Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Sabina Gold & Silver Reports Umwelt Mineralization Now Extended Over a Strike Length of 1.2 km
Published : June 28, 2011

Encouraging Targets Identified at George Claim Block-Back River Project, Nunavut

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Precious Metals | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - June 28, 2011) - Sabina Gold & Silver Corp. (News - Market indicators) –

  • Hole 11GSE037 at Umwelt returns 8.71 g/t Au over 25.2 m incl. 18.98 g/t Au over 5.5 m

  • Hole 11GSE042 at Umwelt returns 10.54 g/t Au over 10.3 m incl. 16.70 g/t Au over 3.4 m

Sabina Gold & Silver Corp. is pleased to announce additional assay results from holes drilled as part of the 2011 exploration program on its Umwelt and Llama deposits at the Goose property and the first results from exploration drilling on the George property at its 100% owned Back River Project in Nunavut, Canada. 

The 2011 drilling campaign at Back River started on the Goose claim block in March. The focus of work is to extend and expand the new deposits at Umwelt and Llama and to identify new deposits. There are currently eight drills operating at Back River. Five rigs are in the Goose area, where two are shifting focus from resource expansion to focus on the numerous untested discovery targets within the 5 km corridor containing the Goose, Llama and Umwelt deposits. One rig continues at George and two rigs are soon to be operating on the Wishbone properties testing gold targets on those claims retained by Sabina after the Hackett River transaction.

Results continue to demonstrate that Umwelt is a strong, well mineralized system with good continuity and grade. Based on last year's drilling, the Company reported indicated resources at Umwelt of 4.6 m tonnes grading 6 g/t Au for a total of 900,000 oz and an additional inferred resource of 980K tonnes grading 6.4 g/t Au for a total of 221,000 oz  over a strike length of 550 metres.

In 2011 one drill is completing 100 m step out holes tracing Umwelt to the south, with two drills following up behind with infill holes. Most significantly, Hole 11GSE042, the furthest hole to the south in which assays have been returned, intersected 10.54 g/t Au over 10.3 m including 16.70 g/t Au over 3.4 m. This hole is 550 m south of the drilling completed in 2010 and extends the overall strike length of the deposit to over 1.2 km. It is at a vertical depth of 550 m. The deposit continues to remain open along strike and to depth and plunges at a consistent 25 degrees. Other highlights include Hole 11GSE037 which returned 8.71 g/t Au over 25.2 m including 18.98 g/t Au over 5.5 m, located approximately 300 m to the south of the drilling that was completed in 2010. This intersection is at a vertical depth of 420 m. 

"We continue to extend and add to the Umwelt deposit at the Goose property," said Tony Walsh, President & CEO. "The system remains open and we continue to see the structure, mineralization and visible gold as we keep drilling the deposit at depth to the south. There remains excellent potential for Umwelt to continue to grow and add ounces. Also, our Exploration Tool Box is proving successful on other areas on the property. At the George claim block, the application of the tool box has yielded very encouraging prospects for new large scale open pitable discoveries. Additionally, the sale of the Hackett River Project to Xstrata Canada Zinc has also enabled us to focus entirely on looking for new gold discoveries on our retained claims on the Wishbone greenstone belt. A drill and crew have been mobilized and work has begun on the south east portion of the belt adjacent to Back River." 

To date, at Back River a total of 82 holes and 28,700 metres of core have been completed, or are in progress, with many assays still pending. A total of five rigs are currently drilling on the Goose claim block generating approximately 325 m of core per day.

The deposits and target areas at the Goose claim block are within a 5 km corridor that have been identified using an exploration system developed by Sabina's geological team. This new Exploration Tool Box is based on a set of assumptions that specifically target large buried alteration and mineralized features in folded iron formation units that have the potential to be extracted by open pit methods.

Application of the Exploration Tool Box is also in progress at the George claim block. George contains a current indicated resource of 1.84m tonnes grading 10.9 g/t Au for a total of 590,000 oz and an additional inferred resource of 2.6 m tonnes grading 10.5 g/t Au for a total of 866,000 oz of.  The current deposits at George are mainly amenable to being mined by underground methods; however, with the development and application of the new tool box, numerous opportunities to find additional large shallow open pit deposits in the area have been identified.

Work has focused on one relatively underexplored area to-date and this work has resulted in a number of encouraging new discoveries. For example, at the Trigger target, silicified and sulphidized breccia zones in sediments associated with iron formations have returned a number of strong intercepts including 9.12 g/t Au over 6.00 m in hole 11GRL001. Most assays from George are still pending.

UMWELT

To date a total of 22 holes totalling 12,500 m have been drilled or are in progress on the Umwelt zone at the Goose property.

Drilling at Umwelt has effectively extended and expanded the mineralized zone both along strike and down plunge. At this time, the Umwelt zone mineralized trend has been traced over a strike length of 1.2 km and down to a vertical depth of 550 m below surface. The zone remains open both along strike and to depth. 

The mineralized zones are hosted within a turbiditic sedimentary sequence containing silicate and oxide facies iron formations. Gold dominantly occurs with quartz +/- carbonate veining and arsenopyrite +/- pyrite +/- pyrrhotite in the iron formation. Drilling at Umwelt has identified an anti-form structure with a fold hinge that plunges to the south at 25 degrees. Thick zones of gold mineralization are associated with the fold hinge in what is now known as the Main Zone. Mineralization also occurs along a separate iron formation horizon immediately to the west known as the West Zone. The relationship between the Main and West zones is uncertain but the West Zone may be a refolded limb of the Main zone.

Table 1: Umwelt recent assay results
 
Hole Id Area Section Depth From (m) To (m) Length (m) Au (g/t) Comment/
Mineral
Zone
11GSE026 Umwelt 4350 554 327.0 328.0 1.00 9.89 Undetermined
        412.5 424.5 12.00 9.09 Main Zone East
including       413.5 416.5 3.00 22.07 Main Zone East
        481.0 482.0 1.00 1.61 Main Zone West
11GSE031 Umwelt 4500 458 144.0 145.0 1.00 2.93 East BIF
        252.9 253.9 1.00 1.68 Undetermined
        260.0 261.0 0.95 5.40 Undetermined
        316.3 317.3 1.00 1.46 Main Zone East
        336.0 337.3 1.30 1.25 Main Zone East
        350.0 367.0 17.00 4.78 Main Zone East
including       362.0 364.0 2.00 29.26 Main Zone East
        384.3 389.5 5.20 3.21 Main Zone West
        403.5 404.5 1.00 3.69 Main Zone West
11GSE037 Umwelt 4350 683 298.7 299.2 0.50 11.09 Eastern BIF
        450.3 452.6 2.30 1.30 Main Zone East
        465.0 469.0 4.00 1.45 Main Zone East
        472.0 497.2 25.20 8.71 Main Zone East
including       487.5 493.0 5.50 18.98 Main Zone East
and       495.0 496.0 1.00 32.61 Main Zone East
11GSE040 Umwelt 4500 590 399.0 432.0 33.00 3.43 Main Zone East
including       399.0 402.0 3.00 1.91 Main Zone East
including       416.0 426.2 10.16 8.18 Main Zone East
and       423.0 425.0 2.00 25.52 Main Zone East
11GSE042 Umwelt 4050 719 636.5 646.8 10.30 10.54 Main Zone East
        637.5 640.9 3.40 16.70 Main Zone East
11GSE043 Umwelt 4350 662 428.0 428.8 0.75 5.66 Main Zone East
        433.8 436.4 2.55 4.56 Main Zone East
        457.1 469.7 12.65 3.38 Main Zone East
        457.1 458.0 0.95 10.56 Main Zone East
        467.0 468.8 1.80 6.87 Main Zone East
        491.7 492.6 0.95 17.87 Main Zone West
 
True widths are estimated to be 70% of the drill widths.

GEORGE CLAIM BLOCK

To date, a total of 29 holes comprising 5,672 m have been completed or are in progress at George. 

Sabina continues to experience a high level of exploration success, demonstrated by some encouraging results at the Company's Trigger discovery located on the George Property. The first hole of the diamond drilling program confirms a significant gold endowment at this target and validates the company's exploration strategy. Numerous gold intercepts were returned within hole 11GRL001 (Trigger) including; 9.12g/t Au over 6.00 m, 1.87g/t Au over 8.00 m, 4.37g/t Au over 1.00 m, 2.45g/t Au over 1.00 m, 2.11 g/t Au over 1.00 m and 7.99 g/t over 0.50 m within brecciated, silicified and sulphidized sediments associated with oxide iron formation.

Target areas for priority testing at George in 2011 include the Bullwinkle, Rifle, Trigger, Lookout Hill, Shadow Pond and NZ locales, all of which are identified as having geological, geochemical, and geophysical attributes analogous to the deposits at the Goose claim block. Diamond drilling of this area is 100% focused on looking for new shallow open pit discoveries. Assays are still outstanding for much of this drilling.

One drill continues to test the targets at George. 

LLAMA DEPOSIT

Initial drilling at Llama focussed on minor gaps in the resource model and attempting to extend and expand the mineralized zone both along strike and down plunge. 

To date, a total of 27 holes totalling approximately 8,700 m have been drilled or are in progress on the Llama deposit. Many assay results are still pending. The deposit has been challenging to expand, as it has a complicated structure marked by faulting and displacement of the host iron formation to the south.

Noteworthy results from the drill program include Hole 11GSE035, which returned 8.79 g/t Au over 5.0 m on the East Limb.

Table 2: Llama deposit – 2011 assay results
 
Hole Id Area Section From (m) To (m) Length (m) Au (g/t) Comment/
Mineral
Zone
11GSE035 Llama 4950 266.00 271.00 5.00 8.79 Main East

GOOSE DEPOSIT

A total of 3 holes totalling 590 metres were drilled on the Goose deposit. The holes were drilled to provide information for the ongoing geological / resource modelling interpretation in support of an open pit resource estimate. No additional holes have been collared on the Goose deposit.

The open pit resource estimate is currently underway.

SABINA GOLD & SILVER CORP.

Sabina Gold & Silver Corp. is an emerging precious metals company with district scale, world class undeveloped assets in one of the world's newest, most politically stable mining jurisdictions: Nunavut, Canada.

The properties consist of the Back River Gold Project as well as the Wishbone Claims, a vastly prospective grass roots project. 

Quality Assurance

Mr. Doug Cater, P. Geo, and Project Manager, Back River Project of Sabina Gold & Silver Corp. is a Qualified Person under the terms of NI43-101 and has reviewed the technical content of this press release and approved its dissemination.

Mineral resources for Goose and George were generated by RSG Global Consulting Pty Ltd (Coffey Mining) in September 2007. Mineral resources for Llama and Umwelt deposits were generated by Roscoe Postle Associates (RPA) in March 2011. These are all posted on www.sedar.com.

Diamond drill core was sent to TSL Laboratories in Saskatoon, Sask. Quality control is monitored on a continual basis and utilizes a system of standards, blanks and duplicates to ensure analytical accuracy. The protocols and procedures used in 2011 are the same as those used in earlier campaigns by Sabina Gold & Silver Corp. and have been deemed appropriate in the above noted 43-101 compliant resource reports.

Forward Looking Statements

Statements relating to exploration, pre-feasibility work and future operations at the Back River Project and the expected results of this work are forward-looking statements within the meaning of securities legislation of certain Provinces in Canada. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Information inferred from the interpretation of drilling results may also be deemed to be forward looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Sabina's operations and other risks and uncertainties, including those described in Sabina's Annual Report for the year ended December 31, 2010.

Forward-looking statements are based on the beliefs, estimates and opinions of Sabina's management on the date the statements are made. Sabina undertakes no obligation to update these forward-looking statements should management's beliefs, estimates or opinions, or other factors, should change.

This news release has been authorized by the undersigned on behalf of Sabina Gold & Silver Corp.

Tony Walsh, President & CEO
930 West 1st Street, Suite 202
North Vancouver, BC V7P 3N4
Tel 604 998-4175 Fax 604 998-1051
http://www.sabinagoldsilver.com
 
 
Table 3: 2011 Back River project – Goose Lake property Drill results as of June 24, 2011
 
Hole Id Area Section Depth From (m) To (m) Length (m) Au (g/t) Comment/
Mineral
Zone
11GSE026 Umwelt 4350 554 327.0 328.0 1.00 9.89 Undetermined
        412.5 424.5 12.00 9.09 Main Zone East
including       413.5 416.5 3.00 22.07 Main Zone East
        481.0 482.0 1.00 1.61 Main Zone West
11GSE027 Llama 4650 488 314.0 344.0 30.00 0.70 Main Zone West
including       315.9 318.0 2.13 3.72 Main Zone West
and       333.0 334.0 1.00 2.38 Main Zone West
and       343.0 344.0 1.00 2.26 Main Zone West
        464.0 468.0 4.00 3.35 Main Zone West
11GSE028 Umwelt 4250 590 212.9 213.6 0.70 1.47 East BIF
        319.5 321.0 1.50 3.12 Undetermined
        401.7 402.7 1.00 3.04 Main Zone East
        468.5 470.3 1.80 5.83 Main Zone East
        490.5 491.5 1.00 1.34 Main Zone East
        499.2 500.2 1.00 2.40 Main Zone East
        545.3 546.3 1.00 1.11 Main Zone West
11GSE029 Llama 5500 194 110.9 112.1 1.25 2.43 Undetermined
11GSE030 Llama 4750 512 340.0 340.5 0.50 10.05 Main Zone East
11GSE031 Umwelt 4500 458 144.0 145.0 1.00 2.93 East BIF
        252.9 253.9 1.00 1.68 Undetermined
        260.0 261.0 0.95 5.40 Undetermined
        316.3 317.3 1.00 1.46 Main Zone East
        336.0 337.3 1.30 1.25 Main Zone East
        350.0 367.0 17.00 4.78 Main Zone East
including       362.0 364.0 2.00 29.26 Main Zone East
        384.3 389.5 5.20 3.21 Main Zone West
        403.5 404.5 1.00 3.69 Main Zone West
11GSE032 Llama 5350 248.6 NSV        
11GSE033 Umwelt 4150 719 244.4 245.0 0.65 1.41 East BIF
        530.1 530.9 0.80 9.88 Main Zone East
        541.0 542.0 1.00 1.20 Main Zone East
        552.7 564.0 11.30 1.17 Main Zone East
11GSE034 Llama 5000 362 149.5 150.5 1.00 1.56 Midway BIF
        239.2 240.2 1.00 1.34 Main Zone East
11GSE035 Llama 4950 609.5 266.0 271.0 5.00 8.79 Main Zone East
11GSE036 Llama 5200 188 NSV        
11GSE037 Umwelt 4350 683 298.7 299.2 0.50 11.09 Eastern BIF
        450.3 452.6 2.30 1.30 Main Zone East
        465.0 469.0 4.00 1.45 Main Zone East
        472.0 497.2 25.20 8.71 Main Zone East
including       487.5 493.0 5.50 18.98 Main Zone East
and       495.0 496.0 1.00 32.61 Main Zone East
11GSE038 Llama 4750 323 NSV        
11GSE039 Llama 4650 341 NSV        
11GSE040 Umwelt 4500 590 399.0 432.0 33.00 3.43 Main Zone East
including       399.0 402.0 3.00 1.91 Main Zone East
including       416.0 426.2 10.16 8.18 Main Zone East
and       423.0 425.0 2.00 25.52 Main Zone East
11GSE041B Llama 4900 209.5 NSV        
11GSE042 Umwelt 4050 719 636.5 646.8 10.30 10.54 Main Zone East
including       637.5 640.9 3.40 16.70 Main Zone East
11GSE043 Umwelt 4350 662 319.6 320.1 0.50 1.18 Eastern BIF
        323.2 323.8 0.55 1.35 Eastern BIF
        428.0 428.8 0.75 5.66 Main Zone East
        433.8 436.4 2.55 4.56 Main Zone East
        437.7 438.8 1.10 1.90 Main Zone East
        457.1 469.7 12.65 3.38 Main Zone East
including       457.1 458.0 0.95 10.56 Main Zone East
including       467.0 468.8 1.80 6.87 Main Zone East
        491.7 492.6 0.95 17.87 Main Zone West
                 

To view the Figures associated with this press release, please click on the following link: http://media3.marketwire.com/docs/s627m.pdf.



Sabina Gold & Silver Corp.
Nicole Hoeller
Director, IR
1 888 648-4218
nhoeller@sabinagoldsilver.com
www.sabinagoldsilver.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sabina Gold & Silver Corp

EN DÉVELOPPEMENT
CODE : SBB.TO
ISIN : CA7852461093
CUSIP : 785271 10 7
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sabina est une société développant des projet miniers d'or et d'argent basée au Canada.

Sabina est en développement de projets d'or, d'argent, de cuivre, de plomb et de zinc au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est HACKETT RIVER au Canada et ses principaux projets en exploration sont DEL NORTE, ROCKSTONE, GOLDEN SIDEWALK, SKINNER, BACK RIVER - GOOSE LAKE, BACK RIVER, BACK RIVER - GEORGE LAKE, NEWMAN-MADSEN et WISHBONE au Canada.

Sabina est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 482,9 millions CA$ (386,1 millions US$, 352,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 12 juillet 2002 à 0,05 CA$, et son plus haut niveau récent le 21 avril 2011 à 7,63 CA$.

Sabina possède 223 580 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Sabina Gold & Silver Corp
22/04/2010Sabina Silver Corp. Business Summary
21/04/2010Emerging Precious Metals Stock Analysis
Rapports annuels de Sabina Gold & Silver Corp
2007 Annual report
Financements de Sabina Gold & Silver Corp
01/03/2011Completes $97.5 Million Financing
Nominations de Sabina Gold & Silver Corp
24/10/2011Appoints Rob Pease as New President and CEO and Director of ...
06/04/2011Appoints John Wakeford to Board of Directors
Rapports Financiers de Sabina Gold & Silver Corp
20/03/2015Announces Financial Results for the Year Ended 2014
09/08/2013Reports Q2 Financial Results
09/08/2013Reports Q2 Financial Results
02/04/2013Announces 2012 Year End Financial Results
09/11/2012Announces Q3 2012 Financial Results
14/08/2012Announces Q2 2012 Financial Results
14/05/2012Announces Q1, 2012 Financial Results
30/03/2012Announces 2011 Year End Financial Results
20/11/2008ANNOUNCES Q3FINANCIAL RESULTS
03/09/2008Q2 Financial Results
Projets de Sabina Gold & Silver Corp
13/10/2015Sabina Gold & Silver announces assays from Back River confir...
04/11/2013(Back River)Announces Positive Results From Echo Zone at Back River Proj...
22/10/2013(Back River)Announces Continued Positive Results from the Umwelt Deposit...
09/10/2013(Back River)Announces Positive Preliminary Feasibility Study on Back Riv...
22/08/2013(Back River)Announces Positive Results From the George Project at Back R...
24/07/2013(Back River)drills 18.6m of 19.27 g/t Gold at Back River
24/07/2013(Back River)Announces Positive Results from Umwelt Deposit at Back River...
04/07/2013(Back River)Announces Positive Results from George Property at Back Rive...
23/05/2013(Back River)Announces More Significant Assays From Llama Deposit at Back...
09/05/2013(Hackett River)Reports Glencore Xstrata Discloses New Hackett River Resourc...
30/04/2013(Back River)Announces First Results From 2013 Back River Drilling
14/02/2013(Back River)Announces Significant 2013 Back River Work Program
18/10/2012(Back River)Drilling Continues to Demonstrate Confidence at Back River P...
05/03/2012(Back River)Starts Drilling at Back River Gold Project, Nunavut Canada
14/02/2012(Back River)Mobilizes Back River Camps, Drilling Campaign to Commence Ea...
13/02/2012(Back River)Mobilizes Back River Camps, Drilling Campaign to Commence Ea...
12/01/2012(Back River)Completes Technical Report of Resource Estimate for Back Riv...
13/09/2011(Back River)Reports Continued Expansion at Umwelt & Llama Deposits, Back...
31/08/2011(Back River)Reports More Positive Results at Umwelt on the Back River Go...
25/08/2011(Back River)Reports Continued Positive Results at Back River and Wishbon...
22/07/2011(Back River)Reports Continued Positive Results at Back River Gold Projec...
28/06/2011(Back River - Goose Lake)Reports Umwelt Mineralization Now Extended Over a Strike Len...
31/05/2011(Back River)Announces Buy Back of the R.A. Olson Consulting Ltd. Royalti...
22/05/2011(Hackett River)Reports Positive Results from Early 2011 Drilling at the Hac...
27/04/2011(Back River)Reports Positive Results From Early 2011 Drilling at the Bac...
13/03/2011(Back River)Announces Updated Resource Estimate for Back River Gold Proj...
15/02/2011(Back River)Sabina Gold & Silver Files Updated Technical Report on Back ...
03/02/2011(Back River - Goose Lake)amp; Silver Opens Nunavut Camp for Aggressive 2011 Explorati...
15/09/2008(Hackett River)Hackett River Permitting Process Moves Forward
14/07/2008(Hackett River)Announces Interim Update on Corporate Initiatives on Hackett...
08/01/2008(Hackett River)Sabina drills 3.7 m of 40.28% Zn at Hacket River
Communiqués de Presse de Sabina Gold & Silver Corp
16/06/2016Sabina Gold & Silver Statement On The Nunavut Impact Review ...
10/06/2016Sabina Gold & Silver Announces AGM Voting Results
09/06/2016Sabina Gold & Silver Discovers New Gold Zone and Advanced Hi...
25/05/2016Sabina Gold & Silver Reports Encouraging Metallurgical Optim...
20/05/2016Sabina Closes $32 Million Bought Deal Financing: Enables Con...
02/05/2016Sabina Gold & Silver Corp. Announces C$30 Million Bought Dea...
31/03/2016Sabina Gold & Silver Announces Anna Stylianides Appointed To...
24/03/2016Sabina Gold & Silver Announces Financial Results for the Yea...
20/01/2016Sabina Gold & Silver announces 2016 Budget and Work Plans
25/11/2015Sabina Gold & Silver Corp Completes $2.2 Million Financing
13/10/2015Sabina Gold & Silver Announces Assays from Back River Confir...
14/09/2015Sabina Gold & Silver Announces Positive Initial Project Feas...
13/08/2015Sabina Gold & Silver Announces Q2 Financial Results
29/07/2015Sabina Gold & Silver Commences Feasibility Study Assessing L...
14/07/2015Sabina Completes $1.3 Million Financing
23/06/2015Sabina Gold & Silver Files NI 43-101 Technical Report for Fe...
18/06/2015Sabina Gold & Silver Announces John Wakeford Joins As Adviso...
04/02/2015Sabina Gold & Silver Reports Change in Management
12/01/2015Sabina Gold & Silver Reports On Important Back River Permitt...
12/01/2015Sabina Gold & Silver Reports on Important Back River Permitt...
14/11/2014SABINA GOLD & SILVER ANNOUNCES Q3 2014 FINANCIAL RESULTS $38...
14/11/2014Sabina Gold & Silver Announces Q3 2014 Financial Results
07/10/2014Sabina Gold & Silver Reports on Back River Feasibility Study...
07/08/2014Sabina Gold & Silver Announces Q2 2014 Financial Results
31/07/2014Sabina Gold & Silver Reports Completion of Drilling at Echo ...
25/06/2014Sabina Gold & Silver Completes Sale of Newman-Madsen, Ontari...
14/05/2014Sabina Gold & Silver Announces Q1 2014 Financial Results
13/05/2014Sabina Gold & Silver Announces Sale of Newman-Madsen, Ontari...
28/04/2014Sabina Gold & Silver & Kitikmeot Inuit Association Announce ...
22/04/2014Sabina Gold & Silver Reports Significant Estimated Improveme...
07/04/2014Sabina Gold & Silver Announces 2014 Back River Work Program ...
27/03/2014Sabina Gold & Silver Announces 2013 Year End Financial Resul...
13/03/2014Sabina Gold & Silver Reports Completion Of Hackett River 201...
12/03/2014Sabina Gold & Silver Reports Completion of Hackett River 201...
11/06/2013Completes $20.6 Million Financing
02/10/2012(Back River)Reports Drilling Confirms Thickness and Grade at Back River ...
17/09/2012(Back River)Announces New Shallow High Grade Discovery at Back River Pro...
09/08/2012(Back River)Announces High Grade Drill Results from Umwelt Deposit at th...
19/07/2012(Back River)Announces Continued Positive Drill Results From 2012 Drillin...
09/07/2012(Back River)Initiates Permitting Process at Back River Project, Nunavut;...
26/06/2012Completes $34.5 Million Financing
04/06/2012(Back River)Announces More Positive Drill Results from 2012 Drilling at ...
29/05/2012(Back River)Announces Positive Preliminary Economic Assessment at Back R...
26/04/2012(Back River)Announces High Grade Drill Results from 2012 Drilling at Lla...
23/01/2012Announces Aggressive 2012 Nunavut Work Program
04/10/2011to Set Up Development Trust for the Kitikmeot Region of Nuna...
20/09/2011(Back River)Reports Updated Resource Estimate for the Goose Deposit, Bac...
24/03/2011Announces Memorandum of Understanding With the Nunavut Resou...
03/11/2008New Address
26/08/200825 August 2008
21/08/2008ADDS TO ?NORTHERN? MANAGEMENT TEAM
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SBB.TO)Other OTC (SBBFF)
2,16+0.93%0,760-2.56%
TORONTO
CA$ 2,16
21/04 17:00 0,020
0,93%
Cours préc. Ouverture
2,14 2,12
Bas haut
2,11 2,16
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,16 -%
Volume var. 1 mois
1 177 929 -%
24hGold TrendPower© : 27
Produit
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
202362,41%2,261,31
2022-8,90%1,830,93
2021-55,62%3,541,23
202070,47%3,380,71
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :