Reports Results of Preliminary Economic Assessment for Kutcho Copper Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | K Street | Precious Metals | Zinc |

SUITE 860 - 625 HOWE STREET Y VANCOUVER, BC  Y V6C 2T6  CANADA Y TEL: (604) 687-7545  FAX: (604) 689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

 

June 12, 2008                                                                                                                       #08-23

 

Sherwood Reports Results of Preliminary Economic Assessment for Kutcho Copper Project

Study establishes positive base case and sets outs opportunities for significant enhancements

 

VANCOUVER, BRITISH COLUMBIA - Sherwood Copper Corporation (SWC: TSX-V) today announced results of an independent preliminary economic assessment ("PEA") for its high grade Kutcho copper project in NW British Columbia.  This study significantly simplifies the development approach to the project, but only evaluates the development of part of one of the three identified mineral deposits at Kutcho.  However, the PEA lays out several opportunities for enhanced project economics, a number of which Sherwood is already evaluating as part of its on-going work program.

 

"The completion of the preliminary economic assessment for the high grade Kutcho copper project is just the first step in Sherwood's on-going reassessment of the project's potential," said Stephen Quin, President & CEO.  "This study evaluates the potential for the development of a smaller, less capital intensive open pit mining operation on a portion of the Main deposit that can be developed relatively quickly.  We are now pursuing two parallel tracks to enhance this base case option by evaluating: (a) a number of opportunities identified within the study that could significantly enhance the economics of the project as defined, and (b) the potential of increasing the production and mine life by incorporating some of the more than 50% of the project mineral resources not considered in this study," he said.  "The most significant upside opportunities currently being evaluated are increasing the tonnes and grade of material to be processed and improving metallurgical recoveries beyond those assumed in the study.  To this end, we have a major drill program underway at Kutcho to not only better define the highest grade, closest to surface portion of the Main deposit, but to provide sample material for extensive metallurgical testing designed to evaluate opportunities for enhanced metal recoveries."

 

Using the PEA as a platform, Sherwood intends to re-engage the regulatory agencies and advance the Kutcho copper project through the permitting process.  With extensive baseline data, Sherwood has commenced drafting an Environmental Assessment for submission in the third quarter of 2008.  In parallel with the regulatory process, Sherwood aims to continue to actively engage the Tahltan and Kaska First Nations in a consultation process in order to gain their support for the advancement of this project.

 

"Given the decline of active mining in NW British Columbia and the uncertainty surrounding the potential development of a number of other projects in the region, the high grade Kutcho copper project stands out as a mine that could be advanced to production relatively quickly, assuming appropriate support and approvals for the project," said Mr. Quin.  "Our approach to the development of the project should significantly reduce the environmental footprint of the project versus previous proposals and should simplify the long-term abandonment and restoration of the site post-closure," he said.  "In addition, the smaller scale of the proposed development may result in an extended mine life, once the remainder of the mineral resources not considered in this study are evaluated and, if warranted, incorporated into an expanded project."

 

Sherwood intends to issue an updated PEA in the fall of 2008 that would incorporate the results of the 2008 infill drilling, results from initial metallurgical testing currently in process and incorporation of other mineral resources not considered in the PEA.  "Our approach to Kutcho will be similar to that used with our Minto Mine, where we relentlessly pursue every opportunity for increasing the value of the asset we own," said Mr. Quin.  "We aim to evaluate each opportunity and drive it to ground in parallel with our feasibility and permitting process, so that there are regular, incremental increases in the value of the asset."

 

Highlights

The PEA lays out the basis for the development of an open pit mining operation based on mining of the Main deposit only.  Highlights of the PEA, as compared to previously announced plans by prior owners, include the following (note that "M" at the end of a number means "millions" and "K" means "thousands"):

v      Open pit mining of approximately 63% of the Main deposit only, comprising 10.5M tonnes of indicated mineral resource at an average grade of 1.73% copper, 2.35% zinc, 0.27g/t gold and 26.3g/t silver, containing over 400M lbs of copper and 540M lbs of zinc, 90,000oz of gold and 8.9M oz of silver plus some minor amounts of inferred mineral resource; deeper portions of the Main deposit and all of the Sumac and Esso deposits which, combined, total more than 50% of the total resources at Kutcho remain to be evaluated in subsequent studies;

v      Open pit redesigned to optimize grade and strip ratios over the mine life, with an overall strip ratio of 5.1:1 waste:material processed versus 6.7:1 in prior studies;

v      Processing 4,000 tonnes per day ("tpd") vs. prior plans for 6,000tpd, with recoveries of 84% for copper, 74% for zinc and 50% and 52% for gold and silver, respectively;

v      Average annual payable production of 45M lbs of copper, 48M lbs of zinc, 5,600oz of gold and 584,000oz of silver over a 7.3 year mine life;

v      Life of mine payable production of 331M lbs of copper, 348M lbs of zinc, 41,000oz of gold and 4.2M oz of silver over an a 7.3 year mine life, with potential for additional life from underground mining of the remaining 6M tonnes in the Main deposit, as well the Esso and, possibly, portions of the Sumac deposits in later years;

v      Production of separate copper and zinc concentrates, averaging 30.3% copper and 55% zinc, respectively, with payable the precious metals reporting to the copper concentrates;

v      Average unit operating costs of $52.49 per tonne yielding cash costs of $1.70 to $1.72 per pound of copper before by-product credits and $0.82 to $0.93 per pound of copper after by-product credits;

v      Pre-production capital of $183.3M, versus $299M in the pre-feasibility study prepared by prior owners;

v      Pre-tax NPV of $300M to $52M and pre-tax IRR's of 54% to 19% based on metal prices ranging from the recent forward curve (gold and silver prices kept flat) to a 30% discount to the forward curve, giving payback in 1.5 to 3.0 years;

v      Approximately 50% reduction in the aerial extent of disturbance;

v      Switch to compacted and encapsulated dry-stack tailings and buffered waste dumps for any potentially acid generating waste rock.  The dry-stack approach to tailings disposal would eliminate the need for a conventional tailings dam across Andrea Creek and would significantly reduce the environmental impact of the project.

 

The PEA represents an interim update on the Kutcho Project with mineral resource estimates as of the end of 2007 and costs as of May 2008 and only addresses mining of a portion of the Main deposit.  However, the PEA identifies a number of significant value enhancement opportunities that suggest that additional value could be extracted from the Kutcho Project. Sherwood will continue to pursue the crystallization of these enhancements, including possible extraction of some or all of the remaining mineral resources in the Main deposit, Esso deposit and Sumac deposit, possibly by underground methods.  These and other opportunities will be addressed in subsequent studies.

 

Basis of Preliminary Economic Assessment

In May 2008, Sherwood completed the acquisition of Western Keltic Mines Ltd. and its Kutcho Project, so that the Kutcho Project is 100% owned by Kutcho Copper Corp. ("KCC"), a wholly owned subsidiary of Sherwood.  On the basis of the then impending acquisition, Sherwood commissioned the independent PEA completed under the supervision of SRK Consulting (Canada) Inc. ("SRK").  While compiled by SRK, the PEA relies extensively on the contributions of the following companies; JDS Energy and Mining Inc., Rescan Environmental Services Ltd., Techpro, Sacr?-Davey Engineering and Kirkham Geosystems Ltd.

 

The PEA only evaluated open pit mining of a portion of one of the three known deposits comprising the Kutcho Project, known as the "Main" deposit.  The Main deposit is a tabular body of high grade copper-zinc mineralization that outcrops on surface.  West of the Main deposit lies the poorly drilled Sumac deposit and, beyond that, the Esso deposit, the highest grade of the three know deposits. 

 

It is envisioned that, based on the results of this study, KCC will seek permits and support to develop the Kutcho Project as set out in the PEA while, in parallel, advancing the project through completion of a feasibility study and evaluating options to increase the total quantity of material to be mined and processed by considering the potential for mining the remaining portions of the Main deposits, as well as the Esso and Sumac deposits.

 

Mineral Resources

The mineral resource estimate for the Main deposit at Kutcho was completed by Garth Kirkham, P.Geo., of Kirkham Geosystems Ltd., using industry standard methods that conform with National Instrument 43-101 and utilizing MineSightT Software. The resource estimate for the Main deposit was based upon historical data from 221 Main deposit drill holes supplied by KCC.

Kutcho PEA - Mineral Resource Estimate (@ 0.75 %CuEq cut-off) - Main Deposit Only

Class

Tonnes

In situ Grade

Contained Metal

% Cu

%

Zn

g/t Ag

g/t   Au

Cu

(Mlb)

Zn (Mlb)

Ag (Moz)

Au

(000's oz)

Indicated

17,285,000

1.56

2.12

26.1

0.29

594.5

807.9

14.5

161.2

Inferred

367,000

1.62

1.77

23.6

0.13

13.1

14.3

0.3

1.5

 

Mine Plan

The Main deposit is proposed to be developed as an open pit that would produce a total of 10.7 million tonnes (Mt) of mill feed and 54.3 Mt of waste over an initial 7.3-year mine operating life. Additional mineral resources remain within the Main deposit, as well as those in the Sumac and Esso deposits, that could potentially support an extended life. The life-of-mine ("LOM") plan for the Main deposit open pit focuses on achieving the required mill feed production rate, while balancing grade and strip ratios.  Due to the susceptibility of the Kutcho mineralization to oxidation, minimal stockpile and blending capacity is assumed in the PEA.

 

Mine design for the Main deposit open pit was initiated with the development of a Net Smelter Return ("NSR") model. The model included estimates of metal prices, exchange rate, mining dilution, mill recovery, concentrate grade smelting and refining payables and costs, freight and marketing costs and royalties. The NSR model was based on a 5m x 5m x 5m block size. The model was then used with the Gemcom Whittle - Strategic Mine PlanningT ("Whittle") software to determine the optimal mining shell. Mine planning and scheduling was then conducted on the optimal pit shell with the use of MineSightT software and mineral resources were estimated (see table below). A $31/t NSR cut-off was used within the planned pit.

 

Kutcho PEA - Open Pit Life-of-Mine Mineral Resource (@ $31/t NSR cut-off) - Main Deposit Only

Class

Tonnes

In situ Grade

Contained Metal

%

Cu

%

Zn

g/t

Au)

g/t

Ag

Cu (Mlb)

Zn

(Mlb )

Au

(oz)

Ag

(oz)

Indicated

10,513,000

1.73

2.35

0.27

26.3

400.7

543.7

90,400

8,900,000

Inferred

163,000

1.67

1.93

0.11

22.16

6.0

6.9

600

116,100

 

The mining sequence was divided into eight phases designed to maximize grade, reduce pre-stripping requirements, while providing the required mill feed production per period. The Main pit is most economical when phases are mined concurrently. The LOM mine production schedule is summarized in the table below.

Kutcho PEA -Life of Mine Production Schedule - Main Deposit Only

Parameter

Units

Pre-prod

Production Year

1

2

3

4

5

6

7

8

Total

Mineralized rock mined*

Mt

-

1.46

1.46

1.46

1.46

1.46

1.46

1.46

0.5

10.7

Waste mined

Mt

0.6

5.0

8.6

8.5

12.4

10

6.0

2.8

0.3

54.3

Strip ratio

Wt:Ot

-

3.4

5.9

5.8

8.5

6.8

4.1

1.9

0.8

5.1

Cu grade

% Cu

-

1.83

1.74

1.93

1.72

1.65

1.53

1.75

1.65

1.73

Zn grade

% Zn

-

2.83

2.38

2.65

2.22

2.07

1.96

2.39

2.06

2.34

Au grade

Au g/t

-

0.29

0.34

0.32

0.26

0.21

0.2

0.24

0.26

0.27

Ag grade

Ag g/t

-

26.6

28.7

29.8

26.1

23.8

23.4

24.9

28.6

26.3

*Since this is a PEA and incorporates inferred mineral resources (1..5% of the total), this material cannot be quantified as a reserve under NI43-101

 

Waste Management

Tailings from the mill will be sent to the proposed dry-stack location to the east of the mill facility.  The approach for dry-stacking will be similar to that used by Sherwood at its Minto Mine in the Yukon, with the addition of berms to retain and encapsulate the tailings for permanent abandonment.  Non-potentially acid generating ("non-PAG") waste rock from the Main pit will be deposited in a number of dumps adjacent to the pit, as well as in buffered containments for the dry-stack tailings. A separate waste dump has been designed for the potential acid generating ("PAG") rock that will be extracted from the Main pit. Backfilling into previously mined out areas would offer an improvement in the waste haulage cycle for the trucking of waste out of the main pit and will be considered in future studies.

 

Processing

The mineralogy of the Kutcho deposit is fine grained and requires a relatively fine primary grind followed by a very fine regrind to produce copper and zinc concentrates at reasonable recoveries. The mineralized zone rock has been determined to be soft and obtaining a fine grind is not considered to be an issue. The flotation circuit is expected to be a standard copper-zinc circuit with copper being recovered followed by zinc flotation. Both copper and zinc rougher concentrates will be reground to approximately 10 microns followed by three stages of cleaning. Copper concentrate produced will contain sufficient zinc to likely incur a smelter penalty. The penalty has been assumed to be $4.00/dmt of concentrate. The copper concentrate is expected to be 30.3% copper. The sphalerite is low in iron and the grade of the concentrate will be high at 55% zinc. Recoveries are expected to be 82-84% for copper and 72-74% for zinc. The recovery assumptions used in this report are shown in the table below.

 

Metallurgical test work is ongoing to refine the fineness of primary grind and the reagent scheme. Variability testing will refine the metallurgical response with depth and will refine annual production of metals. The current drill program is an opportunity to refine the characteristics of the mineralization with respect to bornite/chalcopyrite ratios, degree of dissemination and pyrite content and relate these characteristics to metallurgical response.

Kutcho PEA - Assumed Metallurgical Parameters Used in Cash Flow - Main Deposit Only

Metal

Assumed recovery

Assumed Cu concentrate grade

Assumed Zn concentrate grade

Copper

84%

30.30%

 

Zinc

74%

 

55%

Gold

50%

4 g/t

 

Silver

52%

330 g/t

 

 

Operating& Capital Costs

Operating and capital expenses were derived from a number of sources. Many costs were factored from Sherwood's Minto Mine in the Yukon. The Minto Mine is also a small high-grade deposit with many similarities to the Kutcho design and, therefore, served as a valuable reference of a small, northern open pit base metal mine and mill.  Capital and operating expense estimates are summarized in the tables below.

Kutcho PEA - Operating Cost Assumptions & Estimates - Main Deposit Only

Parameter

Unit Cost

Unit

Mining cost

1.64

C$/t rock

Mining cost

9.87

C$/t milled

Site Services & G&A cost

 

 

Labour

4.48

C$/t milled

Equipment

0.68

C$/t milled

Materials

14.02

C$/t milled

Expenses

0.94

C$/t milled

Contingency

2.01

C$/t milled

Total Services and G&A

22.13

C$/t milled

Milling cost

 

 

Labour

4.04

C$/t milled

Equipment

0.62

C$/t milled

Materials

7.48

C$/t milled

Expenses

0.37

C$/t milled

Contingency

1.25

C$/t milled

Total Milling

13.76

C$/t milled

Capital leases (total)

5.0

C$/t milled

Royalties

2%

NSR

 

Kutcho PEA - Capital Cost Estimates - Main Deposit Only

Item

Initial Capital (Millions)

Site Infrastructure

$8.80

Mining

$7.10

Process Plant

$72.50

Services

$2.30

Ancillary Buildings

$5.90

Construction Camp Costs

$6.10

Off site Infrastructure

$18.00

Total Direct Capital Costs

$120.70

Indirect Capital Costs

$38.70

Total Project

$159.40

Contingency @ 15%

$23.90

G R A N D   T O T A L

$183.30

 

In addition to the capital in the table above, there is another $43.1M in capital equipment that will be leased over a seven-year period. Approximately 50% of the leased capital is mobile equipment for the open pit mine.

 

Production

The following sets out the copper, zinc, gold and silver in concentrates and estimated payable metal detailed in the PEA.

Kutcho PEA - Life-of-Mine Metal Production Forecast - Main Deposit Only

 

 

Year

 

 

Item

Unit

1

2

3

4

5

6

7

8

Total

 

Copper in cons

lb ('000)

49,400

47,100

52,300

46,400

44,600

41,500

47,500

14,700

343,000

Zinc in cons

lb ('000)

67,500

56,700

63,400

52,800

49,200

46,700

57,100

16,100

409,000

Gold in cons

oz ('000)

6.8

8.0

7.4

6.0

4.9

4.7

5.7

2.0

45.5

Silver in cons

oz ('000)

653

705

734

643

585

574

613

232

4,739

Conc. grade

% Cu

30.3

30.3

30.3

30.3

30.3

30.3

30.3

30.3

30.3

Payable copper*

lb ('000)

47,700

45,400

50,500

44,800

43,100

40,000

45,800

14,100

331,000

Payable zinc*

lb ('000)

57,400

48,200

53,900

44,900

41,800

39,700

48,500

13,700

348,000

Payable gold

oz Au ('000)

6.1

7.2

6.7

5.4

4.4

4.2

5.1

1.8

41

Payable silver

oz Ag ('000)

588

634

661

578

527

517

552

208

4,265

*Copper, gold and silver are payable only within the Cu concentrate.  Zn is payable only within the Zn concentrate.

 

As noted above, additional smoothing of production is planned post-PEA as part of an on-going process of open pit optimization, as well as evaluating options for extending the mine life by incorporating additional mineral resources defined on the Kutcho Project but not considered in the PEA, including the balance of the Main deposit and those in the Esso and Sumac deposits.

 

Economic Analysis

The economic assessment in the PEA is preliminary in nature and uses inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that this PEA will be realized. The inferred mineral resource used in the mine plan is 1.5% of the total LOM resource.

 

Three cash flow cases were studied. All cash flow cases used the same mineral resource estimate and production factors as shown in the table below.

Kutcho PEA - Summary of Production Cases - Main Deposit Only

Item

Unit

All Cases Totals/Averages

Waste mined

M tonnes

54.4

Mineralized rock mined

M tonnes

10.7

Strip ratio

Waste rock:Plant feed

5.1

Mill Feed

M tonnes

10.7

Copper millhead grade (average)

% Cu

1.73%

Zinc millhead grade (average)

% Zn

2.34%

Gold millhead grade (average)

g/t Au

0.26

Silver millhead grade (average)

g/t Ag

26.5

Copper in Cu cons

M lb

343

Zinc in Zn cons

M lb

409

Gold in Cu cons

K oz

46

Silver in Cu cons

K oz

4,739

Cu Concentrate Grade

% Cu

30.3%

Zn Concentrate Grade

% Zn

55%

 

The cash flow cases were differentiated by average metal prices and the results for each case are shown in the table below.  Case 3 pricing was based on the forward curve for copper as of April, 2008, and spot prices for gold and silver with no escalation or de-escalation going forward. Case 2 represents an approximately 15% discount to Case 3 copper gold and silver prices, and Case 1 a 30% discount of copper, gold and silver prices compared to Case 3. Zinc prices were set at current spot prices for Case 3 with a US$0.01/lb and US$0.02/lb reduction for Cases 2 and 1 respectively. All cases used a gradual zinc price decrease to US$0.92/lb by the 4th year of production. Exchange rates are based on historic correlations of C$ exchange rates and copper prices for Case 3, but were not changed for case 2 and 1, whereas historic relationships suggest that the C$ would be weaker than indicated at these metal prices.

Kutcho PEA - Summary of Results by Case - Main Deposit Only

Item

Unit

Case 1

Case 2

Case 3

Average Copper Price

US$/lb

$2.24

$2.73

$3.20

Average Zinc Price

US$/lb

$0.94

$0.95

$0.96

Average Gold price

US$/oz

$600

$725

$850

Average Silver price

US$/oz

$10.00

$13.00

$16.00

Exchange rate

C$:US$

$1.11

$1.11

$1.11

NSR

C$/t milled

$88

$106

$125

Unit Mining costs (ex equip. lease)

$/t mined

$1.64

$1.64

$1.64

Unit Mining costs (ex equip. lease)

$/t milled

$9.87

$9.87

$9.87

Unit Milling costs

$/t milled

$13.76

$13.76

$13.76

Unit G&A and Site services (ex equip. lease)

$/t milled

$22.13

$22.13

$22.13

Unit Lease costs

$/t milled

$5.00

$5.00

$5.00

Unit Total OPEX (inc royalties)

$/t milled

$52.49

$52.86

$53.24

Unit OPEX

C$/lb Cu

$1.70

$1.71

$1.72

Unit OPEX (with Zn, Au, Ag credits)

C$/lb Cu

$0.93

$0.87

$0.82

Pre-Production Capital (excluding sustaining capital, capital leases and closure)

$ M

$183.30

$183.30

$183.30

NPV @ 10% discount rate pre-tax

$ M

$52

$176

$300

NPV @ 10% discount rate after tax

$ M

$31

$116

$199

IRR pre-tax

%

19%

38%

54%

IRR after tax

%

16%

33%

46%

Payback period (tax in)

Years

3

2

1.5

 

Sensitivity Analysis

Sensitivity analysis was done using metal prices, mill head grade, capital costs and operating costs as variables. As with many projects, the Net Present Value ("NPV") was most sensitive, in order of magnitude, to metal price, grade and recovery, operating expenses ("OPEX") and capital expenses ("CAPEX").  Each variable was changed independently while all other variables were held at the constant base case level.

 

In Case 1, a 20% increase in metal prices leads to an increase in the post-tax NPV using a 10% discount rate ("NPV10%") from $31M to $148M. The mill head grade and recovery also have a similar large impact with a $79M NPV10% gain for a 20% increase in grade or recovery. Conversely, decreases in metal prices, mill head grades or recoveries have a correspondingly large negative effect on the NPV10%. The Case 1 results show the project is uneconomic if metal prices or mill head grade/recovery drop by more than 5-7%.  Cases 2 assumes higher metal prices than Case 1 and is therefore more immune to negative metal price changes. Case 2 shows the same large variances in NPV10% as Case 1 but an 18% drop in metal prices is required before it will lead to a negative NPV10%. Case 3 assumes metal prices approximately in line with the forward curve for copper and zinc, but with no escalation of precious metal prices, and is the most robust scenario.

 

Environmental

The Kutcho Project is subject to the British Columbia Environmental Assessment Act and the Canadian Environmental Assessment Act. The former requires that the project undergo an environmental assessment and obtain an Environmental Assessment ("EA") Certificate. The Project was initiated into the BC EA process through the issuance of a Section 10 order by the BC Environmental Assessment Office ("EAO") on July 29, 2005.. The provincial and federal processes will be integrated in a harmonized review, with the EAO taking the lead. On December 24, 2007, the Canadian Environmental Assessment Agency announced that the Kutcho Project would be subject to a Comprehensive Study.

 

In 2005, a program of environmental and socio-economic baseline studies was begun to provide the information necessary to prepare the EA Application and to develop management and monitoring plans. It covered all facets of the biophysical and human environment, including meteorology, air quality, hydrology, hydrogeology, metal leaching and acid rock drainage, aquatic ecology, fish and fish habitat, soils, vegetation, ecosystem mapping, wildlife, wetlands, archaeology, socio-economics, land use, country foods and human health, and traditional use and traditional ecological knowledge. The program was completed in 2007. Monitoring of meteorology, air quality, hydrology and water quality will continue throughout the construction, operation, closure and post-closure phases. The most significant environmental issue for the Project will be maintaining water quality in the

receiving environment. Treatment of mine effluent to BC water quality criteria will be required during all mine phases.

 

The Kutcho Project is in the traditional territories of the Tahltan and Kaska Dena First Nations. Consultation with these First Nations and other stakeholders has been ongoing since activity at the Kutcho Project re-started approximately four years ago.

 

Project Risks

The major risk areas identified in the PEA are:

1.      Environmental and permitting requirements could delay or preclude the development of the Kutcho Project;

2.      Adverse changes in exchange rates, metal prices and external financial influences could negatively impact the development of the project;

3.      Process recoveries could be less than assumed in the PEA, negatively affecting project returns;

4.      Potential for increases in capital costs over those estimated in the PEA;

5.      Poor grade control could result in over-dilution of the high grade mineralization, negatively affecting recoveries.

 

Project Opportunities

The most important opportunities to improve the project are:

1.      Increased grade of the in situ mineral resource as a result of in-fill drilling currently in process (In-fill drilling in 2006 on a limited portion of the Main deposit suggested potential to increase overall mineral resource grades versus that previously modelled - with a comprehensive in-fill drill program underway, Sherwood will be better able to evaluate this opportunity by the fall of 2008);

2.      Optimization of mine plan following in-fill drilling to maximize grade and reducing stripping in the early years of the mine plan (an increase of 1M tonnes of mill feed at the average grade used in the PEA would increase the pre-tax NPV10% $12M;

3.      Increased life of mine production as a result of mining additional mineral resources from the Main pit (only 63% of the Main deposit mineral resource is extracted in the proposed open pit, leaving 6.3Mt that could be exploitable, depending on metal prices and costs, and extending the mine life);

4.      Exploitation of mineral resources from the other deposits already known (Esso and Sumac) which, together with the unmined portion of the Main deposit, comprise more than 50% of the total project resources;

5.      Reduced stripping by steepening pit walls, if supported by planned geotechnical drilling (a 0.1 reduction in the strip ratio increases the pre-tax NPV10% by $1M);

6.      Improved metallurgical recoveries in the process plant as a result of metallurgical test work currently in process (a 1% increase in recoveries increases the pre-tax NPV by $7M and IRR by 1%) and improved concentrate grades (a 1% increase in concentrate grade increases pre-tax NPV10% by $4M);

7.      Reduced energy usage as equipment is specified and sized;

8.      Reduced capital costs through expanded utilization of used and refurbished equipment;

9.      Reduced overall transportation costs of concentrate from mine to smelter (a 10% reduction increases pre-tax NPV10% by $3M); and

10.  Potential for lower than assumed TC/RC's, especially copper, where current rates are well below those assumed in the PEA (a10% reduction in TC/RC's increases pre-tax NPV10% by $3M).

 

It should be noted that the upside potential indicated above could also become negative if the factors are worse than expected.  In this regard, the list can be used to identify which parameters might have the largest positive or negative effect on the project and risk mitigation plans could be developed..

 

Moving Forward

As a result of the recommendations in the PEA, Sherwood has an extensive work program underway to investigate the project opportunities identified and to mitigate the project risks.  This work program includes:

1.      In-fill drilling the Main deposit in order to better define the high grade mineralization, optimize the mine planning and enhance the quality of the assay database;

2.      Geotechnical investigations to steepen up the pit walls and reduce the overall stripping;

3.      Evaluating the potential of an expanded open pit or underground extraction of the unplanned portions of the Main deposit immediately adjacent to the current proposed open pit;

4.      Evaluating the potential of the Esso and Sumac resources as potential sources of supplemental feed, possibly by ramp access out of the proposed open pit, extending the mine life;

5.      Extensive metallurgical testing in order to determine the potential for improved metallurgical recoveries and improved concentrate grades;

6.      Possible recovery of free gold in a gravity circuit;

7.      Conducting more ABA testing to better define the extent of potentially acid generating rock;

8.      Geotechnical and hydrogeological evaluations to optimize open pit planning;

9.      Re-engage the regulatory agencies to advance the Kutcho copper project through the permitting process.

10.  Re-engage the Tahltan and Kaska First Nations to attain meaningful and equitable IBA agreements.

 

An updated PEA is planned for the fall of 2008, incorporating some or all of the results from items #1, #3, #4 and #5 above, and a feasibility study in the first half of 2009 (depending on timeliness of work programs required to support a feasibility study).

 

Resource Estimation Methodology

Kirkham Geosystems Ltd. prepared the mineral resource estimate for the Kutcho deposit.  Mr. Kirkham has reviewed pertinent geological information in sufficient detail to support the data incorporated in the resource estimate.  Garth Kirkham, P.Geo. of Kirkham Geosystems Ltd. is the Independent Qualified Person under National Instrument 43-101 responsible for the resource estimate. 

 

The estimates for copper, zinc, silver and gold were completed for the PEA Report dated June of 2008 using the MineSightTM 3-dimensional mine planning software system. The estimate was based upon a database comprised of 346 drill holes supplied by Kutcho Copper. The estimation process was constrained by a solid model based on lithological boundaries combined with grade contours. Assays were then composited into 2.5m intervals for statistical and geostatistical analysis to be performed within the constraining domains. A 5m by 5m by 5m orthogonal block model was created and Ordinary Kriging was used as the method to interpolate grades into each block within the solid domain. Bulk density measurements were supplied within the drill hole database and also interpolated into each block using Inverse Distance to the 3rd power as the interpolator. Individual blocks were then classified into indicated and inferred categories based on number of drillholes, number of composites, average distance to composite, distance to nearest composite and relative error. The grades and tonnages reported in the resource estimate represent the material contained within the mineralized portion (as a percentage) of the classified block below topography.

 

Mineral resources that are not mineral reserves do not have demonstrated economic viability.  Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution.  These mineral resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves.  There is also no certainty that these inferred mineral resources will be converted to measured and indicated mineral resource categories through further drilling, or into mineral reserves once economic considerations are applied.

 

Technical Report

A National Instrument 43-101 compliant technical report will be filed within the next week on SEDAR and, once filed, can be accessed under Sherwood's profile at www.sedar.com.

 

Diagrams

Kutcho PEA - Claim area showing schematic of proposed mine site -

http://www.sherwoodcopper.com/i/maps/kutcho/2008-06-12KutchoClaimArea.jpg

 

Kutcho PEA - Proposed project layout -

http://www.sherwoodcopper.com/i/maps/kutcho/2008-06-12KutchoProjectLayout.jpg

 

Kutcho PEA - Computer Generated Image of the Three Known Massive Sulphide Deposits, Drill Holes, and Surface Topography (Wardrop 2007) -

http://www.sherwoodcopper.com/i/maps/kutcho/2008-06-12KutchoMassiveSulphides.jpg

 

Kutcho PEA - Proposed phasing of open pit on Main deposit (looking south) -

http://www.sherwoodcopper.com/i/maps/kutcho/2008-06-12KutchoProposedPhasing.jpg

 

About Sherwood Copper

Sherwood's objective is the profitable production of base and precious metals from high grade, open pit mines in Canada.  Sherwood's first operating mine, the high grade Minto copper-gold mine in Yukon, Canada, was built on budget and ahead of schedule.  The Minto Mine is one of the highest-grade open pit copper-gold mines in the world, and is forecast to be a low cost producer.  Aggressive exploration on the Minto property has yielded significant success, providing Sherwood the opportunity to 'grow from within' by expanding the mineral resource and mineral reserve base, potentially leading to further production increases.  To further accelerate its production growth, Sherwood intends to pursue merger & acquisition opportunities that fit its business model and, in May 2008, Sherwood acquired 100% ownership in Western Keltic Mines Ltd., owner of the high-grade Kutcho copper-zinc-gold-silver deposit in northwestern British Columbia.  Sherwood expects to lever off its successful development of the Minto Mine and rapidly advance the Kutcho Project to a production decision.

 

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & CEO of Sherwood.  The following SRK employees are QPs for this project; Gordon Doerksen, P.E. (WY) - Project Overview; Dino Pilotto, P.Eng. - Mining;.  Garth Kirkham, P.Geo. of Kirkham Geosystems - Mineral Resource Estimates, Jeff Stibbard P.Eng. - Capital, G&A and Operating Costs, Dave Hendriks, P.Eng. - Metallurgy and Mineral Processing, Brad Mercer P.Geo. - Geology.

 

The report relies on the work and opinions of non-QP experts without verification by SRK, including: Roger Nonis and Robert Johnston, P. Eng., of Sacr?-Davey Engineering (mineral processing and project infrastructure), Mike McGurk of Rescan Environmental (environmental and permitting), Carl Hovey of All-North Consultants (access road and site earthworks), Wentworth Taylor of WH Taylor Inc. (taxation).

 

Additional Information

Additional information on Sherwood and its Minto & Kutcho projects can be obtained on Sherwood's website at http://www.sherwoodcopper.com.

 

On behalf of the board of directors

SHERWOOD COPPER CORPORATION

"Stephen P. Quin"

Stephen P. Quin

President & CEO

 

Investor Contacts:

Sherwood Copper:

Stephen P. Quin 604.687-7545 or Brad Kopp 604-687-7545

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

 

Forward-Looking Statements

 

This document may contain "forward-looking statements" within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this document and the Company does not intend, and does not assume any obligation, to update these forward-looking statements.

 

Forward-looking statements relate to future events or future performance and reflect management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed form time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward-looking statements.

 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sherwood Copper Corp.

CODE : SWC.V
CUSIP : 82442N 103
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sherwood Copper est une société développant des projet miniers de cuivre basée au Canada.

Sherwood Copper est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 56,5 millions CA$ (46,4 millions US$, 36,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 8,26 CA$, et son plus bas niveau récent le 21 novembre 2008 à 1,01 CA$.

Sherwood Copper possède 53 853 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Sherwood Copper Corp.
2007 Annual report
Financements de Sherwood Copper Corp.
29/02/2008 Signs Committed Term Sheet for Corporate Credit Facility wi...
15/02/2008 Announces $7.2 million Flow-through Financing
Nominations de Sherwood Copper Corp.
01/04/2008Makes Key Appointments to its Board & Management
16/01/2008 Appoints Kevin Weston as Chief Operating Officer
Rapports Financiers de Sherwood Copper Corp.
27/08/2008Reports Continued Strong Financial Results for the Three Mon...
22/07/2008Reports Increased Copper Production & Reduced Costs in Secon...
30/05/2008Reports Strong Results from Operations in First Quarter 2008
Projets de Sherwood Copper Corp.
26/01/2009(Minto Mine)Capstone Mining Corp. Commences US$ 3 Million Resource Expan...
10/12/2008(Minto Mine)Capstone Mining Corp. Reports Final Drill Intercepts of Nea...
13/11/2008(Kutcho Creek)Increases Continuity of High Grade Copper Trend at its Kutch...
07/11/2008(Minto Mine)Raises US$37.5 million from Minto Precious Metal ProductionT...
04/11/2008(Minto Mine)Reports New Copper-Gold Discovery at Minto Mine and possible...
22/09/2008(Kutcho Creek)Reports Further High Grade Intercepts from its Kutcho Copper...
18/09/2008(Minto Mine)Reports Thick Intervals of Near Surface Copper-Gold Minerali...
02/09/2008(Kutcho Creek)Reports Multiple High Grade Intercepts from its Kutcho Coppe...
28/08/2008(Minto Mine)Reports High Rainfall temporarily restricts access to its Mi...
21/08/2008(Minto Mine)Reports Further High Grade Copper-Gold Results From Areas 2 ...
17/07/2008(Minto Mine)Releases Further High Grade Copper-Gold from Area 2 & Area 1...
14/07/2008(Kutcho Creek)Reports High Grade Intercepts from the Kutcho Drill Program
17/06/2008(Minto Mine)Announces Significant Increase in Copper-Gold Resources at M...
17/04/2008(Minto Mine)Reports Minto Copper-Gold Mine Achieves & Exceeds Design Cap...
10/03/2008(Kutcho Creek) Completes Funding Arrangements for Kutcho Project & Begins ...
25/02/2008(Minto Mine)Reports 2007 Production Results & 2008 Production Estimate f...
13/02/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization in 4 Separa...
14/01/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Area 118...
18/12/2007(Minto Mine) Reports Phase 2 Mill Expansion at Minto Copper-Gold Mine Co...
12/12/2007(Minto Mine) Reports Results of Pre-feasibility Study for Expansion of M...
07/12/2007(Minto Mine)Reports Groundwork has Commenced on Carmacks to Stewart Tran...
03/12/2007(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Ridgetop...
29/10/2007(Minto Mine) Intersects High Grade Copper-Gold Mineralization at Area 11...
25/10/2007(Minto Mine) Ships first Minto Mine Concentrates from Skagway
25/09/2007(Minto Mine)Receives Encouraging Results From 2007 Gradient IP Geophysic...
19/09/2007Discovers High Grade at Airstrip & Expands High Grade at Are...
05/09/2007(Minto Mine)Reports "On budget & Ahead of Schedule" Phase 1 Construction...
25/07/2007(Minto Mine)Delivers First Concentrates from Minto Mine to Port of Skagw...
15/06/2007(Minto Mine)Phase 2 Exploration Program Underway at Minto Copper-Gold Mi...
12/06/2007(Minto Mine)Reports Excellent Metallurgical Test Results from Area 2 at ...
24/05/2007(Minto Mine)Discovers High Grade Copper-Gold Mineralization in Minto 'Ga...
24/04/2007(Minto Mine)Awarded Funding from the Yukon Government to Advance Area 2 ...
12/04/2007(Minto Mine)Expands Scope of Pre-feasibility Study on Minto Copper-Gold ...
11/04/2007Accelerates Phase 2 Mill Expansion at Minto Copper-Gold Mine...
Communiqués de Presse de Sherwood Copper Corp.
23/01/2009Capstone Mining Corp. Reports Debt Repayments, Funding of De...
24/12/2008Capstone Mining Corp. Mails Offer to Purchase to its Debentu...
24/11/2008Reports Cash Flow from Mining Operations of $29.9 million in...
21/11/2008Announces Closing of Precious Metal Transaction
19/09/2008sets Shareholder Meeting Date for Capstone Combination
05/08/2008Reports Higher Copper Production Forecast for 2009 & Updated...
25/07/2008Reports Phase 3 Mill Throughput Increase to 3,200tpd Approve...
30/06/2008Finalizes Exploration Agreement with Northern Tiger Resource...
12/06/2008Reports Results of Preliminary Economic Assessment for Kutch...
05/06/2008Holds Successful Annual Meeting & Reports on Strategic Objec...
28/05/2008and Western Keltic Announce Closing of Business Combination
07/04/2008and Western Keltic Mines Inc. Announce Planned Business Comb...
06/03/2008 Increases Holdings to Approximately 93% of Western Keltic S...
03/03/2008Signs Exploration Memorandum of Understanding with Firestone...
22/02/2008Acquires 91.7% of Western Keltic Shares & Extends Offer for ...
12/02/2008Takes up 85.6% of Western Keltic Shares & Extends Offer for ...
30/01/2008Extends Offer for Western Keltic Mines to February 11, 2008
24/12/2007 Mails Offer for Western Keltic Mines
26/11/2007 Announces Agreement for Acquisition of Western Keltic Mines
29/10/2007 Appear on BNN TV
12/10/2007 Holds the Official Opening Ceremony for the Minto Mine, Yuk...
04/10/2007 Reports that Minto Mine Declares Commercial Production
17/07/2007Identifies Two Extensive Copper-Gold Systems at Minto Projec...
16/07/2007Reports Geotech Program Results in Improved Pit Slopes at Mi...
29/05/2007reports Yukon Utilities Board Approves Revised Power Purchas...
15/05/2007reports Yukon Government Support for Revamped Power Purchase...
10/05/2007Nominates Industry Leader for election to its Board of Direc...
02/05/2007Announces Yukon Utilities Board Turns Down Provisions of the...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SWC.V)
1,05-7.89%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
1,14 1,04
Bas haut
1,02 1,12
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,05 -%
Volume var. 1 mois
0 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,84 AU$+1,75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,28 US$-0,39%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,71 GBX+4,41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,18 CA$+1,47%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+7,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,91 CA$-4,02%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,06 US$-1,54%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$-5,26%Trend Power :