Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Il serait plus approprié d'appeler le Fascisme Corporatisme parce qu'il s'agit d'une fusion entre l'Etat et la puissance des grandes sociétés
Benito Mussolini  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1349,00-19,70
Silver 21,25-0,45
Platinum 1408,50-27,50
Palladium 692,20-17,60
MARCHES MONDIAUX
DOWJONES 15112-203
NASDAQ 3443-39
NIKKEI 13245238
ASX 484247
CAC 40 3839-21
DAX 8197-32
HUI 246-8
XAU 1030
MONNAIES (€)
AUS $ 1,4317
CAN $ 1,3655
US $ 1,3287
GBP (£) 0,8582
Sw Fr 1,2337
YEN 128,3010
RATIOS & INDEXES
Gold / Silver63,48
Gold / Oil13,77
Dowjones / Gold11,20
MATIERES PREMIERES
Copper 3,140,00
WTI Oil 97,97-0,47
Nat. Gas 3,950,04
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

Re:        News Releases - Tuesday, January 08, 2008
Title:     Atna Reports Progress at Pinson Gold Mine, Nevada

Vancouver, B.C. (January 08, 2008). Atna Resources Ltd. (ATN: TSX) is pleased to report progress of work by Pinson Mining Company (Barrick Gold) at the Pinson Gold Mine located in the Getchell Gold Belt, Nevada. Atna owns a 70% interest in the property and Pinson Mining Company (PMC) owns 30%. PMC may reverse the parties' interests by spending US$30 million on further work to advance and develop the property before April 6, 2009. PMC commenced material work on the project in August 2007. Initial plans called for 50,000 feet of surface drilling, 35,000 feet of underground drilling, and 4,000 feet of underground development.

Dewatering to enable underground development began in August. A rapid infiltration basin (RIB) to handle the water is under construction and a second RIB will be installed to handle any overflow needs. Bids have been called for the underground development, which is expected to begin in Q1 2008. Three core drills and one reverse circulation (RC) rotary drill are presently in operation on the property. Twenty three holes have been completed (RC pre-collar and core tail); 11 holes are pre-collared and cased; four holes are in progress. A total of 26,899 feet, including 20,364 feet of RC and 6,535 feet of core drilling, was completed through the end of November. Analytical turn-around is an issue, with PMC experiencing 3 to 5 week delay from sample delivery to receipt of analytical results.

PMC has focused drilling in four principle target areas: 1) infill definition drilling in the Range Front/Ogee/CX West zones, 2) infill drilling in the CX zone, 3) exploration drilling in the HPR-104 area, and 4) in the Summer Camp area near the northern property boundary with the Getchell Mine property. Highlights of the results are reported as follows:

Range Front/Ogee/CX West

Early results include a high grade drill intersection (BRFC-019) of gold mineralization confirming the tenor and grade in the Ogee zone. High grade gold intersections in the CX West zone (BRFC-009, 010) underscore the potential to add new mineralization in the CX-West zone to the total estimated resource at Pinson. CX West is a mineralized structure between the Range Front and Ogee structures which was encountered at the end of Atna's 2006 drill program and which made a minor contribution to the June 2007 resource estimate. No assays are yet available from core within the Range Front resource envelope. However, broad intersections of gold mineralization in the hanging wall of the Range Front (BRFC-022 & 023) indicate additional opportunities to increase the deposit resource. Core-tails drilled on strike outside the south boundary of the resource estimate (BRFC - 002, 003) cut zones of lower grade mineralization. Data is partial and incomplete, as work is in progress. Additional core assaying and drilling of core tails is required to enable full reporting and interpretation. Highlights of the drill intersections are reported in the following table:
-----------------------------------------------------------------------
Drill Hole     From            Length  Gold
Number         (ft)    To (ft)  (ft)  (oz/t)           Zone
-----------------------------------------------------------------------
BRFC-002(1)    445.0    485.0   40.0  0.049  Range Front - south of
                                              resource envelope
-----------------------------------------------------------------------
  including    445.0    450.0    5.0  0.181
-----------------------------------------------------------------------
BRFC-003(1)    573.0    598.0   25.0  0.037  Range Front - south of
                                              resource envelope
-----------------------------------------------------------------------
BRFC-007(2)    210.0    230.0   20.0  0.069  Range Front (hanging wall)
-----------------------------------------------------------------------
BRFC-009(2)     60.0     80.0   20.0  0.599  CX-West (RC)
-----------------------------------------------------------------------
-----------------------------------------------------------------------
BRFC-010(2)    245.0    300.0   55.0  0.299  CX-West (RC)
-----------------------------------------------------------------------
BRFC-019(3)    375.0    405.0   30.0  0.352  Ogee (RC)
-----------------------------------------------------------------------
  including    380.0    400.0   20.0  0.497
-----------------------------------------------------------------------
-----------------------------------------------------------------------
BRFC-020a(3)   445.0    460.0   15.0  0.131  Range Front (hanging wall)
-----------------------------------------------------------------------
BRFC-022(4)    650.0    740.0   90.0  0.284  Range Front (hanging wall)
-----------------------------------------------------------------------
  including    650.0    665.0   15.0  0.867
-----------------------------------------------------------------------
  including    700.0    720.0   20.0  0.540
-----------------------------------------------------------------------
BRFC-023(3)    630.0    640.0   10.0  0.128  Range Front (hanging wall)
-----------------------------------------------------------------------
  and          675.0    695.0   20.0  0.215  Range Front (hanging wall)
-----------------------------------------------------------------------
  including    675.0    685.0   10.0  0.343
-----------------------------------------------------------------------
(1) Core-tail completed; assays complete.
(2) Core-tail completed; assays complete on pre-collar; assays pending
    on core-tail.
(3) Pre-collar RC only, core-tail not yet completed; pre-collar assays
    complete.
(4) Hole deviated and would have twinned existing hole. Core-tail not
    planned.
CX Zone

PMC is conducting definition drilling in the CX zone and has completed 8 pre-collar RC holes with 5 core tails. Assays have been received from only one of the completed core-tails: hole number BCXC-018 cut 11.8 feet grading 0.236 oz/ton gold in the core-tail, confirming this area within the CX resource shell. Three of the pre-collar holes deviated from the planned path and no core-tails will be done, as they would only twin existing core holes.
--------------------------------------------------------------
Drill Hole     From            Length    Gold
Number         (ft)    To (ft)  (ft)    (oz/t)           Zone
--------------------------------------------------------------
BCXC-018(1)   1060.2   1120.6   60.4    0.097             CX
--------------------------------------------------------------
  including   1060.2   1072.0   11.8    0.236
--------------------------------------------------------------
(1) Core-tail completed; assays complete.
HPR - 104 and Summer Camp Exploration Targets

Drill hole HPR - 104 intersected strongly anomalous gold values (555 feet grading 0.096 oz/ton Au from 1,500 to 2,055 feet) in previous drilling of favorable host stratigraphy 800 feet north of the main Pinson mineralization. An exploration hole drilled in the current program by PMC to test this gold anomaly deviated more than 250 feet from its intended course and failed to explore the previous intercept in a meaningful way. Summer Camp is about 3 miles north of the Pinson resource area and straddles the main structural trend as defined by gravity surveys and geologic mapping between Pinson and the Getchell Mine. All analytical data is pending at Summer Camp.

All sample preparation and gold assays in this press release were completed by American Assay Laboratories in Reno, Nevada, an independent analytical laboratory with a Certificate of Laboratory Proficiency PTP-MAL from the Standards Council of Canada. Gold assays were completed by standard fire assay methods with an atomic absorption finish or a gravimetric finish for higher grade samples. Pinson Mining Company has instituted a rigorous QA/QC protocol which includes certified assay standards and blanks, replicates, and duplicate samples which bolsters American Assay's own internal QA/QC program.

This press release was prepared under the supervision and review of William Stanley, V.P. Exploration of Atna, a Licensed Geologist, and Qualified Person with the ability and authority to verify the authenticity and validity of information contained within this news release.

For further information, please visit our website, www.atna.com, or contact:

ATNA RESOURCES LTD., Kendra Johnston, Investor Relations Manager & Geologist;
Tel: (604) 684-2285, E-mail: kjohnston@atna.com

Forward-Looking Statements

Except for the statements of historical fact that may be contained herein, this news release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements are based on the opinions and estimates of management at the date that the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to, risks involved in the exploration and development of mineral properties; the uncertainties involved in interpreting drilling and other exploration results; fluctuating commodity prices and exchange rates; the possibility of project cost overruns or unanticipated costs and expenses; the need to obtain additional financing and uncertainty as to the availability and terms of future financing; environmental risks and hazards; and other risks and uncertainties disclosed in the Company's current Annual Information Form filed with the Canadian securities regulatory authorities and Form 20-F filed with the United States Securities and Exchange Commission. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements.


Copyright © 2008 ATNA RESOURCES LTD. (TSE:ATN) All rights reserved. For more information visit our website at http://www.atna.com/ or send email to info@atna.com ..

Tweet

Atna Resources Ltd

PRODUCTEUR
CODE : ATN.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Atna Resources Ltd
05/07/2010Gold Participating Bond Offering
25/05/2010Positive Preliminary Economic Assessment for the Columbia Go...
09/12/2009Atna Announces Closing of Gold Participating Bond Offering
Rapports annuels de Atna Resources Ltd
2008 Annual report
Annual Report 2007
Nominations de Atna Resources Ltd
08/01/2013Mr. Daniel Saint Don Joins Atna as Vice President and Chief ...
16/08/2011Douglas Stewart Joins Atna As Chief Operating Officer
05/04/2011Paul H. Zink Joins Atna's Board of Directors
Rapports Financiers de Atna Resources Ltd
13/11/2012Announces Third Quarter 2012 Earnings and Operations
15/10/2012(Pinson)Reports Third Quarter Development Progress at Pinson
14/11/2011Reports Third Quarter Earnings of $2.5 Million
16/08/2011Reports Second Quarter Earnings of $1.1 Million
24/05/2011Reports First Quarter 2011 Results
25/03/2011Reports Fourth Quarter and 2010 Fiscal Year End Results
15/11/2010Reports Third Quarter 2010 Results and Update of Operations
12/08/2010Reports Second Quarter 2010 Results
26/03/2010Reports Fourth Quarter and Year End 2009 Results
14/08/2009Reports Second Quarter 2009 Results
15/05/2009Reports First Quarter 2009 Results
31/03/2009Reports Year End and Fourth Quarter 2008 Results
14/11/2008Reports Third Quarter 2008 Results
31/10/2008(Pinson)Reports Third Quarter Progress at Pinson Gold Project, Nevad...
14/08/2008Reports Second Quarter 2008 Results
29/05/2008REPORTS FIRST QUARTER 2008 RESULTS
14/11/2007 Reports Third Quarter Results
13/08/2007Reports Second Quarter Results
15/05/2007Reports First Quarter Results
Projets de Atna Resources Ltd
03/06/2013(Pinson)Provides Additional Information on its Pinson Mine
29/05/2013(Pinson)Modifies Operations at its Pinson Mine
18/03/2013(Ty)Extends $17.5 Million Credit Facility
06/11/2012(Pinson)Development Drilling at Pinson Returns 60 feet of 1.38 oz/to...
13/10/2011(Briggs)Completes Briggs Drilling with Strong Gold Intercepts
25/05/2011(Briggs)Drills 100 feet (30.5 m) grading 0.058 oz/ton gold (1.97 g/t...
02/05/2011(Briggs)Expands New Reserve Area
07/04/2011(Briggs)Announces Expansion of Deep Briggs Zone
23/03/2011(Briggs)Reports Additional Positive Drill Results at Briggs Mine
03/03/2011(Reward Property)Reports Updated Gold Reserves at Briggs and Reward Mines
03/03/2011(Briggs)Reports Updated Gold Reserves at Briggs and Reward Mines
28/02/2011(Briggs)Reports Initial Drill Results at Briggs Mine
27/01/2011(Briggs)Commences Briggs Mine Exploration
24/01/2011(Briggs)Reports Increased Gold Production and Lower Costs at Briggs ...
06/10/2010(Briggs)Reports Strong Production at Briggs Mine
25/05/2010(Columbia Property)Announces Positive Preliminary Economic Assessment for the C...
02/03/2010Provides NI-43-101 Resource Estimate for Cecil R Project
26/02/2010(Briggs)Reaches Commercial Production Levels at the Briggs Mine
22/02/2010(Briggs)Updates Reserve Estimates for Briggs and Reward
10/09/2009(Columbia Property)Reports Significant Gold Resource for its Columbia Gold Proj...
24/08/2009(Reward Property)Receives Approval for Development of Reward Gold Mine
11/08/2009(Briggs)Increases Gold Resources at Briggs Mine
08/06/2009(Briggs)Expands Mineralization at Briggs Mine
04/06/2009(Pinson)Reports Additional Pinson Drill Results
13/05/2009(Briggs)Makes First Gold Pour at Briggs Mine
01/05/2009(Ty)Receives Final Payment in Marg Property Sale
09/04/2009(Pinson)Signs Pinson Joint Venture Agreement
27/02/2009(Briggs)Confirms New Gold Zone at Briggs Mine
18/02/2009(Briggs)Reports Reserve Increase and Updated Mine Plan for the Brigg...
04/02/2009(Clover)Provides Update on Exploration Venture Properties
28/01/2009(Briggs)Commences Mining Gold Ore at Briggs
15/01/2009(Pinson)Receives Notice of Completion of $30 Million Expenditure at ...
09/10/2008(Clover)Drilling Commences at Atna's Clover Project
08/10/2008(Seven-up Pete Gold)After 17 years of fighting, Atna finally throws in the towel...
22/07/2008(Mcdonald): Mountain States Legal Foundation Files Petition With US Su...
16/06/2008(Ty)COMPLETES CONSOLIDATION OF SEVEN-UP PETE GOLD PROPERTY
09/05/2008TECHNICAL REPORT RECOMMENDS RE-START OF BRIGGS MINE IN CALIF...
23/04/2008(Mcdonald)RECEIVES COURT OPINION ON ITS MCDONALD TAKINGS CLAIM
16/04/2008(Briggs)Drilling Extends Gold Mineralization At Briggs Mine
03/04/2008ATNA TECHNICAL REPORT RECOMMENDS DEVELOPMENT OF REWARD GOLD ...
11/03/2008(Jarbridge)Terminates Option Agreement at Jarbidge, Nevada
08/01/2008(Pinson)Reports Progress at Pinson Gold Mine, Nevada
21/12/2007(Jarbridge) Completes First Phase of Drilling at Jarbidge, Nevada
16/11/2007(Clover) Meridian Gold Commences Drilling Atna's Clover Project
18/09/2007(Pinson)Reports Work Underway at Pinson Project
11/07/2007(Pinson)Increases Resource at Pinson
03/07/2007(Pinson)Reports Pinson Mining Company to Begin Work at Pinson Gold P...
14/06/2007(Jarbridge)Commences Drilling at Jarbidge, Nevada
Communiqués de Presse de Atna Resources Ltd
06/05/2013(Pinson)Increases Productivity at its Pinson Mine
25/04/2013Replaces Duplicated Table in its 2012 Annual MD&A
11/10/2012Drills 305 Feet Grading 0.074 oz/ton Gold at Columbia Gold P...
09/05/2011Announces Results of AGM
30/09/2010Identifies Potential to Increase Reserves at Reward Project
06/08/2010Announces Resignation of Director
05/07/2010Announces Gold Participating Bond Offering
18/05/2010To Our Shareholders...
15/04/2010Presents at European Gold Forum!
28/01/2010Provides Update on Exploration and Venture Projects
09/12/2009Announces Closing of Gold Participating Bond Offering
23/11/2009Announces Gold Participating Bond Offering
07/10/2009John Theobald Joins Atna's Board of Directors
07/08/2009Announces Changes to Board of Directors
02/06/2009Enters Into New Agreement in the Sand Creek Uranium Joint Ve...
07/04/2009Extends Gold Mineralization at Cecil R Project
19/12/2008Announces Management Changes and Option Grants
08/10/2008Commences Drilling at Briggs Gold Mine
07/10/2008Denied Grant of Certiorari in the McDonald Takings Case
09/09/2008Accelerates Briggs Gold Mine Re-Start
04/09/2008Agrees to Sell Royalty Portfolio for US$20 Million
05/08/2008Reports 2nd Quarter Progress at Pinson Gold Project, Nevada
15/05/2008Reports AGM Results
14/05/2008Delays Filing Interim Financial Statements Due To Recent Mer...
06/05/2008Reminds Shareholders of its Annual General Meeting and Web C...
19/03/2008 and Canyon Announce Closing of Merger
13/03/2008Canyon Stockholders Approve Agreement and Plan of Merger wit...
07/03/2008Announces Postponement of Canyon Shareholders Meeting Relati...
03/03/2008Underground Drifting Commences at Pinson Mine, Nevada
28/02/2008President and CEO Interview
23/01/2008Advances Towards Merging With Canyon Resources
19/11/2007Correction - Atna and Canyon Agree to Merge
19/11/2007 Agree to Merge
06/06/2007Completes Drilling at Beowawe Project, Nevada
28/04/2007Reports AGM Results
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ATN.TO)Other OTC (ATNAF.PK)
0,175-7.89%0,180-5.26%
TORONTO
CA$ 0,175
19/06 15:45 -0,020
-7,89%
Cours préc. Ouverture
0,190 0,190
Bas haut
0,170 0,190
Année b/h Var. YTD
0,175 -  1,28 -85,04%
52 sem. b/h var. 52 sem.
0,175 -  1,35 -83,33%
Volume var. 1 mois
681 237 -59,30%
24hGold TrendPower© : -44
Produit Gold
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Copper - Gold - Lead - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-86,33%
201247,13%1,540,76
201142,62%1,020,52
2010-8,96%0,770,43
200921,82%0,990,48
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois