Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

LOS ANDES COPPER

Publié le 16 juillet 2008

Reports Significant Increase of Indicated Resources in an Updated Mineral Resource Estimate for the

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

Los Andes Copper Reports Significant Increase of Indicated Resources in an Updated Mineral Resource Estimate for the Vizcachitas Copper-Molybdenum Project

July 16, 2008

Vancouver, BC � Los Andes Copper Ltd. ("Los Andes", or the "Company", TSX Venture Exchange: LA) announces that it has received an interim, independent resource estimate for the Vizcachitas Project in Central Chile. The resource estimate includes the results from 62 diamond drill holes totaling 17,465 metres drilled by Los Andes over the past year. Drilling continues on the property and the final mineral resource will only be known when the drilling is complete.

The interim sulphide mineral resource estimate at a 0.3% CuEq.(1) cutoff is as follows:

Indicated Resources
515 million tonnes (�MT�) grading 0.39% CuT and 0.011% Mo (0.46% CuEq (1))
Contains 4.43 billion pounds (�lbs�) copper, a 90% increase over the previous resource estimate and 125 million lbs molybdenum, a 54% increase over the previous resource estimate

Inferred Resources
572 MT grading 0.34% CuT and 0.012% Mo (0.41% CuEq (1))
Contains 4.29 billion lbs copper, a 31% decrease over the previous resource estimate
and 151 million lbs molybdenum, a 34% decrease over the previous resource estimate

Roger Moss, President and CEO said, �We are very pleased with the significant increase in indicated resources shown by this interim resource which, together with the application of a pit shell to constrain resources which exhibit reasonable economic viability, demonstrates significantly increased confidence in the Vizcachitas resource. Drilling is ongoing at Vizcachitas, and we hope to continue to increase the size of the deposit.�

The updated NI 43-101 compliant mineral resource estimate at different cutoff grades is shown in the table below:

Sulphide Indicated Mineral Resources

Cut-off
Grade
(CuEq%) (1)

Mtonnes

TCu (%)

Mo (%)

CuEq (%)

Cu
(Billion lb)

Mo
(Million lb)

0.20

597

0.36

0.010

0.43

4.74

132

0.25

563

0.37

0.011

0.44

4.59

136

0.30 (2)

515

0.39

0.011

0.46

4.43

125

0.35

442

0.41

0.012

0.48

4.00

117

0.40

351

0.43

0.012

0.51

3.33

93

0.45

252

0.47

0.013

0.55

2.61

72

0.50

160

0.51

0.013

0.60

1.80

46

Sulphide Inferred Mineral Resources

Cut-off
Grade
(CuEq%) (1)

Mtonnes

TCu (%)

Mo (%)

CuEq (%)

Cu
(Billion lb)

Mo
(Million lb)

0.20

798

0.30

0.010

0.36

5.28

176

0.25

685

0.32

0.011

0.39

4.83

166

0.30 (2)

572

0.34

0.012

0.41

4.29

151

0.35

420

0.36

0.013

0.44

3.33

120

0.40

280

0.39

0.013

0.48

2.41

80

0.45

176

0.43

0.014

0.52

1.67

54

0.50

92

0.46

0.016

0.57

0.93

32

  1. Copper equivalent is calculated using US$1.50/lb Cu and US$10.00/lb Mo according to the formula Cu eq% =Cu% + (Mo% x 6.67) and assumes 100% mining and metallurgical recoveries which remain uncertain.
  2. Sulphide �base case� cut-off grade of 0.30%CuEq highlighted in tables.
  3. Mineral resources do not have demonstrated economic viability.

The resource estimate also includes a near surface mixed leached/oxide zone which may have different metallurgical characteristics to the sulphide zone and has thus been separated out. Results for this �oxide� zone are shown below:

Oxide Indicated Mineral Resources

Cut-off
Grade
(TCu%)

Mtonnes

TCu (%)

Mo%

Cu
(million lb)

Mo
(million lb)

0.1

69

0.33

0.009

502

14

0.15

63

0.35

0.010

486

14

0.2

55

0.38

0.010

461

12

0.25

47

0.40

0.010

414

10

0.3

38

0.44

0.010

369

8

0.35

29

0.47

0.010

300

6

0.4

21

0.51

0.010

236

5

 
Oxide Inferred Mineral Resources

Cut-off
Grade
(TCu%)

Mtonnes

TCu (%)

Mo%

Cu
(million lb)

Mo
(million lb)

0.1

67

0.21

0.005

310

7

0.15

51

0.24

0.005

270

6

0.2

33

0.28

0.007

204

5

0.25

22

0.31

0.007

150

3

0.3

8

0.37

0.006

65

1

0.35

5

0.42

0.007

46

0.7

0.4

3

0.46

0.008

30

0.5

  1. The degree of oxidation is highly variable and it is unknown what effects this may have on the metallurgical characteristics at this stage. 
  2. Oxide �base-case� cut-off grade of 0.2% CuT  highlighted in tables.
  3. Mineral resources do not have demonstrated economic viability

Copper and molybdenum grades were calculated using ordinary kriging into a 3D block model with blocks with a nominal size of 20m x 20m x 10m. The resource estimate is based on a total of 35,255 metres of diamond drilling in 130 diamond drill holes, including 17790 metres of drilling in 69 holes completed in the 1990�s by Placer Dome Sudamerica Ltd. and General Minerals Corporation.

The previous NI43-101 compliant mineral resources estimate, dated February 7, 2007, showed indicated sulphide resources of 245 million tonnes grading 0.43% Cu and 0.015% Mo and inferred sulphide resources of 805 million tonnes grading 0.35% Cu and 0.013% Mo at a 0.3% CuEq.(1) cutoff grade. The current resources include indicated sulphide resources total 515 million tonnes grading 0.39% Cu and 0.011% Mo and inferred sulphide resources of 572 million tonnes grading 0.34% Cu and 0.012% Mo at the same cutoff grade of 0.3% CuEq.(1). The current indicated resource represents a 90% increase in contained copper and a 54% increase in contained molybdenum over the previous estimate. A decrease of 31% of contained copper and 34% of contained molybdenum in the inferred resource reflects the upgrading of inferred resources to indicated status and the application of a pitshell that reduced a portion of the deeper inferred resources. The previous resource model was not subjected to a pit shell to limit the resources.

Robert Sim, P.Geo., a qualified person as defined by NI 43-101 is responsible for the mineral resource estimate. Roger Moss, Ph.D., P.Geo, is the company�s qualified person, as defined by National Instrument 43-101, for the Vizcachitas Project. They have both reviewed and approved the contents of this release.

Logging, sampling and splitting of the drill core is conducted at the Vizcachitas site by independent consultants Geologica LTDA. under the direct supervision of geologist Ramon Fam. Samples are securely transported by Geologica staff to the SGS Laboratory in Santiago Chile and analyzed for copper and molybdenum by atomic absorption following a three acid digestion. Dr. Moss and Mr. Fam have visited the laboratory and are satisfied that the sample preparation and analytical procedure is consistent with standard industry practice. Los Andes routinely inserts standards, duplicates and blanks into the sample stream and sends 5% of sample rejects to Actlabs for check analysis.

An updated NI43-101 technical report detailing the mineral resource estimate will be completed and filed within 45 days. The company has retained AMEC to complete a scoping study/Preliminary Economic Assessment based on the updated resource estimate. The study should be completed in October.

About Vizcachitas

The Vizcachitas Project offers potential for a low strip, open pit operation in an area of low elevation with excellent infrastructure, including water and power in central Chile. The Vizcachitas deposit occurs in the same metallogenic belt as the large copper-molybdenum porphyries Rio Blanco-Los Bronces, Los Pelambres-El Pachon and El Teniente. Based on 35,255 metres of drilling in 130 diamond drill holes, the project contains an indicated resource of 515 million tonnes grading 0.39% copper and 0.011% molybdenum and an inferred resource of 572 million tonnes grading 0.34% copper and 0.012% molybdenum at a 0.30% copper equivalent (1) cutoff. Additional information about the Vizcachitas Project is available on our website at www.losandescopper.com.

For more information please contact:   
   
Michael Kuta, Corporate Secretary Tel: 604-697-6201 or
   
Roger Moss, President  Tel: 416-516-6050
   
E-Mail: info@losandescopper.com  or visit our website at: www.losandescopper.com

This document contains certain forward looking statements which involve known and unknown risks, delays and uncertainties not under the Company's control which may cause actual results, performance or achievements of the Company to be materially different from the results, performance or expectation implied by these forward looking statements.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

LOS ANDES COPPER

EXPLORATEUR
CODE : LA.V
ISIN : CA5443121010
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

LOS ANDES COPPER est une société d’exploration minière de cuivre basée au Canada.

LOS ANDES COPPER détient divers projets d'exploration au Chili.

Son principal projet en exploration est VIZCACHITAS au Chili.

LOS ANDES COPPER est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 2,7 milliards CA$ (2,0 milliards US$, 1,8 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 21 novembre 2008 à 0,03 CA$, et son plus haut niveau récent le 26 avril 2024 à 10,90 CA$.

LOS ANDES COPPER possède 244 860 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de LOS ANDES COPPER
11/04/2019After legal battle, Los Andes Copper's past drilling campaig...
Financements de LOS ANDES COPPER
22/08/2008Announces Completion of $7.5 Million Private Placement
23/07/2008Announces $7.5 Million Private Placement To Fund Ongoing Exp...
14/01/2008 Announces Completion of $500,000 Private Placement
19/12/2007Announces Private Placement of 1,000,000 Units
26/11/2007 Announces Completion of its $6 Million Private Placement pl...
Attributions d'options de LOS ANDES COPPER
30/04/2008 Announces Issuance of Stock Options
03/12/2007Announces Issuance of Stock Options
Projets de LOS ANDES COPPER
15/05/2013(Vizcachitas)Engages Coffey Mining and Alquimia Conceptos S.A. for Vizcac...
05/02/2009(Vizcachitas)Final Drilling Results From The 2008 Program At Vizcachitas
06/08/2008(Vizcachitas)Intersects 26 metres grading 0.95% Cu and 0.02% Mo (1.08% C...
16/07/2008(Vizcachitas)Reports Significant Increase of Indicated Resources in an Up...
26/06/2008(Vizcachitas)Appoints AMEC to Conduct a Scoping Study on the Vizcachitas ...
13/06/2008(Vizcachitas)MINING FLASH: Los Andes Copper Ltd. (LA-V) - Vizcachitas Con...
12/06/2008(Vizcachitas)Intersects 138 metres grading 0.71% Cu equivalent within 65...
14/05/2008(Vizcachitas)Extends Vizcachitas Mineralization Eastwards
02/04/2008(Vizcachitas)Intersects 0.57% Cu Over 218 Metres
27/03/2008(Vizcachitas)Completes Acquisition of Consumptive Water Rights for Vizcac...
27/02/2008 Intersects 0.41% Cu Over 432 Metres
25/01/2008(Vizcachitas)Acquire Consumptive Water Rights for Vizcachitas
17/12/2007(Vizcachitas)Intersects 353.2 metres grading 0.59% and 66 metres grading ...
02/10/2007Los Andes Intersects 220 Metres Grading 0.52% Cu and 0.015% ...
23/08/2007Intersects 240 Metres Grading 0.40% Cu and 0.017% Mo at Vizc...
Communiqués de Presse de LOS ANDES COPPER
01/04/2016Los Andes Announces The Final Assay Results From The 2015-20...
23/10/2015Los Andes Announces Extension Of Current Private Placement O...
05/10/2015Los Andes Announces First Tranche Closing
10/09/2015Los Andes To Raise Approximately $2.3 Million
01/09/2015Los Andes Announces Grant Of Stock Options
24/12/2014Los Andes To Raise Approximately $2.1 Million
17/06/2014Los Andes Announces Hydroelectric Project Development Agreem...
22/08/2013Announces Acquisition of Water Rights and Hydroelectric Proj...
01/03/2011Announces a Private Placement for Up to $935,000
27/01/2009Announces Restatement of 2007 Financial Statements
16/01/2009announces Agreement for Restructuring of Option Payments
13/06/2008Cambridge House Invite
29/11/2007Be featured on CEO Clips on The Biography Channel
30/10/2007Drills 324.5 metres grading 0.45% Cu and 0.011% Mo at the Vi...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (LA.V)OTHER OTC (LSANF)
10,90+2.83%8,04+3.77%
TSX-V
CA$ 10,90
26/04 16:26 0,300
2,83%
Cours préc. Ouverture
10,60 10,73
Bas haut
10,73 10,90
Année b/h Var. YTD
10,15 -  13,00 -11,02%
52 sem. b/h var. 52 sem.
9,53 -  19,00 -10,07%
Volume var. 1 mois
1 100 0,926%
24hGold TrendPower© : 21
Produit
Développe
Recherche Copper - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-2,24%
2023-15,53%19,1010,20
202216,71%17,7311,00
202161,57%9,9910,00
20201650,00%7,500,20
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :