 73% recovery at a nominal P80 grind size of 100 microns, and 80% recovery at a finer nominal grind size of 70 microns. The best gold recovery was on the highest grade, with 91% recovery at the coarser grind size and 94% recovery at the finer grind size.  The lowest sulphur grade produced the highest recovery.
 
Recovery Increases with Flotation and Cyanidation
A second phase of metallurgical testing was completed on three of the samples representing the sulphide zone from the previous test work.  Three batch cleaner tests were carried out as well as cyanide bottle roll tests on the rougher and cleaner tails.  A 5% to 10% increase in gold recovery using flotation and cyanidation of the rougher and cleaner tails was achieved on a nominal 100 micron grind and a 4% increase in gold recovery was achieved on a nominal grind of 70 microns.
 
Further Metallurgical Testing for Potential Improvement in Recovery
The next stage of metallurgical testing, as recommended by RPA, should investigate means for improving cyanidation recovery including pre-aeration, aeration under leach, lead nitrate addition, and varying cyanide concentration and grind conditions.  A variability test program will be undertaken to better understand the relationship between gold and sulphur grades with respect to gold recovery.  Additional testing also will include a gold deportment study, heap leach test work on oxide material and an economic capital cost analysis for two grind scenarios.
 
 
The mineral resource estimate and other scientific and technical information contained in this news release were prepared by or under the supervision of Paul Chamois, M.Sc. (applied), P.Geo., and Luke Evans, M.Sc., P.Eng., of Roscoe Postle Associates Inc., who are independent Qualified Persons under National Instrument 43-101.
 
 
ON BEHALF OF THE BOARD OF
BATERO GOLD CORP.
 
Brandon Rook
 
President & CEO
Batero Gold Corp.
For further information please contact:
Batero Gold Corp.
Tel: 604.568.6378 or
Email: info@baterogold.com
 
FORWARD LOOKING STATEMENTS: Certain of the statements and information in this press release constitute �forward-looking statements� or �forward-looking information� Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as �expects�, �anticipates�, �believes�, �plans�, �estimates�, �intends�, �targets�, �goals�, �forecasts�, �objectives�, �potential� or variations thereof or stating that certain actions, events or results �may�, �could�, �would�, �might� or �will� be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information.
Forward-looking statements or information relate to, among other things: the timing and scope of expected diamond drilling; resource estimate, grades on the Batero-Quinchia project; scope of mineralization within the Batero-Quinchia project; timing of receipt of permits and regulatory approvals; the sufficiency of the Company�s capital to finance the Company�s operations; geological interpretations and potential mineral recovery processes.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuations in the spot and forward price of gold or certain other commodities; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada, Colombia or other countries in which the Company may carry on business in the future; the uncertainties involved in interpreting geological data; business opportunities that may be presented to, or pursued by, the Company; operating or technical difficulties in connection with mining activities; the speculative nature of gold exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks).

This list is not exhaustive of the factors that may affect any of the Company�s forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company�s Filing Statement dated as of June 22, 2010 under the heading �Risk Factors�. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company�s forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management�s assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.
 
Cautionary Note Regarding Mineral Resources and Mineral Reserves
Readers are advised that National Instrument 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Readers should refer to the Company�s current technical reports and other continuous disclosure documents filed by the Company, available on SEDAR at www.sedar.comfor further information the mineral resource estimates of the Company�s projects, which are subject to the qualifications and notes set forth therein, as well as for additional information relating to the Company more generally.
 
Mineral resources which are not mineral reserves, have a great amount of uncertainty as to their existence and do not have demonstrated economic or legal viability. Inferred mineral resources have insufficient confidence to allow the meaningful application of technical and economic parameters or to enable an evaluation of economic viability suitable for public disclosure. Neither the Company, nor readers, can assume that all or any part of an inferred mineral resource will be upgraded to indicated or measured mineral resources. Most projects at the inferred mineral resource stage do not ever form the basis of feasibility or other economic studies, or achieve successful commercial production. Each stage of a project is contingent on the positive results of the previous stage and that there is a significant risk that the results may not support or justify moving to the next stage.
 
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1:  Gold Grades - Section 5300 N
 
Figure 2:  Gold Grades - within Gold Envelope and 0.16 cut-off Gold Whittle Pit Shell � 1525 m Bench 
 
Figure 3:  Sulphur Grades � Section 5300 N
 

 
 
 

 
 
Table 1:  Summary Cyanide Leach Test Results
 
Sample Grind Grade Recovery - 48 hrs CN Lime
(�m P80) (g/t Au)  (%) (kg/t) (kg/t)
MMLC-004 101 1.17 91 0.4 7.7
71 94 0.5 7.0
MMLC-005 97 0.79 72 1.3 3.1
71 76 1.5 3.1
MMLC-010 99 0.66 66 0.5 2.2
72 68 0.7 1.5
MMLC-011 98 0.58 66 0.5 1.8
67 82 0.7 1.1
MMLC-012 94 0.65 69 0.4 2.1
59 84 0.5 1.0
MMLC-014 101 0.78 75 0.5 1.4
68 76 0.7 1.2
Average 98 0.77 73 0.7 2.8
68 80
 
 

 
Table 2:  Preliminary Oxide and Sulphide Resource Potential
 
 
�Oxide Zone� - Indicated at 0.16 g/t Au Cut-Off
 
Area Tonnes
(Mt)
Au (g/t) Ag (g/t) Cu
(%)
Gold
(000 oz)
La Cumbre 15.4 0.56 1.73 0.08 275
Dos Quebradas 2.8 0.42 1.75 0.07 37
Total 18.2 0.54 1.73 0.08 313
           
�Sulphide Zone� - Indicated at 0.16 g/t Au Cut-Off
 
Area Tonnes
(Mt)
Au (g/t) Ag (g/t) Cu
(%)
Gold
(000 oz)
La Cumbre 188.5 0.43 1.5 0.08 2,597
Dos Quebradas 41.8 0.47 1.61 0.08 637
Total 230.3 0.44 1.52 0.08 3,234
           
�Oxide Zone� - Inferred at 0.16 g/t Au Cut-Off
 
Area Tonnes
(Mt)
Au (g/t) Ag (g/t) Cu
(%)
Gold
(000 oz)
La Cumbre 6.7 0.37 1.66 0.05 81
El Centro 13.3 0.32 1.85 0.06 138
Dos Quebradas 3.8 0.46 1.7 0.06 56
Total 23.9 0.36 1.77 0.06 275
           
�Sulphide Zone� - Inferred at 0.16 g/t Au Cut-Off
 
Area Tonnes
(Mt)
Au (g/t) Ag (g/t) Cu
(%)
Gold
(000 oz)
La Cumbre 67.3 0.38 1.32 0.05 824
El Centro 122.3 0.28 2.14 0.07 1,093
Dos Quebradas 28.8 0.43 1.48 0.06 395
Total 218.4 0.33 1.8 0.06 2,313
                     
 
 
 
 
 
  
 follow on Twitter | forward to a friend Email not displaying correctly? View it in your browser 
Copyright � 2012 Batero Gold Corp, All rights reserved.
You are receiving this email because you opted in at our website.
Our mailing address is:
Batero Gold Corp
3703-1011 W Cordova St.
Vancouver, BC V6C 0B2

Add us to your address book
  |  

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Batero Gold Corp

EXPLORATEUR
CODE : BAT.V
ISIN : CA0705051021
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Batero Gold est une société d’exploration minière d'or basée au Canada.

Son principal projet en exploration est BATERO QUINCHIA en Colombie.

Batero Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 6,3 millions CA$ (4,6 millions US$, 4,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 04 mars 2011 à 6,57 CA$, et son plus bas niveau récent le 08 septembre 2023 à 0,02 CA$.

Batero Gold possède 115 182 383 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Batero Gold Corp
02/11/2012Announces Private Placement of $17.8 Million at 46% Premium ...
30/04/2012Closes $6.3 Million Special Warrant Financing
16/04/2012Announces Upsize to Proposed Special Warrant Financing for G...
28/11/2011Announces Closing of C$7.2 Million Bought Deal Private Place...
Attributions d'options de Batero Gold Corp
21/02/2011Grants Options
Nominations de Batero Gold Corp
29/06/2012Announces Appointments to Advisory Board and Director Resign...
28/06/2012Appoints Leonard (Len) Harris to Board of Directors
14/12/2011Announces Appointment of Dr. Darryl Lindsay to Senior Vice P...
05/10/2011Appoints Dr. Darryl Lindsay as Chief Operating Officer
Projets de Batero Gold Corp
13/09/2012Expands Higher Grade Core of Oxidized Gold Mineralization at...
26/07/2012Reports Additional Metallurgical Results from La Cumbre Depo...
20/07/2012Commences Drill Program at La Cumbre Deposit
18/07/2012Announces Work Program to Assess Development of La Cumbre De...
22/03/2012Reports Preliminary Oxide Resource Potential and Metallurgic...
27/02/2012Initial 43=2D101 Resource Estimate
13/01/2012RELEASES FINAL DRILL RESULTS FROM 55=2C755 METRE DRILL PROGR...
15/12/2011Extends Mineralization
13/12/2011secures 100 percent ownership of surface rights in immediate...
07/12/2011Drill Results News Release
16/09/2011Drills Vertical Hole Intersecting 751.00 metres Grading 0.54...
10/05/2011Completes 100% Acquisition of Two Historic Gold Mines on Bat...
01/04/2011PDAC- Toronto March 2011 - Batero-Quinchia Project Colombia ...
07/03/2011(Batero Quinchia)Intersects 460.00 Metres Grading 0.70 g/t Gold and 0.12% Cop...
17/02/2011(Batero Quinchia)Intersects 519.70 Metres Grading 0.80 G/T Gold and 0.14% Cop...
11/02/2011Initiates Preliminary Metallurgical Testing on the Batero-Qu...
Communiqués de Presse de Batero Gold Corp
01/12/2015Batero Gold Corp. Appoints Juan David Uribe as Chairman
06/11/2015Batero Gold Corp. Closes Private Placement With CB Gold
15/10/2015Batero Gold Corp. Appoints Mr. Felipe Ferraro as President a...
08/10/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. Pur...
06/10/2015Batero Acquires All CB Gold Common Shares Deposited to the B...
24/09/2015Batero to Acquire All Shares Tendered to Its Superior Offer ...
18/09/2015Batero Remains Committed to Its Superior Offer and Extends B...
15/09/2015Batero Bid Remains the Best Option for CB Gold Shareholders
15/09/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
12/09/2015Red Eagle's Allegations Dismissed by BCSC -- Batero's Bid Re...
09/09/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
09/09/2015Batero Mails Increased Offer to Acquire CB Gold and Acquires...
08/09/2015Batero Announces Entering Into of a Letter of Intent for Pro...
05/09/2015Batero Significantly Raises Offer to Acquire CB Gold
04/09/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
01/09/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
27/08/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
25/08/2015Batero Gold Corp. Reaffirms Superior Proposal to Acquire All...
25/08/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
21/08/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. Thr...
12/08/2015Batero Gold Corp. Commences Offer To Acquire CB Gold Inc.
11/08/2015Batero Gold Corp. Commences Offer to Acquire CB Gold Inc.
24/07/2015IIROC Trading Resumption - BAT
24/07/2015Batero Gold Announces Friendly Acquisition of CB Gold
24/07/2015IIROC Trading Halt - BAT
09/07/2015Batero Samples 2.64 g/t Au in La Cumbre Oxide
24/03/2015Investors See A Silver Lining In Europe's Plain Packaging La...
01/03/2015Batero Provides Exploration and Corporate Update
28/01/2015Batero Reports Results of Oxide Sampling Program
18/12/2014Batero Provides Corporate Update
03/06/2014Batero Provides Corporate Update
08/04/2014Batero Launches Corporate Shared Value Alliance Program In Q...
05/11/2013Announces Preliminary Economic Assessment for the Batero-Qui...
02/10/2013Receives Confirmation of Registration of Concession Contract
19/09/2013Provides Corporate Update
19/09/2013PRESIDENT AND CEO STEPS DOWN
18/06/2013to Commence Drilling On Two New Oxide Targets at La Cumbre
14/05/2013Provides Corporate Update
21/03/2013Releases 2012 CSR Report=2C Outlines Key Programs Integral T...
07/01/2013Announces Conversion of Subscription Receipts and New Board ...
05/07/2012Adopts Shareholder Rights Plan
18/06/2012Announces Receipt for Final Prospectus for the Qualification...
15/05/2012Clarifies Technical Disclosure
14/03/2012Files NI 43=2D101Technical Report and Announces 2012 Plans
14/03/2012Files 43=2D101 on Sedar and Provides Update
18/01/2012in Globe and Mail Newspaper + Presentation Invitation
16/01/2012Concession Agreement Confirmation
12/10/2011Reports Further Drilling Results from Batero-Quinchia Projec...
30/08/2011Reports Further Drilling Results from Batero-Quinchia Projec...
19/05/2011Drills Deepest Mineralized Intercept to Date in Vertical Hol...
05/05/2011Provides Corporate Update
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BAT.V)
0,055-15.38%
TSX-V
CA$ 0,055
29/04 11:38 -0,010
-15,38%
Cours préc. Ouverture
0,065 0,055
Bas haut
0,055 0,055
Année b/h Var. YTD
0,030 -  0,065 83,33%
52 sem. b/h var. 52 sem.
0,020 -  0,065 57,14%
Volume var. 1 mois
20 000 83,33%
24hGold TrendPower© : -17
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024120,00%
202325,00%0,040,02
2022-73,33%0,110,02
2021-31,82%0,160,06
202083,33%0,130,05
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,39 US$+1,06%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,30 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,89 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,16 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :