Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Northgate Minerals Corporation

Publié le 10 novembre 2010

Reports Significant Gold Intersections at its Fosterville and

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Northgate Minerals Reports Significant Gold Intersections at its Fosterville and Stawell Gold Mines

Northgate Minerals Corporation) is pleased to report positive exploration results from diamond drill programs at its Fosterville and Stawell Gold mines in Victoria, Australia.

Exploration Highlights

  • Fosterville: drilling below and down-plunge of the Phoenix Reserve block continues to show promising results:

           Phoenix Footwall

  • Drilling within the Footwall has intersected strong mineralization: hole UDE038 (6850 mN) intersected 5.4 grams per tonne ("g/t") gold over 24.9 metres ("m"), including 11.5 g/t over 5.6 m and 10.1 g/t over 4.3 m.
  • Hole UD756 (7360 mN) intersected 4.7 g/t over 6.3 m and 5.5 g/t over 18.6 m, including 8.1 g/t over 9.1 m.
  • These holes follow on assay results released previously: hole SPD547B (7000 mN) returned 6.3 g/t over 23.3 m and 4.6 g/t over 6.5 m.
  • Results from the Footwall indicate that there is potential to add new reserves close to the existing Phoenix underground development and to increase ounces per vertical metre immediately below the existing reserves.

           Phoenix Extension (6850 mN)

  • Hole UDE037 intersected 14.1 g/t over 4.7 m and hole UDE038 intersected 5.8 g/t over 5.0 m.
  • These holes follow on the assay results released previously: hole SPD527C (6950 mN) returned 6.5 g/t over 5.1 m and hole SPD526C (6900 mN) returned 12.2 g/t over 6.3 m.
  • Results indicate the potential for increasing the Phoenix Extension zone another 150 m south along strike and down plunge.
  • Stawell: in addition to the two new gold discoveries in previously untested areas (see press releases dated August 31 and November 1, 2010), drilling from Golden Gift 6 Lower ("GG6L") intersected high-grade mineralization, further enhancing the new GG6 reserve zone, with current average reserve grade of 6.3 g/t:

           Basalt Contact:

  • Hole MD-5338 returned 13.2 g/t over 4 m.
  • Hole MD-5281 contained several excellent intervals: 4.9 g/t over 16.4 m, including 7.1 g/t over 7.6 m and 15.9 g/t over 5.1 m.
  • Hole MD-5790 also contained several excellent intervals: 5.7 g/t over 5.2 m, including 13.0 g/t over 1.5 m; a second interval returned 5.8 g/t over 9.7 m, including 8.0 g/t over 3.0 m and 13.2 g/t over 1.5 m.

           Waterloo:

  • Hole MD-5281 returned 24.0 g/t over 10.6 m.
  • Hole MD-5481 returned 21.0 g/t gold over 3.1 m.

Ken Stowe, President and Chief Executive Officer, remarked, "The excellent results received to date represent a significant step towards achieving our goal of reserve and resource expansion at our Australian mines.  Drilling within the Phoenix Footwall and Extension down dip from the existing reserves is testing for the large scale continuity of the Phoenix Deposit, which has been the most productive orebody identified on the property to date, and while in its early stages, we are encouraged by the excellent results and the potential to add to reserves.  We also continue to be very excited on the progress that is being made at Stawell in identifying new areas on our mining lease, including two new gold bearing basalt domes and a potentially significant waterloo zone, as we look to make further extensions to the mine life."

2010 Diamond Drill Programs

Fosterville - Phoenix Footwall and Phoenix Extension

To date, three holes have been drilled totalling 1,590 m using underground drill platforms. 

We are encouraged by results within the Phoenix Footwall, which has appreciable widths and grades and has the potential to be an ore shoot paralleling the known Phoenix orebody. A drill program is in progress in the area between 7200 mN and 7500 mN to determine the grade and continuity of this potential zone.

Drill results from the Phoenix Extension indicate the potential for extending the Phoenix orebody another 150 m south along strike and down plunge. A drill program is also progressing on section 6850 mN to potentially extend mineralization up dip of existing drill intersections.

Figure 1: Fosterville Gold Mine Long Projection of Phoenix Extension and Footwall

www.northgateminerals.com/Theme/Northgate/files/Releases/11-10F1.gif

Table 1: Assay Results from Phoenix Extension and Footwall Drilling

Hole ID

From (m)

To (m)

Interval (m)

Gold Assay
(g/t)

Phoenix
Extension / Footwall

UDE037

446.5

451.2

4.7

14.1

Extension

UDE038

462.6

467.6

5.0

5.8

Extension

UDE038

500.7

525.6

24.9

5.4

Footwall

   including

500.7

506.3

5.6

11.5

Footwall

   and

516.1

520.4

4.3

10.1

Footwall

UD756

468.1

474.4

6.3

4.7

Footwall

UD756

478.0

496.6

18.6

5.5

Footwall

   including

482.7

491.7

9.1

8.1

Footwall

Stawell - GG6L

Drilling within GG6L is ongoing, where there is potential to add to high-grade reserves similar to the 6.3 g/t reserve grade within GG6. Assay results received to date are presented in the following tables and have returned significant thicknesses of mineralization. The GG6L mineralized zone extends over 200 m along strike and over 180 m in vertical height at present. Since 2008, a total of 13 holes have been drilled into the GG6L scoping program. Seven of these holes intersected the high-grade basalt contact zone.

While the initial work in the GG6L zone has centered on the high grade basalt contact mineralization, the discovery of a potentially significant waterloo zone further east of the main basalt contact provides another high-grade area to focus on.  Potential for further upside at GG6L is promising. Multiple ore surfaces in the GG6L zone and extensions at depth, as well as the identification of the waterloo zone, all present excellent opportunities for additional ounces to be discovered in the GG6L zone.

The exploration team at Stawell has begun the interpretation of the drill intercepts for a GG6L resource estimate. Upon completion of the proposed 2011 drill program, it is expected that there will be 27 intercepts into the basalt contact zone at 50 m by 50 m spacing, which should be sufficient to initiate resource definition drilling in the zone with the focus on reserve conversion.

Figure 2: Stawell Gold Mine Long Projection of GG6L

www.northgateminerals.com/Theme/Northgate/files/Releases/11-10F2.gif

Table 2: Assay Results from GG6L Zone - Basalt Contact Zone Mineralization

Hole ID

From (m)

To (m)

Downhole
Interval (m)

Estimated
True Width
(m)

Grade
(g/t)

MD-5338

417.9

421.9

4.0

1.9

13.2

MD-5540

359.5

360.8

1.3

1.0

12.6

MD-5540W1

366.2

369.5

3.3

2.0

4.9

MD-5281

493.7

510.1

16.4

8.4

4.9

      including

502.5

510.1

7.6

3.8

7.1

MD-5281

525.9

531

5.1

2.6

15.9

      including

525.9

528.5

2.6

1.3

12.7

      and

529.2

530.2

1.0

0.5

40.3

MD-5281

559.2

561.7

2.5

1.1

9.6

MD-5489

444.5

445

0.5

0.4

8.8

MD-5550

361.6

366.7

5.1

3.3

12.3

MD-5790

273.2

278.4

5.2

3.2

5.7

      including

274.7

276.2

1.5

0.9

13.0

MD-5790

345.3

355.0

9.7

6.8

5.8

      including

347.7

350.65

3.0

2.0

8.0

      and

353.5

355.0

1.5

1.0

13.2

Table 3: Assay Results from GG6L Zone - Stockwork Zone Mineralization

Hole ID

From (m)

To (m)

Downhole
Interval (m)

Estimated
True Width
(m)

Grade (g/t)

MD-5282

476.1

477.3

1.2

0.8

5.2

MD-5282

485.2

486.9

1.7

0.9

5.4

MD-5481

418.8

420.2

1.4

1.1

5.9

MD-5489

437.5

441.2

3.7

2.8

2.7

MD-5550

351

354.4

3.4

2.7

9.0

Table 4: Assay Results from GG6L Zone - Waterloo Zone Mineralization

Hole ID

From (m)

To (m)

Downhole
Interval (m)

Estimated
True Width
(m)

Gold (g/t)

MD-5281

535

545.6

10.6

5.6

24.0

MD-5282

512.4

516.2

3.8

2.0

9.6

MD-5481

439.3

442.4

3.1

2.9

21.0

Appendix 1: Phoenix Extension and Footwall Drill Hole Collar Locations

Hole ID

Northing

Easting

Elevation

Collar
Azimuth

Collar Dip

Depth (m)

UDE037

6,750

1,680

4,845

347.0

-77

509.9

UDE038

6,750

1,680

4,845

329.0

-80

546.1

UDE756

7,378

1,680

4,943

234.0

-86

533.5

Appendix 2: GG6L Drill Hole Collar Locations

Hole ID

Easting

Northing

Elevation

Collar
Azimuth

Collar Dip

Depth (m)

MD-5281

659031.19

898049.14

-1273.30

49.0

-66.0

620.6

MD-5282

659030.6

898049.4

-1273.3

30.0

-69.0

569.8

MD-5338

659030.66

898049.45

-1273.31

20.0

-68.0

491.9

MD-5481

659069.54

897967.75

-1331.47

29.6

-56.0

575.3

MD-5489

659069.87

897967.56

-1331.47

38.6

-54.7

689.5

MD-5540

658943.88

898035.33

-1357.67

28.3

-60.4

503.7

MD-5540W1

658943.88

898035.33

-1357.67

31.5

-58.2

560.7

MD-5550

659013.54

898004.4

-1355.52

60.0

-45.5

491.5

MD-5580

659014.1

898002.7

-1355.9

63.0

-47.7

677.6

MD-5599

659014.1

898002.7

-1355.9

71.0

-47.5

746.6

MD-5790

659009.3

898044.8

-1442.37

14.5

-58.0

404.6

* * * * * *

Quality Control - Analyses and Sample Location
The quality assurance/quality control and other analytical and testing procedures for sample analysis and drill hole survey methodology were those reported in the Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") compliant Technical Report filed on SEDAR (
www.sedar.com) on October 22, 2008. 

Qualified Persons
The program design, implementation, quality assurance/quality control and interpretation of the results from Fosterville are under the control of Northgate's geological staff, which includes of number of individuals, each of who are qualified persons as defined under NI 43-101. Supervision of the program is by Glenn Grayson (BSc Geology, MAusIMM), Northgate's Senior Exploration Geologist and Simon Hitchman (BSc Geology (Hons), MAusIMM, MAIG), Northgate's District Exploration Geologist at the Fosterville Gold Mine.

The program design, implementation, quality assurance/quality control and interpretation of the results from Stawell are under the control of Northgate's geological staff, which includes a number of individuals, each of who are qualified persons as defined under NI 43-101 and is supervised by Steve Harper, Senior Exploration Geologist (Australian Institute of Mining and Metallurgy). Mark Haydon (Australian Institute of Geoscientists), Stawell Gold Mine's Geology Manager, has supervised the preparation of the information that forms the basis of this release, and is responsible for the overall management of the program.

* * * * * * *

Note to Investors:
The terms "Qualified Person", "Mineral Reserve", "Proven Mineral Reserve", "Probable Mineral Reserve", "Mineral Resource", "Measured Mineral Resource", "Indicated Mineral Resource", and "Inferred Mineral Resource" used in this news release are defined in accordance with NI 43-101.

* * * * * * *

Northgate Minerals Corporation is a gold and copper producer with mining operations, development projects and exploration properties in Canada and Australia.  Our vision is to be the leading intermediate gold producer by identifying, acquiring, developing and operating profitable, long-life mining properties. 

Cautionary Note Regarding Forward-Looking Statements and Information:
This Northgate press release contains "forward-looking information", as such term is defined in applicable Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995, concerning Northgate's future financial or operating performance and other statements that express management's expectations or estimates of future developments, circumstances or results. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "expects", "believes", "anticipates", "budget", "scheduled", "estimates", "forecasts", "intends", "plans" and variations of such words and phrases, or by statements that certain actions, events or results "may", "will", "could", "would" or "might" "be taken", "occur" or "be achieved". Forward-looking information is based on a number of assumptions and estimates that, while considered reasonable by management based on the business and markets in which Northgate operates, are inherently subject to significant operational, economic and competitive uncertainties and contingencies. Northgate cautions that forward-looking information involves known and unknown risks, uncertainties and other factors that may cause Northgate's actual results, performance or achievements to be materially different from those expressed or implied by such information, including, but not limited to gold and copper price volatility; fluctuations in foreign exchange rates and interest rates; the impact of any hedging activities; discrepancies between actual and estimated production, between actual and estimated reserves and resources or between actual and estimated metallurgical recoveries; costs of production; capital expenditure requirements; the costs and timing of construction and development of new deposits; and the success of exploration and permitting activities. In addition, the factors described or referred to in the section entitled "Risk Factors" in Northgate's Annual Information Form for the year ended December 31, 2009 or under the heading "Risks and Uncertainties" in Northgate's 2009 Annual Report, both of which are available on the SEDAR website at
www.sedar.com, should be reviewed in conjunction with the information found in this press release. Although Northgate has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in forward-looking information, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information in this press release is made as of the date of this press release, and Northgate disclaims any intention or obligation to update or revise such information, except as required by applicable law.

Cautionary Note to US Investors Regarding Mineral Reporting Standards:
Northgate prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to mineral resources in this press release are defined in accordance with National Instrument 43-101-Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral Reserves. The Securities and Exchange Commission (the "SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. The Company uses certain terms, such as, "measured mineral resources" "indicated mineral resources", "inferred mineral resources" and "probable mineral reserves", that the SEC does not recognize (these terms may be used in this press release and are included in the Company's public filings which have been filed with securities commissions or similar authorities in Canada).



For further information:

Ms. Keren R. Yun, Director, Investor Relations, Tel: 416-216-2781 Email: ngx@northgateminerals.com

.

Northgate Minerals Corporation

PRODUCTEUR
CODE : NGX.TO
ISIN : CA6664161024.
CUSIP : 666416102
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Northgate Minerals est une société de production minière d'or et de cuivre basée au Canada.

Northgate Minerals est en développement de projets d'or, de cuivre et d'argent au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont STAWELL MINE et FOSTERVILLE MINE en Australie et KEMESS SOUTH au Canada, son principal projet en développement est YOUNG - DAVIDSON au Canada et ses principaux projets en exploration sont BOULEVARD, KEMESS UNDERGROUND, MATACHEWAN MINE et AWAKENING GOLD au Canada.

Northgate Minerals est cotée au Canada. Sa capitalisation boursière aujourd'hui est 943,3 millions CA$ (928,4 millions US$, 655,4 millions €).

La valeur de son action a atteint son plus bas niveau récent le 28 janvier 2000 à 0,60 CA$, et son plus haut niveau récent le 12 mai 2006 à 5,29 CA$.

Northgate Minerals possède 254 245 479 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Northgate Minerals Corporation
26/10/2011AuRico Gold Completes Acquisition Of Northgate Minerals Corp...
14/08/2006Follow up N° 8
29/04/2006Follow up N° 7
Financements de Northgate Minerals Corporation
28/02/2011Sells Auction Rate Securities
23/09/2009Announces C$100 Million Bought Deal Financing
Nominations de Northgate Minerals Corporation
12/07/2011Northgate Minerals Corporation Announces the Appointment of ...
11/07/2011Announces the Appointment of Richard Hall as President and
10/05/2011Announces Retirement of President and CEO Ken Stowe
Rapports Financiers de Northgate Minerals Corporation
14/10/2011Reports Strong Third Quarter Production
10/08/2011Primero Reports Second Quarter 2011 Results; Earnings Increa...
10/05/2011Reports First Quarter Results
07/04/2011Northgate Minerals Provides Details for its 2011 First Quart...
07/04/2011Provides Details for its 2011 First Quarter Results and ...
10/08/2010Reports Second Quarter Results
11/05/2010Solid First Quarter Results
08/04/2010Details for Annual General and Special Meeting and 2010 Firs...
10/08/2009Strong Second Quarter Operating Cash Flow of $50 Million
04/03/2009Posts Fourth Quarter Net Earnings of $0.07 per Share
14/01/2009Reports Record Gold Production in the Fourth Quarter 2008
01/08/2008Generates Cash Flow from Operations of $41 million in the Se...
02/05/2008 Reports First Quarter Financial Results; Adjusted Net Earni...
08/04/2008 announces details for annual general meeting and 2008 first...
29/02/2008 posts fourth quarter net income of $32 million
28/01/2008Reports fourth quarter operating results and production fore...
30/11/2007Revises fourth quarter metal production forecast
04/05/2007first quarter gold production on plan; Kemess South mine-lif...
Projets de Northgate Minerals Corporation
24/10/2011AuRico Gold's Acquisition of Northgate Minerals Receives Ove...
16/09/2011(Young - Davidson)Announces a 500,000+ Ounce Indicated Resource at YD West
25/08/2011(Young - Davidson)Intersects Two Major Intervals in the YD West Zone at Young-...
02/08/2011(Kemess Underground)Announces Positive Preliminary Assessment for its Kemess Und...
24/06/2011(Young - Davidson)Provides Update on Construction and Exploration Activities a...
23/06/2011(Awakening Gold)Initiates Drill Program at =?ISO-8859-1?Q?=20the=20Awakening...
08/06/2011(Young - Davidson)Intersects 4=2E31 Grams per Tonne Gold Over 79=2E6 Metres at...
27/05/2011(Young - Davidson)Underground Delineation Drilling at NorthgateMinerals' Young...
20/05/2011(Matachewan Mine)Matachewan Consolidated Mines, Limited Announces Sale of Min...
13/04/2011Northgate Minerals Provides Update on Construction and Explo...
13/04/2011(Young - Davidson)' Young-Davidson Project Remains On Schedule and On Budget
16/02/2011(Kemess Underground)Northgate Minerals Announces Updated Resource Estimate for K...
12/01/2011(Young - Davidson)Drilling at Northgate Minerals' Young-Davidson Project Confi...
30/11/2010(Kemess South)Northgate Minerals Successfully Completes 2010 Diamond Drill...
02/07/2010(Young - Davidson)Receives Key Permit for the Development
09/02/2010(Young - Davidson)Receives Board Approval for Development of the Young-Davidso...
25/01/2010(Young - Davidson)Releases Final Feasibility Study for the Young-Davidson Proj...
15/09/2009(Fosterville Mine)Significant Extension of Mineralization Discovered at Northg...
10/09/2009(Young - Davidson)New Gold Zone Discovery at Northgate Minerals' Young-Davidso...
06/08/2009(Stawell Mine)Extends Mine Life at the Stawell Gold Mine
15/07/2009Announces Positive Young-Davidson Pre-Feasibility Study
30/06/2009(Fosterville Mine)Three-Year Collective Agreement Ratified at Northgate's Fost...
10/12/2008(Young - Davidson)Announces Dramatic Increase in Resources at its Young-Davids...
18/07/2008(Young - Davidson) Additional Drill Results for the Young-Davidson Project
23/04/2008reports first quarter production results and updated 2008 pr...
16/04/2008Exploration drilling at Northgate's Stawell mine intersects ...
09/04/2008(Kemess South)New three-year collective agreement ratified at Northgate's ...
17/03/2008(Kemess South)Tentative labour agreement reached at Northgate's Kemess min...
08/03/2008(Kemess South)Federal and Provincial Environmental Ministers announce fina...
05/03/2008(Kemess South)Unionized employees at Northgate's Kemess mine turn down ten...
21/12/2007(Young - Davidson) Announces Additional Young-Davidson Drill Results - Drill H...
31/05/2007(Kemess South)2007 Technical report
02/05/2005(Kemess South)2005 Technical report
Communiqués de Presse de Northgate Minerals Corporation
10/10/2011Miners Boost Hedging Even as Gold Demand Strengthens
14/09/2011Miners Continue to Underperform in Gold Market
13/09/2011AuRico Gold and Northgate Minerals Provide Update on Special...
29/08/2011Primero Announces Termination of Arrangement Agreement With ...
29/08/2011AuRico Gold to Acquire Northgate Minerals and Create A Leadi...
13/07/2011and Primero to Combine and Create
31/05/2011..lling at Northgate Minerals\342\200\231 Young-Davids...
17/05/2011Recognized for Its Commitment to Sustainability
13/04/2011Northgate Minerals Provides Update on
08/03/2011Northgate Minerals Reports Excellent Cash
16/02/2011Northgate Minerals Announces Updated
14/01/2011Reports 2010 Gold
14/01/2011Reports 2010 Gold
02/07/2010Renews Base Shelf Prospectus
11/06/2010To Renew Universal Base
07/06/2010& Nevada Exploration Sign Formal Option Agreement
22/03/2010Added to S&P/TSX Composite Index
09/03/2010Reports Record Cash Flow from Operations in 2009
19/01/2010Reports Record Gold Production of 362,743 Ounces in 2009
14/10/2009Announces Diamond Drill Results Adjacent to Established Rese...
30/09/2009 Closing of C$100 Million Common Share Offering
20/07/2009Confirms Discussions with Dioro Exploration NL
03/07/2009Matachewan First Nation Signs Impact and Benefits Agreement ...
22/12/2008Comments on Recent Market Activity
20/09/2008Issues Statement on its American Stock Exchange Closing Pric...
09/09/2008 Announces Increase in Gold Reserves at its Stawell Gold Min...
25/06/2008Files Preliminary Assessment Report for the Young-Davidson P...
17/05/2008files preliminary base shelf prospectus
26/03/2008Matachewan First Nation signs Memorandum of Understanding wi...
18/03/2008 reports final audited revenue and net earnings for 2007
25/02/2008's Fosterville Gold Mine to Transition to Owner Mining
18/02/2008Completes Acquisition of Perseverance
14/02/2008Tentative labour agreement reached at Northgate's Kemess min...
07/02/2008Major increase of indicated resources at Northgate's Young-D...
01/02/2008Final court approval received for Northgate's acquisition of...
21/01/2008Perseverance shareholders and warrant holders approve Northg...
18/12/2007Updates progress on Perseverance acquisition
05/11/2007reports strong quarterly production and record low cash cost...
28/10/2007Announces Friendly Proposal to Acquire Perseverance Corporat...
20/09/2007to speak at Denver Gold Forum - Update on Kemess North Proje...
18/09/2007announces further drill results at Young-Davidson analysts' ...
18/09/2007Review Panel submits recommendation report for Northgate's K...
10/09/2007Review panel announces date for the release of recommendatio...
02/08/2007Review panel announces recommendation report for Northgate's...
27/07/2007reports strong quarterly cash flow of $43.7 million - A thir...
02/12/2005Follow Up N° 6
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NGX.TO)
3,71-0.27%
TORONTO
CA$ 3,71
27/10 15:00 -0,010
-0,27%
Cours préc. Ouverture
3,72 3,76
Bas haut
3,65 3,84
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  3,71 -%
Volume var. 1 mois
1 270 800 -%
24hGold TrendPower© : 11
Produit Copper - Gold
Développe Gold
Recherche Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 22/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,94 US$-2,84%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX-1,39%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,45 CA$-1,61%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,06 CA$-2,27%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,69 CA$-2,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,98 US$-1,32%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :