Publié le 06 janvier 2010

Reports Results of Summer 2009 Exploration on the Hidden Bay Project: SP-203 Intersects 1.527% U(3)O

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Uranium |

UEX Reports Results of Summer 2009 Exploration on the Hidden Bay Project: SP-203 Intersects 1.527% U(3)O(8) Over 1.5 Metres at Telephone Lake.

UEX Plans $1.6 Million Winter 2010 Exploration Program at Hidden Bay and the Commencement of Scoping Studies on its Horseshoe and Raven Deposits.

Trading Symbol: UEX-TSX

VANCOUVER, Jan. 6 /CNW/ - UEX Corporation ("UEX") is pleased to announce the results of the summer 2009 drilling program and its plans for 2010 exploration and scoping studies on its 100%-owned Hidden Bay Project ("Hidden Bay"). Hidden Bay is located in the productive eastern Athabasca uranium district and contains the Horseshoe, Raven and West Bear Deposits.

"Hidden Bay hosts one of the most significant uranium resources in the Athabasca Basin due primarily to our successful drilling programs in recent years at the Horseshoe and Raven Deposits," said Graham Thody, President and CEO of UEX. "We will now advance these deposits through scoping studies to be conducted during 2010. In addition, we are very encouraged by the drilling results from our 2009 exploration program at Telephone Lake and will continue to explore this promising area, which lies immediately to the south of the McClean Lake Mine."

Results from the Hidden Bay Summer 2009 Drilling Program

The summer 2009 drilling program at Hidden Bay was comprised of 49 drill holes totaling 15,071 metres. Significant mineralization was found in several holes. The program was completed in September 2009 and was carried out in three areas:

    -   Horseshoe and Raven - designed to test targets peripheral to the
        Horseshoe and Raven Deposits for possible extensions of
        mineralization and to assess nearby geophysical and geological
        targets;
    
    -   Telephone Lake - designed to follow up previous drilling results and
        to further explore the Telephone Lake trend. This trend is a major
        fault zone which contains previous mineralized drill intercepts and
        extends northward into the Sue Deposits on the adjacent McClean Lake
        Mine property, operated by AREVA Resources Canada Inc. ("AREVA"); and
    
    -   Vixen Lake South - designed to test a geophysical anomaly coincident
        with intense clay alteration in historical drill holes.

Maps of the 2009 drilling at Hidden Bay are available for viewing in the "News Releases" section of UEX's website at www.uex-corporation.com.

Drilling in the Area of the Horseshoe and Raven Deposits

During the winter of 2009, UEX successfully expanded the Horseshoe and Raven Deposits through a stepout drilling program. In July 2009, UEX reported National Instrument 43-101 compliant resource estimates for the Horseshoe and Raven Deposits as follows:

    -   At a cut-off grade of 0.05% U(3)O(8) total resources are:
    
    -------------------------------------------------------------------------
    Category                Tonnes           U(3)O(8)(%)        U(3)O(8)(lbs)
    -------------------------------------------------------------------------
    Indicated             10,293,600           0.155              35,044,000
    Inferred               1,109,200           0.111               2,715,000
    -------------------------------------------------------------------------
    
    -   At a lower cut-off grade of 0.02% U(3)O(8) total resources are:
    
    -------------------------------------------------------------------------
    Category                Tonnes           U(3)O(8)(%)        U(3)O(8)(lbs)
    -------------------------------------------------------------------------
    Indicated             16,688,500           0.108              39,971,000
    Inferred               1,982,500           0.079               3,470,000
    -------------------------------------------------------------------------

During the summer of 2009, 23 drill holes totaling 7,103 metres were completed in the Horseshoe, Raven and adjacent areas. Thirteen of these holes tested possible extensions of some mineralized zones to assess the potential for resource expansion and for down dip continuation of mineralization. Results of principal intercepts in the Horseshoe and Raven area are reported in Table 1. Drilling intercepts with a grade-thickness product of greater than 0.05 and grades of greater than 0.05% U(3)O(8) include the following:

    -   0.076% U(3)O(8) over 4.0 metres, and 0.140% U(3)O(8) over 2.1 metres
        in hole HU-361 (Horseshoe northeast);
    -   0.087% U(3)O(8) over 1.0 metre in hole RU-219 (pod on south side of
        Raven);
    -   0.107% U(3)O(8) over 4.4 metres in hole RU-225 (Raven west); and
    -   0.120% U(3)O(8) over 4.6 metres in hole RU-226 (Raven west).

These intercepts slightly expand the strike length of the mineralized zones and would result in a small increase in estimated resources. Other drill holes bounded mineralization down dip.

The remaining drill holes tested geophysical, structural and known alteration targets within one kilometre of the Horseshoe and Raven Deposits. While none of these holes intersected any significant mineralization, areas of intense alteration which could potentially host mineralization were intersected, identifying future targets. Notably, in one deep hole (HU-363) which tested the Dragon Lake Fault on the east side of the Horseshoe Deposit, extensive and intense alteration extends downward for at least 600 metres into basement rocks, forming a potential feeder zone for mineralization. Given the intensity of alteration along this corridor, future drilling will target areas to the south where the Dragon Lake Fault intersects graphitic gneiss.

Telephone Lake

During the summer of 2009, 7,968 metres of drilling in 26 drill holes distributed over a four-kilometre strike length were completed in the Telephone Lake area ("Telephone"). Telephone is located immediately south of the Sue and McClean Lake Deposits and has the potential for the discovery of Sue C, D and E or Eagle Point style basement-hosted mineralization along the Telephone Lake Fault, or where fault systems intersect the sub-Athabasca unconformity.

Drilling in 2009 targeted areas of known mineralization near the unconformity that included previous intercepts of 0.20% U(3)O(8) over 6.8 metres in 2006 drill hole SP-166 and 4.52% U(3)O(8) over 0.5 metres in 2005 drill hole SP-156.

Results of principal intercepts obtained during 2009 at Telephone are reported in Table 1. Drilling intercepts with a grade-thickness product of greater than 0.05 and grades of greater than 0.05% U(3)O(8) include the following:

    -   0.110% U(3)O(8) over 0.5 metres in hole SP-191;
    -   0.100% U(3)O(8) over 2.0 metres, and 0.401% U(3)O(8) over 1.9 metres
        in hole SP-193;
    -   0.277% U(3)O(8) over 0.3 metres in hole SP-194;
    -   0.066% U(3)O(8) over 1.1 metres, and 0.055% U(3)O(8) over 1.0 metres
        in hole SP-196;
    -   0.105% U(3)O(8) over 1.1 metres, and 0.074% U(3)O(8) over 2.8 metres
        in hole SP-201;
    -   1.527% U(3)O(8) over 1.5 metres in hole SP-203;
    -   0.076% U(3)O(8) over 1.6 metres in hole SP-207;
    -   0.062% U(3)O(8) over 1.0 metres in hole SP-209;
    -   0.120% U(3)O(8) over 0.7 metres in hole SP-210;
    -   0.370% U(3)O(8) over 6.5 metres, including 1.131% U(3)O(8) over
        2.0 metres, in hole SP-211;
    -   0.360% U(3)O(8) over 1.0 metres in hole SP-212; and
    -   0.140% U(3)O(8) over 0.4 metres, and 0.125% U(3)O(8) over 2.7 metres
        in hole SP-213.

True thickness of mineralization has not yet been determined. Intercepts in drill holes SP-201, 203, 210, 211 and 212 are unconformity-hosted mineralization, while all other intercepts are basement-hosted.

The Telephone drilling has highlighted three anomalously mineralized areas that contain a combination of unconformity-hosted and basement-hosted mineralization. Additional mineralized drilling intercepts are also present periodically along the four-kilometre length of the Telephone Lake trend and extend southward into the Shamus Lake area.

As mineralization is open in many areas, UEX will focus its 2010 winter exploration program to follow up on these results. It is anticipated that this drilling program will commence in mid-January 2010.

Vixen Lake South

In the Vixen Lake South area, which lies 1.5 kilometres northwest of the Raven Deposit, drilling tested the core of a well-defined, east-northeast trending gravity-resistivity low where historical drilling in shallow holes had identified broad areas of clay alteration. Alteration style, geophysical signature and the east-northeast trend of the alteration zones are similar to the signature of alteration associated with the Horseshoe and Raven Deposits. Four drill holes (VU-001 to VU-004, 1,697 metres total) were drilled; no significant mineralization was intersected.

Future Scoping Studies for Horseshoe and Raven

With a high proportion of the Horseshoe and Raven resource base in the Indicated category, UEX will be initiating a scoping level evaluation of the potential economic viability of mining the deposits, which could then be advanced to feasibility level if results are encouraging. These studies will examine the most efficient methods and procedures for extracting the defined uranium resource, including the most appropriate road access and support infrastructure, mining methods, operating plans, cash flow analyses and projections in order to determine net present values and internal rates of return for the deposits at various uranium price levels. In support of such work, environmental baseline studies have been underway since 2006, previously reported metallurgical studies have been completed and initial geotechnical studies have been performed. UEX intends to identify a lead contractor for the scoping and potential feasibility level work in the near future.

2010 Winter Program at Hidden Bay

A budget of $1.6 million has been approved for UEX's upcoming 2010 winter program on the Hidden Bay property. This winter exploration program will be comprised of the following:

    -   Telephone Lake - a 20-hole, 6,000-metre diamond drilling program to
        test potential down dip continuation of known mineralization, to test
        along strike for extensions of unconformity mineralization, and to
        test gaps where widely spaced sections have favourable geology for
        basement-hosted mineralization; and
    
    -   Shamus grid - a 120 line-kilometre geophysical survey consisting of
        D.C. resistivity and gravity. This geophysical survey will extend
        from the southwestern parts of the Telephone Lake area southwesterly
        to the Hidden Bay property boundary and will test for areas of
        alteration potentially associated with uranium mineralization. Areas
        of anomalous alteration and low-grade mineralization have previously
        been intersected in several drill holes on the Shamus grid and
        mineralization occurs to the southwest on adjacent properties along
        the same trend.

In addition to these activities, property-wide compilation and evaluation will continue utilizing previous exploration data.

Maps and other information regarding UEX's exploration projects are available for viewing on UEX's website at www.uex-corporation.com under "Projects".

Sample Handling and Quality Assurance

Geochemical samples are selected with the aid of a hand-held scintillometer to identify areas of above-background radioactivity. Samples are split, with half remaining in the core box, and the remainder shipped to Saskatchewan Research Council Geoanalytical Laboratories ("SRC") where they are crushed and ground to minus 106 microns. The pulp is digested in aqua regia leach and analyzed by ICP for uranium and other elements. In addition to the geochemical analyses, down-hole probe radiometric results obtained for all drill holes on completion of drilling provide an independent check of the geochemical data. UEX systematically inserts sample blanks and standards of several grades into the sample stream. In addition, repeat analyses are routinely analyzed, laboratory standards are inserted by SRC, and selected sample pulps have been submitted to other independent laboratories for check analyses to assess sample repeatability and accuracy of the SRC results.

Technical information in this news release has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX's Vice President of Exploration, and David Rhys, P.Geo., a consultant to UEX, who are Qualified Persons as defined by National Instrument 43-101.

About UEX

UEX is a Canadian uranium exploration and development company actively involved in 19 uranium projects, including seven that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, ten joint-ventured with AREVA and one under option from JCU (Canada) Exploration Company, Limited, which are operated by AREVA. The 19 projects, totaling 353,134 hectares (872,613 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which accounts for approximately 21% of the global primary uranium production. UEX is currently developing several uranium deposits in the Athabasca Basin which include the Kianna, Anne and Colette Deposits at its 49%-owned Shea Creek Uranium Project, a joint venture with AREVA in the western Athabasca Basin, and the Horseshoe, Raven and West Bear Deposits located at its 100%-owned Hidden Bay Project in the eastern Athabasca Basin.

           ON BEHALF OF THE BOARD OF DIRECTORS OF UEX CORPORATION
    
                               Graham C. Thody
                              President and CEO

Forward-Looking Statements

This news release contains "forward-looking statements" that are based on UEX's current expectations, estimates, forecasts and projections. These forward-looking statements include statements regarding UEX's outlook for our future operations, plans and timing for the commencement or advancement of exploration activities on our properties, and other expectations, intention and plans that are not historical fact. The words "estimates", "projects", "expects", "intends", "believes", "plans", or their negatives or other comparable words and phrases are intended to identify forward-looking statements. Such forward-looking statements are based on certain factors and assumptions and are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking statements. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, continuity and grade of deposits, fluctuations in uranium prices and currency exchange rates, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the securities commission on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking statements made in this news release are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking statements. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

                                   Table 1
    
                   Summer 2009 Hidden Bay Drilling Program
    
     Intersections from Drill Holes HU-359 to HU-367, RU-217 to RU-226,
                   SP-191 to SP-216 and VU-001 to VU-004.
    
       Only intervals with composite grades greater than 0.02% U(3)O(8)
      and a grade-thickness product greater than 0.02 are listed below.
     All analyses were performed by Saskatchewan Research Council by ICP.
    
    -------------------------------------------------------------------------
                         Depth
    Hole     Location   of Hole      From       To      Length    Avg. Grade
                        (metres)   (metres)  (metres)  (metres)  (% U(3)O(8))
    -------------------------------------------------------------------------
    HU-359  Horseshoe    300.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-360  Horseshoe    300.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-361  Horseshoe    270.0        71.0      72.0       1.0         0.032
                                     120.0     124.0       4.0         0.076
                                     133.0     136.0       3.0         0.107
                          including  133.4     135.5       2.1         0.140
                                     220.5     223.0       2.5         0.034
    -------------------------------------------------------------------------
    HU-362  Horseshoe    291.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-363  Horseshoe    639.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-364  Horseshoe    534.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-365  Horseshoe    399.0       271.0     272.0       1.0         0.023
    -------------------------------------------------------------------------
    HU-366  Horseshoe    324.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    HU-367  Horseshoe    489.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-217  Raven         81.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-218  Raven         72.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-219  Raven         81.0        45.0      48.0       3.0         0.035
                          including   46.0      47.0       1.0         0.087
    -------------------------------------------------------------------------
    RU-220  Raven         72.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-221  Raven         81.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-222  Raven         72.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-223  Raven        411.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-224  Raven        549.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    RU-225  Raven        222.0       179.5     180.5       1.0         0.061
                                     183.4     192.6       9.2         0.062
                          including  187.2     191.6       4.4         0.107
    -------------------------------------------------------------------------
    RU-226  Raven        219.0       112.0     113.0       1.0         0.040
                                     138.4     143.0       4.6         0.120
    -------------------------------------------------------------------------
    SP-191  Telephone    349.0       230.0     230.8       0.8         0.030
                                     295.0     297.0       2.0         0.042
                          including  295.5     296.0       0.5         0.110
                                     325.0     328.0       3.0         0.035
    -------------------------------------------------------------------------
    SP-192  Telephone    411.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    SP-193  Telephone    369.0       226.0     229.0       3.0         0.020
                                     236.0     238.0       2.0         0.100
                                     252.0     253.9       1.9         0.401
    -------------------------------------------------------------------------
    SP-194  Telephone    359.0       223.7     224.5       0.8         0.128
                          including  223.7     224.0       0.3         0.277
                                     270.0     272.5       2.5         0.023
    -------------------------------------------------------------------------
    SP-195  Telephone    321.0       101.3     102.0       0.7         0.025
                                     291.0     292.0       1.0         0.035
    -------------------------------------------------------------------------
    SP-196  Telephone    345.0       258.0     259.0       1.0         0.021
                                     314.3     315.4       1.1         0.066
                                     325.0     326.0       1.0         0.055
                                     334.0     336.0       2.0         0.024
    -------------------------------------------------------------------------
    SP-197  Telephone    398.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    SP-198  Telephone    352.0       310.0     314.0       4.0         0.020
                                     324.0     325.0       1.0         0.022
    -------------------------------------------------------------------------
    SP-199  Telephone    386.0       298.0     298.5       0.5         0.054
                                     361.0     362.0       1.0         0.027
                                     363.0     364.0       1.0         0.021
                                     376.0     378.0       2.0         0.026
    -------------------------------------------------------------------------
    SP-200  Telephone    300.0       272.0     273.0       1.0         0.020
    -------------------------------------------------------------------------
    SP-201  Telephone    300.0       165.0     166.1       1.1         0.105
                                     230.5     234.0       3.5         0.026
                                     239.5     242.3       2.8         0.074
                                     266.0     267.0       1.0         0.031
    -------------------------------------------------------------------------
    SP-202  Telephone    372.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    SP-203  Telephone    270.0       122.0     123.5       1.5         1.527
                                     252.5     253.0       0.5         0.045
    -------------------------------------------------------------------------
    SP-204  Telephone    351.0       266.5     267.5       1.0         0.044
    -------------------------------------------------------------------------
    SP-205  Telephone    343.0       237.0     239.5       2.5         0.030
                                     248.0     250.0       2.0         0.035
    -------------------------------------------------------------------------
    SP-206  Telephone    351.0       178.0     178.5       0.5         0.045
    -------------------------------------------------------------------------
    SP-207  Telephone    351.0       279.4     281.0       1.6         0.076
    -------------------------------------------------------------------------
    SP-208  Telephone    300.0       121.0     122.6       1.6         0.039
                                     137.5     138.0       0.5         0.077
                                     142.5     143.5       1.0         0.021
                                     180.5     181.5       1.0         0.035
    -------------------------------------------------------------------------
    SP-209  Telephone    348.0       139.0     140.0       1.0         0.020
                                     188.6     189.6       1.0         0.062
                                     200.6     202.6       2.0         0.021
    -------------------------------------------------------------------------
    SP-210  Telephone    171.0        99.0     103.0       4.0         0.035
                          including  101.3     102.0       0.7         0.120
    -------------------------------------------------------------------------
    SP-211  Telephone    180.0       135.0     145.0      10.0         0.245
                          including  137.5     144.0       6.5         0.370
                          including  137.5     139.5       2.0         1.131
    -------------------------------------------------------------------------
    SP-212  Telephone    180.0       140.0     141.0       1.0         0.360
    -------------------------------------------------------------------------
    SP-213  Telephone    330.0       250.95    252.0       1.05        0.064
                          including  250.95    251.35      0.4         0.140
                                     259.3     265.0       5.7         0.068
                          including  259.3     262.0       2.7         0.125
                                     295.0     296.0       1.0         0.027
    -------------------------------------------------------------------------
    SP-214  Telephone    180.0       136.0     137.0       1.0         0.024
    -------------------------------------------------------------------------
    SP-215  Telephone    171.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    SP-216  Telephone    180.0       142.0     145.0       3.0         0.028
                          including  144.0     144.5       0.5         0.090
                                     155.6     156.6       1.0         0.022
    -------------------------------------------------------------------------
    VU-001  Vixen        391.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    VU-002  Vixen        366.0     No intervals (greater than) 0.02% U(3)O(8)
                                     with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------
    VU-003  Vixen        549.0       405.0     405.5       0.5         0.043
    VU-004  Vixen        391.0     No intervals (greater than) 0.02% U(3)O(8)
                                    with grade-thickness (greater than) 0.02
    -------------------------------------------------------------------------

%SEDAR: 00017609E For further information: UEX CORPORATION, SUITE 1007 - 808 NELSON STREET, VANCOUVER, B.C., CANADA, V6Z 2H2, PH: (604) 669-2349, FAX (604) 669-1240, Website: www.uex-corporation.com, email: uex@uex-corporation.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

UEX Corp

EXPLORATEUR
CODE : UEX.TO
ISIN : CA9026661061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

UEX est une société d’exploration minière d'or et de cuivre basée au Canada.

UEX détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS et JAMES CREEK PROJECTS au Canada.

UEX est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 158,0 millions CA$ (126,3 millions US$, 110,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 15 août 2003 à 0,05 CA$, et son plus haut niveau récent le 09 novembre 2007 à 9,30 CA$.

UEX possède 319 240 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de UEX Corp
18/05/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
05/06/2013Announces Closing of Private Placement
25/05/2013Announces $3.175 Million Private Placement
23/02/2012Announces $3 Million Private Placement
Nominations de UEX Corp
19/12/2013Announces the Appointment of Roger Lemaitre as President and...
29/04/2011appoints Ed Boney as Chief Financial Officer
27/05/2010Appoints Walter Segsworth and David Rhys to its Management A...
Rapports Financiers de UEX Corp
06/11/2013Third Quarter 2013 Financial Results and MD&A
Projets de UEX Corp
07/01/20142014 Joint Venture Exploration Programs Commence
04/06/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
10/04/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
20/03/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
13/02/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
26/04/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
16/02/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
30/11/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
09/08/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
24/02/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
18/02/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
27/01/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
06/01/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
23/07/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
25/02/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
12/01/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
05/01/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
29/09/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
18/06/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
17/01/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
15/01/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
05/12/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
04/12/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
14/11/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
18/10/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
04/09/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
21/08/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
23/07/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
12/07/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
14/06/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
08/02/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Communiqués de Presse de UEX Corp
18/08/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
11/07/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
24/06/2016High Grade Zone Extended at Christie Lake
13/06/2016Drill Turning at Christie Lake
08/06/2016UEX Corporation Reports Results of Annual General Shareholde...
25/05/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
17/05/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
02/05/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
28/04/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
13/04/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
22/01/2016UEX Closes $2.0 Million Private Placement
19/01/2016Final Option Agreement Signed - Drill Program to Commence Im...
19/01/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
22/12/2015UEX Announces $2.0 Million Private Placement
26/10/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
21/09/2015Uranium companies could take the cake
21/04/2015UEX Announces $2.5 Million Private Placement
10/04/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
27/02/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
05/06/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
02/04/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
28/11/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
06/08/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
04/06/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
21/03/2013(Beatty River)Announces Completion of Beatty River Earn-in
08/08/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
08/06/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
31/05/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
07/05/2012Terminates Shareholder Rights Plan
01/05/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
17/02/2012Announces $8 Million Bought Deal
16/12/2011Comments by David Talbot on UEX Corporation in the Energy Re...
07/12/2011Adopts Shareholder Rights Plan
06/12/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
24/06/2011Board Re-elected
28/04/2011appoints Nan Lee as Vice-President of Project Development
17/03/2010Significant Unconformity Intersections at Shea Creek's 58B A...
23/09/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
10/06/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
26/11/2008Announces Minimum $16.5 Million Budget for 2009
09/04/2008 reports final results of 2007 Horseshoe and Raven drilling,...
26/03/2008Eaton Joins UEX Board
22/01/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
14/01/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
14/12/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
11/07/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
23/04/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
28/02/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0,495+16.47%0,385+2.67%
TORONTO
CA$ 0,495
24/08 16:59 0,070
16,47%
Cours préc. Ouverture
0,425 0,400
Bas haut
0,440 0,500
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,495 -%
Volume var. 1 mois
9 418 620 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202230,26%0,510,24
202146,15%0,600,25
2020108,00%0,280,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :